You are on page 1of 1
IL IME TABULATED VALUES ARE BASED ON THE FOLLOWING ALLOWABLE: ‘A TENSION. 19000 PSION TENSILE AREA OF BOLT 1b SHEAR » 10,00 PSION TENSILE AREA OF BOLT 6, PLATE BENDING -7.000 PS. PENGRETE COMPRESSIVE STRENGTH -000PSIAT 28 DAYS. sion b0.Ts SUBJECTED TO COMBNED SHEAR AND TENSION ss sATEY THE FOLONANG ACTUALSHEARSTRESS ACTUAL TENSIONSTRESS. TLOWAGLESHEAR STRESS " ALLOWABLE TENSION STRESS 4. ANCHOR BOLTS FOR CONERESSORS, SEVERELY VARATING OR PULSATING ECVE TAEN IY PRESSURE NO ene RIBENT CONDIIGNS ARE SELOW-20 DEO F WAV REQURE SPECI TTEEION ren on SPEiFcATION,eMSEDNENT DESGN INSTALLATION TECINGUE,TEMTENNG PROCEDURE. ETC. 4. rox aNGHOR 80175 SUALLERTHEN2" IN DAVETER, TYPE 190178 SHOADNORWALLY BE 1D cn BOLTS TIN DMNETEROR ARGER, NE 90LTS SHOULD BE USEDUNLESS MTG COR sone OF THE CONCRETE PREVENT THE USE OF THESE BOLTS. «cyst one nu ON ANCHOR BOLTS FOR HORIZONTAL VESSELS, COLIMNS ANO)NOR EOUPMENT «use TWO NTS ON ANCHOR BOLTS FOR TOWERS, RECEROOATING Pues Cowrneocone 8 A See nT USE TWO HUTSON SUDING END OF HORTENTAL SHEL AND TURE SASS We SIMILAR APPUCATIONS WNGRE SLOTTED HOLES ARE PROVIDE ee eMENT: HAND TIGHTEN FAST NUT, JAM SECURELY WITH SECOND NUT «. vse onaur sezves N FOUNDATIONS SUPPORTING TOWERS AND OTHER VERTION VESSELS THING aSce AND ALL OTHERNACHNERT WITH CAST BASES CR BED PLATES. 1. FonTHE SPEGAL CASE OF ANARROW PEROR PEDESTAL SUBLECT TOUPUFT FORCES, TST re reer arbi Be PROMDED THROUGH THE POTENTIAL CRAG ANEMBEDNENT SNS are ETAL GRACK SUFFICIENT TO REST THE TENSION LOMO PRODUCED BY THE UPLFT a. sieanaeneoncent sta BE PROVIDED F MMM STANCE TOEDGEISLESS THEN TAT SPECIFIED IN’SHEAR" COLUMN 5 saNMUNA ZDGE OISTANCE AS SHOWNIN TABLE 1, REPRESENTS MINIM ee ERIM OF AVCHORDOLTS APROPRATE AENFORCEUENT SHALL BEPROVEEDFOR EDGE DISTANCE LESS THAN THE VALUEIN TABLE CIVIUSTRUCTUAL STANDARD DRAWING. ANCHOR BOLT SCHEDULE DESIGN NOTES 10 CITGO Petrolum Corporation STRESSES! 0 TO ALLOW FOR THERMAL {a(DISTANCE FROM FACE OF

You might also like