Thursday, Participants: Irsan, Irmadi, Adhi M, Alan F. ‘SOE Meeting Notes 1. Dari beberapa module SOE, yg menjadi target go live di bln Dec 2020 adalah: a. Efficiency evaluation, yg mencakup: i. Performance summary based on KPI yaitu: power output (MW), net plant heat rate (kcal/kWh), plant effciency (%), total auxiliary power (MW), capacity (MW, assume input unit capacity from name plate or design), Action, IT (Imadi) to consult Adhi for mapping data, ii, Performance trending chart (in a week): power output (MW), net plant heat rate (kcal/kWh), plant effciency (%), total auxiliary power (MW). Action, IT (Irnadi) to consult Adhi for mapping data. iii, Heat Balance Diagram dim format simplified P&ID, actual & predictive utk: power output (MW), gross plant heat rate (kcal/kWh), boiler heat rate (kcal/kWh), turbine heat rate (kcal/kW}, cleanliness factor condenser, fuel heat input (HHV). Action, IT (Irmadi) to consult Adhi for mapping data. iv. Performance impact chart, trending chart based on time period parameters (a week): power output (MMW), gross plant heat rate (kcal/kWh), boiler heat rate (kcal/kWh), turbine heat rate (kcal/kW), cleanliness factor condenser, fuel heat input (HHV). Action, IT (Irmadi) to consult Adhi for mapping data. v. Degradation, gap value between actual and commissioning utk: power output (MW), gross plant heat rate (kcal/kWh), boiler heat rate (kcal/kWh), turbine heat rate (kcal/kW), cleanliness factor condenser, fuel heat input (HAV). Action, IT (Irnadi) to consult Adhi for mapping data Vi. Boiler heat losses: total losses, H20 in fuel loss, dry flue gas loss, unburned carbon in fly ash and bottom ash, H2in air loss, radiation loss. Action, IT (Irnadi) to consult Adhi for mapping data. vil. Energy analysis: © Heat rate (1/0) gap: NPHR actual vs reference. Action, IT (Irnadi) to consult Adhi for mapping data © Heat loss gap analysis dim format Heat losses gap pareto: operator controllable, unit controllable, boiler component, turbine component, makeup water. Action, IT (Irmadi) to consult Adhi for heat losses mapping data. © Fault three analysis dim format recommendation: operator action, maintenance action Action, IT (madi) to consult Alan for operator action and maintenance action, EPRI CS5-4554 dan TR-109546 can be taken as a reference. © Auxiliary power gap analysis dim format Pareto chart antara actual vs reference. Action, Adhi to discuss with iCore to follow for the reference number. Mapping data IT (Irnadi) to consult Adhi. viii, What if simulator: performance summary, heat balance diagram (simplified). it is advised to follow GE for output figure, for the numbers or parameters being pick-up can consult Adhi. b. Operation Advisory i. Flexibility: start-up chart, ramp rate (chart). li, Anomaly detection -> Operation trend--> Recommendation -> Fault three analysis. Action, Alan should work with Imadi, itis advised to follow GE for output figure. atch Optimizer |. Unit ranking, penentuan ranking berdasarkan kombinasi dari factor Rp/kWh paling efisien dan reliability. Current challenge: formula masih follow GE.

You might also like