Tamiz Abertura Gravilla Arena

mm % q Pasa % q Pasa
2" 50 100% 100%
100%
1 1/2" 40 95%
1" 25 80% 72% 90%

3/4" 20 40% 80%

1/2" 12.5 12% 70%


3/8" 10 4% 60%
#4 5 50%
#8 2.5 100% 40%
#16 1.25 87% 30%
#30 0.63 64% 20%
#50 0.315 17% 10%
#100 0.16 4% 0%
#200 0.08 3% 0% 0.01 0.

Absorcion:
GRAVILLA= 1,5%=0,015
ARENA= 3,5%=0,035
Agua de absorcion
ABSORCION= 1.265*0,015+642.4*0,035= 41.5Lts

AGUA TOTAL

A amasado + absorcion
Agua de absorcion
154+41.5= 195.5 Lts

CANTIDADES TOTALES

GRAVILLA= 1.265 kg

ARENA= 642.4 kgs

CEMENTO= 308 kg

AGUA= 195.5 Lts

RAZON A/C= 0,50


ARENA= 642.4 kgs

CEMENTO= 308 kg

AGUA= 195.5 Lts

RAZON A/C= 0,50