You are on page 1of 1
y 6/ u 8 O 28/3/2011 UDATPUR MHS. Le - Hiimetion of sub standard results to. Superintending Lagmeer/Lavcutive Engineer concerned by Executive Engineer QC Dn. along with copy to agency, ‘Notice/ intimation to agency by regular Executive Engines? for rectification / modification’ removal/ replacement, etc. of works/ items regarding sub standard results, with copy to Executive Engineer QC Dn. Tntitnation by agency ‘to Superintending Engineer/ Executive Engineer & Executive Engineer QC regarding rectification done supported by test results/ photographs within week time, Verification of these resutis / rectitication ete. by field statf within week time, Intimation by regular Executive Engincer to Executive Engineer QC Dn. Regarding report received from agency and verification done by fild staff along with results of tests conducted. Verification of result submitted by agency and field staff by Executive Engineer QC Dn. and submission of report to Superintending Engineer / Executive Engineer concemed with in week’s time. Recommendation by Superintending Engineer to Addl. Chief Engineer for final decision with all supporting details from Executive Engincer, (field stafl) agency and Executive Engineer QC. Finalisation of ATR by Addl. Chief Engineer. Finalisation of ATR’s be done in above manner. Copy by FAX to Addl. Chief Engineer PWD Zone Jaipur-{/ Jaipur — II/ Bikaner/ Kota/ Dhratpur/ Udaipuc/ Jodhpur for compliance. Chief Engineer (SS) @ PWD Raj. Jaipur. Camp Udaipur. Syalary

You might also like