BTS/Node

No. Province Start time Reason


B/EnodeB

10 INH UINH045 10/12/2020 02:22:33 Loss power (Not enough gen) at INH131
11 INH INH131 10/12/2020 01:24:39 Loss power (Not enough gen)
18 INH UINH074 09/12/2020 07:23:16 Port down
19 INH INH203 08/12/2020 13:25:27 Loss power (Not enough gen)
16 MAN MAN302 09/12/2020 16:01:05 Link down at MAN085-MAN302
2 MAT LMAP141 10/12/2020 07:00:46 Loss power (Not enough gen)
3 MAT UMAP141 10/12/2020 06:57:59 Loss power (Not enough gen)
4 MAT MAP141 10/12/2020 06:57:52 Loss power (Not enough gen)
5 SOF SOF143 10/12/2020 06:31:59 Loss power (Lack fuel)
20 SOF SOF265 08/12/2020 08:22:59 ODU broken
6 TET TET005 10/12/2020 06:19:56 Loss power (Not enough gen)
7 TET UTET005 10/12/2020 06:19:13 Loss power (Not enough gen)
8 TET TET057 10/12/2020 02:49:09 Loss power (Lack fuel)
9 TET UTET057 10/12/2020 02:48:46 Loss power (Lack fuel)
13 TET TET276 09/12/2020 20:33:25 Loss power
14 TET TET185 09/12/2020 20:21:51 Loss power (Lack fuel)
Resolve

Put and run gen at INH131


Put and run gen
Check port down
Not enough gen
Repair link MAN085-MAN302
Put and run gen/Check EDM
Put and run gen/Check EDM
Put and run gen/Check EDM
Supply and run gen
Replace ODU (Raining)
Put and run gen/Restore EDM
Put and run gen/Restore EDM
Supply and run gen
Supply and run gen
Run generator
Supply and run gen
Note

06:36 Lucas-860111050 is working at the site.


06:36 Lucas-860111050 is working at the site.
06:35 Mr.Helio-860784777 is prepaing then will make 50km to site.
07:35
06:12 Malate-860111049
Joaquim-864027802is preparing then will make 120km to site.
is preparing material then will make 50km to MAN302.
07:14 Feliciano-864111112 is processing car then will go to the site.
07:14 Feliciano-864111112 is processing car then will go to the site.
07:14 Feliciano-864111112 is processing car then will go to the site.
07:14 Mateus-860111022 is preparing then will go to the site.
06:16 Nilo-860111015 is on the way to site about 40km.
06:45 John-860111029 is preparing then will make 7km to site.
06:45 John-860111029 is preparing then will make 7km to site.
06:45 Machava-867111080 is on the way to site about 100km.
06:45 Machava-867111080 is on the way to site about 100km.
06:33 Frainete-864112110 is processing car then will go to the site.
Frainete-864112110 is already required money to buy fuel so BOD TET is processing.