Borris, S. (2006). Total Productive Maintenance. Mcgraw-Hil.
Https://Doi.Org/10.1036/0071467335 Dhillon, B. S. (2009). Human Reliability, Error, And Human Factors In Engineering Maintenance. Isnaini Rozaq, M. (2015). Penerapan Overall Equipment Effectiveness (Oee)Dalam Implementasi Total Productive Maintenance (Tpm)Studi Kasus Di Pt. Adi Satria Abadi Kalasan. Retrieved From Http://Eprints.Upnyk.Ac.Id/4763/ Limantoro, D., & -, F. (2013). Total Productive Maintenance Di PT. X. Jurnal Titra, 1(1), 13–20. Mobley, R. K. (2002). An Introduction To Predictive Maintenance (Second Edition). An Introduction To Predictive Maintenance (Second Edition). Https://Doi.Org/10.1016/B978-075067531-4/50018-X Nakajima, S. (1988). Introduction To TPM (Total Productive Maintenance)- Productivity Press. Nurfaizah, U., Adianto, H., & Prassetiyo, H. (2014). Rancangan Penerapan Total Productive Maintenance (TPM) Di Bagian Press II PT. XYZ. Reka Integra, 2(1). Rahmad, Pratikto, & Wahyudi, S. (2012). Penerapan Overall Equipment Effectiveness (OEE) Dalam Implementasi Total Productive Maintenance (TPM) (Studi Kasus Di Pabrik Gula PT. “Y”). Jurnal Rekayasa Mesin, 3(3), 431–437. Https://Doi.Org/0216-468X Rinawati, D. (2014). Total Productive Maintenance , 21–26. Smith, A. M., & Hinchcliffe, G. R. (2004). Rcm-Gateway To World Class Maintenance. Butterworth-Heinemann. Retrieved From Http://Elsevier.Com Viirdian, R. P. . E. P. E. (2015). Evaluasi Efektivitas Mesin Coal Feeder Dengan Penerapan Total Productive Maintenance ( TPM ) di PT . Pembangkitan Jawa Bali Services PLTU Paiton Unit IX Oleh Riza Virdian , Endang P . W . dan Erlina P . Prodi Teknik Industri FTI- UPN ” Veteran ” Jawa Timur, 35– 49. Yoseph Bilianto, B., & Ekawati, Y. (2016). Pengukuran Efektivitas Mesin Menggunakan Overall Equipment Effectiveness Untuk Dasar Usulan Perbaikan. Profisiensi, 1–9.