You are on page 1of 12
PITNO, =: MC-1711 TE! | MATERIAL REQUISITION | foo\, Sime so: for Steel Structure fabrication cnet aa Steel Structure fabrication MC1711-MR-S-02 PROJECT —: Sihanoukville Phase 2 1x150MW Coal Fired Power Plant CLIENT : TPSC LOCATION: Sihanoukville, Cambodia 2) All information in this requisition is proprietary of Dong Yang P&F and to be returned upon request. Vendor shall not be allowed to copy, disclose or reproduce to third parties without written permission from Dong Yang P&. 2) Design, manufacture and construction shall be done in accordance with stated specifications, standards & code on the requisition. Vendor shall obtain all necessary approval from statutory authorities. i ae \ Ho Bae 42 az AOL PMe aoe FATE ae 2017-10-31 08:48:22 2218!-PC PITNO, = :MC-A711 BSE | MATERIAL REQUISITION | Pov. hms for Steel Structure fabrication ae TABLE OF CONTENTS 1. General Description 2. Delivery 3. Scope 4. Design Conditions 5. Codes and Design Standard and Operating Conditions 6. Vendor Data Requirements 7. Painting and Protective Coating 8 Quality Assurance, Inspection, and Testing 9. Packing for Preparation for Shipment, Preservation 10. Preparation for shipment, Preservation 11. Documentation 12. Warranties 13. Contact Point 14, Attached Document 2017-11-01 16:56:23 BBE-PC PITNO, — :MC-1711 BE | MATERIAL REQUISITION | toch, Shs for Steel Structure fabrication a oa 1. General Description 1) This specification covers the technical and associated requirements for design, manufacturing and furnishing of belt conveyor & tower shop fabrication works and all the necessary auxiliaries. 2) All data, specifications, drawings and documents shall be in English. All documentation which is specifically produced for the Project shall be supplied in SI(System International). : 179, Mar. 2018 ~ TT-O1, 11-02, TT-03, TT-04, TC-01, MS-01, SM-O1, TK-O1, ET-O1 Delivery date : 2%! 13. Apr. 2018 - Conveyor Structure BC-05, BC-06 Delivery date : 3% 12, May. 2018 - Conveyor Structure BC-01, BC-02, BC-03, BC-04 2) Korea Vendor : FOB Busan or Masan or Pyeongtaek ‘Overseas Vendor : FOB port of Export 3. Scope The following equipment shall be supplied according to the specified requirements in this requisition and the related documents & drawings referred here to. 1)_Item, Description and Quantity Description Remark Ta Transfer Tower shipment 1.3 Taser Tower TF Shipment T.08 Transfer Tower Shipment Coal Crushing Tower ___}* Shipment Magnetic Separator Tower 1 Shipment Coal Sampling System Tower 8C.05 Tke-up Tower ment Etsng Tove Shipment Bek Coneyor 5 sen “Bat Conver 3 shpment Bet Conger «Shipment Belt Conveyor Belt Conveyor(Extension) 2* Shipment Belt Conveyor 2 Shipment onan aa Dawe Yann ear CSO 2017-11-01 16:56:23 BBAI-PC <0ING PITNO, —:MC-3711 DB) G=/F MATERIAL REQUISITION sit DOC NO. : MR-S-02 for Steel Structure fabrication ee 2) Scope of Supply Item and Quantities shown on Item, Description and Quantity Conveyor Structure Transfer Tower Item No. | _ Estimate Weight (ton) Item No. Estimate Weight (ton) BC-OLAB 5862 Transfer Tower TT-01 69.49 BC-02N/B 56.40 Transfer Tower 11-02 135.89 BC-03VB 203.85 Transfer Tower TT-03 28.83 BC-O4VB 3431 Transfer Tower TT-04 21.29 BC-05 3286 Coal Crushing Tower TC-01 61.25 BC-06 102.93 Magnetic Separator Tower MS-O1 21.49) Coal Sampling System Tower SM-O1 2224 8C-05 Take-up Tower TK-O1 30.18 Existing Tower ET-01 834 Total 399.0 887.97 ton - Delivery weight Shipment Item No. Estimate Weight (ton) 12 Shipment TH-01, 11-02, TT-03, 11-04, TC-01, MS-O1, (@. Mar. 2018) SM-O1, TK-O1, ET-O1 28 Shipment (13, Apr. 2018) 3° Shipment (22. May. 2018) 39900 BC-05, BC-06 135.79 BC-O1, BC-02, BC-03, BC-04 353.18 Grand Total 887.97 ton ee 2017-11-01 16:56:23 BEPC fo iF MATERIAL REQUISITION | prt, Neue e for Steel Structure fabrication eR - Supply Material & fabrication for Transfer Tower, Description Remarks | GA Drawing Engineering Drawing by Auto Cad Shop Drawing by auto cad & BOM | 3D Modeting(Tekla) ee Supply Material_(by JIS or ASTM) Fabrication Supply Material & Fabrication (Typical) O1. Structure 02. Ladder, Stair, Grating, Checkered Plate, Girth, Purlin, Deck, handrail, ete 03. Architectural : ___ Gutter, Rain spout, etc. iE 04. All fastners for assembly & erection Include 10% spare (05. Hoist Rail Beam and Support 06, Platform 07. Earthing & Lifting Lug (if necessary) - Supply Material & fabrication for Belt Conveyor Frame, Description Remarks GA Drawing Engineering Drawing by Auto Cad v Shop Drawing by Auto Cad & 80M v 3D Modeling (Tekla) a v Supply Material (by JIS or ASTM) v $ | Fabration 5 i : © | Supply Material, Fabrication & Assembly v = On, Stringer Frame Part ¥ § 0. Tass Part and Galery a with Wak way & Grating ca Dust pan. Side Cover, Checkered Plate = Support & Bent Par y OH, Toke Up Part Fame v 05. Cable Tray Support Ee v 2017-11-01 16:56:23 ZZIe-PC ie MATERIAL REQUISITION | Priv, Nes os Og for Steel Structure fabrication nek 06. Instruments Support & Bracket 07. Equipment Support All safety equipment (fence..) 3\s Fire Fighting Pipe Support & Bracket 10, Sun Shade Frame & Casing 1. Accessary (Wire, Rubber, PC Plate, Gasket, etc..) 12. Earthing & Lifting Lug 13, All Fastner for Assembly & Erection 14. Liner & Shim Plate 15, All Steel Manufacture 16, Ladder, Over Bridge, Handrail 17. Architectural (if necessary) (if necessary) (if necessary) Include 10% spare Drainage spout Bracket, ete 118, Maintenance Platform v ¥ Test equipment, if necessary Y Fastener(Bolt, Nut, Washer) for installation of structure (Included 10% spare) 3) Scope of Work ¥ Design - Shop (fabrication) Drawing for All Item Supply Material (by JIS or ASTM) Manufacturing Painting and Rust Prevention Test and Inspection Protection and Packing Transportation (Korea Vendor : FOB Busan or Masan or Pyeontaek, Oversea Vendor : FOB ee ead port of Export) Ocean Transportation CFR (Sihanoukville port, to be proposed as an option) Erection and Commissioning (if necessary, to be proposed as an option) Application of Local Regulation in Design and Manufacturing Performance and Guarantee Document & Drawing as per " Vendor Data Requirement” 5% Touch-up paint Material Supervision (Per diem Rate), As optional Training (Per diem Rate), if required Seu ieaeewseneic eee 4) Out of scope ¥ Motor, Reducer, Coupling, Back Stop Y Conveyor Belt 2017-11-01 16:56:23 2Ze-PC PUT NO. MATERIAL REQUISITION | focno. for Steel Structure fabrication Raye :MC-1711 :MR-S-02 :A Idler Seal Belt Belt Cover ee 4, Design Conditions Pulley & Bearing 1% & 24 Belt Cleaner Power Cylinder for Diverter & Coal scraper All products except the above goods are vendor's scope of supply. Head and Tail Frame Tower and Belt Conveyor ~ ASTM A36 Pipe IS G3444 STK400 High Strength Bolt - JIS B1186 FLOT ~ Hot Dip Galvanized Common bolt ~ ASTM A307M Grade A ~ Hot Dip Galvanized Grating = ASTM A36 or Equivalent - Bearing Bar : Plat Bar 3x32 @30mm Center to Center ~ Cross Bar : 8x®&mm Twisted Square bar @100 Center to Center, - Nosing : Checkered Plate 40mm x 4.5mm |[- Hot Dip Galvanized ASTM A123 Handrail - Handrail post : Dia, 48.6 x 3.2t stee! pipe, IS G3444 STK400 = Top rail: Dia, 48.6 x 3.2t steel pipe, JIS G3444 STK400 - Mid rail : Dia, 34.0 x 23t steel pipe, JIS G3444 STK400 Toe Plate : 100mm x mm, ASTM A36 - Hot Dip Galvanized ASTM A123 Stair Tread - ASTM A36 or Equivalent ~ Bearing Bar : Plat Bar 3x32 @30mm Center to Center ~ Hot Dip Galvanized ASTM A123, Checkered plate = Thickness 60mm, JIS $S400 = Hot Dip Galvanized ASTM A123 Hoist Beam ~ASTM A36, H or I Section 2017-11-01 16:56:28 2ZS!-PC iF MATERIAL REQUISITION | focus. iimsor OY for Steel Structure fabrication me 5. Codes and Design Standard and Operating Conditions 2) Codes and Design Standards = JIS, ASTM, ANSI, AISI, AWS, DIN, ISO, CEMA, API, ACI 2) Design and Operating Conditions Description Deal County : Gonbovia Max monty averge temperature i 2 Monthy Maximum temperature ae 45 Monthy Minimur temperature "c 2 Minium teperature "c ma Abie Presse Tbr 108 Maxum Win Sed ms 2 Arnal averge nfl wm 3200 Highest mom Rifas Pe Wow ie 375020) Mort Relative Huriiy(verage % 76 ~ sa Earthquake acceleration mm/s? 0.2 to 0.4 6. Vendor Data Requirements For Approval (Note) No. DESCRIPTION ‘W/Bid (Note) Documents 1__| Master schedule 2_| Design Criteria “3 [BOM list v 4__| Material certifications (Included Mil sheet) v v 5__ | Weekly and Monthly Progress reports v v 6 _| inspection and test plan / procedure v v 7__ | Vendor document list & schedule v 8_| installation manuals & Procedure v 9 _| site welding 8.0. list v v Preservation, packaging, and shipping procedures | Supliers Quay Assurance : : 12_| Fel tes nd ispecon procedure and report a 1a [wesppor 5 fi a 1a | leaning panting procedure wih specication a i 15 _| Site welding & Cutting list & drawing E v v 1 Drawing 1 | Sep draving for manufacturing of a Rem 5 5 — 2017-11-01 16:56:28 Baa-PC ie MATERIAL REQUISITION | focc, Me eas rl DOC NO. : MR-S-02 for Steel Structure fabrication ene cae | @ 2__[ Erection drawing for construction of all Item 3D Modeling Tekla Native File 7. Painting and Protective Coating 1) All steel surfaces shall be protected against corrosion by a coating system and decorative paint system, all as approved by the Purchaser. 2) Vendor shall perform surface preparation, priming, and finish painting in accordance with Specification, MC1711-ME-PS-00 (Rev.0), Painting Specification, 3) Vendor shall perform surface preparation, priming, and finish painting in accordance with Painting Specification. 8. Quality Assurance, Inspection, and Testing 2) Quality Control by Vendor ) The vendor shall prepare a Quality Control Plan covering all control, tests and inspection to be applied to all items of conveyor and tower structure. This document shall be submitted to contractor for review prior to manufacture. ») Criticalty rating shall be in accordance with the relevant job specification. ©) These ratings determine the requirements for project quality documentation, planning the level of quality assurance requirements, inspection surveillance requirements and the material certification requirements, 4) All personnel performing Non Destructive Testing must be adequately certified. Certification record shall be available at vendor's shop(s) before test. ) The company and contractor inspector shall have the right to request additional Inspection or examination to ensure that the requirements comply with the relevant job specification and codes. 2) Quality Requirements All necessary quality control and testing will be conducted to industry standard during the fabrication process. The quality control and testing will include any specified documentation and certificates. 3) Inspection and Testing by Contractor a) Inspection and tests at the vendor's shop shall be executed according to “Purchaser's document to be supply later” unless otherwise specified. 2017-11-01 16:56:23 2z12-PC Doc No. for Steel Structure fabrication ie ok GyyeBe | MATERIAL REQUISITION | 27", inser b) Vendor shall submit the content of the Inspection and Test Plan (ITP), which sets out specific quality practices and activities relevant to his entire scope of supply. It shall include as a minimum; check list of inspection and test, procedure reference, documentation and certification to be provided. Purchaser will determine and denote inspection points to be performed (such as hold, witness and/or review points) on the ITP submitted by Vendor. ©) Vendor shall notify Purchaser the witnessed inspection & test operation in three (3) weeks advance to permit Purchaser's inspector to witness at vendor's shop, ) Access shall be made available to the Purchaser's representatives at any time during the manufacture of the structure. ©) Inspection and witnessed tests by the Purchaser shall not relieve Vendor's any guarantees, responsibilities or obligations to provide satisfactory equipment. 4) Shop Inspection & Test Plan Shop Inspection & Test Plan shall comply with Specification, MC1711-QC-ITPL-00. 5) Shop Inspection and Test Procedure Refer to the document, MC1711-QC-ITPR-00, Shop Inspection & Test Procedure for stee! structure, Packing for Preparation for Shipment, Preservation Refer to the document, Shipping and packing Instruction, SPC-MP-2014-000071 Rev. 1. 10. Preparation for shipment, Preservation 1} Al items shall be suitably protected against damage during shipment and storage. Refer to Shipping and packing Instruction 2) The vendor shall be entirely responsible for the adequacy of the packing for shipment and storage on site, The structure / material shall be encased to prevent damage. Packages shall not be shipped unprotected. 3) It is the vendor's responsibility to ensure that surfaces be protected from damage during shipping and proper notification and treatment shall be required for free of damage during storage and installation. 4) During loading the vendor shall witness the loading and bracing to satisfy himself that all reasonable precautions have been taken to prevent damage occurs during transit. 2017-11-01 16:56:28 ZZe-PO PITNO, — : MC-1711 ASE? | MATERIAL REQUISITION | cho. tsa for Steel Structure fabrication REVNO. GA 11. Documentation 1) The measurement of design and engineering shall be applied as Metric, Celsius and kilogram Units in all respect. But inch and pound system for pipe components shall be applied as exception 2) Review and approval of vendor's drawings, calculations and other documents by the purchaser does not relieve vendor's responsibility for correctness under the terms of order. 3) Documents for proposal 1a) Proposal documents shall state the Name of Purchaser, Requisition No, Item No., Name of the equipment, firm price(s) by item, earliest delivery date(s), origin of material being quoted (country, place, manufacture name) and approximate shipping weight and dimension. b) Price shall be broken down as follows; 1 Weight Table for Quotation (Shop Drawings, Bolts, Main Steel, Grating, Checkered Plate, Handrail, etc) I Export packing and transportation to FOB port of Export I Spare parts for erection (as optional) ©) Vendor shall state the applied specifications and codes in his technical proposal. 4) Documents Required after Purchase Order a) Documents to be submitted and Number of Copies; Related drawings and documents shall be submitted according to the requirements of the Purchaser's "Vendor Documents & Data Requirements” attached in this material requisition. b) Documents and drawings shall be submitted in accordance with the procedure of Engineering Specification. ©) Procedure of Documentation = Vendor's documents and drawings shall be submitted to the Purchaser within the date mutually agreed. - Vendor shall check data on each drawing enough to avoid errors or inconsistency with ones on the other documents or drawings before issuing it, = Vendor shall inform the purchaser of design changes, which influence the Purchaser's design, by such a communication method as Tele-fax or E-Mail prior to issuing the revised documents or drawings in order to ask for the Purchaser's acceptance. 2017-11-01 16:56:23 Aze-PC PITNO, =: MC-1711 | TSE’ | MATERIAL REQUISITION | ply. tse: for Steel Structure fabrication revna {A 12. Warranties 2) Vendor shall guarantee the operation the equipment to the specified design conditions. 2) Vendor shall guarantee the materials and workmanship of the equipment a period of 18 months from final delivery data. But the maximum warranty period will not exceed 28, Fab, 2022. 13. Contact Point Mr. GUN SOO, PARK, Director : gspark@dypnf.com (+82-2-2106-8107) Mr. HEE CHANG, DO, Assistant Manager : dohe@dypnt.com (+82-2-2106-8037) 14. Attached Document The following documents, drawings and those referred shall form a part of this requisition. Document No Description MCL711-ME-DW-LA-00 Layout Drawing MC1711-ME-DW-8CO1~BCO6 GA. Drawing PNC-VC-XCSV2-0004-R4 Technical Specification of Coal Handling Plant ‘SPC-MP-XCSV2-0001 Shipping and Packing Instruction MCL7LI-ME-PS-00_REVO Paint Specification CAL-NC-XCSV2-0001 Design Criteria for civil and structural works TTA-NCXCSV2-0003 Standard drawing MC1711-ST-DW-BCO1-BCO6 Engineering Drawing for Conveyor MC1711-ST-DW-TTO1-TT04 Engineering Drawing for Transfer Tower MC1711-QC-ITPL-00 ‘Shop Inspection & Test Plan MC1711-QC-ITPR-00 ‘Shop Inspection & Test Procedure MC1711-QC-WPS-00 Welding Procedure MC1711-QC-WPQR-00 Welding Procedure Qualification Record Tem weight Table 2017-11-01 16:56:23 ZZe-PC

You might also like