You are on page 1of 5

HCIP-Routing & Switching-IEEP V2.

5 mock
exam

1. (Multiple Response) Which of the following cabling modes are commonly used in a data

center? (  )

A. TOR

B. DOD

C. EOR

D. PHP

E. NSF

2. (Simple Response) Which of the following features is not applied to enterprise WANs? (  )

A. Wide coverage

B. Difficult O&M

C. Multiple types

D. High costs of utilization

3. (Multiple Response) Data center switches greatly differ from campus switches. Which of the

following features are specific to data center switches but are not supported by campus

switches? (  )

A. MSTP

B. TRILL

C. NFV

D. FCoE

E. VXLAN

4. (True or False) If the number of checked goods is different from the number of goods on the

packing list, you can unpack and inspect goods and then contact the vendor to handle the

inconsistency. (  )

5. (Single Response) Which of the following authorization items is not required for risky

operations? (  )
第 1 页, 共 5 页
HCIP-Routing & Switching-IEEP V2.5 mock
exam

A. Management authorization

B. Technology authorization

C. Customer authorization

D. Administrative authorization

6. (Multiple Response) Which of the following statements regarding the device software

upgrade necessity are true? (  )

A. The new software version continuously increases new functions.

B. The new software version continuously improves usability.

C. The new software version continuously improves stability.

D. You are advised to immediately upgrade the system software to the latest version.

7. (Single Response) Which of the following is the core idea of network troubleshooting? (  )

A. Service traffic path check

B. Determining and analysis

C. Information collection

D. Top-down

8. (Multiple Response) Which of the following tasks need to be completed during the planning

stage of a project? (  )

A. Work out the technical design

B. Know the project background

C. Determine the model of network devices in the project

D. Make clear the requirements of a project

9. (Multiple Response) Which of the following contents are included in a migration project

solution? (  )

A. Migration preparation

B. Migration implementation
第 2 页, 共 5 页
HCIP-Routing & Switching-IEEP V2.5 mock
exam

C. Rollback solution

D. Contingency plan

10. (Single Response) Which of the following work is not prepared before the migration? (  )

A. Hardware test

B. Software test

C. Expenses

D. Tools

11. (Single Response) During MSTP troubleshooting, the display current-configuration

command is executed to obtain the configuration file of the device. Which of the following

statements is false? (  )

A. Check the port configuration to verify that the MSTP-enabled port is configured (for example,

using the bpdu enable command) to send protocol packets.

B. The port connected to a user device has MSTP disabled or is configured as the edge port.

C. The BPDU tunnel configuration has no impact on MSTP.

D. Check whether the interface is added to the correct VLAN.

12. (Single Response) If all data packets are lost when you ping the peer host, which of the

following methods is the most appropriate for subsequent troubleshooting? (  )

A. Configuration comparison

B. Bottom-up

C. Service traffic path check

D. Top-down

13. (Multiple Response) During follow-up operations of the structured network troubleshooting

process, which of the following parties does not require advertisement of information? (  )

A. Parties affected by the fault

B. Authorization parties in each phase of troubleshooting


第 3 页, 共 5 页
HCIP-Routing & Switching-IEEP V2.5 mock
exam

C. Other vendors and service providers

D. Users who are interested in the root cause for the fault

14. (Single Response) A network administrator fails to access devices on the internal network

through Telnet. Which of the following causes is the most impossible? (  )

A. The route is unreachable, and the client fails to establish a TCP connection with the server.

B. The number of login users reaches the upper limit.

C. An ACL is bound in the VTY user interface view.

D. The protocol inbound all command is configured in the VTY user interface view.

15. (Multiple Response) Which of the following items are used to remind customers of

information security? (  )

A. Account sort-out reminder

B. Password update reminder

C. Log protection reminder

D. Data backup reminder

16. (Single Response) During the structured network troubleshooting process, which of the

following statements regarding the fault identification phase is true? (  )

A. Focus on how to better solve faults, regardless of whether a fault is within your own

responsibility scope.

B. Pay attention to user feedback and identify faults based on user feedback.

C. To minimize the fault effect, try not to let others know the network fault.

D. Check whether the troubleshooting is within your own responsibility scope.

17. (Single Response) If a fault is located on a router that works in redundancy mode with

another router, which of the following methods is the most appropriate for subsequent

troubleshooting? (  )

A. Configuration comparison
第 4 页, 共 5 页
HCIP-Routing & Switching-IEEP V2.5 mock
exam

B. Bottom-up

C. Service traffic path check

D. Top-down

18. (Multiple Response) Which of the following causes may result in an IS-IS neighbor

relationship fault? (  )

A. The devices on two ends of a link have the same system ID.

B. The devices on two ends of a link have inconsistent IS-IS levels.

C. When an IS-IS Level-1 neighbor relationship is established, the devices on two ends of a link

have inconsistent area addresses.

D. The IP addresses of interfaces on two ends of a link are on different network segments.

19. (Single Response) Which of the following events represent the end of the network planning

stage? (  )

A. Project initiation

B. Bid release

C. Contract signing

D. Preliminary project acceptance

20. (Single Response) Which of the following network features is described by counters such as

mean time between failures (MTBF) and mean time to repair (MTTR)? (  )

A. Scalability

B. Availability

C. Security

D. Cost-effectiveness

Answer:1.AC    2.C  3.BDE  4.F  5.D  6.ABC  7.A  8.BD  9.ABCD  10.C  11.C  12.B  13.ABC  14.A 

15.ABCD  16.D  17.A  18.ABCD  19.B  20.B


第 5 页, 共 5 页

You might also like