Job Information

Engineer Checked Approved


Name:
Date: 24-Oct-20

Structure Type SPACE FRAME

Number of Nodes 84 Highest Node 84


Number of Elements 146 Highest Beam 146

Number of Basic Load Cases 2


Number of Combination Load Cases 1

Included in this printout are data for:


All The Whole Structure

Included in this printout are results for load cases:


Type L/C Name
Primary 1 LOAD CASE 1
Primary 2 LOAD CASE 2
Combination 3 COMBINATION LOAD CASE 3

Whole Structure (Input data was modified after picture taken)

24/10/2020
R1
R1 R1
R1
R1 R1
R1 R1
R1 R1
R1 R1 R1 R1 R1
R1 R1 R1 R1
R1 R1 R1
R1 R1
R1 R1 R1 R1
R1 R1 R1 R1
R1 R1
R1 R1 R1 R1
R1 R1 R1
R1 R1 R1 R1 R1 R1
R1 R1 R1 R1
R1 R1
R1 R1 R1 R1 R1
R1 R1 R1
R1 R1 R1 R1 R1 R1
R1 R1 R1 R1 R1
R1 R1
R1 R1 R1 R1 R1
R1 R1 R1
R1 R1 R1 R1 R1 R1
R1 R1 R1 R1 R1
R1 R1
R1 R1 R1 R1 R1
R1 R1 R1
R1 R1 R1R1 R1
R1 R1 R1 R1
R1
R1 R1 R1 R1
R1 R1 R1
R1 R1 R1 R1
R1 R1 R1 R1
R1 R1 R1 R1
R1
R1 R1 R1 R1
R1 R1 R1
R1
R1 R1
R1 R1

R1

R1 = 3.13 m
R1 = 9.03 m
R1 = 3 m
R1 = 3.13 m
R1 = 9.03 m R1 = 3 m
R1 = 4.72 m R1 = 3.13 m
R1 = 3.13 m R1 = 3.13 m
R1 = 3 m R1 = 9.03 m R1 =R19.03 = 3mm R1 = 3 m
R1 = 6.1 m R1 = 3.13 m R1 = 4.72 m R1 = 3.13 m
R1 = 3 m R1 = 3.13 m R1 = 3.13 m
R1 = 3 m R1 = 9.03 m R1 =R19.03= 3mm R1 = 3 m
R1 = 3.13 m R1 = 6.1 m R1 R1==4.72
3.13mmR1 R1==3.13
4.72mm R1 = 3.13 m
R1 = 3 m R1 = 3 m R1 = 3.13 m R1 = 3.13 m
R1 = 3 m R1 = 3 m R1 = 9.03 m R1 =R19.03
R1==6.1
3.13 = 3mm
R1==3.13
R1 6.1 m
m R1 m m R1 R1==4.72
3.13mmR1R1==3.13
4.72mm R1 = 3.13 m R1 = 3 m
R1 = 3 m R1 = 3 m R1 = 3 m R1 = 3.13 m R1 = 3.13 m
R1 = 3 m R1 = 3 m R1 = 9.03 m R1 R1
R1==6.1
3.13 = 9.03
= 3m
m
R1 = 3.13 m R1 R1==3.13
6.1 m
m R1 m m R1 R1==4.72
3.13mmR1R1==3.13
4.72mm R1 = 3.13 m R1 = 3 m
R1 = 3 m R1 = 3 m R1 = 3 m R1 = 3 m R1 = 3.13 m
R1 = 3 m R1 = 3 m R1 = 9.03 m R1 =R19.03
R1==3.13
6.1 m R1 = 3.13 m R1==4.72 = 3m
m R1 = 3 m
R1 = 3.13 m R1 m R1 = 6.1 m R1 3.13mmR1 R1==3.13
4.72mm R1 = 3.13 m
R1 = 3 m R1 = 3 m R1 = 3 m R1 = 3 m R1 = 3.13 m
R1 = 3 m R1 = 3 m R1 = 9.03 m
R1==6.1
3.13 R1 = 3 m
R1 = 3.13 m R1 R1==3.13
6.1 m
m R1 m m R1R1==4.72
3.13mmR1R1==3.13
4.72mm
R1 = 3 m R1 = 3 m R1 = 3 m R1 = 3 m
R1 = 3 m R1 = 3 m R1 = 9.03 m
R1==6.1
3.13 R1 = 3 m
R1 = 3.13 m R1 R1==3.13
6.1 mm R1 m m R1 = 4.72 m R1 = 3.13 m
R1 = 3 m R1 = 3 m R1 = 3 m R1 = 3 m
R1 = 3 m
R1 = 3.13 m R1 = 6.1 m R1 = 3.13 m R1 = 4.72 m
R1 = 3 m R1 = 3 m R1 = 3 m
R1 = 3 m
R1 = 3.13 m R1 = 6.1 m
R1 = 3 m R1 = 3 m

R1 = 3 m

24/10/2020
Whole Structure (Input data was modified after picture taken)

Whole Structure

Whole Structure Mz 100kNm:1m 3 COMBINATION LOAD CASE 3

24/10/2020
Whole Structure Fy 100kN:1m 3 COMBINATION LOAD CASE 3

Whole Structure Fy 45kN:1m 3 COMBINATION LOAD CASE 3

24/10/2020
Whole Structure Displacements 100mm:1m 3 COMBINATION LOAD CASE 3

Whole Structure Mz 100kNm:1m 3 COMBINATION LOAD CASE 3

24/10/2020
Whole Structure

24/10/2020

You might also like