Professional Documents
Culture Documents
Establishment Details
Name of Establishment & Address: Babarbal Pink Marble Mines (ML no 68/93) , near village babarmal , tehsil sarada, , Udaipur , Rajasthan -
Longitude : Lattitude :
Employer/Owner Details
Longitude : Lattitude :
Mobile 9414166140
E-Mail vikramsinghkhichi@icloud.com
Name : Nil
Longitude : Lattitude :
Agent Details (if Any) as defined in section 2(c) of Mine Act 1952
Name : NA
Longitude : Lattitude :
Name :
Address : ,,,,-
Longitude : Lattitude :
1 0 -1
1 1 0
8 0 0 8 0 0 0 0 8 0 0 8
2 0 0 2 0 0 0 0 2 0 0 2
Maximum no. of persons including contractual employees employed on any one day during the year, 2018
In on-shore
In off-shore
Classification Total mandays worked Avg Daily No. of persons Employed Total mandays worked Avg Daily No. of persons Employed Total (Departmental + Contractual) Mandays worked Avg Daily Employment (Departmental + Contractual)
Male Female Transgender Total Male Female Transgender Total Male Female Transgender Total Male Female Transgender Total Male Female Transgender Total Male Female Transgender Total
1600 0 0 1600 8.00 0.00 0.00 0 0 0 0 0 0.00 0.00 0.00 0 1600 0 0 1600 8.00 0.00 0.00 8.00
400 0 0 400 2.00 0.00 0.00 0 0 0 0 0 0.00 0.00 0.00 0 400 0 0 400 2.00 0.00 0.00 2.00
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19)
Details of Machinery
Belowground Mine
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP
Opencast Mine
Coal
Material Transport Other Transport Drilling Machine Loading Machine Compressor Conveyor Pumping Coal Dressing Plant (Installed Aboveground) Other Machinery Total
Cutting / Ripping / Shearing
1 2 3 4 5 6 7 8 9 10 11
No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP
Coal raised during the year, 2018 [column (7) of above converted in cubic metre Stone, debris etc. handled during the year, 2018 (cubic metre) Total material handled during the calendar year, 2018 (cubic metre) [col. (1) + (2)]
Opening stock on 1st January, 2018 Output of the Mineral during the year, 2018 Despatches Closing stock on 31st December, 2018 Metal Extracted if any
Value of Mineral
Run-off Mine (ROM)
Name of Mineral Run-off Mine (ROM) [col. 2+4+5- produced
Processed Mineral Run-off Mine (ROM) Processed Mineral Run-off Mine (ROM) Processed Mineral Processed Mineral [col. 3+6-8] Name Quality Unit Value
7]
Raised Below Ground Open Cast Total
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16)
ROM raised during the year, 2018 [column (5) of above converted in cubic metre Stone, debris etc. handled during the year, 2018 (cubic metre) Total material handled during the calendar year, 2018 (cubic metre) [col. (1) + (2)]
3851 3851
Details of Machinery
Belowground Mine
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP
Opencast Mine
Mineral
Material Transport Other Transport Drilling Machine Loading Machine Compressor Conveyor Pumping Mineral Dressing Plant (Installed Aboveground) Other Machinery Total
Cutting / Ripping / Shearing
1 2 3 4 5 6 7 8 9 10 11
No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP No. HP
Details of Production
Despatches
Closing stock as on 31st december,
Opening stock as on 1st January, For house 2018
Type of Product 2018 Production Value (in Rs.) To refinery To market consumption [ col. (3+4)-(6+7+8) ]
Drilling and other Rigs, oil well and gas well and pipelines (for all mines)
1.1 Drilling
1.2 Workover
3.3
Sr. No. Name of the drilling rig Date of commissioning Number of wells drilled during the year Total meters drilled since its commissioning
Workover Rings
Sr. No. Name of the drilling rig Date of commissioning Description of work done during the year
Pump Compressor Material handling equipment Assembly Draw-work Derrick Others Total
Place Prime mover Prime mover Prime mover Prime mover Prime mover Prime mover Prime mover
HP HP HP HP HP HP HP HP
(Elec./Fuel) (Elec./Fuel) (Elec./Fuel) (Elec./Fuel) (Elec./Fuel) (Elec./Fuel) (Elec./Fuel)
On-Shore 0 0 0 0 0 0 0
Off-Shore 0 0 0 0 0 0 0
Sr. No. Name of the Installation Location Particulars of modifications/changes done Reasons for the modifications/changes Whether modifications/changes are incorporated in SMP(Safety Management Plant) & EP (Emergency Plan) to this effect
Laying Details
Sr. No. Designation of the pipeline Type of fluids Pressure rating Length (in meters) Avaibility of surface plan(Yes/No) Whether risk assessment has been prepared(Yes/No) Whether fit for purpose (Yes/No)
(1) (2) (3) (4) (5) (6) (7)
Details of health monitoring of the pipelines carried out during the year
Sr. No. Designation of the pipeline Thickness inspection Visual inspection Cathodic protection Intelligent pigging Periodic pigging Corrosion probes Scale probes
(1) (2) (3) (4) (5) (6) (7) (8)
Quantity of waste water
produced
Place Electrical operated machinery(HP) Oil/Natural gas/steam/any other(HP) Compressed air(HP) Total
Lighting
1 0 350
Occupational diseases
No. of cases
Sr. No. Disease Name
Departmental Contractual
(G) Accidents Statistics
Type Number No. of person(s) killed No. of person(s) seriously injured Number No. of person(s) seriously injured Number No. of person(s) seriously injured Number No. of person(s) seriously injured
0 0 0 0 0 0 0 0 0
Initial/periodical medical examination (IME/PME) conducted during the year, 2018 [Rules 29B and 29P(1) of the Mines Rules, 1955]
Number of Persons Employed Number of Persons Required to Undergo IME Number of Persons Required to Undergo PME Number of Persons Undergone PME Number of Persons Declared Medically Unfit Number of Cases of Occupational Diseases Detected
Departmental Contractual Departmental Contractual Departmental Contractual Departmental Contractual Departmental Contractual Departmental Contractual
10 0 0 0 2 0 2 0 0 0 0 0
Number of safety committee meeting conducted during the year, 2018 (Rule 29V of the Mine Act, 1955): 2
Number of persons required to undergo vocational training Number of persons actually undergone vocational training
0 0 0 0
0 0 0 0