You are on page 1of 1

Ecozone Monthly Performance Report (EZMPR)

Monthly ONLINE submission of reports due every 20th of the following month
PEZA Memorandum Circular No. 2006-026 dated 30 October 2006; 2007-005 dated 14 February 2007 and 2009—09 dated 19 March 2009
EZMPR Online Submission: apps.ho.peza.gov.ph/ezmpr
Sign up for an account: apps.ho.peza.gov.ph/ezmpr/signup.php

Guidelines for amendments and late submissions only:


1. To submit/amend previous months’ reports, the official prescribed format (as of January 2014) is to be used
or you may download the “Locator’s Monthly Performance Report” form at www.peza.gov.ph under
“Enterprise”.
2. Do not save another version/format (e.g. xlsx, pdf, etc.) or rename the worksheets inside the file.
3. Attach one (1) file per period/month and email to ezmpr@peza.gov.ph
4. Input the figures in the form. Negative value is rejected in the format.
5. Retain the format of the downloaded form and do not rename the Data Entry Form worksheet nor create
formula.
NOTE: Please be informed that the e-mailed report/s will be manually uploaded since the deadline for
submission has already lapsed. The system will reject incorrect format and will cause delay in the uploading

EZMPR are subject for verification.

Tax Incentives Management and Transparency (TIMTA)


1. Annex A.1 Annual Tax Incentives Report-Income Tax Based
2. Annex A.2 Annual Tax Incentives Report-VAT, Excise Tax and Duty-Based Incentives
3. Other Relevant Data or Information-Actual Investments and Benefits
Republic Act No. 10708, PEZA Memorandum Circular No. 2016-003 dated 04 August 2016; 2016-014 dated 11 April 2016, 2016-035 dated 30
September 2016, and PEZA Memorandum Order No. 2017-009 dated 30 June 2017.

Enterprises are advised to:


a) submit only the lacking reports, in order to avoid flooding of unnecessary re-submission of reports; and
b) Attach one (1) file per report (Annex A.1, Annex A.2 and Other Information) per year (2015, 2016, 2017, 2018)

NOTE:
(1) Annex A.1 and Annex A.2 – email excel file at timta@peza.gov.ph and hard copy duly certified by
two highest officials of the enterprise to be submitted to the PEZA Zone Office;
(2) “Other Information” - email (a) excel file and (b) signed scanned copy at esdtimta@peza.gov.ph;

TIMTA reports may be subject for verification.

Please be mindful of the deadline of EZMPR and TIMTA reports. We wish to advise that due diligence be
applied in the submission of reports in order to avoid delay processing of your PEZA request.

You might also like