CRU eA eT Office of the
‘feetta a2, AoA Superintending Engineer
9h cate (oom) Design Circle-I,BWDB
Wa3Ae 72 Green Road, Dhaka-1215
TAR - pd3auom Telephone: 9117609
‘Taw design?_bwdb@yahoo.com Email: design2_bwdb@yahoo.com
AES ACF-OY/STATET/ 9/209 HIRE. 08-08-2038 Rr
a,
are ear
‘fewer, ari ear, ret |
‘Fens. aterror orf By cats wt Standard Schedule of Rates « cafe, om STR aR AR RAITT
ore |
scare,
are ery re op Boras RACH CAPAC BIRTEAT MEHR CE, ME 03-08-Rode Re HAN SIATEAT 6 FO
caterers aremior oii Ta GE ot Standard Schedule of Rates « cafe at SRN HIRE GRE RMTATT
‘Fal RAR | HRT LRT Item Description Gaf¥-r), Analysis Template (¥eqfS-2) wae aniBeat at
‘fafeq ietere was Se STEN TLE He (HeYS-0) STATE HHT HAMAS @ AMT aR VT A AN CeAT SAT
mi
RCTS TEATS |
ST ETS
c
oD
yak
cron
epee aca,
fear ae,
wert, eT |
afb RE Ae oeonege
RTE At--92/ATATET/99/294(B2) wifees-o8-08-2o%n Be
Sa meaferre ar fe anon BT cert aT Re
‘hee wtahte, area, OTT |
ce ee, RT BE, ATTA, TT |
ee CaM, Ceara, aia, Hea |
ater arco, HAM, Tone CeT, Az |
ener excel, Bae-oedvoe, areiBeet, BART |
seers ene, aera, TIMBAT, OBA |
scary exert, Sex oom, ABTA, aITA |
acy ee, ARE PORTT, AIMSTAT, LAT |
a aca, wG-PomER, TBAT, BAIT |
do, eta ei, para fare, aIenEeaT, ATTA |
29, Belen ard A, aoe tea rea, areca, FEO |
32, BBMANS ACSA, COTA ee ATCA, aTNBTAT, COAT |
do. Beaune ace, eaet sts mee, aMIBeat, AOET |
Seeeeouy
¥38, Beers acd, Serge or ae, AIBA, BH
3a, opreee ecaleA), BUA ex ae, atiBea, PDA |
be, areerre ace, gn to ae, aeeTBeAT, ARET |
39, Omaears aca Brat tox auc, eMC, eT
Se, OBEN ace, wits tox AIC, META, WHR |
3p, Bese ers, CHA et aA, TITER, CA
30, OPE aM, Ken Ae IER, ABCA, NO |
33, OBTRETT aM, eT tea ac, TTB, FAT |
33, Opes aca, afar ste meen, earBeat, AAT |
0, Bere echo, eStore test be, etiBcat, OTE T AA
38. UBreaTrs ace, ema eos AIA, ATMOTAT, TTA
2¢, BRU aca, Tea me HI, ABTA, AAT |
3y, OpreUTTS aca, eM mer acer, Tene, eT |
29, OBRUTS aca, ae me Bet, IMEC, ST |
2, OBA aca, HT MT MTANR, AMET, AL
3, OPUS Aca, SG oto mr, eB ee, Pre |
90, Brees aca, Sree es Ice, ateTeTAT, TEAS |
oy, Oper aero, wearer et GaN TIE, META, FIAT |
98, wareenres eta, part Sa are, ase, eA 1
90, Bgreerme acai, gaa SorcHe AIT, ABCA, APTS |
08, wyraerne aaa, RBA Set ATC, aIeTBCRT, TAT |
0, Beerae ata, Rea @ Oral me, caw es, eID, ATEN |
oo. earere ate, aR ME, TBC, FT:
80, Speers acre, (See ACA, AMET, DT |
85, Probe atid, TET ARAL om, Bre WADI er nee, aIeTBeRT, eT) cee
= 15 0.000055 cum @Tk. pe cu
SubTotal m
20, Materials: Miss.
20-245 Diesel Fuel 0.082455 te @%e TK
20-310 Lubicant( Mobileoi ee.) (9.02474 te @th op oo
20-530 Rope: Jue 0.000080 kg @tkpe kt Tk
20-545. Rope, Nylon 0.000048 ke @mkipe OT
Sub Tou m%
30, Wood Work
30-025 Bamboo, Barack: 7.5m long 80-100mm dia 0.00048 No. @M..pe 00 .No Ty
Sub Total ™
40, Mata Wark
40-020 Angle, MS. 0.000038 ke @hk.p be
40-645. Shoot, Psi G1 16 BWG. 2000019 sqm @Tk.pe aT
40-742. Welding Are 000160 m Qk. om Tk
Seb Total ™
70, Fauipmsa Tools
70-055. Chain hos, 3 tons: 8s ay 1000016 diy Tk. pe YT
70-077 Engine boat (40 ton capacity) 0.000208 day Tk. pe ty TR
70-087 Booster Pump (with iver pipe: 8hrs dry 000036 day = @ Tk. pe YT,
70-110 26" Shore pipe 0.089286 midey —@Tk.. pe miday Th,
70-175 Tripod stand 0.000016 dy TK. pe ay Te
Seb Total Te
80, Laboue
50.210 Fiter 0.000016 sy TK pe TH
80-370 Labour, Skiled 0.000554 ay Qn dy Te
80-375 Labor, Unkle 0.000199 sy @TK. pe ty TH
50-463 Operator, booster pump 0.000036 sy TK. pe ty TH
0-464 Helper, booster pump 0.000036 diy TK. pe ay TR
0-477 Operator, Engine boat 0.000208 diy = @ Th pe ty Te
80479 0.000208 diy Th. pe ty TR
80-755 0.000032 day TK. pe YT
Sub Toul Tk
‘Som of Sub Tota Te
Overnend & Ext 2.50% Te
item Toa Tr
Contractors Prof 1000057
Tal Te
var. 2.00% Te,
term Grand Total Te
PageNo. |
aANALYSIS TEMPLATE REPORT
Printed: April 04, 2019
Primary Element Secondary Element Weight Unit Element Rate Vive
90 . Dredging Work
90-150-20 Extra Rte for booster punp beyond |S km: 20" Dredger
10, Material: Conrete
10-040 Bricks: Ist Chae 010486 Ne @tk..pe 1000NA TK
10-100 Cement: Porn 0.022573 by @m.pe te Tk
10.380. Sand FM >= 15 ooo can = @Tk pe | cam TE
‘SubTotal Tm
20, Mata: Miss.
20-245 Dice! Ful 0.080485 tr @mie
20-310 Lubricant ( Mobile oil ete) @hkip
20-520 Rope: Jute 0.00086 ke @tp OTK
20-545. Rope, Nylon 0.00054 kg Pl
Seb Total i
30, Wood Work
30-025 Bamboo, Buck: 7.5m long, 80-100mm dia 0.000056 No. @T..pe 100 No Tk
SubTotal ™
‘Metal Work
40.020 Angle MS. 1.000052 bg @mip wm
40.685 Sheet, Phin Gi. 16 BW. 0.000013 am @Tk. pe mT.
40.782 Welding Are 0.00216 m= Que =
Sub Tot m
70, auiment, Tools
70-085 Chin bos, 3 tons 8 bes day 0.000002 dey TR petty TH
70-077 Engine bot (40 ton capacity) 0000179 dy = Tk pe ty TH
“70-087 Booster Pump (with delivery pipe): Hhrs dry 0000076 day @ TK. pe ty TE,
70-12 20° Shore pipe 0190476 midsy—@ Tk. pe lay Te.
70-195 Tripod sand 00022 diy == @ Tk. pe ay Th
SubTotal Th
50, Labour
0-210 Finer 0.000022 xy @ Tk. pe ty TR
80-370 Labo, Skiled 0.00006 dy @TK pe YT
80-375 Labour, Unkiled 0.000206 xy @TK. pe aT
80-463 Operator, booster pump 00076 dy GTR pe ty
0-464 Helper, tooster pump 000076 dey TR pe tT
80-477 Operator, Engine boat (0.000179 day Gh | ty
80-479 Helper Engin boat) 0000179 day @Tk.pe YT
80-755. Welder 0.000088 day @Tk.pe ty TR.
Sub Total me
‘Som of SubTotal Te
Overhead & Ext 250% Te.
Trem Tor Tr
Contracior’s Prot 10.00%
Tal Te
var. 2.00% Te,
‘Wem Grand Tour Te
Bhs kashfin @ ae
Page No.ANALYSIS TEMPLATE REPORT
Printed: April 04, 2019
Primary Element Secondary Element Weight _Unit___Ekment Rate Value
90. Dredging Work
90-150-30 Extra Rit for ooster pump beyond |S km: 18" Dredge
10, Materials; Conte
10-040 Bricks: st Chas. 0010788 No @TK..pe 1000NE TK
10-100 Cement: Porta 10023200 kg @kop oT
10.380 Sand, FM>= 15 0.000049 cum @Tk. pe cum
‘Sub Total me
20, Mattias: Miss.
20-245 Diesel Fal 01096033 enue i te
20-310 Labrcas (Mabie oll ec). (3.002881 er ene ot
20-530 Rope: Jae 0.000096 ke Qh OTK
20-545 Rope, Nylon 0.0064 kg rn
SubTotal t
30, ood Work
30-025 Bamboo, Barack: 7.5m long 80-100mmdia 000064 No @Tk..pe 100 No Tk
Sub Total Th
40, Maal
40.020 Angle, MS. 0.00077 kg @mipe Te
40-645. Shes, Pain GL 16 BW, 0.000008 gm TK. pe MTR
40-72 Welding Ac 0000320 m @koe = %
Seb Total ™
70, ipsa Too
70-085 Chain bist, 3 tons: hs 0.000032 diy = @Th. pe ey T
70-077 Engine boat (40 ton capacity) 0001S diy = @Tk. pe ty TR
70-087 Booster Pump with diver pipe hrs day 0.000120 day @tk.pe day Te
To-114 18" Shore pipe 0310559 miley @Tk..pe lay Th,
70-175 Teipod stand 0.000082 dy Tk. pe day TH
Seb Total ™
80, Labour
80.210 Finer 0.000082 dy @TR pe tty TH
80-370 Labour Skilled 0.00086 dry @TR pe ty TH
0-375 Labour, Uns 0000284 diy = @ Tk. pe ty TR
0-453 Opera, booster pump 0000120 dy @ Tk. pe ty TR.
0-464 Helper, booster pump 0.000120 xy @ Tk. pe ty, Te
0-477 Operator, Engine boat 0.000156 dy @Tk. pe ty Te
0-479 Helper (Engine boat) 0.000158 dy @TK. pe aT
80-755. Welder 0.000064 dy = @Th pe day
%
Toad Tr
Overiead & Est 2.50% Te
Tem Tot Tr
Contractor's Prof 10.005
Te
700% Te
PageNo. 1
™Printed: April 04, 2019
ANALYSIS TEMPLATE REPORT
Primary Element Secondary Element eight —_Unit___Elment Rate Value
90, Dredging Work
90-200-10 Consraction and dismantling of 26° Shore Pipe Line on Ground
20, Mattias: Mise,
20-065. Bags, Guy : New (50k) 0555556 No
20-535. Rope: Ite Sting 0083333 ky
30, Wood Work
30-015 Bamboo, Barnck: 6m long,> Onn dis... 277 No,
40, Metal Work
40-760. Wire, Gi. 16 BWG 0027778 ky
40-800 Rubber Gasket fr Shore Pipe of26" Dredger: 0.165657 No
40-810. Nutblt or Shore Pipe of 26 Dredger, Din 25 1.655567 kg
(60% Savage)
70, aioe Tools
70-055. Chain hos, 3 tons: 8 hr day outs day
70-175 Tripod stand (0030217 day
80, Labour
80-210 Fiter noises aay n
80-305 Head Man 065278 aay ™
80-370 Labour, Skilled Derwe9 diy @ TK. pe YT
Sub Tota n
‘Som of Sub Tatar Tr
Overhead & Ext 2.50% Th.
item Tou Te
Contractors Prof 10.007
Total Te
var. 7.00% Te
item Grand Total 7
Cc eee
Page 1Printed: April 04, 2019
ANALYSIS TEMPLATE REPORT
rary Element Secondary Element Weight Unt Element Rate Vane
90 . Dredging Work
90-200-20 Construction nd dismantling oF 20 Shore Pipe Line on Ground
20, Materials: Miss.
20-065 Bags, Gunny: New (50 kg) 0500000 No @T..pe 100 No TK
20-535. Rope Jt Sting 0.072917 kg @tm.pe eT.
‘SubTotal m
30, Wood Wank
30-015 Bamboo, Barack Gm long,> Hmmdia..._ 002778 No. QT. pe 100 No Te
Tk
40, Maal
40-760. Wire, GI. 14/16 BWO 0020833 ke ane & Tt
40-801, Rubber Gasket for Shore Pipe of20" Dredger: 0.165657 No @m.p No oT
40-K1T Natbol for Shore Pipe of 20" Dred, Dia 201000000 kg @m.pe te Tk
m
Sob Total Tk
70, alps Too
70-085 Chain hos, 3 tos: 8 hrs doy 0037500 dy @Tk..pe YT
70-175 Tripod stand aout ay TK %
Sub Te me
80, Labour
80-210 Fier 01037500 day amp fy
80-305 Head Man 0058333 dy @ Tk. pe ty TH
80-370. Labour, Skilled 0433333 dy @ Tk. pe ty TR
Sub Total ne
‘Sem of Sub Tour Te
Overhead & Eat 250% Te.
Tem Tor Tr
Contractors Prof 10009
To Tk
var. 2.00% Th,
‘tem Grand Toad Tr
Ga kl QO
PageNo. 1
(50% Savage)ANALYSIS TEMPLATE REPORT
90 . Dredging Work
Secondary Blement Weight Unit
90-200-90 Construction and imantl Shore Pipe Lin on Ground
20, Maeials: Miss
20-065 Bag, Gunny: New (50) 0.416667 Wo
20-535. Rope: Jute Sing 0072917 kg
20. os W
30-015 Bamboo, Barack 6m lons,> BOmm din... 0.002222 No.
40, Mata Work
40-760. Wire, GI. 1416 BWG 0.016667 kg
40-802 Rubber Gasket fr Shor Pipe of 18" Dredger: 0.166657 No
40-812. Natok for Shore Pine of 18 Dodge, Dia 16 0.533333 kg
70, ouipment. Tons
70-085 Chain bos, 3 tons: 8 rs day 0318 day
70.175 Tripod stand 031818 day
80, Labour
80-210 Fier 0031818 éay
80-505 Head Man - 0052652 day
80-570- Labour, Sled 032082 day
Keshfin
PageNo. 1
Printed: April 04, 2019
Element Rate Vale
(50% Salvage)
100 No Te
otk
T.
@M%..pe WN.
™%
amp ke om
@n ip Nh
@m.p oT
SubTotal 1
Qtr dy Te
Qtr dy TK
SubTotal ™
amp wy oT
@m.p ty TK
Om. wy oT
Seb Tots Te
‘Sum of Sub Toad Te
Overiead & Est 250% Th.
Trem Tord Te
Contractors Prof _10.095TK.
“Toul Tk
var. 200% Th,
Wem Grand Toate
aANALYSIS TEMPLATE REPORT
Printed: April 04, 2019
Primary Element ‘Secondary Element Weight _Unit__ Bement Rate Value
90. Dredging Work
90-220-10 Contraction nd dismantling of empocaypermanent 26 Shore pipe
ne ying on staging
20
20-535. Rope: Ite Sing 0.125000 kx Qn OT
Te
30, Wood Work
30-015 Ramboo, Barack: 6m long,> mm dia... 0.002778 No amp WN.
30-025 Bamboo, Barack: 75m long, 80-100mm gia 0.165651 No. @T..pe 0 No T%
50-150 Bulla Local hardwood : 100m ia 1.666667 @hop = %
SubTotal, m
40, Meal Work
40.760 Wire, GI L416 BWG 0.055556 kg Qt. OTK
40.801, Rubber Gaskst for Shor Pipe of20" Dredger: 0.165667 No @tk.pe NO Tk
40810 Nutbot for Shore Pipe of 25° Dredger, Dia 28 1.656667 kg @top Tk
Tm
Sub Toul m
7, Equipment, Tools
70-085. Cain bos, 3 tos: 8 hrs day omen dy @ Teepe oY
70-178 Tripod stand Ooms day @TK..pe YT
Seb Tota
0, Labour
80.210 Finer OoMsslI dry @TR.pe YT
0.305 Head Man Domes day Tk. pe YT
0-370. Labour, Skilled O78 dry @TK. pe YT
Sob Tota Te
‘Sem of Sub Tota Te
Overhead & Est 250% Te
emt
Contractors Prof 10.00%
Toul Tk
var. 2.00% Te
‘tems Grand Toad Tk
PageNa 1
keshfin Ww
(0% Salvage)Printed: April 04, 2019
ANALYSIS TEMPLATE REPORT
Primary Blement Secondary Element Weight Unit emer Rate Value
90, Dredging Work
90-220-20 Construction and dismantling ofemporarypermanent 2" Shore pipe
line ying on staging
20-535. Rope: Jue Suing 0125000 ke an Tk
SubT Te
30, Wood Wor
30-015 Bamboo, Barack: 6m long,> Bln da... 0.002778 No, @Te.ye 100 No TK
30-025 Bamboo, Barack: 7.5m ong. 80-100mm dia 0.166667 No, @T..pe 100 No Tk
30-150 Bullah, Local ard wood 100mm dia 1.666657 ene ™ 1%
SubTotal 1
40 Work
40.760 Wire, Gi. 1416 BWO 0.061667 kg a
40-801 Rubber Gasket fr Shor Pip of 20" Dredge: 0.166667 No @m%pe NOT
40-811 Nutbol for Shore Pipe of20" Dredger, Dia 2 1.000000 @hkipe wT
Ths (50% Salvage)
Seb Tota %
70, auipment Toots
10.088 Chain hos, 3 tons: 8 vs day 0038382 dy = @Tk.pe YT
0-175 ‘Tripod stand 0039352 ay = @Tk. pe YT
SubTotal n
80, Labour
0.210 Finer 0039389 dy Tk. pe ay TH.
10-305 Head Man oosiss dy Tk. pe YT.
80-370 Labour, Sled osesoel day = @ TR. pe YT
Sub Tota me
Sum of Sub Tot Te
Overhead & Et 2.50% Th
Tem Torr TE
Conteactr'sProf_ 10.00%
Tonal Tk
var. 1.00% TK
QB Gn ee
PageNo. |ANALYSIS TEMPLATE REPORT
Printed: April 04, 2019
Primary Element Secondary Bement Weight Unit Blment Rate Vave
90 . Dredging Work
90-220-30 Construction and dismantling of mporarypermancat 18" Shor pipe
tin tying on staging
2».
20-535 Rope: Jute String 0.108933 kg ani wm
SubTotal ™
30, ood Work
30.015 Bamboo, Barack 6mlong,> 80mm da... 0002778 No @Tk. pe 100 No Te
30-025 Bamboo, Barack: 7.5m long 80-100mm dia 0.166667 No @Tk..pe 100 No Tk
30-150 Bullah Lea ard wood: 1m dia 1.866667 = @he om Tk
Sub Total Tk
40, Met
40-760 Wire, G1. 14!16 BWG 002333 kg amir OT
40-802. Rubber Gasket fr Shore Pipe of 1" Dredge: 0.165657 No @Tk.pe NO TK
40-812. Nutol fr Sbore Pipe of 1" Droge, Dia 16 0533333 ky ani i
1
SubTotal %
70, auipment. Too
70-085. Chain ois, 3 tons: 8s dy 0030556 dry @Tk..pe ty
70-195 Tipo stand D030sss ay = @Tk. pe ty TR
‘SubTotal me
80, abou
0.210 Finer 0.030556 dey @Thape YT
0-308 Head Man 0051389 xy Tk. pe YT.
80:370 abou Sled 0301667 dry Tk pe YT
Sub Towa me
Sum of Sub Tot Tr
2.506 Tk
Te
soo
Tk
00% Te
item Grand Tool Te
Page No
(50% Salvage)Printed: April 04, 2019
ANALYSIS TEMPLATE REPORT
Primary Element Secondary Element Weight Unit Element Rate Vae
90 . Dredging Work
90.240 Construction of Mouring where nesesary
30, Wood Work
30-185 Bullah Local hard wood 125m di ‘000000 m mo
a
40-760 Wie, GI. /16 BWG 1.000000 ee
7 Sub Toul m
so, Labour
0-210 Finer 0500000 diy @ TR pe ty Th
0-305 Head Man 0500000 dy = @ Th. pe ty TR
80-370 Labour, Skil 3000000 diy Tk. pe ty, TR
Sub Total 1m
Tr
te
item Grand Total
@ Oi,
PageNo. 1ANALYSIS TEMPLATE REPORT
Primary Bement Secondary Element Weight Unit
‘90 . Dredging Work
90-250-10 _Liting 26 shore pie sinked into them low the ground evel
70, Eauinment Tools
70-055 Chain bois, 3 con: 8 hs dy 0333333 aay
70-195 Tipo stand 0.03533 day
80, Labour
0-210 Finer 0.083333 day
0.305 Head Man 0.083333 aay
0.370 Labour, Skilled 1.088333 day
PageNo. 1
Printed: April 04, 2019
Value
ay Te
aay Te
m
ay Tk
ay Tk
4y Tk
Tk
Tr
250% Te
Te
10.00,Printed: April 04, 2019
ANALYSIS TEMPLATE REPORT
Primary Element ‘Secondary Element Weight _Unit__ Element Rate Value
90. Dredging Work
90-250-20 Lifting 20° shore pie siked into the mud below the round level
70, Egupment,Tols
70-055. Chin hos, 3 to 8 bes day 0023 dy @Tkape MYTH
70-175 Tripod sand 083323 day @mk pe ay 1%
Sub Tou ™
0, Labour
80.210 Fier 093323 aay ani ty %
190305 Head Man 00m ay = @ TK. pe YT
80-370 Labour, Sled 0.666667 day @Tk. pe ty Te
Seb Tota 1.
‘Som of Seb To Te
Overnead & Ext 2.50% Th.
Item Torr TE
ContraciorsProf 10.00%
PageNo. 1ANALYSIS TEMPLATE REPORT
Printed: April 04, 2019
Primary Element ‘Secondary Element Weight _Unit__ Element Rae Value
90. Dredging Work
90-260-50 Lifting 18" shore pipe sinked ino the mud below the round level
70, auiment Tons
70-055 Cain hos, 3 tons: be day 0083333 day @ TE. pe YT
70-175 Tripod sand 11083333 day @nipe ay TK
Seb Toul cs
80, Labour
80-210 Fier 0.03323 aay amp ty Te
0.305 Head Man 0.08333 dry @Tk..pe YT
80.370 Labour Skilled 0500000 diy @Tk.pe ty TR.
Sob Total 1.
Som of Sb To Tk
Overhead & Ext 2.5% Th.
item Toar Tr
Contractor's Prof 10.00%
‘Tova Te
var. 2.00% Te
Item Grand Total Te
® Ob eshfin
PageNo. 1
aPrinted: April 04, 2019
ANALYSIS TEMPLATE REPORT
Pray Element Secondary Bement Weight Unit Element Rate Value
90 . Dredging Work
9027040 Consction snd dismantling of OUTLET for 26” dodger
20, Matis Mise,
20-075 Bags, Ganny:New (75 kg) 100°00 Be. @T..pe 00 -No Te
20-495 Polythene Shee:(L0kgper6 05g). 30000000 sgn @ Tk. pe
20-530 Rope ute 1.000000 ane fe
Sub Toul
40, Meal Work
40-760 Wire, Gi. 16 BWG 2.000000 3 @tk.e Tk
40-800 Rubber Gasket for Shor Pipe of 26" Dredger: 6.000000 No @tk. pe No Tk
40-810. Nul-bol for Shore Pipe of 26" Dredger, Din 25 60000000 @tkipe OTK
Sub Tou Te
70, auiment Too
70-055. Chain bois, 3 tons: 8s day 2000000 dey @ TK
70-110. 26" Shoe pipe 00140 misy —@ TK
Seb
80, Latour
0.210 Fiuee 4000000 diy @ TK pe ty Te
0-305 Head Man 4000000 dy Tk. peda TR
80-370 Labour, Sled S2000000 day @Tk.pe YT.
‘Sub To mk
Som of Sub Tour Te
Overhead & Est 2.50% Te
item Torr Tr
Contractors Prof 10.00%,
Tout Tk
var 700% Te
‘em Grand Tost TeANALYSIS TEMPLATE REPORT
Printed: April 04, 2019
Primary Bement Secondary Element Weight _Unit__Element Rte Value
90 . Dredging Work
90-270-20 Construction and dismantling of OUTLET fo 20" deer
20, Materials: Miss,
20-075 Bags, Ganny: Now (75 kp) 100-00 wo @tk..pe 100 No TK
20-495 Polythene Shect:(.0ky per650sqm). 30000000 sqm @Th. pe SMT
20-530 Rope te #000000 @thkp oT
SubTotal m
40, Meal Work
40.760 Wire, GL 1/16 BG. 2.000000 @tk.pe Tk
40.801. Rubber Gasket for Shore Pipe of20" Dredger: 6.000000 No @tk.pe NO Tk
40811, Nuttot for Shore Pipe of20" Dredger, Dia 20. 36.000000 kg @tp Te
‘Sub Tol Te
70, gunmen, Tools
70-085 Chain hos, 3 too: 8 br day 2000000 day @ TE. pe YT
70-112. 20" Shore pipe 0.001440 midsy —@TK..pe ida TH,
Sub Total Te
80, Labour
80-210 Finer 4.000000 day
80-305 Head Man “4.000000 sy
80-370 Labour Skilled 32.0000 aay
PageNo. 1Printed: April 04, 2019
ANALYSIS TEMPLATE REPORT
Primary Element Secondary Bement Weight Unit Element Rate Valve
90, Dredging Work
90-270-30 Construction and dismantling of OUTLET for 18" dedger
20, Mattias: Miss
20-075 Bags, Gunny : New (75 ks) 100*00: No @Tk..pe 100 No. Te
20-495 Polythene Sheet (LOkgper6S0sqm). 50000000 sqm @ Th. pe SMT,
20-530 Rope ute 1.000000 @tkpe Ke Tk
Sob Total m
40, Metal ork
40.70 Wire, GL 16 BG. 2.000000 kg @tkpe ke Tk
40.802 Rubber Gasket for Shore Pipe oF 18" Dredger: 6.000000 No @t pe = NO Tk
40.812 Nutolt for Shore Pipe of 18 Dredger, Dia 16 19.200000 kz Gh OTH
Seb Toul | ——— Tk
70, Eauiomen Tools
70-055. Chain hos, tons: 8 hrs dy 2000000 diy = @Tk..pe dey Tk
70-114 18" Shore pipe. 0.002160 may @Tk..pe—iday TR.
Sub Toca me
80, Labour
10.210 Fiter 4000000 day = @Tk..pe ty Te
05305 Head Man 4000000 diy @ Tk. pe aT
0-370 Labour, Skilled 24000000 day = @Tk..pe YT.
Tk
Tr
Overnead & Est 2.50% Th
item To Tr
Contractor's Prof 10.0047,
Tout
yar
item Gi
PageNo. 1
bshfix — @ePrinted: April 04, 2019
ITEM RATES For Barisal O&M Circle
Year: 2018-19
tem Code Description Unit Meas. Rate (Taka)
90_. Dredging Work
BOO Banc Dredging wor by 20 rege on Trae
90:100.20 Base Dredging work by 20" reget om TGA
90-100-30 Basie Dredging work by TF dredge on 1532
'90:150-10 Extra Rate for bose pp beyond 15 kn: 26° Drea can 1396
"0150-20 Entra Rate Tor booster pnp beyond 15 kn: 20” Drege cum aH
9150-30 Extra Rae fr booster amp beyond 15k 1 Deda ‘ame Toa]
99-20-10 Constaton of 26° Shore Pipe Line on Grou m= a8
90-20020 Consrution of 20 Shore Pipe Line on Ground = ais
30-2000 Consraction of 18” Shae Pipe Line on Grou = 700
W0-200-10 Consaction of 26° Shae pipe ine on aging = Tera
30-2200 Consraction of 207 Shore pipe ine on aging 7 7106.08
90-220:30 Construction of IF Shore pipe ine on aging = 31720}
30-210 Consrustion of Mouring where nesesary eh aaa
‘BORSOTO Ling 26° share pipe sinked ito the mud below the ground evel = T0996
90-250-20 Liing 20 share pip aked to the mud below the ground evel = E710
30-2503 Lifting TW shore pipe snked into the md Blow te ground evel ™ Has
90-2505 Lifliag 12" shore pipe sake av the md Blow te ground eel = 2796
30-270-19 Consntion and dismantling of OUTLET for 26° edger ech asi?
30-27020- Constaction and dismantling of OUTLET fo 20" edger ch ease
90-270:30 Consraction and demantling af OUTLET for 18" edger ech sna
Page No. I+ 1
lsh Oh A. WwITEM RATES For Bhola 0 & M Circle
Year: 2018-19
Printed: April 04, 2019
tem Code Description Unit Meas. Rate (Taka)
90_. Dredging Work
‘O-TOOIO Basi Dreging work by 20" ela oo Ta]
90-100-20 Basie Dredging work by 20" rege am 7624]
30-10030 Base Dredging work by 18" dred am Ts]
30-50-10 Ext Rate for booster pump beyond 13 Ean 26° Dre ame Ta98
0150-20 Extra Rate for booster ump beyond 13 km 20" Dredger vem 15:0]
90-15030 Extra Rae for booster pump Beyond 15am: 1 Dre ‘aren 34]
99-200-10 Constrtion of 26° Shore Pipe Line on Grad = waa
90-20020 Conatation of 2 Shore Pipe ine on Grou = on
0-20030 _ Consration of 19” Shae Pipe Line oa Ground = 807
B0-220-10 Consacton of 267 Shae pipeline on aging 7 Ta
90-2200 Construction of 207 Share pipe ine on Saging = 10860
'90-220:30 Construction of 19 Share pipe ine on aging = 305.05
30-210 Constrution of Mouring where neseery eh 7490
‘BORSO-1O Ling 26 shoe pipe sinked nto the madlbsow the ground evel m 706025}
‘ORST-RO_Liing 20” shoe pipe inked to te mud blow te ground evel ™ a7
‘ORS0-30 Ling 18" shae pipe waked oto de mud below the ground evel ™ saa
‘250-50 Ling 12° shor pipe sak to te ad below the round Ibe = 293
90-270-10 Consriction and dismantling of OUTLET for 26° edger ech T9749
90-27020 Construction and dismantling of OUTLET for20" dredge eh 55602
39-270:30 Constution and damanteling of OUTLET for 16" edger ech Bas
Page No. [+ 1
keshpin On @ITEM RATES For Bogra O&M Circle
Year: 2018-19
Printed: April 04, 2019
Item Code Description Unit Meas. Rate (Taka)
90_. Dredging Work
BO-100-10 Basi Dredging work by 20" oar a Tire
90-100-29 Base Dredging wook by 20" edger am Ta624
90:100:30 Base Dredging work by 18" dredge om 1s327
90:150-10 Ex Rate fo booster pump beyond 15 ne 26° Drs calc 7390)
30-150-20 Entra Rae or bower pnp beyond 1S kn 20” Dredger uv 1507
"0150-30 Extra Rate To booster pp beyond |S kn: 18” Deca ale oat
30-200-10 Constrton af 26° Shore Pipe Lins cn Ground m= WSe01
90-2002 Conarton of 20 Shore Pipe Line on Ground = 6.8
90-2000 Consrution of 18 Shore Pipe Line on Ground = a7
{0-220-10 Consration of 267 Shore pipe Tin oa aging = Tas
0-200 Consracon of 20 Shore pipe ine on staging = 7.0860
90-2003 Conran of 19 Shae pipe ine on aging ™ 303.08
30.210 Consraction of Mouring where neces ech eT
'90:250-10 Lifting 26" shore pipe snkedio the mud below te ground evel = 1.06025
30-2502 Ling 20" shore pie snked it the mad slow te ground level = 277
B0-250330 _Lifing 1 shore pipe sinked tote mad bow the ground evel = sal
‘250-50 Ling 12 shore pipe snkol inio te mudbalow the round ebvel = 2193
‘O-TTUIO Consent sd dismantling of OUTLET for2 dedger exch 97409
90-270-20 Construction and dismantling of OUTLET for 20” deer ach BaGa
'50:270-30 Construction and dismantling of OUTLET for 1 dedger eh TASS 65
Page No. I 1
kafs ye @Printed: April 04, 2019
ITEM RATES For Chandpur O&M Circle
Year: 2018-19
Item Code Deseription Unit Meas.
90_. Dredging Work:
TOI — Base Dodging work 10 Gree am Ta]
90-10020 Base Dredging work by 20" dredge cam THe
90-10030 Bac Dredging work by dredge cam 15327]
90-1500 Ena Rae for boaseypunp beyond 13 kms 26° Dreger came 1399]
90-15020 Ext Rate for booster ump Beyond 15k 20° Dredger com 507]
90-1500 Ext Rate forbooser pump Beyond 15 kn 1 Dredger comm Bal
'30-200-10 Comsration of 26° Share Pipe Line oa Ground = waa
90-2002 Consracion of 207 Shae Pipe Line on Ground = or
90-200;30 Construction of 19” Shore Pipe Line on Ground = 807
30-220-10 Constacton of 26° Shoe pipe ine on waning 7 Ta
30-200-20 Consaction of 2 Shoe pie ine on waging = 7.0860
90-200:30 Consraction of 19 Shae pipe in on aging = 037
90.210 Consraction of Moaring where eeesary ech 67490
90-250-10 Ling 26" share pipe snked ito the mad bow the ground evel = 106028
90-2500 Ling 20" shore pipe inked iv the mud below the ground level ™ a7
BO-250-30 Ling 1 shoe pipe inked to the mad below the ground evel ™ Saal
‘90-250-50 Ling 12" shore pipe inked mo te madbalow the ground ebvel = 293
0-7TU-1O Constantin nd dismantling of OUTLET for26" dodger ea Tara
50:270-20 Construction and dismantling of OUTLET for20" dedger each Bee
‘0270-30 Construction and dismantling of OUTLET for IW" dodger mach TRS
Page No. I- 1Printed: April 04, 2019
ITEM RATES For Chittagong O&M Circle
Year: 2018-19
Item Code Description Unit Meas. Rate (Taka)
90. Dredging Work
90-1010 Basic Dodging wok 720 aredaer oo TH75]
99-10020 Base Dredging work by 20" edger a 725.953
W0-10030 Base Dredging work by 1 dredge cam Ta)
90-150-10 Ex Rae for booster punp beyond 13 ns 26° Drea comin B07)
90-1500 Ext Rate for booster pump beyond 15 kn: 20° Dredger canton 15
90-1500 Ext Rate for booster pump beyond 1-5 kms” Dred oo 13)
'0-200-10 Conston of 26° Shore Pipe Lins oa Ground = wi]
'90-200-29 Consraction of 20° Share Pip Line on Ground = ass
39-200-30 Construction of 1” Shore Pipe Line on Ground = 5.6]
30-220-10 Constution of 6° Shore pipe ne on aging = 7305
‘OIBU-20Consrastion of 30" Shore pipe ne on waging = T0937]
"220-30 Connon of 1” Share pipe Hae on staging m wos
‘0-240 Contraction of Mouring where ne=sary enh Fsa005|
90-250-10 Lifting 26" shore pipe snkeint the mud Blow the ground evel = T55)
90-2500 Lifting 20" sere pipe snked nv he mud Plow the ground level = 65513
30-25030 Ling 1 shore pipe snked int he mad blow te ground level = 35258
‘25050 Ling 12 shore pipe wake int he mad blow the ground bv = 0
‘O-270-10 Consration and dismantling af OUTLET for 26” edger wh Gia5.66
027020 Consraction nd daniel eh Bows
30-27030 Coneretion and diamant ech 3601
fashfin
Page No. [- 1
A @ITEM RATES For Comilla O&M Circle
‘Year: 2018-19
Printed: April 04, 2019
Item Code Description Unit Meas. Rate (Taka)
90_, Dredging Work
30-100-19 Basie Dredging work by 20" rodeo = Trae
30:100-20 Base Dredging work by 20" rela om 14624
90-10030 Basie Dredging work by 18" dre am T3327
90:150-10 Ena Rate fo booster pump beyond 5 ks 20° Drege amie B90]
'90-150-20 Enea Rate To booster pump beyond 15 ka 20” Dredger ‘ae 1507
0-150-30 Ente Rate or booster pump beyond 15 ans 147 Dredger amen 1930]
‘0-200-10 Consronion 0726" Shor Pipe Line on Ground ny Tsar
30-200-20 Construction of 20° Shor Pipe Line on Ground ™ eis
'50-200-30 Construction of 8" Shor Pipe Live on Ground = 5887
0220-10 Construction of26" Shor pipe ne on staging = Ta
50-2200 Consration of 20” Shore pipe Hin on aging = T0860
020030 Consration of 19 Share pipe in on aging = 903.05
30-240 Construction of Moaring where necesary ech ar490
'99:250-10 Ling 26" shoe pipe snkeinf the mud below te ground level 7 7.05025
99-2502 Lifting 20" shore pipe snked into te mud below the ground evel = Ga
90-25030 fing 18" shos pipe snked ito the mud below the ground evel = Sear
30-2505 Ling 12 shore pipe inked into te madbelow the ground ebvel = BIi95
‘0-2 70-10 Consaction and dismantling of OUTLET for 26" dodger wach Bi 9TA09|
90-270-20 Consrastion sd dismantling of OUTLET for 20" dedger each Baee
'90-270.30 Consrustion and dismantling of OUTLET for 1 deder ach Hae
Page No, I 1
keira
WwPrinted: April 04, 2019
ITEM RATES For Cox's Bazar WD Circle
Year: 2018-19
Item Code Description Unit Meas, Rate (Taka)
90_. Dredging Work
30-100-10 Bani Dredging work by 20" roger a Te
90:100-20 Basie Dredging work by 20" rer a 5.95]
30:100:30 Base Dredging work by 1 dredge a= 13334
90:150-10 Extra Rae for booster pump Beyond 1S ks 20° Dredge can 99
90:150:20 Evra Rate or booster pnp Beyond 1-5 ke 20" Dredger oo T56
90-150-30 Ena Rate for booster pump Beyond 15 kane 18” Dror cami 19a
'0-200-10 Consation of 6° Shore Pipe Line on Grom = BEL 10
'90:200-20 Consraction of 0° Shore Pie Line on Ground = eis
'90-200-30 Constantin of Shore Pip Line on Ground = 6]
'90:220-10 Consrustion of 25° Share pipe ne on aging = 7305.8]
90-220-20 Constion of 0° Shore pipe neon aging 7 100937]
‘O-200-30 Consrution of Shore pipe ine on aging = ws
‘0-240 Constrostion of Moaring where neseary ech EEE
'90-250-10 Ling 26° shore pie snked io the mad bow the ground evel = T1055]
'90:250-20 Ling 20" shoe pipe inked ito the mad below the proud Tovel = 6.13
90:250-30 Ling 18 share pip inked othe mad below the ground evel = $a
90:250-50 Ling 17" share pipe inked ino te mabelow the ground ebvel = 09%
30-270-10 Construction and dismantling of OUTLET for 26" edger each Baas
90-270-20 Construction and dismantling of OUTLET for 7 dedger each oes
‘0-3 70-30 Consostion and dismantling of OUTLET for IW” dodger eh 36011
Page No. I- 1
leetfin Oa @
MWITEM RATES For Dhaka O&M Circle
Year: 2018-19
Printed: April 04, 2019
Item Code Description Unit Meas. Rate (Taka)
90_. Dredging Work
90-10010 Dane Dredging work by 20° dredges cam TR
90-10020 Base Dredging work by 20" dredge em ry
9010030 Base Dredging work by 18 dredge cam TS
90-150-10__ Extra Rate for booster pump beyond 15k 26 Dele canien 196
90-15020 Extra Rae for booster pp beyond 15 kn 20" Dredger came Ta
90-1503 Extra Rate fr booster par Beyond 13 ke Dede ‘ame T938]
9020010 Constrction of 26" Shore Pipe Line on Grom = I
90-200-20 Construction of 20° Shore Pipe Line on Ground = Bras
'90:200-30 Constrasion of 9” Shore Pipe Line on Growc = 66
'0:220-10 Conntrostionof26° Shor pipe neon aging m THI
0220-20 Construstion of 30" Shar pipe neon waging = 7.10505]
90-220-30 Construction of 1 Shore pipe Tne on aging = 32017
‘90-240 Construction of Moaring where nceary eh a9.
30-250-10 Ling 26° shore pipe sinked ito te madbcow th rnd evel = T1055)
30-250-20 Ling 20" shore pipe inked io the mud below the ground evel = Cony
90:250:30 Ling 18 shore pie snked ito the mad bow tho ground evel = Ey
30-250-50 Ling 1 shore pipe inked ino te maudbclow the round ebvel = 72098
90-270-10 Consrasiton sd dismantling af OUTLET for26” edger eh Baas
90-270-20 Construction and danantling of OUTLET for 20” dodger wach Bor]
90:270-30 Construction and dismantling of OUTLET fr 19” edger each OTL
Page No, T= 1
vin Oe @ITEM RATES For Fenl O&M Circle
Year: 2018-19
Printed: April 04, 2019
Ttem Code Description Unie Meas. Rate (Taka)
90_. Dredging Work
9010010 — Base Dodging work by 20" drole am Ta]
90-10020 Basic Dredging work by 20° dred am T624
9010030 Base Dredging work by 1 dredge cam 1327]
90-50-10 Ext Rate for booster pup beyond 13K 26 Dale came 3.90)
90-5020 Ext Rate for booster ump beyond 1-3 kn 20" Dredger oo 107)
90-13030 Ext Rae for booster pup Beyond 1am: 1 Drolet came T331
90-200-10 Constration of 26° Shae Pipe Line on Ground = S001
90:200.20 Consraction of 20" Shore Pipe Line on Ground = a8}
30-200-30 Construction of 1° Shore Pipe Line on Ground = 5.57
30-220-10 Construction of 6° Shore pipe neon aging = T5]
‘220-20 Consrstion of 0" Shae pipe Hae on aging = T0860}
‘O-RB0-30 Construction of Share pipe ine on aging = 305.05
90-240 Construction of Moaring where neesry oc a9]
0-250-10 Ling 26° shore pipe snked to the mad blow the round evel = 706025}
'-25020 Lifing 20” shore pipe snked in. The nud blow the ground evel = 97
0-500 Lifting 1 sore pipe sake int he mud blow the ground evel ™ saa
90-2505 Ling 1 shore pipe sake iat the mad blow the ground DVT = TI133|
{0-270-10 Consraiton and dismantling of OUTLET for 26” edger eh S194.
90-2700 Consracion and dmanteling of OUTLET for 20" edger wh “56a?
30-270:30 Construction and dismantling of OUTLET for 19” dredge wh eS
Page No. I 1
malfi. Oke @Printed: April 04, 2019
ITEM RATES For Faridpur O&M Circle
Year: 2018-19
Ttem Code Deseription Unie Meas. Rate (Taka)
90_. Dredging Work
30-100-10 — Basi Dreging work by 20" roles om Tra]
30-100-20 Basie Dregne work by 20" rede ea Taz
'50:100:30 Basie Dredging work by IF dredge ca 1537
'0-150-10 Entra Rate fo booster pup beyond 15 kan 26° Drea came 1390
90-150-20_ Extra Rate To booster pump beyond |S kn: 20° Dredge came 1507
'90:150-30 Ente Rae Tor booster pump beyond 15 km 19” Deedee ame Bar
30:200-10 Construction 0726" Shor Pipe Line on Grow = 5407
9020020 Construction of 20" Shore Pipe Line on Ground 7m or
‘90-200-30 Construction of 1” Shor Pipe Line on Ground ™ S87
‘0-220-10 Connon of26° Shor pipe neon Raging = T3235]
'90:220-20 Constrostion of 20" Shore pipe neon waging = T0860}
'0:220-30 Conatrustion of Shar pipe neon waging = 305.05
90-240 Construction of Moring where neseeary each ara]
0-250-10 Ling 26" share pipe siked to te mad below the ground evel ™ 706025}
‘0-350-20 Ling 20” shore pipe inked tothe mad below the ground evel ™ 297
‘0-250-30 Ling 1” shore pipe inked oto the mad below the ground evel ™ saa
‘0-250-50 Ling 12 shore pipe ike nto te mad below the ground ebvel. = 293
‘0-7T0-10 Construction sd dismantling of OUTLET for26" dodger eat Tara
'50:270-20 Construction and dismantling of OUTLET Yor" dedger eh G6
‘O2T0-30 Construction and dismantling of OUTLET for IW dedger exch TAS.
bach fis
Page No. I- 1
a
WwPrinted: April 04, 2019
ITEM RATES For Jessore O&M Circle
Year: 2018-19
Item Code Description Rate (Taka)
90_. Dredging Work
30-100-10 — Basi Dredging wok by 20" roles aa Ta]
'30-100-20 Basi Dreging work by 20° dredge ea or
'30-100-30 Basie Dredging work by IF dredge ca T3327
90-150-10 Entra Rate fo booster pump beyond 15 kan 26° Drea amie Tar
90-150-20 Extra Rae for booster pump beyond 15 kr 20° Dredge amen 307
"0150-30 Entra Rate Tor booster pump beyond 15 kam 19” Dredge comin 191
'50:200-10 Construction O72 Shor Pipe Line on Grom = W5a01
'30-200-20 Construction of 207 Shor Pipe Line on Ground ™ eis
90-200-30 Construction of 9” Shor Pipe Line on Ground = a7
‘OR20-10 Construction of26" Shor pipe neon Raging = Ts
‘0-220-20 Conatrostion of 20" Shor pipe neon waging = 1.0860]
‘-R20-30 Consrosion of” Shor pipe ne on agin = 903.05
90-240 Construction of Mowrng where nace) exh Tara90
3025010 Lifting 26" shore pipe sake int the mud blow te ground evel ™ 706025}
90-25020 Lifting 0" shore pipe snked ot the mad Wlow the ground evel = eat
30-2500 Lifting 1” shore pipe snked int the mad Blow the growd level = Saal
{30-2500 Lifting 12” shore pipe waked int the md blow the pound abel = 2195)
{0-270-10 Consrition and dismantling of OUTLET for 36° dredger ech T9709
30-27020 Consraction and damanteling of OUTLET for 20" edger eh B62
30-2700 Consracon and dismantling af OUTLET for 15" edger ech Base
Page No. I 1
Jobo & @
vwPrinted: April 04, 2019
ITEM RATES For Khulna O&M Circle
Year: 2018-19
Item Code Description Unie Meas. Rate (Taka)
90_. Dredging Work
9010010 — Base Dodging Wok by 20 deer eam Ta]
90-100:20 Base Dredging work by 20 dredger cam 1624
010030 Base Dredging work by 1 dredge oo 15327]
90:150-10 Ext Rae for booster punp beyond 15 kn 26° Dredg cane BAT
90-1500 Ewa Rate for booster punp Beyond 15 hn: 20" Deeper came 1506)
90-1503 Ext Rate for booster pump beyond 15 kn Dredger came 1932)
'0-200-19 Constion of 6° Shore Pipe Line on Ground = S01
'0-200-20 Consraction of 0° Share Pipe Lins on Ground = enn
90-200-30 Consraction of 5 Shore Pipe Line on Ground = 87
'90:220-10 Construction of 6° Shore pie neon Staging = T3235]
O-220-20 Consrustion of 0" Shore pipe neon waging = 1.08620}
‘O-220-30 Connon of 1” Shore pipe neon aging = 305.03
‘0-240 Conntrostion of Moaring where neesary eh aar499]
‘ASOCIO Ling 26° shore pipe snked to the mad below the round evel a 706025}
90-2500 Lifting 20" shore pipe saked int the mud Blow he ground evel ™ 07
90-25030 Lifting 1” sore pipe snked int the mad low the grownd evel ™ Sai
90-2500 Ling 12” sore pipe snked int he md below the ground bv = 71195]
DDI Consration and dismantling of OUTLET for 26" edger eh T9740
0-27020 Consraction and dmantling af OUTLET for 20" edger each 6a?
90-2703 Consracion and damantling f OUTLET for 1 edger eh TS
Page No. I+ 1
Kechficn Gh @
WwPrinted: April 04, 2019
ITEM RATES For Kushtia O&M Circle
Year: 2018-19
Item Code Description Unit Meas, Rate (Taka)
90_. Dredging Work
30-100-10 Base Dodging work by 2 rege = Te
90-1002 Base Dredging work by 20” dreger ea 162)
0100530 Base Dredging work by 1 aredge eam 15327
0-150-10 Ents Rate for booster pnp beyond 1S ean 3° Dreger comin T
90-1500 Extra Rate for booster pup Beyond 1S kn 20° Dredger cane T307
90:150:30 Ex Rate for booster punp Beyond 15 kms 16” Dredger canln T93t
0-200-19 Constrastion of 6° Shore Pie Line on Ground = wir
'0-200-20 Consration of 0° Shore Pie Line on Ground 7 sins
'90-200-30 Consration of IF Shore Pipe Line on Ground = 57
‘0220-10 Constrution of 26° Share pipe ine on Saging = THaa5]
'90:220-20 Consus of 20" Shore pipe ne on staging = T.o6a0]
‘9-220-30 Constion of I Shore pipe ine on Raging = 305.05
0-240 Construstion of Moaring where neesary each 7490]
‘O-2S0-1O Ling 26° shore pipe inked ito the md blow the round evel ™ 7060.25}
90:250-20 Ling 20" share pipe inked tothe mad below the ground evel = eaa7
50:250-30 Ling 19" shae pip ked to the mud below the ground evel = Steal
'90-250-50 Ling 12" shore pipe sake nto te mad below the round Ibe = 2195]
30-27-10 Consttion and dismantling of OUTLET for 36° dredger ah TpTa
90-27020 Consration and dmanteling of OUTLET for 20" edger eh 6a
90-2700 Consrution and dsmanieling of OUTLET for 1 dedger eh aS
kas
Page No. I- 1
yr aPrinted: April 04, 2019
ITEM RATES For Moulvibazar O&M Circle
Year: 2018-19
Item Code Description Unit Meas, Rate (Taka)
90_. Dredging Work
DO-T00T0 Base Dredging wor by 20 eer cam Tae
90-100.29 Bane Dredging woek by 20" reer am 1620
90-100:30 Bane Dredging work by 1 reg a Ts
90-150-10 Ents Rate for booster pump beyond 13 ns 26° Dredg ane 9r
30: 150-20 Ente Rae for booster pnp beyond 15 kn 20" Dredg came TS.08
BO 1S0-30 Entra Rate Tor oowe pup beyond 5 kn: 18” Deed came 13
‘0-20-10 Construction of26" Shor Pipe Linc on Grom = Teor
90-200-20 Construction of 0° Shore Pipe Line on Gros m= ens
OR00-30 Construction of 9” Shore Pipe Line on Ground 7 a7
‘O-RRE-IDConstrastion 0726" Shar pipe ne on staging = Ta
90-220.20 Conaracon of 20” Shoe pipeline ov aging = T0860
90-220:30 Corsten of 18 Shoe pie ine on aging = 905.05
30210 Construction of Mouring whe necessary wah Ter490
30-250-10 Ling 26" shore pipe snked into the mad bcow the round evel 7 706025
'0-250-20 Liing 20" hore pipe inked tothe mudbsiow the ground evel 7 ‘Gam7
ORSU-30 Ling 1 share pipe inked vote mud below the ground level = se
‘0-250-50_Lifing 1?" share pipe Snked into te madbelow the ground ebvel = 21195]
‘O-IT0-10 Construction and dismantling of OUTLET for26" dredge each Tigra
30-27-30 Conatraton and iamanteling of OUTLET for 20° edge eh Bea
30-2700 Consration and dmanteling of OUTLET for 1 edger ach Hae
Page No. I- 1
klix Ola
uvPrinted: April 04, 2019
ITEM RATES For Mymensingh O&M Circle
Year: 2018-19
Item Code Deseription Unit Meas. Rate (Taka)
90_. Dredging Work
30-100-10 Bane Dredging work by 20 rege = Tire
90-1002 Base Dredging work by 20" dredge oo Tas
90-100-30 Basie Dredging work by 18 dre om T3327
90-150-10 Ents Rate for booster pump beyond 15 es 20° Deeg ‘am 1397
'90:150-20 Extra Rat To booster pump beyond 15k 20" Dredge ame 5.08]
O-150-30 Entra Rane or booster pump beyond 15 kan: 197 Deed am 32
90-200-10 Consretion af 26° Shoe Pipe Line on Ground ™ 535
90-20020 Consraction of 207 Shoe Pipe Line on Ground = 61339
90-20030 Construction of 18 Shoe Pipe ine on Ground 7 oa
30-220-19 Consaction 026° Shoe pipe Tine on aging = Ta
W9-22020 Construction of 207 Share pipe ine on aging = 7.0860
WO-220-30 Construction of 1 Shae pipe in on aging = 50305
WOO Construction of Mouring where nesesary aah a0
90-250-10 Ling 26" shove pie sinked if te ud blow the ground evel = 7.06025}
30-250-20 Ling 2” shore pipe inked ito the mad below the ground evel = 297
90:250-30 Lifting 1 shore pip sked oto te mad below the ground evel m Seal
90-2500 Lifting 12” shore pipe snk avo he mud below te ground bv) = TI135|
BD-RTIO Constation and dimsntling of OUTLET for 26° edger wach Bwr9s
0-27020 Consraction and Umaniling af OUTLET for 20" dedper ech 3027
2730 Consracuon and damanling of OUTLET for 18" dedger ech BESTS
Page No. I 1
keifix he @Printed: April 04, 2019
ITEM RATES For Pabna O & M Circle
Year: 2018-19
tem Code Description Unit Meas. Rate (Taka)
90. Dredging Work
30-100-10__ Basi Dredging work by 20" reac oo Ta]
90-100-20 Basie Dredging work by 20 dredge ea Tea
‘O-100-30 Basi Dredging work by IF" edge eam 15327]
0-50-10 Ext Rate for booster pump beyond 1S km 26 Dredger ame 7399]
0-15020 Extra Rae for booster pump beyond 15 kn: 20" Dredger ae 1307
90-1500 Ewa Rae for boosie pump Beyond 15 kn 1 Drdeer ‘aren Tat
70-200-19 Consttion of 26° Shoe Pipe Line on Gro = B01
90-20020 Consration of 29" Shoe Pipe Line on Ground = cr
0-200: Consraction of 19 Shoe Pipe Line oa Ground = a7
0-220-10 Consacon of 26° Shae pipe in on aging = Ta
90-2200” Consracion 0207 Shore pipeline on saging 7 Tone
90-220:30 Construction of 1 Shore pie ine on aging = 30805
O20 Constrastion of Mouring where nesesry eh 6490
‘BOASU-TO Ling 26” shoe pipe sinked ito te mudbsow the round evel = 706028
‘0-250-20 _Liing 20" shore pipe inked to te mad below the ground evel m ai
90:250-30 Ling 18" share pipe siaked tote mad blow the ground level m aa
'90-250-50 Lifting 12" share pipe inked no te mud below the round evel ™ 293
'50:270-10 Consuuction and dismantling of OUTLET for 26" dedger exh TroT409
30-27020 Constaction and domanteling of OUTLET for 20° edger wh $060]
BD-27030 — Consniction and dmanteling of OUTLET for IS edger ech Has
Page No. I 1
kshis Ok @
VvPrinted: April 04, 2019
ITEM RATES For Patuakhali WD Circle
Year: 2018-19
tem Code Description Unit Meas. Rate (Taka)
90_. Dredging Work
BO-1001O Basi Dredging work by 26" algo = Tire
90-100-20_ Basie Dredging work by 20" dre am Ta624
90-100-30 Basie Dredging work by 18 dre am 13327
90-150-10 Ente Rate for booster pump beyond 15 ks 26° Decor comin 95]
0: 150-20 Ena Re or booster pp beyond 15 kan 20” Deca came 1509
‘OIS0-30 Entra Rite or bower pump beyond 1S kan: 18” Deed uv 1935]
‘o-200-10 Construction of 26" Shor Pipe Lin on Ground m Teor
90-200-20 Conatrton of 20° Shore Pipe Line on Growme ™ cas
90-2003 Construction of 18 Shore Pipe ine on Ground = 887
0-20-10 Consration of 26° Shore pipeline on aging = T3235]
22020 Consration of 27 Shore pipe in on sasing = T0860
O-20030 Conran of 19 Shae pipe ine on aging = oa
70-240 Consraction of Mouring where necenary eh TaT490
B0-250-10 Ling 26" shore pipe snked int the mad slow te ground evel = 1060258
30-2500 Ling 20" hore pie snked into the mad sow the ground level = 297
0250-30 Ling 1 shore pipe winked tothe mud below te ground evel = SaxaT
90-250-50 Ling 12" shoe pipe sikel ino de mud below the ground ebve = 2193
30-270-10 Consracion and dismantling of OUTLET for2" edger each i974.
50:270-20 Construction and Gisnantling of OUTLET for 20" deter each Bae
'0:270-30 _Construstion ad dismantling of OUTLET for 1 edger ech Hae
Page No. I 1
Keshix Bu. aITEM RATES For Rajsha
Year: 2018-19
Printed: April 04, 2019
&M Circle
Ttem Code Description Rate (Taka)
90 _. Dredging Work
90-100-10__ Basic Dredging work by 20" reduc a Ta]
90-10020 Base Dredging work by 20 arty ca THe
9010030 Base Dredging wok by 1 dredger cam sis
0-50-10 Ext Rate for booster pnp beyond 13 kn 26° Dreger cant Ba
90-1500 Ewa Rate for booster punp beyond 13 kn: 20" Dredger cam Tha
90-1503 Ewa Rate for booster pump beyond 15 ns 1 Dredger comin TRL
30-200-19 Constation of 26° Shore Pipe Line on Ground = ans
39-200-20 Consration of 0° Shore Pipe Line oa Ground = Sea
90-200-30 Consraction of 1 Share Pipe Line on Ground ny Bsa
90-220-10 Construction of 6° Share pipe ine on Saging = T0024
'90:220-20 Constutin of 07 Shore pipe ine on aging ™ 7829
90-220-30 Consvtion of IF Shore pipe neon waging = wos
BORO Constrostion of Moaring where necamary ea TK
‘O-RSO-TO Ling 26° shore pipe inked to the md blow the ground evel ny oT
‘9250-20 Ling 20” hare pipe Haked to te mud below te ground evel 7 Io
90:250-30 Ling 18" ahare pipe slaked to te mud below the ground evel ™ Base
90-250-50 Ling 12" shore pipe sake ino the mad below the ground Iebve = 19a
30-27-10 Consniction and dismantling of OUTLET for 26" edger ech pa6
90-27020 Consniction and dismantling of OUTLET Yor 20" edger eh oo.
30-27030 — Consration and dmsntling af OUTLET for 18 edger ech Bano
Page No. 1
leshfin Ge ®
M/ITEM RATES For Sylhet O&M Circle
Year: 2018-19
Printed: April 04, 2019
Tem Code Description Unit Meas, Rate (Taka)
90. Dredging Work
30-1010 Base Dodging work by 20 edger am Tra
99-10020" Bane Dredging work by 20" edger am Tao
9010030 Base Dein work by 1 Wredger eam Tsar
30-150-10 Ext Rate for booster pump Beyond 13 ks 30° Dredpr come iy
90-150-20. Ext Rate for booster pump Beyond 15 kn 20" Dredger cane Ts
90:150:30 Extn Rae for booster pump Beyond 1-5 ns 18” Drea cunt 1937
90-200-10 Construction of 6° Shore Pipe Line oa Grom = TIO
30-200-20 Construction of 0" Shore Pipe Line on Ground 7 iss
'9-200-30 Construction of 1” Shore Pipe Line on Ground 7 TG
'O-220-10 Constacton of 26° Shore pipe ine on aging = T3Ga1
90-220-20 Consraction of 2 Shae pipe ne on aging = T0565]
'90:220:30 Consrucion of TH Share pipe ine on aging a 320.17
30-210 Construction of Mouring where nsesary each Tai.
‘9250-10 Ling 26 shore pie inked to the mad below the round evel m= 7.105)
‘9350-20 Ling 20" shore pipe inked to the mad below the ground evel m= C3
‘250-30 Ling 18" shoe pipe Hed ato the mad below the ground evel = 35254
9250-50 Liting 1 shore pipe sake inv he wud below te ground eel = 09%
30.70.10 Censrtion and dismantling of OUTLET for 26 edger eh Baa5.56
90.27020 Censtracton and dmanteling of OUTLET for 20" edger eh wows
BO-27030 Construction and damanteling of OUTLET for 1 Gedger ech Boor
faslfix
Page No. I+ 1
Oe @ VYPrinted: April 04, 2019
ITEM RATES For Rangpur O&M Circle
Year: 2018-19
Item Code Description Unit Meas, Rate (Taka)
90_. Dredging Work
90-100-10 — Basie Dredging work by 20" rsler = Tras]
0100-20 Base Dredging work by 20" dredge om 4624
30-100:30 Basie Dredging work by 19 area cam isa?
90:150-10 Exes Rate fo booster pup Beyond TS kn 2 comin 191
90:150-20 Extra Rat To bower pp beyond 15 kms 207 come TS.
30: 150-30 Ente Rae for booster pump beyond 1-5 kas 19” Deed cue 132
'90-200-19 Consretion of 6° Shor Pipe Line on Gros m= aso
'90:200.29 Consracion of 0° Shore Pipe Line on Ground 7 eis
9020030 Construction of Shor Pipe Line on Ground = a7
0-220-10 Construction of 6° Shor pipe ne on Raging = Ts
‘0-230-20 Connon of 0° Shor pipe neon waging = T0860)
90220-30 Construction of "Shor pipe Tne on aging = 905.03
‘90-240 Contraction of Moaring where neesary each Tara90
‘9250-10 iting 26° share pipe kd to te ma below the round evel ™ 1.06025;
99-25020 Lifting 20" shore pipe sake nt the mud Blow the ground evel = 297
90-2500 Lifing sore pipe snked nt the mad low the ground evel = Saal
9-250-50 Lifing 12” shore pipe sake iat he md blow the ground ebveT = EE)
{0-270-10_ Consrton and dismantling of OUTLET for 26° edger wh T9740
90-27020 Consraton and dmsntling of OUTLET for 20" cede ech Been
{90.2700 Conaracon and dismantling of OUTLET for 15" edger ech BS
eC
Page No. I 1Printed: April 04, 2019
ITEM RATES For Thakurgaon O&M Circle
Year: 2018-19
Item Code Description Unit Meas, Rate (Taka)
90. Dredging Work
PO-T0010 — Base Dodging wok Wy 20 deter am Tam
100-20 Base Dredging work by 20 aredger eam TG
30-1000 Bane relying work by TF dredge ca 157
90-150610 Eats Rate fr booster pump Beyond 13s 96° Dre cane 190
0-15020 Ext Rae forbooser pump Beyond 15 kn 20" Dreger comin 15.06
90-13030_ Ewa Rate for booser pump Beyond 15 kn: 1 Dreger comin Ta
0-200-10 Consrtion of 26° Shae Pipe Line oa Ground = asso
90-2002 Consraction of 20° Shae Pipe Line on Ground = anne
90-200330 Consracion of 1 Shore Pipe Line on Ground = ase
30-200-10 Consraction of 6° Shore pie Tine on aging = T3235]
'0-200-20_ Consacton of 20" Shore pipe ine on waging = 7.0860}
90-200-30 Consration of TF Shae pipe neon aging = 303.05
90-240 Consraction of Moaring where nesesary eh ara90|
30:250-10 Laing 26" shoe pipe sinked to te mud below the ground evel = 106025
90-250-20 Ling 20" shoe pip sinkedinto the mud below the ground level ™ e297
BORSU-O Ling 18" shore pipe inked to the mad below tho ground evel ™ Saal
‘0-250-50__Liing 12 shore pp inkl nto te mad below the ground Iebve = 7195]
‘O-FTU-10 Constostion and dismantling of OUTLET for 25" dedger ech G1974.09
‘0:770-20_Constrostion and dismantling of OUTLET for 20" cede ech B60
‘90:370-30 _Construstion and dismantling of OUTLET for 18" oedger ech TAS
Page No. I- 1
kishfia Bde a
WV