You are on page 1of 3

SHRAM SUVIDHA / म सुवधा

Ministry of Labour & Employment / म एवं रोजगार मंालय


Government of India / भारत सरकार
Common Annual Return under Mines Act, 1952

Acknowledgement No. : 181000031257 Date of Return : 04-02-2019

(A) General Information Details

Establishment Details

Name of Establishment & Address: Babarbal Pink Marble Mines (ML no 68/93) , near village babarmal , tehsil sarada, , Udaipur , Rajasthan -

Labour Identification Number : 1-8239-8968-1

Longitude : Lattitude :

Date of Opening : 31-01-2014 Mine Code : 1823989681

Company name/ Owner name : Jabbar Singh Type of Organization : Others

Name of Mineral : Type of Mineral : Metal

Date of closing : Date of reopening (if any) :

Type of Mine : Degree of Gassiness : Data Source: Online

Mine Subtype: Type of Ownership :

Fax No : Post Office Name :

Nearest Railway Station : Police Station :

Employer/Owner Details

Name: Jabbar Singh

Address: 200, A-Block , Chitrakoot Nagar, Bhuwana , Udaipur , Rajasthan - 313001

Longitude : Lattitude :

Post office name :

Contact Type Contact Value

Mobile 9414166140

E-Mail vikramsinghkhichi@icloud.com

Manager/Person/Agent details, responsible for supervisor and control of establishment

Name : Nil

Address : Nil , , Nil , Udaipur , Rajasthan - 313001

Longitude : Lattitude :

Post office name :

Contact Type Contact Value

Agent Details (if Any) as defined in section 2(c) of Mine Act 1952

Name : NA

Address : NA , , NA , Udaipur , Rajasthan - 313001

Longitude : Lattitude :

Post office name :

Contact Type Contact Value

Contractor Details (if Any)

Name :

Address : ,,,,-

Longitude : Lattitude :

Post office name :

Contact Type Contact Value

(B) Employment Details

Statutory personnel employed in the mine

Designation No. of Required No. of Available Shortage/Surplus

1 0 -1

1 1 0

No. of Contractors engaged


:

No. of persons employed on roll in the mine

Departmental Contractual Total (Departmental + Contractual)


Classification
Male Female Transgender Total Male Female Transgender Total Male Female Transgender Total

8 0 0 8 0 0 0 0 8 0 0 8

2 0 0 2 0 0 0 0 2 0 0 2

Maximum no. of persons including contractual employees employed on any one day during the year, 2018

Category Specify Day Specify No. of Persons

In Working below ground

In the mine(Below + Aboveground + Opencast) 10

In on-shore

In off-shore

Details of mandays worked and average employment

Departmental Contractual Total

Classification Total mandays worked Avg Daily No. of persons Employed Total mandays worked Avg Daily No. of persons Employed Total (Departmental + Contractual) Mandays worked Avg Daily Employment (Departmental + Contractual)

Male Female Transgender Total Male Female Transgender Total Male Female Transgender Total Male Female Transgender Total Male Female Transgender Total Male Female Transgender Total

1600 0 0 1600 8.00 0.00 0.00 0 0 0 0 0 0.00 0.00 0.00 0 1600 0 0 1600 8.00 0.00 0.00 8.00

400 0 0 400 2.00 0.00 0.00 0 0 0 0 0 0.00 0.00 0.00 0 400 0 0 400 2.00 0.00 0.00 2.00

No. of days worked : 200 No. of shift worked : 1

No. of working shifts in a day : 1

(C) Details Under CMR

Coal Raised ETC. (for all coal mines)

Coal raised during the year, 2018 Closing


stock on
Belowground 31st
Opening December,
Mineral
stock on Bord & Pillar method Method other than Bord & Pillar: Mechanisation Total of 2018 [Diff.
1st Sub Total (3 From Sub Total columns of column Value of
Manual
January, Splitting as final Fully Mechanised (Long wall, Short Semi Mechanised (Other than Longwall, To 7) Other of 11 + (2) and Coal Internal (15) - Output (In
Dev Depillar Dev Extraction
2018 Operation wall and Continuous Miner) Shortwall and Continuous Miner) Open cast Source 12 + 13 (14) Dispatched Consumption (16+17)] Rupees)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19)

Details of Machinery

Belowground Mine

Winding Engine Coal


Material Loading Mechanical Ventilator Mechanical Ventilator Coal Handling Paint Winding Engine (Installed
(Installed Other Transport Cutting / Ripping / Drilling Machine Compressor Conveyor Pumping Other Machinery Total
Transport Machine (Installed Belowground) (Installed Aboveground) (Installed Aboveground) Aboveground)
Belowground) Shearing

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP

Opencast Mine

Coal
Material Transport Other Transport Drilling Machine Loading Machine Compressor Conveyor Pumping Coal Dressing Plant (Installed Aboveground) Other Machinery Total
Cutting / Ripping / Shearing

1 2 3 4 5 6 7 8 9 10 11

No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP

Material Handled (for opencast coal mines only)

Coal raised during the year, 2018 [column (7) of above converted in cubic metre Stone, debris etc. handled during the year, 2018 (cubic metre) Total material handled during the calendar year, 2018 (cubic metre) [col. (1) + (2)]

(1) (2) (3)


(D) Details Under MMR

Material Handled (for opencast coal mines only)

Opening stock on 1st January, 2018 Output of the Mineral during the year, 2018 Despatches Closing stock on 31st December, 2018 Metal Extracted if any
Value of Mineral
Run-off Mine (ROM)
Name of Mineral Run-off Mine (ROM) [col. 2+4+5- produced
Processed Mineral Run-off Mine (ROM) Processed Mineral Run-off Mine (ROM) Processed Mineral Processed Mineral [col. 3+6-8] Name Quality Unit Value
7]
Raised Below Ground Open Cast Total

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16)

2334.42 10400 10400 10140.37 10400 2594 Tonnes

Material Handled (for opencast coal mines only)

ROM raised during the year, 2018 [column (5) of above converted in cubic metre Stone, debris etc. handled during the year, 2018 (cubic metre) Total material handled during the calendar year, 2018 (cubic metre) [col. (1) + (2)]

(1) (2) (3)

3851 3851

Details of Machinery

Belowground Mine

Winding Engine Mineral


Material Loading Mechanical Ventilator Mechanical Ventilator Coal Handling Paint Winding Engine (Installed
(Installed Other Transport Cutting / Ripping / Drilling Machine Compressor Conveyor Pumping Other Machinery Total
Transport Machine (Installed Belowground) (Installed Aboveground) (Installed Aboveground) Aboveground)
Belowground) Shearing

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP

Opencast Mine

Mineral
Material Transport Other Transport Drilling Machine Loading Machine Compressor Conveyor Pumping Mineral Dressing Plant (Installed Aboveground) Other Machinery Total
Cutting / Ripping / Shearing

1 2 3 4 5 6 7 8 9 10 11

No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP

3 100 1 60 1 148 1 60 1 45 7 413

(E) Details Under OMR

Details of Production

Despatches
Closing stock as on 31st december,
Opening stock as on 1st January, For house 2018
Type of Product 2018 Production Value (in Rs.) To refinery To market consumption [ col. (3+4)-(6+7+8) ]

(1) (2) (3) (4) (5) (6) (7) (8)

Oil (in metric Tonnes)


3
Gas (in M )

Drilling and other Rigs, oil well and gas well and pipelines (for all mines)

Item No. Classification Type of Rig Total No. of units in use

(1) (2) (3) (4)

1 Drilling, workover and other rigs

1.1 Drilling

1.2 Workover

1.3 Other Rigs

2 Oils, gas and other wells

b.1 Wells drilled

b.2 Wells abandoned

b.3 Gas wells completed

b.4 Oils wells completed

b.5 Gas wells on production

b.6 Oils wells on production

b.7 Water injection wells in use

b.8 Oils wells where production discontinued

b.9 Gas wells where production discontinued

b.10 Water Injection wells which are discontinued

3 Pipelines Length in meters Diameter in meters

3.1 Flowlines laid from wells to gathering station

3.2 Pipelines laid from gathering station to central storage tanks

3.3

Details of Exploration Rings

Sr. No. Name of the drilling rig Date of commissioning Number of wells drilled during the year Total meters drilled since its commissioning

Workover Rings

Sr. No. Name of the drilling rig Date of commissioning Description of work done during the year

Aggregate Horse-Power of Machinery and Equipment used/installed in the Mine

Pump Compressor Material handling equipment Assembly Draw-work Derrick Others Total
Place Prime mover Prime mover Prime mover Prime mover Prime mover Prime mover Prime mover
HP HP HP HP HP HP HP HP
(Elec./Fuel) (Elec./Fuel) (Elec./Fuel) (Elec./Fuel) (Elec./Fuel) (Elec./Fuel) (Elec./Fuel)

On-Shore 0 0 0 0 0 0 0

Off-Shore 0 0 0 0 0 0 0

Details of modifications/changes made during this year on Installations

Sr. No. Name of the Installation Location Particulars of modifications/changes done Reasons for the modifications/changes Whether modifications/changes are incorporated in SMP(Safety Management Plant) & EP (Emergency Plan) to this effect

Laying Details

Sr. No. Designation of the pipeline Type of fluids Pressure rating Length (in meters) Avaibility of surface plan(Yes/No) Whether risk assessment has been prepared(Yes/No) Whether fit for purpose (Yes/No)
(1) (2) (3) (4) (5) (6) (7)
Details of health monitoring of the pipelines carried out during the year

Sr. No. Designation of the pipeline Thickness inspection Visual inspection Cathodic protection Intelligent pigging Periodic pigging Corrosion probes Scale probes
(1) (2) (3) (4) (5) (6) (7) (8)
Quantity of waste water
produced

Quantity of waste water


treated

No. of emergency mock


drills carried out

(F) Equipment Info

Aggregate Horse-Power of Machinery and Equipment used/installed in the Mine

Place Electrical operated machinery(HP) Oil/Natural gas/steam/any other(HP) Compressed air(HP) Total

205 148 60 413

Total 205 148 60 413

Whether explosive(s) used


No
in the mine?

Voltage(s) at which electricity is used)

Lighting

Sr. No. Voltage Installed Capacity (HP)

1 0 350

Machinary (Give voltage wise)

Sr. No. Voltage Installed Capacity (HP)

Power Prime Mover (Give voltage wise)

Sr. No. Voltage Installed Capacity (HP)

Occupational diseases

No. of cases
Sr. No. Disease Name
Departmental Contractual
(G) Accidents Statistics

Accidents Statistics (during the three years)

Fatal Accident Serious Accident Reportable Accident Minor Accident

Type Number No. of person(s) killed No. of person(s) seriously injured Number No. of person(s) seriously injured Number No. of person(s) seriously injured Number No. of person(s) seriously injured

0 0 0 0 0 0 0 0 0

Initial/periodical medical examination (IME/PME) conducted during the year, 2018 [Rules 29B and 29P(1) of the Mines Rules, 1955]

Number of Persons Employed Number of Persons Required to Undergo IME Number of Persons Required to Undergo PME Number of Persons Undergone PME Number of Persons Declared Medically Unfit Number of Cases of Occupational Diseases Detected

Departmental Contractual Departmental Contractual Departmental Contractual Departmental Contractual Departmental Contractual Departmental Contractual

10 0 0 0 2 0 2 0 0 0 0 0

Appointment of Workmen's Inspectors [Rule 29Q of the Mine Act, 1995

Number of workmen's inspectors required : 0 Number of workmen's inspectors provided: 0

Number of safety committee meeting conducted during the year, 2018 (Rule 29V of the Mine Act, 1955): 2

(H) Vocational Training

Vocational Training (Mines Vocational Training Rules, 1966)

Number of persons required to undergo vocational training Number of persons actually undergone vocational training

Departmental Contractual Departmental Contractual

Basic Vocational Training (under rule 6)

0 0 0 0

Refresher Training (under rule 8)

0 0 0 0