1251285 HO kerb
251255 SP. kerb
see Note 4
ramet]
Base Course
ood Base
‘Sub-bose
HB2_& SP KERB — CONSTRUCTION A
1251255 H82 kerb
Weoring Course
125x255 C31, channel
1. All dimensions are in milimetres
Unless otherwise. stated
2. For Notes see Drg No [SOZTIZ1A]
125785 SP here
\we]
ose Course
Teen Ties
Road Bose
Cement morta
‘Sub-base (see Note 2)
16 dowel bars
of 480 centres
HB2_& SP KERB — CONSTRUCTION 8
Cua ase, hrs ond kar, boctng
1254150 8N kerb
wm Nate
ioe Co]
[Bose Course
sonerete C15,
BN_‘DROPPED' KERB — CONSTRUCTION A
(Wf construction B is used the 18 dowel, bars
‘re 180 tong with SD above kerb base)
(Kerb base set prior to laying kerb
504180 EF footway edging
\ ee
Foatwa
[> ———onerete cis
Topsoil
Warn
bo
Course
‘la
a
Concrete to be trimmed as
‘shown to, prevent reflective
‘racking’ t6 footway
FOOTWAY EDGING EF — 150
(For EF-200 and FF-260
se Drg No[SOZ1173])
concrete C15
|
as] al
a 2
530 150
Eldepth
HO2_& SP _KERB WITH CS1_CHANNEL
CONSTRUCTION B
1254150 HBS bert
Conergte C15
Weaing Cou
Bose Course
% i
tatia tot Sto
16 dowel bare 275, 275
of ASS" Centres
HBS_KERS
(Kerb laid above existing
carregeway surfer
‘STANDARD DRAWING
CONSTRUCTION DETAILS
KERBS, CHANNELS AND FOOTWAY EDGINGS
KERBS AND FOOTWAYS =| SD/T1/2