You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14

48.00
[157.48]

ELEV-3
1300
B B B B B B B
B
B B 2100

A INV INV INV INV INV INV INV

200
INV INV
INV beam beam beam D2 D3 D4
beam beam beam beam beam beam 0.75
1.90 beam BALC. 1.90
1.15 2.00 0.60 BALC. 0.87 1.30 0.87 2.25 BALC. BALC. BALC. BALC. 0.60 2.50 0.15 1.55 0.95 0.55 BALC. 1.30 1.40

0.95
0.95
B B B B B B B B B
3.05 B 3.80
3.05 3.80 3.05 3.05
3.40 3.05 3.40
0.80 0.95 0.25 0.25 0.80
1.00 1.80 1.80 0.70

3.15

3.15
0.70 1.80 0.69 1.00 1.80 1.00 1.00 1.80 1.00 1.00 0.70
2.00

2000
2.23
4.15

4.15

4.25
4.24
4.25
3.20

4.25
3.20 3.80 3.80 3.80

WM

WM
5.03
2.00

4.83
A 50

5.35
A

5.35
5.40
7.30 1.43 CM K.T 1.43 0.80
K.T

4.28

4.28

4.35
4.28

4.28

4.28

4.28
4.35

7.30
1.05

6.60
1.05

1.30

1.30
5.00
0.95 2.05 2.70 2.70 1.10 1.00 2.05
200 2.05

0.45

0.45

2.40
1.00

2.30
1.95 1.00 1.95 DW1 DW2 DW3

WM
WM
1.95 1.00 2.60
0.62 1.20 0.95

0.85
1.20

1.30

1.30
BATH

1.00

1.00
1.40

1.45
1.20 1.20

7.95

7.95

7.95
1.20 1.20 1.20
K.T 1.00 2.15

2.10
2.15

50
1.00 BATH
BATH BATH

2.35
K.T

2.32

0.86
2.60

2.55
2.57 0.90 1.30 1.65 1.65

0.80
0.95
2.60

1.30

1.30

1.29

1.10
5.80

1.20
0.50 0.64 0.57 0.57

1.49
1.10
1.02

0.27

0.83
1.90 0.95 0.60
0.60 0.60

2.30
B
0.22 0.91

2.15
4.90
A

0.28
2.00

var
0.55 0.45 2.00 1.85 0.45 60 1.20
0.83 0.25 0.80 0.24 1.20 60

0.30
0.95 1.85 1.40

0.70

0.70
1.10 CM

0.90
0.80
1.50 1.55
0.95

2.50
6.15

1.05
6.15 A
BALC. BALC.
0.42 BATH ENT.

2.28

2.28

2.28

2.28
ENT.

2.20
2.20

3.32
TOI.

0.80
2.00 BATH BATH LOBBY LOBBY

1.60
1.40

1.40
1.38

1.38

1.38
1.37
1.38
B
INV B

1.00
BATH
3.55

0.90 BATH TOI. TOI.


3.70
1.80

2.00 0.90 1.70

2.50
beam

0.58

0.58

0.55
07

580
WM

WM

WM

WM

WM
1.20 06 05 03 2.00 02

0.55
1.70 1.70

1800
01

3.99
04 1.20 1.45

0.45
0.45
0.45
1.45 1.70

3.84
0.90 0.90
B B
INV
1000

0.28
beam

1.40

1.69
08
0.95

1800
0.60
6.15

1.10
29
sec A-A sec B-B

2400
1.40 6.15

0.60
3.95 0.67
0.80

WM

0.72
0.78
800 2.70 3.95
2.70 450 450 800 2.40 800
WM
3.16
3.16

1.00

0.40
2.38

W.M
K.T
2.48

1.00

2.38
2.10

2.10

2.10
ELEC. 1800 K.T
2.00
4050

3.60

13.19

3.98
RM.

3.41
1.00

3.53
G

3.30

3.30

0.90
2.25
LIFT LIFT LIFT LIFT LIFT LIFT 1.65

2.30
2.30

0.25
4.30
3.60
1.12

2.65
1.17

09 2.05

0.93
1.09
1.20
A
28

C
2.05 A

1.90

1.90
60
BATH BATH 60 beem with drop
1.30 1.80 CM 3.09
0.85

60 cm under slab 0.90 W1 W2 W3


1.10

0.90
4.55

0.60
1.21

0.70
BALC.
1.22

A
1.02

0.95
1800 1.16 2.05 1.71 A 60
5.19

1.27
TOI. 0.28 CM TOI.
1.80 BALC.
B B B B
INV INV 1.02
1.80 beam
18 beam 19
3.50

3.00

3.00

3.00
1.80
B
INV B
3.35

3.20

1.80

3.50
3.32
beam

2.20
8.54
2.12

BATH 0.44 A A

0.92
2.10
B
INV B

0.53
BALC. BALC. BATH
WM
1.22

0.60
18 beam

0.60
0.85

A A WM
0.82

1.20
50
3.00

0.80
50

0.75
6.90

3.00 4.55

6.90
3.00 8.54 1.21 8.54

1.16
0.82
0.85

1.16
17

1.19
20 3.00 4.55

0.75
BALC.

0.82
1.22

0.42

1.23

1.23
2.12

BATH

ELEV-2
BATH

2.13
W4 W5 W6
B
0.60 INV B
beam 0.60
3.35

3.45

17
1.80
[149.37]

[149.37]
1.81
4.13
4.13

4.13

4.14
1.80

1.80
1.80

0.80

3.38

3.38
B
INV B
45.53

45.53
B
INV B 1.45 B B 1.40 1.80
3.00 INV beam
2.70

2.70
beam beam 3.00

0.25
5.33
1.43

1.30
1.30 4.55 ENT.

1.00
10 BALC. BALC. 27 BALC.
1.50

1.50

1.50

0.95
1.17
LOBBY

1.17
D
WM 1.00
1.80 1.80 WM
0.55

1.90 1.90 0.70


1.00 1.14
1.30

1.46

1.46

1.05
BATH
FRESH FRESH
1.70

1.69
0.80
2.41

2.41
BATH 0.80 SD SD1 D1
800 K.T AIR AIR K.T

2.50
0.53
2.50

3.60

28.74

0.53 DUCT 2.87 2.87 DUCT 750

3.53
2.60

2.55
3.98
0.95

1.03

0.95
1.10 0.70 200
WM

WM
3.84 2.27 0.70 1.00
2.10

2.12
2.15

200

200
UP TOI.
1.00

1.00
UP
STR.01

1.00
1.21

1.20
TOI.
3.18 0.73 STR.02 700 1.03
0.14

0.72
B
7.89

E 3.84

7.77
INV 3230

F.H.C
F.H.C

2200
2.20

A
beam
0.27
0.55

WM 1.03 3.84

0.52
1.20 B
WM
0.27

1.03 A
0.15

1.99

1.99

1.99
2.03

TOI. TOI.

2.12
200
16 21
0.15
WM

1.10

0.89

WM
0.70

1.18
0.88

3.18
4.08 W7 W8
2.50

3.60

3.80

0.89
3.75
3.75

B
INV B
0.85 530 K.T 0.60 0.53
3.84 beam
1.00 0.75 0.85
K.T 0.80
2.48

2.55 0.43 0.80 0.23

2.43
B B

1.10
800 2.55

2.30
INV

1.20
950

1.00
1.70

1.70
beam
1.70
1.60

BATH BATH

1.55
BALC. BALC.

1.52
4.90
F 1.00 1.90 4.90 3.05
APARTMENT CALCULATION

0.50
0.50 1.90

0.20
16
200

1.00
0.20

1.85 2.00
0.85

4.55 1.85

0.50
3.00

0.95
TOI. 6.30 TOI.
1.09

1.20
1.10

1.10

1.20
BALC. 11 26

0.39
3.00
0.94
0.80 0.45

0.48
1BED ROOM 14 FLATS
3.60

3.00 1.70
1.80

3.00
3.35

0.93

3.50
0.93

1.80
0.93
1.11

2.50
3.53

3.53
1.11

B
INV B 0.44 15 SWIMMING POOL 22 0.44 B
INV B

2.51
3.10
2.13

beam 3.10

2.13
BATH beam
3.00
BATH
1.23

1.00
1.20

1.23
1.20
6.65
1.00

6.60
0.85

1.80
1.80 4.55 BALC.

0.75
1.80 1.80
K.T
2BED ROOM 4 FLATS
7.15

900
2.25
2.25

2.25

7.30
7.30
6.05 0.74 3.00
3.00 5.75
3.76 3.00 1.04
0.95

BALC.

0.95
0.85

1.25
1.15

1.50 BALC.

1.02
15 WM 4.75 4.75 1.80
BALC. BALC. WM
1.95

1.30
1.30 1.30 0.70 1.00
2.05

TOI. 3.55

2.20

2.30
B
INV B
2.20
B
INV B
0.90 BATH
STUDIO 11 FLATS

0.50 0.85
3.55
3.60

1.80

beam 0.65 beam


3.50

3.50
1.80

3.69

1.80
3.30
3.30

3.90
0.95
B
B
INV B INV B

2.48
BATH
2.38

2.38
BATH
2.28

beam 0.95 beam


12
1.30 POOL DECK 1.80
TOTAL 29 FLATS

1.03
1.00

1.80

1.60
1.00

7.65 1.80 1.70 0.85


3.55

1.15
A
25
G
0.90 1.20
40
1.40
0.50
CM A
0.20 A
5.24 4.45 40
0.99
0.99

14 23 PROJECT
1.20

K.T CM

1.00
1.43

1.43
40 3.99

1.30

1.20
1.67
1.67

3.80
A CM A

WM4.40 WM
K.T
2.07 1.34 0.59 1.75
A
40
CM
A
A
1B+G+5P+12F
0.95

0.87
2.97

2.97
2.97

0.24

0.50 0.80
WM

2.97
0.69

0.90

0.64
3.65

13 1.89
0.88
4.81

1.97

WM

0.63
240

3.40
1.20 KID'S POOL

3.26
1.25 24 1.80
BATH

4.56
2.65

1.20

1.20

LOCATION PLOT NO. USE


0.30

BATH

2.21
40
1.10

2.20
1.20 BATH
0.46

1.50
2.89

2.79

1.50 3.15
2.89

AJMAN - Aamra 0494 COMMERCIAL+Residentail

2.54

2.74
2.64

2.84
1000

3.29
1.99

3.85 1.79 BATH 3.85


NO. OF FLOORS

0.40
5.50 BLOCK NAME BLDG. NO.
1100
1.11

1.10

1.11
1.50 1.00 1.50 1.10
0.58 1.80 3.20
3.20 1.80 3.95 1B+G+5P+12F
5.05 0.58

0.73
0.42
5.39

8.00 1.79
0.81 5.05 ALL DIMENSIONS SHALL BE CHECKED AND CORELATED WITH
1.1
6.94

6
6.84

6.69

6.69

6.69

6.69
THE RELEVANT ARCHITECTURAL, STRUCTURAL AND OTHER
3.65

3.65
6.69

6.59

1.20
1.80
1.30
SERVICES DRAWINGS, ANY AMBIGUITY, DISCRIPANCY OR
3.61
2.45

2.45

BATH 3.55 OMISSION SHALL BE BROUGHT TO THE NOTICE OF THE


1.60 ARCHITECTS IMMEDIATELY BEFORE COMMENCING THE WORK.
4.49

4.49
H K.T BATH
3.95

3.95
3.0

1.80
0

0.50 0.86 440 1.16 0.89 1.80 1.16 0.40 0.54 K.T
A
40
A
3.79 SHEET TITLE

2.55
CM
2.60
2.60

3.79 5.80

1.90
1.90

1.90

8.00
8.00 2.60

9
5.4

1.1

5.4
1.50

BALC. BALC.
2ND - 12TH TYPICAL FLOOR
6 B B 40
3.35
0.20

B
INV B INV 3.79
0.89 2.00
9

0.70 B B A
CM
A
beam beam 0.43 0.99 2.00 0.80 0.70 0.95 1.29
INV INV
beam beam
B B

11.82
(MODIFY)
11.82 5.80
48.00 5.80

[157.48]
AS BUILT ENG NAGY
2ND - 12TH TYPICAL FLOOR COORDINATION 20/06/2020

You might also like