Professional Documents
Culture Documents
04 & 4a - 132KV Foundation Detail For CT
04 & 4a - 132KV Foundation Detail For CT
1/3
华星印度模组项目
Italy see bear fruit : Italy see bear fruit : Italy see bear fruit :]
意见结果 : 意见结果 : 意见结果 :
1. □ 2. □ 3. □ 4. □ 1. □ 2. □ 3. □ 4. □ 1. □ 2. □ 3. □ 4. □
Check Chapter: Check Chapter: Check Chapter:
意见结果 : 意见结果 : 意见结果 :
Date: Date: Date:
日期: 日期: 日期:
** If you have more comments , please write on A4 paper and attach it to the back .
** 如有更多的意见,請写于 A4 纸上附在后面.
Italy See results :
1. No discrepancy found
2. Follow the mark repair positive
3. Please resubmit for review within _____ days after modification .
4. Please resend in accordance with the requirements within _____ days .
Check the check just to make sure to send examination of materials in line with
engineering design, subject to the provisions of the contract documents. Any of
the above instructions is to meet the requirements of engineering drawings and
specifications. Contracting business responsibilities include: confirmation
corresponds to the size of the site , in line with the concept of the production
process requirements
and construction technology. Coordinate the work of all links to achieve
satisfactory results.
意见結果:
1. 未发现不符之处
2. 请按照标注修正
3. 请修改后再送审_____天之內重送审.
4. 请按照要求重送_____天之內重送审.
检查核对只是为了确保送审材料基本符合工程设计理念,遵循合同文件的规定。任何一项上述的指
示都是为了满足工程图纸和规范的要求。承包商的职责包括:确认尺寸与现场的对应,符合生产工
艺和施工技术的理念要求。协调各项环节的工作,以达到令人满意的工作结果。
PM Manager Owner Manager
PM 经理 业主经理
编号 合同包号
2/3
华星印度模组项目
公司 工程名称
Opinion /其他
Signature of
Person
Design /设计 Incharge / Date
负责人签字 日 期
Opinion /其他
Signature of
Management
Person Date
Company /
Incharge
日 期
管理公司
负责人签字
Opinion /其他
Signature of
Person Date
Owner /业主 Incharge
日 期
负责人签字
3/3