You are on page 1of 1
1251285 HO kerb 251255 SP. kerb see Note 4 ramet] Base Course ood Base ‘Sub-bose HB2_& SP KERB — CONSTRUCTION A 1251255 H82 kerb Weoring Course 125x255 C31, channel 1. All dimensions are in milimetres Unless otherwise. stated 2. For Notes see Drg No [SOZTIZ1A] 125785 SP here \we] ose Course Teen Ties Road Bose Cement morta ‘Sub-base (see Note 2) 16 dowel bars of 480 centres HB2_& SP KERB — CONSTRUCTION 8 Cua ase, hrs ond kar, boctng 1254150 8N kerb wm Nate ioe Co] [Bose Course sonerete C15, BN_‘DROPPED' KERB — CONSTRUCTION A (Wf construction B is used the 18 dowel, bars ‘re 180 tong with SD above kerb base) (Kerb base set prior to laying kerb 504180 EF footway edging \ ee Foatwa [> ———onerete cis Topsoil Warn bo Course ‘la a Concrete to be trimmed as ‘shown to, prevent reflective ‘racking’ t6 footway FOOTWAY EDGING EF — 150 (For EF-200 and FF-260 se Drg No[SOZ1173]) concrete C15 | as] al a 2 530 150 Eldepth HO2_& SP _KERB WITH CS1_CHANNEL CONSTRUCTION B 1254150 HBS bert Conergte C15 Weaing Cou Bose Course % i tatia tot Sto 16 dowel bare 275, 275 of ASS" Centres HBS_KERS (Kerb laid above existing carregeway surfer ‘STANDARD DRAWING CONSTRUCTION DETAILS KERBS, CHANNELS AND FOOTWAY EDGINGS KERBS AND FOOTWAYS =| SD/T1/2

You might also like