You are on page 1of 47
CRU eA eT Office of the ‘feetta a2, AoA Superintending Engineer 9h cate (oom) Design Circle-I,BWDB Wa3Ae 72 Green Road, Dhaka-1215 TAR - pd3auom Telephone: 9117609 ‘Taw design?_bwdb@yahoo.com Email: design2_bwdb@yahoo.com AES ACF-OY/STATET/ 9/209 HIRE. 08-08-2038 Rr a, are ear ‘fewer, ari ear, ret | ‘Fens. aterror orf By cats wt Standard Schedule of Rates « cafe, om STR aR AR RAITT ore | scare, are ery re op Boras RACH CAPAC BIRTEAT MEHR CE, ME 03-08-Rode Re HAN SIATEAT 6 FO caterers aremior oii Ta GE ot Standard Schedule of Rates « cafe at SRN HIRE GRE RMTATT ‘Fal RAR | HRT LRT Item Description Gaf¥-r), Analysis Template (¥eqfS-2) wae aniBeat at ‘fafeq ietere was Se STEN TLE He (HeYS-0) STATE HHT HAMAS @ AMT aR VT A AN CeAT SAT mi RCTS TEATS | ST ETS c oD yak cron epee aca, fear ae, wert, eT | afb RE Ae oeonege RTE At--92/ATATET/99/294(B2) wifees-o8-08-2o%n Be Sa meaferre ar fe anon BT cert aT Re ‘hee wtahte, area, OTT | ce ee, RT BE, ATTA, TT | ee CaM, Ceara, aia, Hea | ater arco, HAM, Tone CeT, Az | ener excel, Bae-oedvoe, areiBeet, BART | seers ene, aera, TIMBAT, OBA | scary exert, Sex oom, ABTA, aITA | acy ee, ARE PORTT, AIMSTAT, LAT | a aca, wG-PomER, TBAT, BAIT | do, eta ei, para fare, aIenEeaT, ATTA | 29, Belen ard A, aoe tea rea, areca, FEO | 32, BBMANS ACSA, COTA ee ATCA, aTNBTAT, COAT | do. Beaune ace, eaet sts mee, aMIBeat, AOET | Seeeeouy ¥ 38, Beers acd, Serge or ae, AIBA, BH 3a, opreee ecaleA), BUA ex ae, atiBea, PDA | be, areerre ace, gn to ae, aeeTBeAT, ARET | 39, Omaears aca Brat tox auc, eMC, eT Se, OBEN ace, wits tox AIC, META, WHR | 3p, Bese ers, CHA et aA, TITER, CA 30, OPE aM, Ken Ae IER, ABCA, NO | 33, OBTRETT aM, eT tea ac, TTB, FAT | 33, Opes aca, afar ste meen, earBeat, AAT | 0, Bere echo, eStore test be, etiBcat, OTE T AA 38. UBreaTrs ace, ema eos AIA, ATMOTAT, TTA 2¢, BRU aca, Tea me HI, ABTA, AAT | 3y, OpreUTTS aca, eM mer acer, Tene, eT | 29, OBRUTS aca, ae me Bet, IMEC, ST | 2, OBA aca, HT MT MTANR, AMET, AL 3, OPUS Aca, SG oto mr, eB ee, Pre | 90, Brees aca, Sree es Ice, ateTeTAT, TEAS | oy, Oper aero, wearer et GaN TIE, META, FIAT | 98, wareenres eta, part Sa are, ase, eA 1 90, Bgreerme acai, gaa SorcHe AIT, ABCA, APTS | 08, wyraerne aaa, RBA Set ATC, aIeTBCRT, TAT | 0, Beerae ata, Rea @ Oral me, caw es, eID, ATEN | oo. earere ate, aR ME, TBC, FT: 80, Speers acre, (See ACA, AMET, DT | 85, Probe atid, TET ARAL om, Bre WADI er nee, aIeTBeRT, eT) cee = 15 0.000055 cum @Tk. pe cu SubTotal m 20, Materials: Miss. 20-245 Diesel Fuel 0.082455 te @%e TK 20-310 Lubicant( Mobileoi ee.) (9.02474 te @th op oo 20-530 Rope: Jue 0.000080 kg @tkpe kt Tk 20-545. Rope, Nylon 0.000048 ke @mkipe OT Sub Tou m% 30, Wood Work 30-025 Bamboo, Barack: 7.5m long 80-100mm dia 0.00048 No. @M..pe 00 .No Ty Sub Total ™ 40, Mata Wark 40-020 Angle, MS. 0.000038 ke @hk.p be 40-645. Shoot, Psi G1 16 BWG. 2000019 sqm @Tk.pe aT 40-742. Welding Are 000160 m Qk. om Tk Seb Total ™ 70, Fauipmsa Tools 70-055. Chain hos, 3 tons: 8s ay 1000016 diy Tk. pe YT 70-077 Engine boat (40 ton capacity) 0.000208 day Tk. pe ty TR 70-087 Booster Pump (with iver pipe: 8hrs dry 000036 day = @ Tk. pe YT, 70-110 26" Shore pipe 0.089286 midey —@Tk.. pe miday Th, 70-175 Tripod stand 0.000016 dy TK. pe ay Te Seb Total Te 80, Laboue 50.210 Fiter 0.000016 sy TK pe TH 80-370 Labour, Skiled 0.000554 ay Qn dy Te 80-375 Labor, Unkle 0.000199 sy @TK. pe ty TH 50-463 Operator, booster pump 0.000036 sy TK. pe ty TH 0-464 Helper, booster pump 0.000036 diy TK. pe ay TR 0-477 Operator, Engine boat 0.000208 diy = @ Th pe ty Te 80479 0.000208 diy Th. pe ty TR 80-755 0.000032 day TK. pe YT Sub Toul Tk ‘Som of Sub Tota Te Overnend & Ext 2.50% Te item Toa Tr Contractors Prof 1000057 Tal Te var. 2.00% Te, term Grand Total Te PageNo. | a ANALYSIS TEMPLATE REPORT Printed: April 04, 2019 Primary Element Secondary Element Weight Unit Element Rate Vive 90 . Dredging Work 90-150-20 Extra Rte for booster punp beyond |S km: 20" Dredger 10, Material: Conrete 10-040 Bricks: Ist Chae 010486 Ne @tk..pe 1000NA TK 10-100 Cement: Porn 0.022573 by @m.pe te Tk 10.380. Sand FM >= 15 ooo can = @Tk pe | cam TE ‘SubTotal Tm 20, Mata: Miss. 20-245 Dice! Ful 0.080485 tr @mie 20-310 Lubricant ( Mobile oil ete) @hkip 20-520 Rope: Jute 0.00086 ke @tp OTK 20-545. Rope, Nylon 0.00054 kg Pl Seb Total i 30, Wood Work 30-025 Bamboo, Buck: 7.5m long, 80-100mm dia 0.000056 No. @T..pe 100 No Tk SubTotal ™ ‘Metal Work 40.020 Angle MS. 1.000052 bg @mip wm 40.685 Sheet, Phin Gi. 16 BW. 0.000013 am @Tk. pe mT. 40.782 Welding Are 0.00216 m= Que = Sub Tot m 70, auiment, Tools 70-085 Chin bos, 3 tons 8 bes day 0.000002 dey TR petty TH 70-077 Engine bot (40 ton capacity) 0000179 dy = Tk pe ty TH “70-087 Booster Pump (with delivery pipe): Hhrs dry 0000076 day @ TK. pe ty TE, 70-12 20° Shore pipe 0190476 midsy—@ Tk. pe lay Te. 70-195 Tripod sand 00022 diy == @ Tk. pe ay Th SubTotal Th 50, Labour 0-210 Finer 0.000022 xy @ Tk. pe ty TR 80-370 Labo, Skiled 0.00006 dy @TK pe YT 80-375 Labour, Unkiled 0.000206 xy @TK. pe aT 80-463 Operator, booster pump 00076 dy GTR pe ty 0-464 Helper, tooster pump 000076 dey TR pe tT 80-477 Operator, Engine boat (0.000179 day Gh | ty 80-479 Helper Engin boat) 0000179 day @Tk.pe YT 80-755. Welder 0.000088 day @Tk.pe ty TR. Sub Total me ‘Som of SubTotal Te Overhead & Ext 250% Te. Trem Tor Tr Contracior’s Prot 10.00% Tal Te var. 2.00% Te, ‘Wem Grand Tour Te Bhs kashfin @ ae Page No. ANALYSIS TEMPLATE REPORT Printed: April 04, 2019 Primary Element Secondary Element Weight _Unit___Ekment Rate Value 90. Dredging Work 90-150-30 Extra Rit for ooster pump beyond |S km: 18" Dredge 10, Materials; Conte 10-040 Bricks: st Chas. 0010788 No @TK..pe 1000NE TK 10-100 Cement: Porta 10023200 kg @kop oT 10.380 Sand, FM>= 15 0.000049 cum @Tk. pe cum ‘Sub Total me 20, Mattias: Miss. 20-245 Diesel Fal 01096033 enue i te 20-310 Labrcas (Mabie oll ec). (3.002881 er ene ot 20-530 Rope: Jae 0.000096 ke Qh OTK 20-545 Rope, Nylon 0.0064 kg rn SubTotal t 30, ood Work 30-025 Bamboo, Barack: 7.5m long 80-100mmdia 000064 No @Tk..pe 100 No Tk Sub Total Th 40, Maal 40.020 Angle, MS. 0.00077 kg @mipe Te 40-645. Shes, Pain GL 16 BW, 0.000008 gm TK. pe MTR 40-72 Welding Ac 0000320 m @koe = % Seb Total ™ 70, ipsa Too 70-085 Chain bist, 3 tons: hs 0.000032 diy = @Th. pe ey T 70-077 Engine boat (40 ton capacity) 0001S diy = @Tk. pe ty TR 70-087 Booster Pump with diver pipe hrs day 0.000120 day @tk.pe day Te To-114 18" Shore pipe 0310559 miley @Tk..pe lay Th, 70-175 Teipod stand 0.000082 dy Tk. pe day TH Seb Total ™ 80, Labour 80.210 Finer 0.000082 dy @TR pe tty TH 80-370 Labour Skilled 0.00086 dry @TR pe ty TH 0-375 Labour, Uns 0000284 diy = @ Tk. pe ty TR 0-453 Opera, booster pump 0000120 dy @ Tk. pe ty TR. 0-464 Helper, booster pump 0.000120 xy @ Tk. pe ty, Te 0-477 Operator, Engine boat 0.000156 dy @Tk. pe ty Te 0-479 Helper (Engine boat) 0.000158 dy @TK. pe aT 80-755. Welder 0.000064 dy = @Th pe day % Toad Tr Overiead & Est 2.50% Te Tem Tot Tr Contractor's Prof 10.005 Te 700% Te PageNo. 1 ™ Printed: April 04, 2019 ANALYSIS TEMPLATE REPORT Primary Element Secondary Element eight —_Unit___Elment Rate Value 90, Dredging Work 90-200-10 Consraction and dismantling of 26° Shore Pipe Line on Ground 20, Mattias: Mise, 20-065. Bags, Guy : New (50k) 0555556 No 20-535. Rope: Ite Sting 0083333 ky 30, Wood Work 30-015 Bamboo, Barnck: 6m long,> Onn dis... 277 No, 40, Metal Work 40-760. Wire, Gi. 16 BWG 0027778 ky 40-800 Rubber Gasket fr Shore Pipe of26" Dredger: 0.165657 No 40-810. Nutblt or Shore Pipe of 26 Dredger, Din 25 1.655567 kg (60% Savage) 70, aioe Tools 70-055. Chain hos, 3 tons: 8 hr day outs day 70-175 Tripod stand (0030217 day 80, Labour 80-210 Fiter noises aay n 80-305 Head Man 065278 aay ™ 80-370 Labour, Skilled Derwe9 diy @ TK. pe YT Sub Tota n ‘Som of Sub Tatar Tr Overhead & Ext 2.50% Th. item Tou Te Contractors Prof 10.007 Total Te var. 7.00% Te item Grand Total 7 Cc eee Page 1 Printed: April 04, 2019 ANALYSIS TEMPLATE REPORT rary Element Secondary Element Weight Unt Element Rate Vane 90 . Dredging Work 90-200-20 Construction nd dismantling oF 20 Shore Pipe Line on Ground 20, Materials: Miss. 20-065 Bags, Gunny: New (50 kg) 0500000 No @T..pe 100 No TK 20-535. Rope Jt Sting 0.072917 kg @tm.pe eT. ‘SubTotal m 30, Wood Wank 30-015 Bamboo, Barack Gm long,> Hmmdia..._ 002778 No. QT. pe 100 No Te Tk 40, Maal 40-760. Wire, GI. 14/16 BWO 0020833 ke ane & Tt 40-801, Rubber Gasket for Shore Pipe of20" Dredger: 0.165657 No @m.p No oT 40-K1T Natbol for Shore Pipe of 20" Dred, Dia 201000000 kg @m.pe te Tk m Sob Total Tk 70, alps Too 70-085 Chain hos, 3 tos: 8 hrs doy 0037500 dy @Tk..pe YT 70-175 Tripod stand aout ay TK % Sub Te me 80, Labour 80-210 Fier 01037500 day amp fy 80-305 Head Man 0058333 dy @ Tk. pe ty TH 80-370. Labour, Skilled 0433333 dy @ Tk. pe ty TR Sub Total ne ‘Sem of Sub Tour Te Overhead & Eat 250% Te. Tem Tor Tr Contractors Prof 10009 To Tk var. 2.00% Th, ‘tem Grand Toad Tr Ga kl QO PageNo. 1 (50% Savage) ANALYSIS TEMPLATE REPORT 90 . Dredging Work Secondary Blement Weight Unit 90-200-90 Construction and imantl Shore Pipe Lin on Ground 20, Maeials: Miss 20-065 Bag, Gunny: New (50) 0.416667 Wo 20-535. Rope: Jute Sing 0072917 kg 20. os W 30-015 Bamboo, Barack 6m lons,> BOmm din... 0.002222 No. 40, Mata Work 40-760. Wire, GI. 1416 BWG 0.016667 kg 40-802 Rubber Gasket fr Shor Pipe of 18" Dredger: 0.166657 No 40-812. Natok for Shore Pine of 18 Dodge, Dia 16 0.533333 kg 70, ouipment. Tons 70-085 Chain bos, 3 tons: 8 rs day 0318 day 70.175 Tripod stand 031818 day 80, Labour 80-210 Fier 0031818 éay 80-505 Head Man - 0052652 day 80-570- Labour, Sled 032082 day Keshfin PageNo. 1 Printed: April 04, 2019 Element Rate Vale (50% Salvage) 100 No Te otk T. @M%..pe WN. ™% amp ke om @n ip Nh @m.p oT SubTotal 1 Qtr dy Te Qtr dy TK SubTotal ™ amp wy oT @m.p ty TK Om. wy oT Seb Tots Te ‘Sum of Sub Toad Te Overiead & Est 250% Th. Trem Tord Te Contractors Prof _10.095TK. “Toul Tk var. 200% Th, Wem Grand Toate a ANALYSIS TEMPLATE REPORT Printed: April 04, 2019 Primary Element ‘Secondary Element Weight _Unit__ Bement Rate Value 90. Dredging Work 90-220-10 Contraction nd dismantling of empocaypermanent 26 Shore pipe ne ying on staging 20 20-535. Rope: Ite Sing 0.125000 kx Qn OT Te 30, Wood Work 30-015 Ramboo, Barack: 6m long,> mm dia... 0.002778 No amp WN. 30-025 Bamboo, Barack: 75m long, 80-100mm gia 0.165651 No. @T..pe 0 No T% 50-150 Bulla Local hardwood : 100m ia 1.666667 @hop = % SubTotal, m 40, Meal Work 40.760 Wire, GI L416 BWG 0.055556 kg Qt. OTK 40.801, Rubber Gaskst for Shor Pipe of20" Dredger: 0.165667 No @tk.pe NO Tk 40810 Nutbot for Shore Pipe of 25° Dredger, Dia 28 1.656667 kg @top Tk Tm Sub Toul m 7, Equipment, Tools 70-085. Cain bos, 3 tos: 8 hrs day omen dy @ Teepe oY 70-178 Tripod stand Ooms day @TK..pe YT Seb Tota 0, Labour 80.210 Finer OoMsslI dry @TR.pe YT 0.305 Head Man Domes day Tk. pe YT 0-370. Labour, Skilled O78 dry @TK. pe YT Sob Tota Te ‘Sem of Sub Tota Te Overhead & Est 250% Te emt Contractors Prof 10.00% Toul Tk var. 2.00% Te ‘tems Grand Toad Tk PageNa 1 keshfin Ww (0% Salvage) Printed: April 04, 2019 ANALYSIS TEMPLATE REPORT Primary Blement Secondary Element Weight Unit emer Rate Value 90, Dredging Work 90-220-20 Construction and dismantling ofemporarypermanent 2" Shore pipe line ying on staging 20-535. Rope: Jue Suing 0125000 ke an Tk SubT Te 30, Wood Wor 30-015 Bamboo, Barack: 6m long,> Bln da... 0.002778 No, @Te.ye 100 No TK 30-025 Bamboo, Barack: 7.5m ong. 80-100mm dia 0.166667 No, @T..pe 100 No Tk 30-150 Bullah, Local ard wood 100mm dia 1.666657 ene ™ 1% SubTotal 1 40 Work 40.760 Wire, Gi. 1416 BWO 0.061667 kg a 40-801 Rubber Gasket fr Shor Pip of 20" Dredge: 0.166667 No @m%pe NOT 40-811 Nutbol for Shore Pipe of20" Dredger, Dia 2 1.000000 @hkipe wT Ths (50% Salvage) Seb Tota % 70, auipment Toots 10.088 Chain hos, 3 tons: 8 vs day 0038382 dy = @Tk.pe YT 0-175 ‘Tripod stand 0039352 ay = @Tk. pe YT SubTotal n 80, Labour 0.210 Finer 0039389 dy Tk. pe ay TH. 10-305 Head Man oosiss dy Tk. pe YT. 80-370 Labour, Sled osesoel day = @ TR. pe YT Sub Tota me Sum of Sub Tot Te Overhead & Et 2.50% Th Tem Torr TE Conteactr'sProf_ 10.00% Tonal Tk var. 1.00% TK QB Gn ee PageNo. | ANALYSIS TEMPLATE REPORT Printed: April 04, 2019 Primary Element Secondary Bement Weight Unit Blment Rate Vave 90 . Dredging Work 90-220-30 Construction and dismantling of mporarypermancat 18" Shor pipe tin tying on staging 2». 20-535 Rope: Jute String 0.108933 kg ani wm SubTotal ™ 30, ood Work 30.015 Bamboo, Barack 6mlong,> 80mm da... 0002778 No @Tk. pe 100 No Te 30-025 Bamboo, Barack: 7.5m long 80-100mm dia 0.166667 No @Tk..pe 100 No Tk 30-150 Bullah Lea ard wood: 1m dia 1.866667 = @he om Tk Sub Total Tk 40, Met 40-760 Wire, G1. 14!16 BWG 002333 kg amir OT 40-802. Rubber Gasket fr Shore Pipe of 1" Dredge: 0.165657 No @Tk.pe NO TK 40-812. Nutol fr Sbore Pipe of 1" Droge, Dia 16 0533333 ky ani i 1 SubTotal % 70, auipment. Too 70-085. Chain ois, 3 tons: 8s dy 0030556 dry @Tk..pe ty 70-195 Tipo stand D030sss ay = @Tk. pe ty TR ‘SubTotal me 80, abou 0.210 Finer 0.030556 dey @Thape YT 0-308 Head Man 0051389 xy Tk. pe YT. 80:370 abou Sled 0301667 dry Tk pe YT Sub Towa me Sum of Sub Tot Tr 2.506 Tk Te soo Tk 00% Te item Grand Tool Te Page No (50% Salvage) Printed: April 04, 2019 ANALYSIS TEMPLATE REPORT Primary Element Secondary Element Weight Unit Element Rate Vae 90 . Dredging Work 90.240 Construction of Mouring where nesesary 30, Wood Work 30-185 Bullah Local hard wood 125m di ‘000000 m mo a 40-760 Wie, GI. /16 BWG 1.000000 ee 7 Sub Toul m so, Labour 0-210 Finer 0500000 diy @ TR pe ty Th 0-305 Head Man 0500000 dy = @ Th. pe ty TR 80-370 Labour, Skil 3000000 diy Tk. pe ty, TR Sub Total 1m Tr te item Grand Total @ Oi, PageNo. 1 ANALYSIS TEMPLATE REPORT Primary Bement Secondary Element Weight Unit ‘90 . Dredging Work 90-250-10 _Liting 26 shore pie sinked into them low the ground evel 70, Eauinment Tools 70-055 Chain bois, 3 con: 8 hs dy 0333333 aay 70-195 Tipo stand 0.03533 day 80, Labour 0-210 Finer 0.083333 day 0.305 Head Man 0.083333 aay 0.370 Labour, Skilled 1.088333 day PageNo. 1 Printed: April 04, 2019 Value ay Te aay Te m ay Tk ay Tk 4y Tk Tk Tr 250% Te Te 10.00, Printed: April 04, 2019 ANALYSIS TEMPLATE REPORT Primary Element ‘Secondary Element Weight _Unit__ Element Rate Value 90. Dredging Work 90-250-20 Lifting 20° shore pie siked into the mud below the round level 70, Egupment,Tols 70-055. Chin hos, 3 to 8 bes day 0023 dy @Tkape MYTH 70-175 Tripod sand 083323 day @mk pe ay 1% Sub Tou ™ 0, Labour 80.210 Fier 093323 aay ani ty % 190305 Head Man 00m ay = @ TK. pe YT 80-370 Labour, Sled 0.666667 day @Tk. pe ty Te Seb Tota 1. ‘Som of Seb To Te Overnead & Ext 2.50% Th. Item Torr TE ContraciorsProf 10.00% PageNo. 1 ANALYSIS TEMPLATE REPORT Printed: April 04, 2019 Primary Element ‘Secondary Element Weight _Unit__ Element Rae Value 90. Dredging Work 90-260-50 Lifting 18" shore pipe sinked ino the mud below the round level 70, auiment Tons 70-055 Cain hos, 3 tons: be day 0083333 day @ TE. pe YT 70-175 Tripod sand 11083333 day @nipe ay TK Seb Toul cs 80, Labour 80-210 Fier 0.03323 aay amp ty Te 0.305 Head Man 0.08333 dry @Tk..pe YT 80.370 Labour Skilled 0500000 diy @Tk.pe ty TR. Sob Total 1. Som of Sb To Tk Overhead & Ext 2.5% Th. item Toar Tr Contractor's Prof 10.00% ‘Tova Te var. 2.00% Te Item Grand Total Te ® Ob eshfin PageNo. 1 a Printed: April 04, 2019 ANALYSIS TEMPLATE REPORT Pray Element Secondary Bement Weight Unit Element Rate Value 90 . Dredging Work 9027040 Consction snd dismantling of OUTLET for 26” dodger 20, Matis Mise, 20-075 Bags, Ganny:New (75 kg) 100°00 Be. @T..pe 00 -No Te 20-495 Polythene Shee:(L0kgper6 05g). 30000000 sgn @ Tk. pe 20-530 Rope ute 1.000000 ane fe Sub Toul 40, Meal Work 40-760 Wire, Gi. 16 BWG 2.000000 3 @tk.e Tk 40-800 Rubber Gasket for Shor Pipe of 26" Dredger: 6.000000 No @tk. pe No Tk 40-810. Nul-bol for Shore Pipe of 26" Dredger, Din 25 60000000 @tkipe OTK Sub Tou Te 70, auiment Too 70-055. Chain bois, 3 tons: 8s day 2000000 dey @ TK 70-110. 26" Shoe pipe 00140 misy —@ TK Seb 80, Latour 0.210 Fiuee 4000000 diy @ TK pe ty Te 0-305 Head Man 4000000 dy Tk. peda TR 80-370 Labour, Sled S2000000 day @Tk.pe YT. ‘Sub To mk Som of Sub Tour Te Overhead & Est 2.50% Te item Torr Tr Contractors Prof 10.00%, Tout Tk var 700% Te ‘em Grand Tost Te ANALYSIS TEMPLATE REPORT Printed: April 04, 2019 Primary Bement Secondary Element Weight _Unit__Element Rte Value 90 . Dredging Work 90-270-20 Construction and dismantling of OUTLET fo 20" deer 20, Materials: Miss, 20-075 Bags, Ganny: Now (75 kp) 100-00 wo @tk..pe 100 No TK 20-495 Polythene Shect:(.0ky per650sqm). 30000000 sqm @Th. pe SMT 20-530 Rope te #000000 @thkp oT SubTotal m 40, Meal Work 40.760 Wire, GL 1/16 BG. 2.000000 @tk.pe Tk 40.801. Rubber Gasket for Shore Pipe of20" Dredger: 6.000000 No @tk.pe NO Tk 40811, Nuttot for Shore Pipe of20" Dredger, Dia 20. 36.000000 kg @tp Te ‘Sub Tol Te 70, gunmen, Tools 70-085 Chain hos, 3 too: 8 br day 2000000 day @ TE. pe YT 70-112. 20" Shore pipe 0.001440 midsy —@TK..pe ida TH, Sub Total Te 80, Labour 80-210 Finer 4.000000 day 80-305 Head Man “4.000000 sy 80-370 Labour Skilled 32.0000 aay PageNo. 1 Printed: April 04, 2019 ANALYSIS TEMPLATE REPORT Primary Element Secondary Bement Weight Unit Element Rate Valve 90, Dredging Work 90-270-30 Construction and dismantling of OUTLET for 18" dedger 20, Mattias: Miss 20-075 Bags, Gunny : New (75 ks) 100*00: No @Tk..pe 100 No. Te 20-495 Polythene Sheet (LOkgper6S0sqm). 50000000 sqm @ Th. pe SMT, 20-530 Rope ute 1.000000 @tkpe Ke Tk Sob Total m 40, Metal ork 40.70 Wire, GL 16 BG. 2.000000 kg @tkpe ke Tk 40.802 Rubber Gasket for Shore Pipe oF 18" Dredger: 6.000000 No @t pe = NO Tk 40.812 Nutolt for Shore Pipe of 18 Dredger, Dia 16 19.200000 kz Gh OTH Seb Toul | ——— Tk 70, Eauiomen Tools 70-055. Chain hos, tons: 8 hrs dy 2000000 diy = @Tk..pe dey Tk 70-114 18" Shore pipe. 0.002160 may @Tk..pe—iday TR. Sub Toca me 80, Labour 10.210 Fiter 4000000 day = @Tk..pe ty Te 05305 Head Man 4000000 diy @ Tk. pe aT 0-370 Labour, Skilled 24000000 day = @Tk..pe YT. Tk Tr Overnead & Est 2.50% Th item To Tr Contractor's Prof 10.0047, Tout yar item Gi PageNo. 1 bshfix — @e Printed: April 04, 2019 ITEM RATES For Barisal O&M Circle Year: 2018-19 tem Code Description Unit Meas. Rate (Taka) 90_. Dredging Work BOO Banc Dredging wor by 20 rege on Trae 90:100.20 Base Dredging work by 20" reget om TGA 90-100-30 Basie Dredging work by TF dredge on 1532 '90:150-10 Extra Rate for bose pp beyond 15 kn: 26° Drea can 1396 "0150-20 Entra Rate Tor booster pnp beyond 15 kn: 20” Drege cum aH 9150-30 Extra Rae fr booster amp beyond 15k 1 Deda ‘ame Toa] 99-20-10 Constaton of 26° Shore Pipe Line on Grou m= a8 90-20020 Consrution of 20 Shore Pipe Line on Ground = ais 30-2000 Consraction of 18” Shae Pipe Line on Grou = 700 W0-200-10 Consaction of 26° Shae pipe ine on aging = Tera 30-2200 Consraction of 207 Shore pipe ine on aging 7 7106.08 90-220:30 Construction of IF Shore pipe ine on aging = 31720} 30-210 Consrustion of Mouring where nesesary eh aaa ‘BORSOTO Ling 26° share pipe sinked ito the mud below the ground evel = T0996 90-250-20 Liing 20 share pip aked to the mud below the ground evel = E710 30-2503 Lifting TW shore pipe snked into the md Blow te ground evel ™ Has 90-2505 Lifliag 12" shore pipe sake av the md Blow te ground eel = 2796 30-270-19 Consntion and dismantling of OUTLET for 26° edger ech asi? 30-27020- Constaction and dismantling of OUTLET fo 20" edger ch ease 90-270:30 Consraction and demantling af OUTLET for 18" edger ech sna Page No. I+ 1 lsh Oh A. Ww ITEM RATES For Bhola 0 & M Circle Year: 2018-19 Printed: April 04, 2019 tem Code Description Unit Meas. Rate (Taka) 90_. Dredging Work ‘O-TOOIO Basi Dreging work by 20" ela oo Ta] 90-100-20 Basie Dredging work by 20" rege am 7624] 30-10030 Base Dredging work by 18" dred am Ts] 30-50-10 Ext Rate for booster pump beyond 13 Ean 26° Dre ame Ta98 0150-20 Extra Rate for booster ump beyond 13 km 20" Dredger vem 15:0] 90-15030 Extra Rae for booster pump Beyond 15am: 1 Dre ‘aren 34] 99-200-10 Constrtion of 26° Shore Pipe Line on Grad = waa 90-20020 Conatation of 2 Shore Pipe ine on Grou = on 0-20030 _ Consration of 19” Shae Pipe Line oa Ground = 807 B0-220-10 Consacton of 267 Shae pipeline on aging 7 Ta 90-2200 Construction of 207 Share pipe ine on Saging = 10860 '90-220:30 Construction of 19 Share pipe ine on aging = 305.05 30-210 Constrution of Mouring where neseery eh 7490 ‘BORSO-1O Ling 26 shoe pipe sinked nto the madlbsow the ground evel m 706025} ‘ORST-RO_Liing 20” shoe pipe inked to te mud blow te ground evel ™ a7 ‘ORS0-30 Ling 18" shae pipe waked oto de mud below the ground evel ™ saa ‘250-50 Ling 12° shor pipe sak to te ad below the round Ibe = 293 90-270-10 Consriction and dismantling of OUTLET for 26° edger ech T9749 90-27020 Construction and dismantling of OUTLET for20" dredge eh 55602 39-270:30 Constution and damanteling of OUTLET for 16" edger ech Bas Page No. [+ 1 keshpin On @ ITEM RATES For Bogra O&M Circle Year: 2018-19 Printed: April 04, 2019 Item Code Description Unit Meas. Rate (Taka) 90_. Dredging Work BO-100-10 Basi Dredging work by 20" oar a Tire 90-100-29 Base Dredging wook by 20" edger am Ta624 90:100:30 Base Dredging work by 18" dredge om 1s327 90:150-10 Ex Rate fo booster pump beyond 15 ne 26° Drs calc 7390) 30-150-20 Entra Rae or bower pnp beyond 1S kn 20” Dredger uv 1507 "0150-30 Extra Rate To booster pp beyond |S kn: 18” Deca ale oat 30-200-10 Constrton af 26° Shore Pipe Lins cn Ground m= WSe01 90-2002 Conarton of 20 Shore Pipe Line on Ground = 6.8 90-2000 Consrution of 18 Shore Pipe Line on Ground = a7 {0-220-10 Consration of 267 Shore pipe Tin oa aging = Tas 0-200 Consracon of 20 Shore pipe ine on staging = 7.0860 90-2003 Conran of 19 Shae pipe ine on aging ™ 303.08 30.210 Consraction of Mouring where neces ech eT '90:250-10 Lifting 26" shore pipe snkedio the mud below te ground evel = 1.06025 30-2502 Ling 20" shore pie snked it the mad slow te ground level = 277 B0-250330 _Lifing 1 shore pipe sinked tote mad bow the ground evel = sal ‘250-50 Ling 12 shore pipe snkol inio te mudbalow the round ebvel = 2193 ‘O-TTUIO Consent sd dismantling of OUTLET for2 dedger exch 97409 90-270-20 Construction and dismantling of OUTLET for 20” deer ach BaGa '50:270-30 Construction and dismantling of OUTLET for 1 dedger eh TASS 65 Page No. I 1 kafs ye @ Printed: April 04, 2019 ITEM RATES For Chandpur O&M Circle Year: 2018-19 Item Code Deseription Unit Meas. 90_. Dredging Work: TOI — Base Dodging work 10 Gree am Ta] 90-10020 Base Dredging work by 20" dredge cam THe 90-10030 Bac Dredging work by dredge cam 15327] 90-1500 Ena Rae for boaseypunp beyond 13 kms 26° Dreger came 1399] 90-15020 Ext Rate for booster ump Beyond 15k 20° Dredger com 507] 90-1500 Ext Rate forbooser pump Beyond 15 kn 1 Dredger comm Bal '30-200-10 Comsration of 26° Share Pipe Line oa Ground = waa 90-2002 Consracion of 207 Shae Pipe Line on Ground = or 90-200;30 Construction of 19” Shore Pipe Line on Ground = 807 30-220-10 Constacton of 26° Shoe pipe ine on waning 7 Ta 30-200-20 Consaction of 2 Shoe pie ine on waging = 7.0860 90-200:30 Consraction of 19 Shae pipe in on aging = 037 90.210 Consraction of Moaring where eeesary ech 67490 90-250-10 Ling 26" share pipe snked ito the mad bow the ground evel = 106028 90-2500 Ling 20" shore pipe inked iv the mud below the ground level ™ a7 BO-250-30 Ling 1 shoe pipe inked to the mad below the ground evel ™ Saal ‘90-250-50 Ling 12" shore pipe inked mo te madbalow the ground ebvel = 293 0-7TU-1O Constantin nd dismantling of OUTLET for26" dodger ea Tara 50:270-20 Construction and dismantling of OUTLET for20" dedger each Bee ‘0270-30 Construction and dismantling of OUTLET for IW" dodger mach TRS Page No. I- 1 Printed: April 04, 2019 ITEM RATES For Chittagong O&M Circle Year: 2018-19 Item Code Description Unit Meas. Rate (Taka) 90. Dredging Work 90-1010 Basic Dodging wok 720 aredaer oo TH75] 99-10020 Base Dredging work by 20" edger a 725.953 W0-10030 Base Dredging work by 1 dredge cam Ta) 90-150-10 Ex Rae for booster punp beyond 13 ns 26° Drea comin B07) 90-1500 Ext Rate for booster pump beyond 15 kn: 20° Dredger canton 15 90-1500 Ext Rate for booster pump beyond 1-5 kms” Dred oo 13) '0-200-10 Conston of 26° Shore Pipe Lins oa Ground = wi] '90-200-29 Consraction of 20° Share Pip Line on Ground = ass 39-200-30 Construction of 1” Shore Pipe Line on Ground = 5.6] 30-220-10 Constution of 6° Shore pipe ne on aging = 7305 ‘OIBU-20Consrastion of 30" Shore pipe ne on waging = T0937] "220-30 Connon of 1” Share pipe Hae on staging m wos ‘0-240 Contraction of Mouring where ne=sary enh Fsa005| 90-250-10 Lifting 26" shore pipe snkeint the mud Blow the ground evel = T55) 90-2500 Lifting 20" sere pipe snked nv he mud Plow the ground level = 65513 30-25030 Ling 1 shore pipe snked int he mad blow te ground level = 35258 ‘25050 Ling 12 shore pipe wake int he mad blow the ground bv = 0 ‘O-270-10 Consration and dismantling af OUTLET for 26” edger wh Gia5.66 027020 Consraction nd daniel eh Bows 30-27030 Coneretion and diamant ech 3601 fashfin Page No. [- 1 A @ ITEM RATES For Comilla O&M Circle ‘Year: 2018-19 Printed: April 04, 2019 Item Code Description Unit Meas. Rate (Taka) 90_, Dredging Work 30-100-19 Basie Dredging work by 20" rodeo = Trae 30:100-20 Base Dredging work by 20" rela om 14624 90-10030 Basie Dredging work by 18" dre am T3327 90:150-10 Ena Rate fo booster pump beyond 5 ks 20° Drege amie B90] '90-150-20 Enea Rate To booster pump beyond 15 ka 20” Dredger ‘ae 1507 0-150-30 Ente Rate or booster pump beyond 15 ans 147 Dredger amen 1930] ‘0-200-10 Consronion 0726" Shor Pipe Line on Ground ny Tsar 30-200-20 Construction of 20° Shor Pipe Line on Ground ™ eis '50-200-30 Construction of 8" Shor Pipe Live on Ground = 5887 0220-10 Construction of26" Shor pipe ne on staging = Ta 50-2200 Consration of 20” Shore pipe Hin on aging = T0860 020030 Consration of 19 Share pipe in on aging = 903.05 30-240 Construction of Moaring where necesary ech ar490 '99:250-10 Ling 26" shoe pipe snkeinf the mud below te ground level 7 7.05025 99-2502 Lifting 20" shore pipe snked into te mud below the ground evel = Ga 90-25030 fing 18" shos pipe snked ito the mud below the ground evel = Sear 30-2505 Ling 12 shore pipe inked into te madbelow the ground ebvel = BIi95 ‘0-2 70-10 Consaction and dismantling of OUTLET for 26" dodger wach Bi 9TA09| 90-270-20 Consrastion sd dismantling of OUTLET for 20" dedger each Baee '90-270.30 Consrustion and dismantling of OUTLET for 1 deder ach Hae Page No, I 1 keira Ww Printed: April 04, 2019 ITEM RATES For Cox's Bazar WD Circle Year: 2018-19 Item Code Description Unit Meas, Rate (Taka) 90_. Dredging Work 30-100-10 Bani Dredging work by 20" roger a Te 90:100-20 Basie Dredging work by 20" rer a 5.95] 30:100:30 Base Dredging work by 1 dredge a= 13334 90:150-10 Extra Rae for booster pump Beyond 1S ks 20° Dredge can 99 90:150:20 Evra Rate or booster pnp Beyond 1-5 ke 20" Dredger oo T56 90-150-30 Ena Rate for booster pump Beyond 15 kane 18” Dror cami 19a '0-200-10 Consation of 6° Shore Pipe Line on Grom = BEL 10 '90:200-20 Consraction of 0° Shore Pie Line on Ground = eis '90-200-30 Constantin of Shore Pip Line on Ground = 6] '90:220-10 Consrustion of 25° Share pipe ne on aging = 7305.8] 90-220-20 Constion of 0° Shore pipe neon aging 7 100937] ‘O-200-30 Consrution of Shore pipe ine on aging = ws ‘0-240 Constrostion of Moaring where neseary ech EEE '90-250-10 Ling 26° shore pie snked io the mad bow the ground evel = T1055] '90:250-20 Ling 20" shoe pipe inked ito the mad below the proud Tovel = 6.13 90:250-30 Ling 18 share pip inked othe mad below the ground evel = $a 90:250-50 Ling 17" share pipe inked ino te mabelow the ground ebvel = 09% 30-270-10 Construction and dismantling of OUTLET for 26" edger each Baas 90-270-20 Construction and dismantling of OUTLET for 7 dedger each oes ‘0-3 70-30 Consostion and dismantling of OUTLET for IW” dodger eh 36011 Page No. I- 1 leetfin Oa @ MW ITEM RATES For Dhaka O&M Circle Year: 2018-19 Printed: April 04, 2019 Item Code Description Unit Meas. Rate (Taka) 90_. Dredging Work 90-10010 Dane Dredging work by 20° dredges cam TR 90-10020 Base Dredging work by 20" dredge em ry 9010030 Base Dredging work by 18 dredge cam TS 90-150-10__ Extra Rate for booster pump beyond 15k 26 Dele canien 196 90-15020 Extra Rae for booster pp beyond 15 kn 20" Dredger came Ta 90-1503 Extra Rate fr booster par Beyond 13 ke Dede ‘ame T938] 9020010 Constrction of 26" Shore Pipe Line on Grom = I 90-200-20 Construction of 20° Shore Pipe Line on Ground = Bras '90:200-30 Constrasion of 9” Shore Pipe Line on Growc = 66 '0:220-10 Conntrostionof26° Shor pipe neon aging m THI 0220-20 Construstion of 30" Shar pipe neon waging = 7.10505] 90-220-30 Construction of 1 Shore pipe Tne on aging = 32017 ‘90-240 Construction of Moaring where nceary eh a9. 30-250-10 Ling 26° shore pipe sinked ito te madbcow th rnd evel = T1055) 30-250-20 Ling 20" shore pipe inked io the mud below the ground evel = Cony 90:250:30 Ling 18 shore pie snked ito the mad bow tho ground evel = Ey 30-250-50 Ling 1 shore pipe inked ino te maudbclow the round ebvel = 72098 90-270-10 Consrasiton sd dismantling af OUTLET for26” edger eh Baas 90-270-20 Construction and danantling of OUTLET for 20” dodger wach Bor] 90:270-30 Construction and dismantling of OUTLET fr 19” edger each OTL Page No, T= 1 vin Oe @ ITEM RATES For Fenl O&M Circle Year: 2018-19 Printed: April 04, 2019 Ttem Code Description Unie Meas. Rate (Taka) 90_. Dredging Work 9010010 — Base Dodging work by 20" drole am Ta] 90-10020 Basic Dredging work by 20° dred am T624 9010030 Base Dredging work by 1 dredge cam 1327] 90-50-10 Ext Rate for booster pup beyond 13K 26 Dale came 3.90) 90-5020 Ext Rate for booster ump beyond 1-3 kn 20" Dredger oo 107) 90-13030 Ext Rae for booster pup Beyond 1am: 1 Drolet came T331 90-200-10 Constration of 26° Shae Pipe Line on Ground = S001 90:200.20 Consraction of 20" Shore Pipe Line on Ground = a8} 30-200-30 Construction of 1° Shore Pipe Line on Ground = 5.57 30-220-10 Construction of 6° Shore pipe neon aging = T5] ‘220-20 Consrstion of 0" Shae pipe Hae on aging = T0860} ‘O-RB0-30 Construction of Share pipe ine on aging = 305.05 90-240 Construction of Moaring where neesry oc a9] 0-250-10 Ling 26° shore pipe snked to the mad blow the round evel = 706025} '-25020 Lifing 20” shore pipe snked in. The nud blow the ground evel = 97 0-500 Lifting 1 sore pipe sake int he mud blow the ground evel ™ saa 90-2505 Ling 1 shore pipe sake iat the mad blow the ground DVT = TI133| {0-270-10 Consraiton and dismantling of OUTLET for 26” edger eh S194. 90-2700 Consracion and dmanteling of OUTLET for 20" edger wh “56a? 30-270:30 Construction and dismantling of OUTLET for 19” dredge wh eS Page No. I 1 malfi. Oke @ Printed: April 04, 2019 ITEM RATES For Faridpur O&M Circle Year: 2018-19 Ttem Code Deseription Unie Meas. Rate (Taka) 90_. Dredging Work 30-100-10 — Basi Dreging work by 20" roles om Tra] 30-100-20 Basie Dregne work by 20" rede ea Taz '50:100:30 Basie Dredging work by IF dredge ca 1537 '0-150-10 Entra Rate fo booster pup beyond 15 kan 26° Drea came 1390 90-150-20_ Extra Rate To booster pump beyond |S kn: 20° Dredge came 1507 '90:150-30 Ente Rae Tor booster pump beyond 15 km 19” Deedee ame Bar 30:200-10 Construction 0726" Shor Pipe Line on Grow = 5407 9020020 Construction of 20" Shore Pipe Line on Ground 7m or ‘90-200-30 Construction of 1” Shor Pipe Line on Ground ™ S87 ‘0-220-10 Connon of26° Shor pipe neon Raging = T3235] '90:220-20 Constrostion of 20" Shore pipe neon waging = T0860} '0:220-30 Conatrustion of Shar pipe neon waging = 305.05 90-240 Construction of Moring where neseeary each ara] 0-250-10 Ling 26" share pipe siked to te mad below the ground evel ™ 706025} ‘0-350-20 Ling 20” shore pipe inked tothe mad below the ground evel ™ 297 ‘0-250-30 Ling 1” shore pipe inked oto the mad below the ground evel ™ saa ‘0-250-50 Ling 12 shore pipe ike nto te mad below the ground ebvel. = 293 ‘0-7T0-10 Construction sd dismantling of OUTLET for26" dodger eat Tara '50:270-20 Construction and dismantling of OUTLET Yor" dedger eh G6 ‘O2T0-30 Construction and dismantling of OUTLET for IW dedger exch TAS. bach fis Page No. I- 1 a Ww Printed: April 04, 2019 ITEM RATES For Jessore O&M Circle Year: 2018-19 Item Code Description Rate (Taka) 90_. Dredging Work 30-100-10 — Basi Dredging wok by 20" roles aa Ta] '30-100-20 Basi Dreging work by 20° dredge ea or '30-100-30 Basie Dredging work by IF dredge ca T3327 90-150-10 Entra Rate fo booster pump beyond 15 kan 26° Drea amie Tar 90-150-20 Extra Rae for booster pump beyond 15 kr 20° Dredge amen 307 "0150-30 Entra Rate Tor booster pump beyond 15 kam 19” Dredge comin 191 '50:200-10 Construction O72 Shor Pipe Line on Grom = W5a01 '30-200-20 Construction of 207 Shor Pipe Line on Ground ™ eis 90-200-30 Construction of 9” Shor Pipe Line on Ground = a7 ‘OR20-10 Construction of26" Shor pipe neon Raging = Ts ‘0-220-20 Conatrostion of 20" Shor pipe neon waging = 1.0860] ‘-R20-30 Consrosion of” Shor pipe ne on agin = 903.05 90-240 Construction of Mowrng where nace) exh Tara90 3025010 Lifting 26" shore pipe sake int the mud blow te ground evel ™ 706025} 90-25020 Lifting 0" shore pipe snked ot the mad Wlow the ground evel = eat 30-2500 Lifting 1” shore pipe snked int the mad Blow the growd level = Saal {30-2500 Lifting 12” shore pipe waked int the md blow the pound abel = 2195) {0-270-10 Consrition and dismantling of OUTLET for 36° dredger ech T9709 30-27020 Consraction and damanteling of OUTLET for 20" edger eh B62 30-2700 Consracon and dismantling af OUTLET for 15" edger ech Base Page No. I 1 Jobo & @ vw Printed: April 04, 2019 ITEM RATES For Khulna O&M Circle Year: 2018-19 Item Code Description Unie Meas. Rate (Taka) 90_. Dredging Work 9010010 — Base Dodging Wok by 20 deer eam Ta] 90-100:20 Base Dredging work by 20 dredger cam 1624 010030 Base Dredging work by 1 dredge oo 15327] 90:150-10 Ext Rae for booster punp beyond 15 kn 26° Dredg cane BAT 90-1500 Ewa Rate for booster punp Beyond 15 hn: 20" Deeper came 1506) 90-1503 Ext Rate for booster pump beyond 15 kn Dredger came 1932) '0-200-19 Constion of 6° Shore Pipe Line on Ground = S01 '0-200-20 Consraction of 0° Share Pipe Lins on Ground = enn 90-200-30 Consraction of 5 Shore Pipe Line on Ground = 87 '90:220-10 Construction of 6° Shore pie neon Staging = T3235] O-220-20 Consrustion of 0" Shore pipe neon waging = 1.08620} ‘O-220-30 Connon of 1” Shore pipe neon aging = 305.03 ‘0-240 Conntrostion of Moaring where neesary eh aar499] ‘ASOCIO Ling 26° shore pipe snked to the mad below the round evel a 706025} 90-2500 Lifting 20" shore pipe saked int the mud Blow he ground evel ™ 07 90-25030 Lifting 1” sore pipe snked int the mad low the grownd evel ™ Sai 90-2500 Ling 12” sore pipe snked int he md below the ground bv = 71195] DDI Consration and dismantling of OUTLET for 26" edger eh T9740 0-27020 Consraction and dmantling af OUTLET for 20" edger each 6a? 90-2703 Consracion and damantling f OUTLET for 1 edger eh TS Page No. I+ 1 Kechficn Gh @ Ww Printed: April 04, 2019 ITEM RATES For Kushtia O&M Circle Year: 2018-19 Item Code Description Unit Meas, Rate (Taka) 90_. Dredging Work 30-100-10 Base Dodging work by 2 rege = Te 90-1002 Base Dredging work by 20” dreger ea 162) 0100530 Base Dredging work by 1 aredge eam 15327 0-150-10 Ents Rate for booster pnp beyond 1S ean 3° Dreger comin T 90-1500 Extra Rate for booster pup Beyond 1S kn 20° Dredger cane T307 90:150:30 Ex Rate for booster punp Beyond 15 kms 16” Dredger canln T93t 0-200-19 Constrastion of 6° Shore Pie Line on Ground = wir '0-200-20 Consration of 0° Shore Pie Line on Ground 7 sins '90-200-30 Consration of IF Shore Pipe Line on Ground = 57 ‘0220-10 Constrution of 26° Share pipe ine on Saging = THaa5] '90:220-20 Consus of 20" Shore pipe ne on staging = T.o6a0] ‘9-220-30 Constion of I Shore pipe ine on Raging = 305.05 0-240 Construstion of Moaring where neesary each 7490] ‘O-2S0-1O Ling 26° shore pipe inked ito the md blow the round evel ™ 7060.25} 90:250-20 Ling 20" share pipe inked tothe mad below the ground evel = eaa7 50:250-30 Ling 19" shae pip ked to the mud below the ground evel = Steal '90-250-50 Ling 12" shore pipe sake nto te mad below the round Ibe = 2195] 30-27-10 Consttion and dismantling of OUTLET for 36° dredger ah TpTa 90-27020 Consration and dmanteling of OUTLET for 20" edger eh 6a 90-2700 Consrution and dsmanieling of OUTLET for 1 dedger eh aS kas Page No. I- 1 yr a Printed: April 04, 2019 ITEM RATES For Moulvibazar O&M Circle Year: 2018-19 Item Code Description Unit Meas, Rate (Taka) 90_. Dredging Work DO-T00T0 Base Dredging wor by 20 eer cam Tae 90-100.29 Bane Dredging woek by 20" reer am 1620 90-100:30 Bane Dredging work by 1 reg a Ts 90-150-10 Ents Rate for booster pump beyond 13 ns 26° Dredg ane 9r 30: 150-20 Ente Rae for booster pnp beyond 15 kn 20" Dredg came TS.08 BO 1S0-30 Entra Rate Tor oowe pup beyond 5 kn: 18” Deed came 13 ‘0-20-10 Construction of26" Shor Pipe Linc on Grom = Teor 90-200-20 Construction of 0° Shore Pipe Line on Gros m= ens OR00-30 Construction of 9” Shore Pipe Line on Ground 7 a7 ‘O-RRE-IDConstrastion 0726" Shar pipe ne on staging = Ta 90-220.20 Conaracon of 20” Shoe pipeline ov aging = T0860 90-220:30 Corsten of 18 Shoe pie ine on aging = 905.05 30210 Construction of Mouring whe necessary wah Ter490 30-250-10 Ling 26" shore pipe snked into the mad bcow the round evel 7 706025 '0-250-20 Liing 20" hore pipe inked tothe mudbsiow the ground evel 7 ‘Gam7 ORSU-30 Ling 1 share pipe inked vote mud below the ground level = se ‘0-250-50_Lifing 1?" share pipe Snked into te madbelow the ground ebvel = 21195] ‘O-IT0-10 Construction and dismantling of OUTLET for26" dredge each Tigra 30-27-30 Conatraton and iamanteling of OUTLET for 20° edge eh Bea 30-2700 Consration and dmanteling of OUTLET for 1 edger ach Hae Page No. I- 1 klix Ola uv Printed: April 04, 2019 ITEM RATES For Mymensingh O&M Circle Year: 2018-19 Item Code Deseription Unit Meas. Rate (Taka) 90_. Dredging Work 30-100-10 Bane Dredging work by 20 rege = Tire 90-1002 Base Dredging work by 20" dredge oo Tas 90-100-30 Basie Dredging work by 18 dre om T3327 90-150-10 Ents Rate for booster pump beyond 15 es 20° Deeg ‘am 1397 '90:150-20 Extra Rat To booster pump beyond 15k 20" Dredge ame 5.08] O-150-30 Entra Rane or booster pump beyond 15 kan: 197 Deed am 32 90-200-10 Consretion af 26° Shoe Pipe Line on Ground ™ 535 90-20020 Consraction of 207 Shoe Pipe Line on Ground = 61339 90-20030 Construction of 18 Shoe Pipe ine on Ground 7 oa 30-220-19 Consaction 026° Shoe pipe Tine on aging = Ta W9-22020 Construction of 207 Share pipe ine on aging = 7.0860 WO-220-30 Construction of 1 Shae pipe in on aging = 50305 WOO Construction of Mouring where nesesary aah a0 90-250-10 Ling 26" shove pie sinked if te ud blow the ground evel = 7.06025} 30-250-20 Ling 2” shore pipe inked ito the mad below the ground evel = 297 90:250-30 Lifting 1 shore pip sked oto te mad below the ground evel m Seal 90-2500 Lifting 12” shore pipe snk avo he mud below te ground bv) = TI135| BD-RTIO Constation and dimsntling of OUTLET for 26° edger wach Bwr9s 0-27020 Consraction and Umaniling af OUTLET for 20" dedper ech 3027 2730 Consracuon and damanling of OUTLET for 18" dedger ech BESTS Page No. I 1 keifix he @ Printed: April 04, 2019 ITEM RATES For Pabna O & M Circle Year: 2018-19 tem Code Description Unit Meas. Rate (Taka) 90. Dredging Work 30-100-10__ Basi Dredging work by 20" reac oo Ta] 90-100-20 Basie Dredging work by 20 dredge ea Tea ‘O-100-30 Basi Dredging work by IF" edge eam 15327] 0-50-10 Ext Rate for booster pump beyond 1S km 26 Dredger ame 7399] 0-15020 Extra Rae for booster pump beyond 15 kn: 20" Dredger ae 1307 90-1500 Ewa Rae for boosie pump Beyond 15 kn 1 Drdeer ‘aren Tat 70-200-19 Consttion of 26° Shoe Pipe Line on Gro = B01 90-20020 Consration of 29" Shoe Pipe Line on Ground = cr 0-200: Consraction of 19 Shoe Pipe Line oa Ground = a7 0-220-10 Consacon of 26° Shae pipe in on aging = Ta 90-2200” Consracion 0207 Shore pipeline on saging 7 Tone 90-220:30 Construction of 1 Shore pie ine on aging = 30805 O20 Constrastion of Mouring where nesesry eh 6490 ‘BOASU-TO Ling 26” shoe pipe sinked ito te mudbsow the round evel = 706028 ‘0-250-20 _Liing 20" shore pipe inked to te mad below the ground evel m ai 90:250-30 Ling 18" share pipe siaked tote mad blow the ground level m aa '90-250-50 Lifting 12" share pipe inked no te mud below the round evel ™ 293 '50:270-10 Consuuction and dismantling of OUTLET for 26" dedger exh TroT409 30-27020 Constaction and domanteling of OUTLET for 20° edger wh $060] BD-27030 — Consniction and dmanteling of OUTLET for IS edger ech Has Page No. I 1 kshis Ok @ Vv Printed: April 04, 2019 ITEM RATES For Patuakhali WD Circle Year: 2018-19 tem Code Description Unit Meas. Rate (Taka) 90_. Dredging Work BO-1001O Basi Dredging work by 26" algo = Tire 90-100-20_ Basie Dredging work by 20" dre am Ta624 90-100-30 Basie Dredging work by 18 dre am 13327 90-150-10 Ente Rate for booster pump beyond 15 ks 26° Decor comin 95] 0: 150-20 Ena Re or booster pp beyond 15 kan 20” Deca came 1509 ‘OIS0-30 Entra Rite or bower pump beyond 1S kan: 18” Deed uv 1935] ‘o-200-10 Construction of 26" Shor Pipe Lin on Ground m Teor 90-200-20 Conatrton of 20° Shore Pipe Line on Growme ™ cas 90-2003 Construction of 18 Shore Pipe ine on Ground = 887 0-20-10 Consration of 26° Shore pipeline on aging = T3235] 22020 Consration of 27 Shore pipe in on sasing = T0860 O-20030 Conran of 19 Shae pipe ine on aging = oa 70-240 Consraction of Mouring where necenary eh TaT490 B0-250-10 Ling 26" shore pipe snked int the mad slow te ground evel = 1060258 30-2500 Ling 20" hore pie snked into the mad sow the ground level = 297 0250-30 Ling 1 shore pipe winked tothe mud below te ground evel = SaxaT 90-250-50 Ling 12" shoe pipe sikel ino de mud below the ground ebve = 2193 30-270-10 Consracion and dismantling of OUTLET for2" edger each i974. 50:270-20 Construction and Gisnantling of OUTLET for 20" deter each Bae '0:270-30 _Construstion ad dismantling of OUTLET for 1 edger ech Hae Page No. I 1 Keshix Bu. a ITEM RATES For Rajsha Year: 2018-19 Printed: April 04, 2019 &M Circle Ttem Code Description Rate (Taka) 90 _. Dredging Work 90-100-10__ Basic Dredging work by 20" reduc a Ta] 90-10020 Base Dredging work by 20 arty ca THe 9010030 Base Dredging wok by 1 dredger cam sis 0-50-10 Ext Rate for booster pnp beyond 13 kn 26° Dreger cant Ba 90-1500 Ewa Rate for booster punp beyond 13 kn: 20" Dredger cam Tha 90-1503 Ewa Rate for booster pump beyond 15 ns 1 Dredger comin TRL 30-200-19 Constation of 26° Shore Pipe Line on Ground = ans 39-200-20 Consration of 0° Shore Pipe Line oa Ground = Sea 90-200-30 Consraction of 1 Share Pipe Line on Ground ny Bsa 90-220-10 Construction of 6° Share pipe ine on Saging = T0024 '90:220-20 Constutin of 07 Shore pipe ine on aging ™ 7829 90-220-30 Consvtion of IF Shore pipe neon waging = wos BORO Constrostion of Moaring where necamary ea TK ‘O-RSO-TO Ling 26° shore pipe inked to the md blow the ground evel ny oT ‘9250-20 Ling 20” hare pipe Haked to te mud below te ground evel 7 Io 90:250-30 Ling 18" ahare pipe slaked to te mud below the ground evel ™ Base 90-250-50 Ling 12" shore pipe sake ino the mad below the ground Iebve = 19a 30-27-10 Consniction and dismantling of OUTLET for 26" edger ech pa6 90-27020 Consniction and dismantling of OUTLET Yor 20" edger eh oo. 30-27030 — Consration and dmsntling af OUTLET for 18 edger ech Bano Page No. 1 leshfin Ge ® M/ ITEM RATES For Sylhet O&M Circle Year: 2018-19 Printed: April 04, 2019 Tem Code Description Unit Meas, Rate (Taka) 90. Dredging Work 30-1010 Base Dodging work by 20 edger am Tra 99-10020" Bane Dredging work by 20" edger am Tao 9010030 Base Dein work by 1 Wredger eam Tsar 30-150-10 Ext Rate for booster pump Beyond 13 ks 30° Dredpr come iy 90-150-20. Ext Rate for booster pump Beyond 15 kn 20" Dredger cane Ts 90:150:30 Extn Rae for booster pump Beyond 1-5 ns 18” Drea cunt 1937 90-200-10 Construction of 6° Shore Pipe Line oa Grom = TIO 30-200-20 Construction of 0" Shore Pipe Line on Ground 7 iss '9-200-30 Construction of 1” Shore Pipe Line on Ground 7 TG 'O-220-10 Constacton of 26° Shore pipe ine on aging = T3Ga1 90-220-20 Consraction of 2 Shae pipe ne on aging = T0565] '90:220:30 Consrucion of TH Share pipe ine on aging a 320.17 30-210 Construction of Mouring where nsesary each Tai. ‘9250-10 Ling 26 shore pie inked to the mad below the round evel m= 7.105) ‘9350-20 Ling 20" shore pipe inked to the mad below the ground evel m= C3 ‘250-30 Ling 18" shoe pipe Hed ato the mad below the ground evel = 35254 9250-50 Liting 1 shore pipe sake inv he wud below te ground eel = 09% 30.70.10 Censrtion and dismantling of OUTLET for 26 edger eh Baa5.56 90.27020 Censtracton and dmanteling of OUTLET for 20" edger eh wows BO-27030 Construction and damanteling of OUTLET for 1 Gedger ech Boor faslfix Page No. I+ 1 Oe @ VY Printed: April 04, 2019 ITEM RATES For Rangpur O&M Circle Year: 2018-19 Item Code Description Unit Meas, Rate (Taka) 90_. Dredging Work 90-100-10 — Basie Dredging work by 20" rsler = Tras] 0100-20 Base Dredging work by 20" dredge om 4624 30-100:30 Basie Dredging work by 19 area cam isa? 90:150-10 Exes Rate fo booster pup Beyond TS kn 2 comin 191 90:150-20 Extra Rat To bower pp beyond 15 kms 207 come TS. 30: 150-30 Ente Rae for booster pump beyond 1-5 kas 19” Deed cue 132 '90-200-19 Consretion of 6° Shor Pipe Line on Gros m= aso '90:200.29 Consracion of 0° Shore Pipe Line on Ground 7 eis 9020030 Construction of Shor Pipe Line on Ground = a7 0-220-10 Construction of 6° Shor pipe ne on Raging = Ts ‘0-230-20 Connon of 0° Shor pipe neon waging = T0860) 90220-30 Construction of "Shor pipe Tne on aging = 905.03 ‘90-240 Contraction of Moaring where neesary each Tara90 ‘9250-10 iting 26° share pipe kd to te ma below the round evel ™ 1.06025; 99-25020 Lifting 20" shore pipe sake nt the mud Blow the ground evel = 297 90-2500 Lifing sore pipe snked nt the mad low the ground evel = Saal 9-250-50 Lifing 12” shore pipe sake iat he md blow the ground ebveT = EE) {0-270-10_ Consrton and dismantling of OUTLET for 26° edger wh T9740 90-27020 Consraton and dmsntling of OUTLET for 20" cede ech Been {90.2700 Conaracon and dismantling of OUTLET for 15" edger ech BS eC Page No. I 1 Printed: April 04, 2019 ITEM RATES For Thakurgaon O&M Circle Year: 2018-19 Item Code Description Unit Meas, Rate (Taka) 90. Dredging Work PO-T0010 — Base Dodging wok Wy 20 deter am Tam 100-20 Base Dredging work by 20 aredger eam TG 30-1000 Bane relying work by TF dredge ca 157 90-150610 Eats Rate fr booster pump Beyond 13s 96° Dre cane 190 0-15020 Ext Rae forbooser pump Beyond 15 kn 20" Dreger comin 15.06 90-13030_ Ewa Rate for booser pump Beyond 15 kn: 1 Dreger comin Ta 0-200-10 Consrtion of 26° Shae Pipe Line oa Ground = asso 90-2002 Consraction of 20° Shae Pipe Line on Ground = anne 90-200330 Consracion of 1 Shore Pipe Line on Ground = ase 30-200-10 Consraction of 6° Shore pie Tine on aging = T3235] '0-200-20_ Consacton of 20" Shore pipe ine on waging = 7.0860} 90-200-30 Consration of TF Shae pipe neon aging = 303.05 90-240 Consraction of Moaring where nesesary eh ara90| 30:250-10 Laing 26" shoe pipe sinked to te mud below the ground evel = 106025 90-250-20 Ling 20" shoe pip sinkedinto the mud below the ground level ™ e297 BORSU-O Ling 18" shore pipe inked to the mad below tho ground evel ™ Saal ‘0-250-50__Liing 12 shore pp inkl nto te mad below the ground Iebve = 7195] ‘O-FTU-10 Constostion and dismantling of OUTLET for 25" dedger ech G1974.09 ‘0:770-20_Constrostion and dismantling of OUTLET for 20" cede ech B60 ‘90:370-30 _Construstion and dismantling of OUTLET for 18" oedger ech TAS Page No. I- 1 kishfia Bde a WV

You might also like