Province of Abra Municipality of Tineg Barangay Belaat
Committee on May 12, 2019 at 9:00 AM
Name of Project Concreting of Community Drainage Canal Phase 1
Location Belaat Tineg Abra Contract No. Labor and Hauling Contract Days 20 Calendar Days
ABSTRACT OF BIDS AS CALCULATED
ITEM NO. DESCRIPTION QUANTITY UNIT CODIEN L. BILONG SAGMANG B. GUCYAM DALLIO P. LIBENG UNIT PRICE TOTAL COST UNIT PRICE TOTAL COST UNIT COST TOTAL COST 103 (1)a Structure Excavation 12 CU.M 2,916.66 35,000.00 404(1)a Reinforcing Steel Bar 89.96 KGS 126.59 402(2)a Structural Concrete 15 CU.M 933.33 13,999.95