REQUEST FOR INSPECTION Saudi Aramco 6717-ENG (11/98) 726-200 (Inspection Department) Ref: RFINo, —_RFL-CIV-009 8: 10-09003-006 __J0: Phase __Construction __Title industrial Support Facilities (SF) Package 13 To : Project inspection Unit/ Mr.Wahidduzzaman Abutalab (7{civil [] Mech. (Jplumb. C]comms. [7] Elect. [J others Inspection/monitoring is required on (date) _24Sept-2019___at (time)_8:00 AM prior to Borehole for the following location/equipment SF ~ Area 2 Work Permit Required: ZY ves [No Project Quality Plan: [] Hold points [ZY Witness Point ‘CONTRACTOR has verified that the work to be inspected Is complete and in compliance with the following specifications: ‘SAPMT representative has verified that the work is ready for Inspection and conforms to the project requirements SAES/SAMSS/Otherstt SAIC-A-1008 SAPMT Name Wahidduzzaman Abutalab Signature (ijeoe— Date _6¢-24, 2019 _ | Contractor/Company RICE Telephone Fax QA/ac Name Marvin Romualda. oserereTe QA/QC Signature This form received by the undersigned Inspection Department employee: Name Signature Date Time Inspector Arrived on site: Inspector Left Site Time nearest 4 hour Concurrence S.A. Proponent: Badge #: Work Description: Rigi 7 - Perform drilling & sampling in BH-18 from 10.0m up to 20m depth & BH-19 from 00.0m up to.10m depth / to continued, Rig# 16 - Perform drilling & sampling in BH-13 up to 15m depth & BH-15 up to 15m depth, Rigi? 22 - Perform drilling & sampling in BH-09 up to 15m depth & BH-24 up to 15m depth, Rigi 15 - Perform drilling & sampling in BH-43 from 00.00m up to 20m depth & BH-44 up to 15m depth. NOTE: Inspector's signature is for receiving this request only and not for approval or disapproval of the work or faclty inspected. Distribution: ‘A. Original— Inspection Unit B. 1st Copy-RPO Proponent _€. 2nd Copy ~ID Coordinator. 3" Copy - Construction Contractor asp] jersueg Auedwiog :cowesy Ipnes "SaLuoqpedsuy ENO KOO] waueieans Ss ‘Suatundog yo enoNddy pue MOIS HRT ‘weljuownedsu) SsouINN mM ‘susunoog jo mOReY 830 WossedSuy 9105 EK OH %OOL_-H ‘SouHEAYIPNES 0} PEUEISSE Se Kyiqsuodsal jo oaiBop OLUES a aNEY Hn JOENUED UIEYT Bi WOK To}DeMUDDGTS oll o} Aujqsuodse paublase ow SoRBMIOP SORENUED URNA] —G POH ose you s| annewueseida) Loneztue6i0 DbIVvO out} PEInpaLOS Se pawLO}Ied aq jeYs 186} 10 UoHDadsU! ay) ‘eAaMO} “ZoueApe Ul 389) 40 UORDOESU| Jo BUNUN AYR JO PaYROU 2a BUS LOREZIHEEIO SOV “SSSUNAN \VopeZUeBI9 UaNONAsUOD Wey eanOU INOW sseiB0xd UI YOM JOWLOU! o} UONenUeBLO QOTYO :s2ueqIeAINS| _Z ‘oueuuoped 9 ou uodn paseq wonedomyed ooweiy Innes jo sian 24 snipe Kew uompedsu cowery pneg ‘poued sun 1eyy_JouUosieg LoKedsul ays cowery Jones Aq UOEEINed 9 OO} aunbey eye AYNo® Bust 10 uonDedsul Yoes 1 sWWEDIOU. seta 81) UL ON TW © L saa i “onnoissmnoosu O10} ayoivs OLOEWOWS | spodey voyesysanu jexuyosioes | ONULNOE 'B ONRIBANIONS sool-w-oIws uonpodsuy Busey Kcwe0ae7 8001 we oredsur sop feopnare afaihg 800-¥-OIS jonoedsul SOM Pats e>qUDeI0% 2001 2001-¥-OIVS | swewaunboy uoueBysonuyjeUyooI009 yOlvs somvevionvs | wsano_| ayoosy guna3v0Nd ‘SVS ~_SINGWNOISSY ‘arin | ALN AIALOY SL ‘BaSVHd L93roud (Oia) 9000-£0060-01 ANVdINO9 ONILOVEILNOD 9? ONIGVHL GIHSVE TV (4S) SALLMIOV4 LOddNS TWRILSNGNI- 193rOUd LNVId S¥O BIPYNVL| Wo 2bveweLz LO-ELWdLIVS uoNeBASAU jea1uy22)029| ‘Oh NVIid NOILSSdSNI TW3IdAL OOWVeY IdNVS eo (Gigi am sp 0 ASN 12 EN ae OOM ORY SAOLARAMCOIDIIO- arn 272017. REV Sante Cen, 201 intervals thereater, and at changes in sol strata, Saudi Aramco: Company General Use SAUDI ARAMCO INSPECTION CHECKLIST irom EE |Geotechnical Field Works Inspection SAIC-A4008 | 27-Mar-17 RFL-CIV-00q7 brocrmr Vado CORTON ecOTRCTOR FrANAJIB GAS PLANT PROJECT - INDUSTRIAL SUPPORT |FACILITIES (ISF) PACKAGE #13 ue oemer 2008 bined TWA ORTON ta wR SK-CIv-0001 8 “NA 7 NA ie Sopnmor = 205;0 00M bie Sopember aot; 080 am “auoiataude use ont anP-atat a ac eee am E: eM ACCEPTANCE CRITERIA REFERENCE | PASS | FAL | WA | REANSPDATE a areal [ [ 7 ‘ne cuttin Contact shal poise anEngowu a Gesogtn ‘AY shall supervise and observe al subsurface exploration operations, Seo. 7.2 a tnt samples sd ropa og bongs, soundest ee ‘Tne gsc conta ea not nate ay fl wor bere g_sahing be Geos’ Flo Nunber The Gecocneal Flo Number | SAES.ATI3 ‘shall be stated in all reports and correspondence with regards to this: Sec. 7.1.3 _ pros {he Gate Contactor hl ish a abr equpment tl, pense, spss an erepotaten queso pre he as leamtcelmvectoatn, eran tng anayen andeparingin| SAESASIS. | ‘accordance with ASTM D420 and SAES A113 including requirements in 7 Krone A ‘The Geli Conacto hlinmedaty tly Saud anc i AM ina fecwoneanertering ndeaesecstermesiesiownine | SESS. | Geotchnalavestoaton spe of wore | |UTM coordinates and Mean Sea Level (MSL) elevations must be | prod rl ete MSL sree ad UTM conten mu be | ‘AS [Shon one fs tet. cal eoornates ang vations ae sassaats | // evecale stabs be eed nie repr sown bom oe a Thin strech bong eatin, | — ‘As |A boring os must be prepared in Savi Aramco Bornglog format SAESANI "ne Gelectie Contact: hal comply wth epee Sa 17 |hranceConetcton Say Manual sno eft ogra and saesaats | / potas of Sava ara, 2 a i an Teton an ep fbr sabe seca te susans | // deotcnalvoatgaton Scape of Wek geo 821 al babs, avon SPT hammers shal be usd, and stand ponatalon tte ae tobe pettrnedInaccrarce mh aSTW 0138 ec 821 [SAUDI ARAMCO INSPECTION CHECKLIST peer ese scence —farlaeeen [Geotechnical Field Works Inspection SAIC-A1008 27-Mar-17 RFI-CIV-00 |TANAJIB GAS PLANT PROJECT - INDUSTRIAL SUPPORT [FACILITIES (ISF) PACKAGE #13 seseeds-000s RICE) re ACCEPTANCE CRITERIA REFERENCE | PASS | FAL | WA | _RENGPOATE ie sls cfec, due tinal ub anges abo 52. chahedm scarce mast DIGST Oaneruue cowones | SAESAIS = [shall be used for rock coring 7 than erator requed,s shalb sang ard base ges ay a 14, jnoungodmaton he rouive coat eee, mea sree fe gee 821 Lv ge. [Sounivtermessurents shale nade er dbliaion he |—SAES-ATIS fete sein tebe Sec 02 ht cette sabe stl wih sandconent oar attteandet | SAEG-AMIS 86 Groundwater measurements, ‘Sec. 8.2.1 7 =] ako Proane Poet Tet ae It cone peneatn shalt Eocene PiezoonePertaton Teng 1 [econ mnauorate at ecrany, Mono haa cone Saes.Actts 4 feratoton etn snot alow cone pnevaton wing sal nc ore peeaueeasents c2 [isrnorona here ttcens cos os ecouneea be parece | AEST Sree epnced win ge caecy ecto core a. Foret cone pension cleat, xing and dal apoing. ASTM | SAEGAHTO Garr cret be lowe Sec 822 > Danie Cone Pertaton Testing ene I ox Pram Cone Feretonear(OCPT) sounds shale peromedin | SAESAtIS 7 rsnce AST Det sec 23 = ET I Ie ston nd deh of esl sees espe n [ne astral vex Sp WoT ac ston eh tt hescomined y ne Convco fl engit bse on il sass atts YZ ondreundrgcind ules nay ex ne ses a ost mut peter oe toe efloed tee crs strc ats sot be cae out os dscbedn ASTM [vse souminegesin vars ofsafoc os emresW SAES- (07 or yamiay ese oundtor. On so! he aa ne z_ [cee tles shel be aed. The ets face conte atemiimum | SAESAATS (0.75 m interval o a depth of 10 m uniess othervise specied inthe ‘Sec. 82.4 ¢ suc! Sap of Wor. On te sats be erpled and igo en cosibod ove. Tho cer hls roc abe tamed bom, 2 aa F ‘Shallow Refraction Seismic Soundings ‘The geophone spread should be twelve geophones at 2 m intervals for a {otal 24 m spread, Soundings shouldbe taken atleast twice at each 1 location, with the energy source at 0 m and again at 28 m (Reverse ‘Spread. Additonal soundings shouldbe taken ifthe rests do not (leary dine the rock ayers. Fz Seismic refraction testing and analysis shal be in accordance with |asTt¢ 5777 6 In-Situ Pressure meter Test Pressure meter Tests shall be performed in accordance to ASTM 'D4718. This test method includes the procedure for cciing the borehole, inserting the probe, and conducting pressure mete tests in both granular and coheste sole, but does not include high preseure testing in rock. a SAES ATS SAES.A-113, 50. 82.5 Sec. 625 SAES-A-113, ‘S00, 8.26 ‘Saudi Aramco: Company General Use S10 A2ACO IBD aen 27 207. REV Cae eMart 3,201) [SAUDI ARAMCO INSPECTION CHECKLIST |Geotechnical Field Works Inspection ITANAJIB GAS PLANT PROJECT - INDUSTRIAL SUPPORT FACILITIES (ISF) PACKAGE #13, 10-09003-0006 SAIC-A-1008 27-Mar-17 RFL-CIV-004 RTcc * Test Piz [ T T tar The locaton and depth of tes pits shal be as specified inthe SAESATTS a eatechnizal investigation Scope of Work Seo 827 - Unless otnerwisespectiad in cope of work, the pis should extend toa 7 epth of mand logged. Density tess salle prtomed on casas 2 [indstiroed sols a epi 0.9, 03, 08, and every 0 3m thereat, AES At [Representative bulk samples of soil layers shall be taken for CBR sc testing per ATW OYEE3 t Plate Testing | Pate tests shal be undertaken below topsol (nominal at a depth of [00 mm ~S00 min o ASTM D185 fo delemine knoduus of ’ t+ labgoderecclonand CBR torus Seaton anager | SAESAHS y ‘and highway paverients). Tests shall cover the range of soil type's * encountered (sand sit cay) TE Thermal Resishvty as |e ET “31 Thermal resistvty testing sha be carded ou as per ASTM DS204 and | SAES-A.119 / whore apptzabo to cover te range of ol ypes encountered Sec. 829 ‘Thermal eis Tests fo be cartad out when desig of power cabo _J2__ installation schemes to be performed (applicable for cil/gas pipeline Lead L construction). See. 82.8 K etal Resisvty [a a savy testing shall be undertaken a8 perASTM GBT andto | SAESAMIS Wa cover he argo of sl types encountered See 8210 ul Infitration Testing | | [ - 1 Infiraton sng shal be undertaken as per ASTM 2985. Tees shall -SAES-A-119 / cover the arge of ol ypes encountered (and, si, a). ‘Sec 8.1 1 Percolation Testing [ ut _TRelocaton of percolation et aea sal be a species inthe SAESATS ectchncal investigation Scop of Work. See. 8.12 Percolation testing shal be performed as described in SASC-S-02. The nz_ [220th of test oles shoud be the same a the dept of proposed saes-tta {renches or seepage ps end unormiy spread over the proposed See, 82:12 7 sorption fold REMARK: ["Speeeo AND ACESTED . IREFERENCE DOCUMENTS: }- SAES-A-113 Geotechnical Engineering Requlrements, 27 March 2017 > Contractor / Third-Party ‘Saudi Aramco [constictan Rapresonatve Xi PT Roprosona stone Aa ies Cas Reger Levee ane nae aD: A Zloud ens, iat anes Pto Representative lac taspectar on Jk Rew ay Poss ay Ra ave sina: 6 Romualdo ron ae erg | [Dorerorenne” Llc reid Ramee” Cie W. Abutala SOA, as a Lae "Fanon Respro Congr a aly Wifi Test Saudi Aramco: Company General Use “E80 TA 0 | IL —_ 5 fore iy ee ~nan e yee ancy ee cn = HET Apt eae es ara Y AI |e Broan a v SOF a a T aR Goo eae ae eo rrmfoae Ape| Ae PSE TSE | ara ae ae + OF] ar 7 aro | Rear can Tas | or ar GRELEOT Tae | RE t Bee pe eee — ree rar 5 ToD A arma | ware Far Tren {Te [OCs Loreen | arate re [oo=| Toe ARE Tere ar ee ca DEI TER || Ta 5 Sree | Tee | Saar TS: os a (Woodow nowvas WHO. SS ee ey x ea roma — a rR aes = {ae Ta a suemmmrmes 9014 cowosopnes, a yoaryaninsrme Seems ery & Vos6 jrra6cig eeaeat apnoea ara (650 smurnovs niodans WassnantJ3sfouauaviasvo av ree wie ie oe mb o \ Aer | psa tbe epee | sar dev peace Cen ewer Aagt= too Taree TS | TRE = -— TaD | Ae | TOTAL A AMR) tocane | arcane ae z tar [a F ra | eee a Ts [Tos eet — | area T aE A TAR Trae | a w (TU o> Ia Peo [ip GAL cama — | ~crrne — a it Te: [a SSL — coe | resem rar a et Aree Femme _ | wrecmaine | sem 4 [oa| = ice Wine | swam | oem q TED Tata og ZA see | warren = tee rower Troan | yrieaiae_| ror 7 DPS a0 EAC ee can Leal oR | re + PG | To ALA SSbo AOA rises — | ercamee ee 3 oe ve a io | Ton t SS i AD | for AF SSS Seer | eewwraiae | ara aye mae Tee | era ti f uote: cw eames antigens (Gs) smuruova sxosans TwntusnoM! LIsfoud AAV SV BVA Cae i | a x rr a Tv re _| ae % waar 4 I co ed 7 —s Tro | ose | wae | u we ‘GAM ek| swine — | reverence T wr ae Wa [ee u ZT = SAS Foal vem ame foe we [Re | OW RRC PCA ween | eracracae | a inital x OBL ee er vcent | arrelee [arma T peta ar Sa ecitiacoe[ar a EEL pre Trae ee z ZETA pai ec afo ahs ZO | [OA ae 10" ebeoe| reece arene 2 2010 DWOJ0 IpAoS. i ene ee ; i Hoy6 iprreGcio owee an SNULOPHLNOD 8 ONOAUL OWEN 7 rz “che | [oe= leone aaa ara | oer © Ow eT erie | cerca | a BUF pus | Sree Eee a | oot eS 2 isnt | rime | ome a 7B aE ome | ieee | Sar a pm APO | [LLOG| orton | carteeeee | oo ale 5 came | rave | U ie Werle _| wereceee | aE AWS ae fea arpa [rarer [ae ‘o2wov0 ipnos_ tvoamaAaasns eats . ey : | HoyS jpretcig scorer ox “DO OMLLDMULNOD 9 SNIOVEL OWSTETY : (6s smunnvs saoaansTvtuusnaNL2foua sx 979 aXe rie tier mente GEERT @) Stieieees | Hot Work Permit | OF03-09 ao Gaea abn ork ‘This Hat Werk Parmit is requirad for any temporary operation Invelving open flames or producing heat or sparks. This includes, ‘but Is not limited to Brazing, Cutting, Soldering, Torching, Welding Name of Contractory—, ‘Name of Responsible Supervisor: Yu No Ne blty of fire Extinguisher ‘Avallabity of fire Blanket Adequate tllumination ‘Adequate Ventilation ‘Complete PPE forall workers & welders Safe ony-acetylene ges cylinder & tubing Flash back erestor installed Pressure gouge in good working order ‘Alleyinder placed in trolley No flammable / explosive atmosphere No flammable substance near hot work Safe condition of welding equipment ‘Suitable and safe mears of access/egress Equipment use intrinslcaly safe N Deqgg go O\0/o\o|o/0\0)0 Oo} YRC ny Oooo) 0/00\o\9 0j0\0 Ze [erie & signature of Receis ee Hot Work Permit ‘This Hot Work Permit required for any temporsry operation Involving open flames or producing heat or sparks. This Includes, ‘buts not timited to Brazing, Cutting, Soldering, Torching, Welding Project Name: Permit ios as A00001 ‘Work Description: Seil testing st of Equipment, Tools, Machinery tobe used? Borg Maching Required Precaution Checklist ‘Avalabllty offre Extinguisher | Avalablity offre Blanket ‘Adequate illumination ‘Adequate Ventilation We oloio oeeReces Complete PPE for al worer & welders | suf onracetvane ger cfinder tubing | ‘Flash back arrestor installed Pressure gouge n good worengorder [ate oc oe a Bciec 33_|Suttble and safe means of acess/ 4 Equipment use intrinsically safe Provide epsug enkey vethew Take raul Ueceks or af Testa fe 7d 7M. ‘OD = wigan stew nae ene Lg ema EER rrrose one ne vocanon Tar TORE HOLE IS AREA 10 COGROTRATEST a aT SRNR EON ANCE WEREW” TRE THE-SOCE-PRGDERTT GF RTOPT TRACE NO AEPROGUCTION BO FULLS OA WT PORT BOALL BE CSTAES FT BARGE eseraesparanisee fnraaew or oe SanananE as eaeae [9 78 Sanit fowwau OC SAUDI ARABIAN” lL. COMPANY. 3 aor [SEoTECHcAL esticaTiON-siTE PLAd FB 3 = er | fe Fi es was | 5 1 ST ena BF e

You might also like