Republic of the Philippines

Province of Abra
Municipality of Tineg
Barangay Belaat

Committee on May 12, 2019 at 9:00 AM

Name of Project Concreting of Community Drainage Canal Phase 1


Location Belaat Tineg Abra
Contract No. Labor and Hauling
Contract Days 20 Calendar Days

ABSTRACT OF BIDS AS CALCULATED


ITEM NO. DESCRIPTION QUANTITY UNIT CODIEN L. BILONG SAGMANG B. GUCYAM DALLIO P. LIBENG
UNIT PRICE TOTAL COST UNIT PRICE TOTAL COST UNIT COST TOTAL COST
103 (1)a Structure Excavation 12 CU.M 2,916.66 35,000.00
404(1)a Reinforcing Steel Bar 89.96 KGS 126.59
402(2)a Structural Concrete 15 CU.M 933.33 13,999.95