You are on page 1of 4

DEUTSCHE NORM September 2007

DIN EN 14587-1
D
ICS 25.160.10; 93.100

Railway applications –
Track –
Flash butt welding of rails –
--`,,,`,````,,`,,`,``,```,``,,``-`-`,,`,,`,`,,`---

Part 1: New R220, R260, R260Mn and R350HT grade rails in a fixed plant
English version of DIN EN 14587-1:2007-09

Bahnanwendungen –
Oberbau –
Abbrennstumpfschweißen von Schienen – Teil 1: Schweißen neuer Schienen der
Stahlsorte R220, R260, R260Mn und R350HT in einer stationären Anlage
Englische Fassung DIN EN 14587-1:2007-09

Document comprises 40 pages

hasfür
Copyright Deutsches Institut theNormung
exclusive
©
No part of this standard may be reproduced without prior permission of
DIN Deutsches Institut für Normung e. V., Berlin. Beuth Verlag GmbH, 10772 Berlin, Germany,
e. V. right of sale for German Standards (DIN-Normen).
English price group 16
www.din.de !$I3\"
Provided by IHS Markit under license with DIN www.beuth.de
Licensee=Istanbul Teknik Universitesi/5956919001, User=z1, z1 11.07 1381657
No reproduction or networking permitted without license from IHS Not for Resale, 04/24/2018 10:17:46 MDT
DIN EN 14587-1:2007-09

National foreword
This standard has been prepared by Technical Committee CEN/TC 256 “Railway applications”, the
Secretariat of which is held by DIN (Germany).

The responsible German body involved in its preparation was the Normenausschuss Fahrweg und Schienen-
fahrzeuge (Rail Track and Vehicle Standards Committee), Technical Committee NA 087-01-01 AA Schienen-
schweißen.
--`,,,`,````,,`,,`,``,```,``,,``-`-`,,`,,`,`,,`---

2
Copyright Deutsches Institut für Normung e. V.
Provided by IHS Markit under license with DIN Licensee=Istanbul Teknik Universitesi/5956919001, User=z1, z1
No reproduction or networking permitted without license from IHS Not for Resale, 04/24/2018 10:17:46 MDT
EUROPEAN STANDARD EN 14587-1
NORME EUROPÉENNE
EUROPÄISCHE NORM June 2007

ICS 25.160.10; 93.100

English Version

Railway applications - Track - Flash butt welding of rails - Part 1:


New R220, R260, R260Mn and R350HT grade rails in a fixed
plant

Applications ferroviaires - Voie - Soudage des rails par Bahnanwendungen - Oberbau - Abbrennstumpfschweißen
étincelage - Partie 1: Rails neufs de nuances R220, R260, von Schienen -Teil 1: Schweißen neuer Schienen der
R260Mn et R350HT dans une installation fixe Stahlsorte R220, R260, R260Mn und R350HT in einer
stationären Anlage

This European Standard was approved by CEN on 3 May 2007.

CEN members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European
Standard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such national
standards may be obtained on application to the CEN Management Centre or to any CEN member.

This European Standard exists in three official versions (English, French, German). A version in any other language made by translation
under the responsibility of a CEN member into its own language and notified to the CEN Management Centre has the same status as the
official versions.

CEN members are the national standards bodies of Austria, Belgium, Bulgaria, Cyprus, Czech Republic, Denmark, Estonia, Finland, France,
Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania,
Slovakia, Slovenia, Spain, Sweden, Switzerland and United Kingdom.

EUROPEAN COMMITTEE FOR STANDARDIZATION


COMITÉ EUROPÉEN DE NORMALISATION
EUROPÄISCHES KOMITEE FÜR NORMUNG

Management Centre: rue de Stassart, 36 B-1050 Brussels

© 2007 CEN All rights of exploitation in any form and by any means reserved worldwide Ref. No. EN 14587-1:2007: E
for CEN national Members.

--`,,,`,````,,`,,`,``,```,``,,``-`-`,,`,,`,`,,`---

Copyright Deutsches Institut für Normung e. V.


Provided by IHS Markit under license with DIN Licensee=Istanbul Teknik Universitesi/5956919001, User=z1, z1
No reproduction or networking permitted without license from IHS Not for Resale, 04/24/2018 10:17:46 MDT
EN 14587-1:2007 (E)

Contents Page

Foreword..............................................................................................................................................................4
Introduction .........................................................................................................................................................5
1 Scope ......................................................................................................................................................6
2 Normative references ............................................................................................................................6
3 Terms and definitions ...........................................................................................................................6
4 Quality management system ................................................................................................................7
5 Requirements for the welding process ...............................................................................................8
5.1 General....................................................................................................................................................8
5.2 Clamping force.......................................................................................................................................8
5.3 Pre-heating .............................................................................................................................................8
5.4 Flashing ..................................................................................................................................................8
5.5 Upsetting ................................................................................................................................................8
5.6 Upset current..........................................................................................................................................8
5.7 Unclamping ............................................................................................................................................8
5.8 Welding parameters ..............................................................................................................................8
5.9 Steps across the weld ...........................................................................................................................9
5.10 Removal of excess upset ....................................................................................................................10
5.11 Post-weld heat treatment ....................................................................................................................12
5.12 Rail end preparation and horizontal alignment requirements ........................................................12
6 Procedure approval .............................................................................................................................12
6.1 General..................................................................................................................................................12
6.2 Information to be supplied by the purchaser ...................................................................................12
6.3 Sample preparation .............................................................................................................................12
6.4 Approval tests ......................................................................................................................................13
6.4.1 Visual inspection .................................................................................................................................13
6.4.2 Weld trimming ......................................................................................................................................13
6.4.3 Weld straightness and flatness..........................................................................................................13
6.4.4 Magnetic particle or dye penetrant inspection .................................................................................13
6.4.5 Bend testing .........................................................................................................................................13
6.4.6 Macro examination ..............................................................................................................................13
6.4.7 Micro examination ...............................................................................................................................14
6.4.8 Hardness testing..................................................................................................................................14
6.4.9 Fatigue testing .....................................................................................................................................15
6.5 Test result report .................................................................................................................................15
7 Approval of other rail profiles or grades ...........................................................................................15
7.1 General..................................................................................................................................................15
7.2 Sample preparation .............................................................................................................................15
7.3 Approval tests ......................................................................................................................................15
7.4 Test result report .................................................................................................................................15
8 Approval of the Welding Contractor ..................................................................................................15
8.1 General..................................................................................................................................................15
8.2 Welding procedure ..............................................................................................................................15
8.3 Operators..............................................................................................................................................15
8.4 Supervision ..........................................................................................................................................16
8.5 Weld Inspection ...................................................................................................................................16
8.6 Equipment ............................................................................................................................................16
9 Weld production following procedure approval...............................................................................16
9.1 Weld production...................................................................................................................................16
9.2 Information to be supplied by the purchaser ...................................................................................16
2 --`,,,`,````,,`,,`,``,```,``,,``-`-`,,`,,`,`,,`---

Copyright Deutsches Institut für Normung e. V.


Provided by IHS Markit under license with DIN Licensee=Istanbul Teknik Universitesi/5956919001, User=z1, z1
No reproduction or networking permitted without license from IHS Not for Resale, 04/24/2018 10:17:46 MDT

You might also like