Professional Documents
Culture Documents
60
0.60
0.61
2.10
B
2.10
1.80
0.60
1.50
2.72
0.60
4
1.10
13
G1 D1 D2 W1 16 15 14 12 11 10 9 8 7 6 5 4 3 2 1
0.15
1.20
0.60 0.60 0.60 0.60 0.60 0.60
PLAN
0.50
0.60
0.60
1.20
1 FRONT ELEVATION
A 2
1.10
1.10
W2 W3 W4 W5
0.70
0.60
2" x 3" TUBULAR BAR
RAIL HEIGHT 0.85m
2ND FLOOR LINE 16
15
2nd STAIR WINDINGS LINE 14 13
12
CONCRETE@0.10M THK.
11
10
9
1 SCHEDULE OF DOORS & WINDOWS 8
3.00
A 5 CONCRETE STAIR
7
0.98
2
N.G.L
ELEVATION
2 STAIR DETAIL
A 5
DRAWINGS AND SPECIFICATIONS AND PROJECT TITLE: SHEET CONTENTS DRAWING NUMBER
OTHER CONTRACT DOCUMENTS SIGNED AND
A 5
SEALED, AS INSTRUMENTS OF SERVICE , ARE
THE INTELLECTUAL PROPERTY AND DOCUMENTS AS SHOWN
OF THE ARCHITECT, WETHER THE OBJECT FOR
WHICH THEY ARE MADE ARE EXECUTED OR NOT. PROPOSED 3 STOREY
IT SHALL BE UNLAWFUL FOR ANY PERSON TO JULIET A. SABADO
APARTMENT BUILDING
DRAWN BY
CHECK BY : SHEET NUMBER
ARCHITECT ENGINEER DUPLICATE OR MAKE COPIES OF SAID
OWNER DATE :
5
DOCUMENTS FOR USE IN THE REPETITION OF
AND FOR OTHER PROJECTS OR BUILDINGS,
PRC : Validity : PRC : Validity : REVISIONS:
17
WHETHER EXECUTED PARTLY OR IN WHOLE,
PTR No. : TIN : PTR No. : TIN : WITHOUT THE WRITTEN CONSENT OF ARCHITECT LOCATION: BAPTISTA VILLAGE, CALAO EAST, SANTIAGO CITY ADDRESS: DATE :
PLACE : DATE : PLACE : DATE : OR AUTHOR OF SAID DOCUMENTS. RA 9266