Gia
ee
PROCEDURE FOR INSTALLATION OF POLARIZATION CELL
Doc | A286-GIGLM-1006-0000-cP-
No. | DOC-PRO-R-0403
Rev: 01
| Pax
hisue ge 1 of
Date |: 19-02-2020 538
waren
PROJECT NAME
MEHSANA-BHATINDA PIPELINE PROJECT PHASE 2
(SECTION v)
OWNER GSPL INDIA GASNET LIMITED (GIGL)
ENGINEERING | ENGINEER INDIA LIMITED(EIL)
CONSULTANT |
TPIA CERTIFICATION ENGINEERS INTERNATIONAL LTD.
CONSTRUCTION | VCS QUALITY SERVICES PVT LTD
‘SUPERVISON |
EPC CONTRACTOR
KALPATARU POWER TRANSMISSION LIMITED(KPTL)
CP CONTRACTOR
‘SARK EPC PROJECTS PRIVATE LIMITED
PROJECT NO
A286
ormation/Record
POLARIZATION CELL
| 00 [16-01-2020 ‘Client's
pproval (0
Rev Date | Descripti
wo
a
ie nature he
| Issued for
01 /19-02-2020, Client's
approval (IFA) |
] Issued for |
a ae
FA)
1
a Prepared | Reviewed | Reviewed | Revi Approved
fom py Sark | bykerL | bycen | byvCS | grt,
1 ie|Doc | A286-GIGLM-1006-0000-cP-
| No. | DOC-PRO-R-0403
IRev |: 01
ee | 1.
UPATARD | : = .- Date |: 19-02-2020 Page 2 of
|
| ia
_ PROCEDURE FOR INSTALLATION OF POLARIZATION CELL
DOCUMENT REVISION DESCRIPTION
Description/ Status
Revision
No
00 _ Issued for Client's Approval
01 | Issued for Client's Approval
SARK Yco)
(OSPLINDIA GASNET LIMITED
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
Rev: 01
PROCEDURE FOR INSTALLATION OF POLARIZATION CELL
TAI CONTENTS
INTRODUCTION............
SCOPE OF DOCUMENT
PIPELINE DETAILS
EQUIPMENTS& MATERIALS ..
REFERENCES...
PROCEDURE FOR POLARIZATION CELL INSTALLTION...
PRECAUTIONS,
RISK ASSESSMENT & CONTROL MEASURES..
DOCUMENTATION eee
INSPECTION & TEST PLAN FOR POLARIZATION CELL
INSPECTION REPORT FORMAT.....
Ar — OO. sin
BROFATARD | SEE rages
|
|
of |
|Doc _ A286-GIGLM-1006-0000-CP-
No. | DOC-PRO-R-0403
= 3
Rev :01
i
PROCEDURE FOR INSTALLATION OF POLARIZATION CELL
| 4.0 INTRODUCTION
M/s GSPL India Gasnet Limited (GIGL) has planned to implement an approx. 937 km
long natural gas pipeline network from Palanpur (Gujarat) to Bhatinda (Punjab) to
cater to gas demands of various industrial consumers & City gas distribution network
In state of Gujarat, Rajasthan, Haryana and Punjab.
‘The proposed pipeline have been divided into Seven sections, namely section-I, II,
M1, 1V, V, VI & VIL.
M/s. Kalpataru Power Transmission has been awarded EPC contract for laying,
erection, testing and commissioning of Section-V under MBPL Project.
M/s. Kalpataru Power Transmission awarded EPC contract for Cathodic Protection for
this pipeline section to M/s, SARK EPC Projects Private Limited, a Cathodic Protection
Specialist Company.
These underground pipelines shall be provided with 3LPE coating as primary
protection from soil side corrosion. For secondary protection, it Is intended to provide
sacrificial anode cathodic protection system to these pipelines using sacrificial anodes
for mitigating soll side corrosion during constructional phase designed for 2 years or
till commissioning of PCP. Once the pipeline is fully functional, impressed current
cathodic protection system using impressed current anodes Is to be provided for a
design life of 40 years.
2.0 SCOPE OF DOCUMENT
This procedure for the installation of Polarization Cell (SSD) required for grounding the
AC interference in the pipeline at the HT Line crossing locations in permanent Cathodic
protection and provide adequate quality assurance / control.
3.0 PIPELINE DETAILS
s. | Dae starring | enpine | LENGTH
&5,| otfapetite | rureune | SANASE | citsce | MPZROX | coArING
i 30” MAIN PIPELINE 706.247 | 843.166 | 136.919 | SUPE
[2 18” SPUR PIPELINE(GGSRL) | 0.000 | 16.325 | 16.325 | 3LPE
3 12" SPUR PIPELINE(NFL) 0.000 | 29.672 | 29.672 | _3LPE
4.0 EQUIPMENTS& MATERIALS
+ Equipments : Calibrated portable multimeter and Too! kit etc.
+ Materials : solid state Polarization Cell, nut bolt, Cable lugs as per approved drawing, etc
Age.
oon NE 0 ean BX
vk HeDoc | A286-GIGLM-1006-0000-cP-
No. DOC-PRO-R-0403
£3
|G racratarv
|
PROCEDURE FOR INSTALLATION OF POLARIZATION CELL
5.0 REFERENCES
Document Dexa held
‘A286-000-06-45-SOW-02
Rev.5
GIGL tenders technical specifications
Control of external Corrosion on Underground or
Submerged Metallic Piping Systems
Standard recommended practice Mitigation of Alternating
NACE SP0177-2014 Current and Lightning effects on Metallic Structures and
Corrosion Control Systems.
Code of practice for Cathodle protection for Land and
marine application
Petroleum and natural gas industries — Cathodic
NACE SP0169-2013
BS 736:
991
| iso 15589 - part 1: protection of pipeline transportation systems — Part 1: On |
land pipelines
6-45-0027 Rev-01 ‘Specification for sacrificial anode CP system for pipelines.
|
6-45-0028 Rev-00 ‘Specification for impressed current CP system for pipelines.
‘A286-000-06-45-DB-01
as CP system Design basis.
Cathodic Protection of buried pipeline structure for
1s : 8062 transportation of natural gas, oll and liquids- Code of
practice
OIsD:188 Corrosion Monitoring of Offshore and Onshore Pipeline
6.0 PROCEDURE FOR POLARIZATION CELL INSTALLTION
* _ IMIR copies to be made readily available.
«Installation should be in line with manufacturer recommendation.
* Check the location of the HT line Crossings
«Check cable to Pipeline connection and install the polarization cell (SSD) inside the
Test station
= Connect the cable from the Zn grounding anode and the cable from the pipeline as
per the H Type connection Scheme with the polarization cell in the TLP Provided.
| Measure DC & AC voltage before connection at cell & after connection of cell along
with current.
* Resistance of ZN grounding cell to be verified.
Agr
SARK ne Cyan ee(659. INDIA GASNET UNITED
Doc | A286-GIGLM-1006-0000-cP-
No. | DOC-PRO-R-0403
ce
Rev: 01
a
PROCEDURE FOR INSTALLATION OF POLARIZATION CELL
7.0 PRECAUTIONS
= Check condition of polarization cell prior to installation.
* Care should be taken while installing the Polarization Cell
* Allcables are to be appropriately tagged.
= All cable connections should be checked for proper tightening.
‘= Cable ferrules are to be provided at both ends
8.0 RISK ASSESSMENT & CONTROL MEASURES
* Only experienced and trained personnel to be deployed for this activity.
* All personnel of the crew should be fully aware of the potential risk involved with
the work.
+ At least one person in the crew shall be trained and be capable of providing first
aid in case of any electrical or non-electrical accidents.
+ All Measuring & Test Equipment’s used must be properly maintained.
+ Use PPE (Personal Protective Equipment), i.e. Helmets, Shoes, Aprons and
Goggles, during working at site.
* Workers should be cautious, on slippery grounds.
* Safety procedures shall be followed during construction activities in line with the
Project HSE procedure.
= Keep sufficient amount of drinking water.
9.0 DOCUMENTATION
SL
No:
Document Name Document Number
TTP Documents
T] INSPECTION & TEST PLAN FOR POLARIZATION | A286-GIGLM-1006-0000-CP-
CELL DOC-ITP-R-0403,
SITE INSTALLATION FORMATS
‘AZ86-GIGIM-1006-0000-CP-
DOC-FR-R-0403
POLARIZATION CELL INSTALLATION FORMAT.Doc | A286-GIGLM-1006-0000-cP-
No. | DOC-PRO-R-0403
2, @ |
—Rev : 01
FRUPATART | SSS so cs aono Pave 7 of
PROCEDURE FOR INSTALLATION OF POLARIZATION CELL |
PROJECT NAME MEHSANA-BHATINDA PIPELINE PROJECT PHASE-2 (SECTION-V)
OWNER GSPL INDIA GASNET LIMITED (GIGL)
ENGINEERING
CONSULTANT ENGINEER INDIA LIMITED(EIL)
TPIA CERTIFICATION ENGINEERS INTERNATIONAL LTD. (CEIL)
CONSTRUCTION
VCS QUALITY SERVICES PVT LTD
SUPERVISION
EPC CONTRACTOR _| KALPATARU POWER TRANSMISSION LIMITED(KPTL)
CP CONTRACTOR SARK EPC PROJECTS PRIVATE LIMITED
PROJECT NO A286
INSPECTION & TEST PLAN FOR SOLID STATE POLARIZATION CELL
INSTALLATION
A286-GIGLM-1006-0000-CP-DOC-ITP-R-0403 REV-01
| ] Issued for
| | approval (IFA)
|
Tiedt | ee vi
0 |:6.03.2020 “cients” | Seg Ve
Lo seproval GFA) ‘Syed en ee
iWereeared Reviewed Reviewed | Approved
Description | by = By by by
SARK “kpTL | Cen ves
[Rev] Date Aopsosee
by GIGt || Doc _ A286-GIGLM-1006-0000-CP-
a) = ace | Saeieeuns
(GSPLINDIA GASNET LIMITED
SoS =.
|______ PROCEDURE FOR INSTALLATION OF POLARIZATION CELL
Legends of inspection requirements.
HP: Hold Point: A point which requires Witnessing/ Inspection/ verification and acceptance by
GIGL/VCS/CEIL before any further processing is permitted.
The Contractor shall not process the activity/item beyond a Hold Point without written approval by
GIGI/VCS/CEIL except where prior written permission for further processing is available.
‘WC: 100% Examination by Contractor
‘W: Witness Point: An activity which requires witnessing/inspection /verification by CEIL/VCS/GIGL when
the activity is performed,
After proper notification has been provided (notification modalities and period shall be finalized before
hand), the contractor is not obliged to hold further processing if CEIL/VCS/GIGL is not available to
witness the activity or does not provide comments before the date notified. Basis of acceptance shall be
4s per relevant technical specification.
S: Surveillance Inspection by CEIL/VCS/GIGL
Monitoring of making observations to verify whether or not material/items or services conform to
specified requirements. Surveillance activities may include audit, inspections, witness of testing review
of quality documentation & records, personnel qualifications, etc.
Rw: Review of Contractor's documentation
SARK yi —Ge Doc A286-GIGLM-1006-0000-cP-
No. DOC-PRO-R-0403
$e rev 1
aay <
PROCEDURE FOR INSTALLATION OF POLARIZATION CELL
40.0 INSPECTION & TEST PLAN FOR POLARIZATION CELL
PROJECT MEHSANA BHATINDA PIPELINE PROJECT PHASE 2 (SECTION V)
owner W/s GSPL INDIA GASNET LIMITED
ENGINEERING
ENareRenn His ENGINEERS INDIA LIMITED(ERL)
TIA 1W/s CERTIFICATION ENGINEERS INTERNATIONAL LTO
| ConstaucTroN
‘SUPERVISION M/s VCS QUALITY SERVICES PVT LTD
EPC CONTRACTOR W/s KALPATARU POWER TRANSMISSION LIMITED(KPTL)
ep CONTRACTOR ws SARK EPC PROJECTS PVT LTO
Ire no {A286-GIGLM-1006-0000-CP-00¢-TTP-
oon
activity or nc
1 APPROVAL OF PROCEDURE FOR POLARISATION CELL] p le i
[INSTALLATION
lcweck ano VERIFY LOCATION OF POLARISATION
2 ICEL INSTALLATION ee RW RY Rey
3 fcABLe CONNECTION a LAYING e | pw [aw] aw
4 INSTALLATION OF POLARISATION CELL p | rw fw] Rw
TAGGING & FERRULING OF CABLE e | rw jew] aw
| |
6 FUNCTIONAL CHECK OF POLARIZATION CELL > | ow | aw w
|
*\? resistance oF zinc GROUNDING CELL e | w few] ew
[ECeND
Ja ae + RANGA WATERS, W - WITNESS ALL, P-
nNDoc | A286-GIGLM-1006-0000-CP-
(No. | DOC-PRO-R-0403
ce
| coro care una
a
oa, he i
i 3 PS a
BE HOTATRT EAT a seocamo p10
ROCEDURE FOR INSTALLATION OF POLARIZATION CELL
in
PROJECT NAME MEHSANA-BHATINDA PIPELINE PROJECT PHASE-2 (SECTION-V)
OWNER GSPL INDIA GASNET LIMITED (GIGL)
ENGINEERING
ene ENGINEER INDIA LIMITED(EIL)
TPIA CERTIFICATION ENGINEERS INTERNATIONAL LTD. (CEIL)
| CONSTRUCTION
VCS QUALITY SERVICES PVT LTD
SUPERVISION
EPCCONTRACTOR | KALPATARU POWER TRANSMISSION LIMITED(KPTL)
CP CONTRACTOR SARK EPC PROJECTS PRIVATE LIMITED
PROJECT NO A286
/A\ FORMATS FOR SOLD STATE POLARIZATION CELL INSTALLATION
Doc No. A286-GIGLM-1006-0000-CP-DOC-PRO-R-0403
NERS
&
oy
| _ 1ssued for 8
(FA) we
Issued for
(IFA) | _
| Prepared
by
SARK
Approved
by GIGL
Rev | Date | DescriptionDoc | A286-GIGLM-1006-0000-cP-
No, DOC-PRO-R-0403
Gia
Rev lags
|
1
PROCEDURE FOR INSTALLATION OF POLARIZATION CELL
11.0 INSPECTION REPORT FORMAT
rans
ROE Relais
'PROSECT IMEHSANA BHATINDA PIPELINE PROJECT PHASE 2 (SECTION V)
jowNER IM/s GSPL INDIA GASNET LIMITED
ENGINEERING CONSULTANT|M/s ENGINEERS INDIA LIMITED(EIL)
[TPA |M/s CERTIFICATION ENGINEERS INTERNATIONAL LTD
[CONSTRUCTION
SEE STOR M/s VCS QUALITY SERVICES PVT LTD
lEPC CONTRACTOR 'w/s KALPATARU POWER TRANSMISSION LIMITED(KPTL)
IcP CONTRACTOR IM/s SARK EPC PROJECTS PVT LTD
FORMAT NO |A286-GIGLM-1006-0000-CP-DOC-FR-R-0403
[DRAWING No: [Report No. DATE:
PERSONNEL RESPONSIBLE SARK : SITE ENGINEER / SUPERVISOR
SI.No. | ACTIVITY CHECK / TEST | REMARKS
1. | LOCATION /CHAINAGE eS
| 2. | type oF TEST STATION \
MAKE 8 SR, NO. AND RATING OF POLARISATION
CELL
4 [cA01e coNNecTiON ofynor 8
5.__| AC VOLTAGE & CURRENT BEFORE CONNECTING FOL CELL
3,
6. | AC VOLTAGE & CURRENT AFTER CONNECTING POL.CELL |
CABLE TERMINATION IN TEST STATION AS PER
77: | CONNECTON SCHEME |
1\ 8. | RESISTANCE OF ZINC GROUNDING CELL a
‘Remarks:
S- Pradhan
14.02.2020 | ermaannahs| 26}>)2»
Dae
aeCase LL a
Anes
™
-
7
— 7
ee a |
23 ae =—
LA RNA He Th ae pK -
z Tee Travers MOT Oa
eo =
ai
P|