S. No.

Item Bidder’s Response


1 Name of Bidder entity CE Info Systems Private Limited
2 Assignment Name End to end Navigation solution
with application, data licensing and
live traffic
3 Name of Client Ford India Private Limited 
4 Name of the entity engaged in the CE Info Systems Private Limited
Assignment
5 Country India
6 Contact Details Name: Lin, Jonathan
(Contact Name, Address, Telephone Address: Ford India Pvt. Ltd.
Number) New Survey No. 6, (Old Survey
No. 1),
Village North Kotpura, Taluka
Sanand, Sanand Gujarat, 382170
Mobile No.:
E-mail- jlin52@ford.com
7 Approximate Value of the Contract INR 60,00,00,000/-
8 Duration of Assignment (months) Months
9 Award Date (month/year) 25th November 2016
10 Completion Date (month/year) Ongoing project
11 Narrative description of the project Navigation solution to calculate
optimal routes and estimated travel
time basis traffic congestion and
detailed road network with various
navigation attributes like direction
of traffic, average speed, divider,
form of way.. etc, rail network,
crossings for optimum route
calculation between 2 or more
points considering various
constraints.

The solution offered as OE line fit,


provides turn-by-turn navigation,
voice guidance to the users.

Availability of over 2 Crore


geocoded addresses to support,
destination input at building level
across the country. Over all base
maps for cartographic visualization
with 2D/3D structures.
12 Details of Work that defines the scope 1. Projects of similar nature in
relevant to the requirement India/ delivered from India
in last 5 financial years (FY
2015-16 to FY 2019-20)
including Software
Application design,
development &
maintenance, data centre
operations, operations &
maintenance, managed
services, Data Licensing,
Integration of data
validation, standardization
and geocoding for at least
50 lakh
addresses/Implementation
and maintenance of
Services platform for
Telematics in
Transportation & Logistics
segments for large fleet
- Project of value of INR
20 Cr or more

13 Documentary Evidence attached LOA and milestone completion