SUBIC BAY
CHECKLIST FOR THE APPLICATION OF BUILDING/RENOVATION PERMIT
()- NEw application (-Resusmission
Date/Time of Application:, Date/Time of Return :
Applicant: Business Name
Address: TeliMobile & Fax No.:
Email Ad.
BIR TIN No.
Project: Coatect Berean: (4 eee ee
|ANDATORY REQUIREMENTS:
CLEARANCES FROM OTHER SBMA DEPARTMENT, LOCATORS & AGENCY/ES:
Submitted:
Yos No
va BUSINESS GROUP (BG) - (Bidg. 225, Dewey Ave., CAD, SBFZ) |
|__a. | Valid copy of Certificate of Registration (CR) ao
®. | Cerificaton thatthe proposed construction is based on business
Aactviy and development commitment (Applicant to subrit
business group copies of the Architectural drawing including
perspective based onthe approved contact
[| CAND & ASSET DEVELOPMENT DEPARTMENT (CABO) ~
Located at Bldg. 52, Sugos St, CBD, SBFZ - Tel. No. 252-4148
Requirement
a, | LADD Property Evaluation = i
3, ECOLOGY CENTER (EO) located at GF, Regulatory Bid, Cabin |
L St, SBFZ — Tel. No. 252-4416
@. | Environmental Clearance forthe proposed workdeonsivudtion
[4, | SUBIC WATER & SEWERAGE COMPANY INC. (SWSCI) Ses
eal Former Sub-com Area, Rizal Highway, SBFZ ~ Tel. No. 262-2960/65 See
| SWSCICiearence— (fo Issue clearance thatthe project wil not afect |
their ulltes) —epplloable only for projects with excavation works :
3, | CIVIL AVIATION AUTHORITY OF THE PHILIPPINES (CAP)
= | pag. 0050, Argonaut Highway, SBFZ ~ Tel. No, 250-2176
applicable only for new construction or renovation involving
onstruction of addtional floors. eas. pee
git Clearance Permit (HCP) ~ (height clearance requirement)
a ‘Endorsement letter from various SBMA Industrial Parks (e.g.
SBDMC, Subic Techno-Park, SOC, SCLIP, Global Terminals) or
Main Lessee.
Subic Bay Metropottan Authosty
IND SAFETY DEPARTMENT
cone Ratan Bin tT sKin Sieat CAM Bren Sie Rav Fraanet ona 979? PhoneBUILDING PERMIT & SAFETY DEPARTMENT (BPSD) REQUIREMENTS:
Requirements:
| No. of | Submitod |
Copies | Yes | No |
AS art nar area BOSD
Hah Letter of authrization from the locator to transact in thelr behalf
(as applicable)
[37 | aeanatomes Certificate of Main ‘Sub-Lessee (ff subleased) eR i.
4/7 | Al Balding Permit Applicaton Fore (Guy signed and sealed bythe ze
ad og Professional and the applicant) — (Forms to be provided by 5 bP
5. | AI Bulking Plans for submital shal conform to Standard Form Type
0, At, A2 and AS of the National Building Code ofthe Philippines,
Fire Code, Mechanical Code, and National Structural Code of the
Philippines, duly signed and sealed by the their respective designing
professional ~aubmit photocopy ofthe latest PR ID & PTI of ne
‘Tespective Designing Professional/s involved in the project:
(G—A0,5-A1,0~A2,0-A3
Philippine Electronic Code, Philippine Electrical Code, Plumbing Code,
GhivStractural Panis
‘Sinuctural Computation and analysis
{coquired for stucture with an area of 1 square moters and above);
[| Architectural Plane
a
a
Electrical Planis
10._| Sanitary Pianis
11._| Plumbing Planvs
12,_| Mechanical Plane
13._| Fite Protection Planis
|For all ypas of cccupancy excopt or naive Tamly da
“®.OnetTwo Fai Gweling unis provide single sition
| ___ portable fe extinguisher.
Hysiaulic/ Flow computation
(4, Electronic Planis z
Bf Construction Spetcatonss
6. Bill of Materials & scope of work
47. | Geo-Techical Investigation Report
(required for three (8) storey building structure and above);
ey ‘Construction Safety Policy and Guidelines of the Company and Rsk
Assessment signed by accredited DOLE Satety Officer ~ (copy af
catiticaton from DOLE) ~ Coy A—
Note: Alrequemonts Tanttiea oes
designing profession
Result of Submission of Requirements:
= [1 APPLICATION RECEIVED
ios. 4 to 16 shall be submitted duly signed and sealed by thelr respective
ee =_ APPLICATION RETURNED: i
Assessed by:
BPSD - SBMA Representative / Designation
(Signature Over Printed Name)
Date /Time: ae
NOTE:
Acknowledged & Acceptod by:
Applicant ~ Representative
(Signature Over Printed Name)
Date /Time: Be
1) For SBTC! Applicant, please include in the submission of electrical plan the following:
a) Commented electrical plan
b) Certification of electrical load
2) APPLICANTS WITH INCOMPLETE REQUIREMENTS (MANDATORY/8PSD) WILL NOT BE ACCEPTED.