This document contains payroll information for 6 employees including their employee code, job level, name, position, basic salary, tax deductions, and net salary. It also includes tables that list the basic salary and allowances for each job level as well as the tax deduction percentages.
This document contains payroll information for 6 employees including their employee code, job level, name, position, basic salary, tax deductions, and net salary. It also includes tables that list the basic salary and allowances for each job level as well as the tax deduction percentages.
This document contains payroll information for 6 employees including their employee code, job level, name, position, basic salary, tax deductions, and net salary. It also includes tables that list the basic salary and allowances for each job level as well as the tax deduction percentages.
kode pegawai gol nama jabatan gapok potongan jmlh pot g bersih
2013ADM001 III A NIA 3700000 2% 74000 3626000
2013TPD002 III B JOLA 4100000 3% 123000 3977000 2014TPD003 III B LALA 4100000 3% 123000 3977000 2015ADM004 III C NILA 5500000 5% 275000 5225000 2015TPD005 III A LULA 3700000 2% 74000 3626000 2015TPD006 III A LULU 3700000 2% 74000 3626000
TABEL GAJI TABEL PO
GOL GAPOK TUNJ III A III B III C III A 3700000 1500000 2% 3% 5% III B 4100000 2250000 III C 5500000 3000000