Professional Documents
Culture Documents
Brocade Switch Zoning: Step Installation Instruction Result Browse Into Switch
Brocade Switch Zoning: Step Installation Instruction Result Browse Into Switch
This document describes how to Create and Administer Zones on Brocade Fabric OS V5.X.
The basic Process is:
A. Plan what you’re going to do.
B. Browse into Switch.
C. Create Aliases.
D. Create Zones.
E. Add Zones to Fabric.
F. Enable Fabric
G. Verify Zoning.
Using Internet Explorer, browse to the switch Internet Explorer displays the
1.
(http://xx.xx.xx.xx). SwitchExplorer main screen.
Visually verify that ports are listed as “N” in the Port Type
3.
column.
Click on the icon to start the Zone Administration A popup window is display and a login
4.
application. prompt appears.
Create Aliases
Expand the “Member Select List” tree for “Ports & Attaching
Either EMC CLARiiON or Emulex
8. Devices” and for the port being “Aliased” (the number just
(WWNN) is displayed.
before “(F-Port)”).
Expand the EMC CLARiiON or Emulex tree node to find more A second EMC CLARiiON or Emulex
9.
EMC CLARiiON or Emulex tree nodes (these are WWPNs). (WWPN) is displayed.
11. Repeat steps 7 and 11 for all Aliases. All Aliases are successfully created.
Create Zones
17. Repeat steps 14 through 17 for all Zones. All Zones are successfully created.
Hold down the <ctrl> key and select the Zones created in steps
12 through 17 from the Selection panel. New Zones are added to the Fabric
21.
configuration in the right panel.
Click “Add Member”.
Verify that the configuration name created in step 20 is A warning dialog is displayed confirming
23.
correctly displayed and click “OK”. the activation of the config.
Verify Zoning
Using Internet Explorer, browse to the switch The Switch Explorer screen is
1.
(http://xx.xx.xx.xx). displayed.