Professional Documents
Culture Documents
Unit 1 Gantt Chart and Text
Unit 1 Gantt Chart and Text
SUBJECT:
English VIIl
UNIT:
I
TOPIC:
Plans and projections
STUDENT´S NAME:
Mauro Concepción Ramírez Arévalo
Kevin Jesús Tadeo Reyes Méndez
TEACHER NAME:
Lic. Fausto Jiménez Palmer
Introduction
In this project we are going to talk about the development of the dimanic speed
governor. They are used in drive units with variable speed to control the speed
of the same. The governors act directly by controlling the fuel supply of the
engine, this allows to control the fuel supply or the power source of the power
unit. Formerly it was necessary the presence and control of a person
permanently to maintain the desired speed.
UNIVERSIDAD TECNOLÓGICA DE CAMPECHE
Gantt Diagram
Description
Kevin; Hello friend, we have a job to do, a man needs us to install the speed limiter
in his daughter's truck. Do you know what has to be done?
Mauro; Of course, we first have to know the model of the truck to install the correct
limiter. let's hurry it´s going to rain tomorrow.
Kevin; I will look in the Manual for your type of installation…. here is the model of
the regulator that is ideal for the car.
Mauro: We will install it with your computer, the controller must be close to the
steering the ring.
Kevin: Well, I removed the battery ¿can you pass me the screwdriver?
UNIVERSIDAD TECNOLÓGICA DE CAMPECHE
Kevin: Alright i'll walk through it, I drive to work every morning and I don't need a
speed regulator.
Mauro: Seriously? you like to spend a lot of gasoline, I save a lot with him.