Professional Documents
Culture Documents
1. Two products are manufactured in a machining center. The production times per unit of
products 1 and 2 are 10 and 12 minutes, respectively. The total regular machine time is
2400 minutes per day. The daily production is between 150 and 200 units of product 1 and
no more than 45 units of product 2. Overtime may be used to meet the demand at an
additional cost of $1 per minute. Assuming that the unit profits for products 1 and 2 are
$12 and $15, respectively, formulate the problem as an LP model.
Using the Big M method, work through the simplex method step by step to solve the
problem.