JANUARY 2019
This information is property of Embraer and cannot be used or reproduced without written permission.
25 E175 United Airlines
2 E175 Mauritânia
BOOK TO BILL:
2 E190 E2 Air Kiribati
2.3
9 E175 Undisclosed Customer
This information is property of Embraer and cannot be used or reproduced without written permission.
ORDERS
DELIVERIES
This information is property of Embraer and cannot be used or reproduced without written permission.
ATR SHARE OF
13% DELIVERIES
(UNITS)
Airbus
16% Bombardier
25%
This information is property of Embraer and cannot be used or reproduced without written permission.
MATURE E2
AT SERVICE ENTRY
Numbers confirm
our promise.
“WiderØe expected some issues, being the global launch customer of the E2 – now our new jets are
showing better reliability than our existing fleet” (which also delivers world class figures)
“We know Embraer’s E-Jets well, and have high expectations for their
new generation aircraft in terms of economics, environmental impact,
and levels of comfort and convenience for our customers”
This information is property of Embraer and cannot be used or reproduced without written permission.
EUROPE 2,840
& CIS 26%
NORTH 2,770
AMERICA 26%
AFRICA & 810
M.EAST 8%
This information is property of Embraer and cannot be used or reproduced without written permission.
Number of Jets reaching 15y or more
(by 2025)
1,200
Number of Aircraft
800 1,700+
400
AGING FLEET
TO BE REPLACED
0
Below 100 seats 100-150 seats by 2025
Seat Capacity
This information is property of Embraer and cannot be used or reproduced without written permission.
60 80 100 120 140 160 180 200 220 240
E-Jets E2
MAX E2 + MAX
Broader market coverage
with no overlap
A220
No regional neo
product
Overlap
E190-E2 EIS Widerøe
April/18
E-JETS E2 TIMELINE
ON TIME, ON BUDGET, BETTER THAN SPEC
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
This information is property of Embraer and cannot be used or reproduced without written permission.
EIS
APRIL
2018
1ST FLIGHT
ADVANCED DESIGN DETAIL DESIGN, MANUFACTURING AND CERTIFICATION
E190-E2
E195-E2 Passes Water Spray Tests
July/18
E-JETS E2 TIMELINE
ON TIME, ON BUDGET, BETTER THAN SPEC
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
This information is property of Embraer and cannot be used or reproduced without written permission.
EIS
APRIL
2018
1ST FLIGHT
ADVANCED DESIGN DETAIL DESIGN, MANUFACTURING AND CERTIFICATION
E190-E2
EIS
2019
1ST FLIGHT
ADVANCED DESIGN DETAIL DESIGN, MANUFACTURING AND CERTIFICATION
E195-E2
E175-E2 First Horizontal Empennage
Aug18
E-JETS E2 TIMELINE
ON TIME, ON BUDGET, BETTER THAN SPEC
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
This information is property of Embraer and cannot be used or reproduced without written permission.
EIS
APRIL
2018
1ST FLIGHT
ADVANCED DESIGN DETAIL DESIGN, MANUFACTURING AND CERTIFICATION
E190-E2
EIS
2019
1ST FLIGHT
ADVANCED DESIGN DETAIL DESIGN, MANUFACTURING AND CERTIFICATION
E195-E2
EIS
2021
1ST FLIGHT
ADVANCED DESIGN DETAIL DESIGN, MANUFACTURING AND CERTIFICATION
E175-E2
5
39
Months
Countries
120
Airlines
nm flown
125,000+
DEMO TOUR
This information is property of Embraer and cannot be used or reproduced without written permission.
This information is property of Embraer and cannot be used or reproduced without written permission.
THANK YOU!