(DRAFT only)
Original EDITION
BY and BETWEEN
___________________ _________________________
Xxxxx Y. Zzzzzzz Xxxx Y. Zzzzz
Chairman Emeritus President / CEO
& Project Manager
Date : _____________________
Memorandum of Understanding : CONDEBUILD Ent. Page 1
** Table of Contents **
1 Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2 Preamble . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
3 The Partners . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
4 Oversight . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
6 Statement of Principles . . . . . . . . . . . . . . . . . 6
8 Responsibilities . . . . . . . . . . . . . . . . . . . . . . 8
9 Confidentiality . . . . . . . . . . . . . . . . . . . . . . . 9
11 Sundry Provisions . . . . . . . . . . . . . . . . . . . . 10
12 Miscellaneous . . . . . . . . . . . . . . . . . . . . . . . . 12
13 Annexures . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
Article - 2 : Preamble
Hereinafter referred to as
The Partners
___________________ ________________________
Xxxxx Y. Zzzzzz Xxxx Y. Zzzzzz
Chairman Emeritus President / CEO
& Project Manager
Date : _______________
Article - 4 : Oversight
& CONDE BUILD
Xxxxx Y. Zzzz Project ENTERPRISE
Chairman Emeritus Manager
President / CEO
and Xxxx Y.
Zzzzz
______________________
________________
Pull its own share of the load , within the Context of Collaborative
Undertaking, as defined in this Memorandum of Understanding;
The Area of Collaboration and Cooperation will be based on, and governed
by, the Minutes of Meeting = MoM, that will inevitably come out to thresh
out the Details of the Scope of Work, as per Project that will be awarded by
The Client to The Partners.
Under such Principle, each Partner shall be given his just, fair and equitable
share of the Scope of Work to be executed.
If - - for any cause or reason - - in the course of time, either Partner is unable to
carry out = execute = some part(s) of his Share of The Work, he has every right to
invoke, or allow, the entry, and participation on the ground, of a Third Party
Entity, or Sub-contractor, to do such task(s) for and on his behalf - - - provided,
however, that Prior Consultation with the Other Partner, was made, and a written
consent and agreement was executed to that effect by both Partners.
Such Prior Consent and Agreement, in Black & White, shall be appreciated,
recognized, honored and considered by both Partners as a legal part and parcel
of this MoU, and, therefore, binding to both Partners, being a Supplementary
Document / Annexure to the Original MoU, which shall now be revised and up-
dated, to reflect its current status.
To preserve, however, the gains of both Partners, the Incapacitated Partner’s First
Option is to allow the Other Partner to exercise The (His) Privilege of First
Refusal, so as to relieve the Incapacitated Partner from such particular ordeal - -
or “Excess Load”, carry out the work on hand within the parameters of Standards
of Quality Performance - - without prejudice to the Original Form, Shape, Spirit,
Letter, Intent and Content, Terms and Conditions, of the Original MoU - - - and
preserve and maintain their unity and teamwork.
1) Observe full compliance with Client’s Safety, Health, QA / QC, Housekeeping and
Environment Policy - - besides, and in addition to, those of Individual Partner’s
Own Protocols on the same issue. Maintain proper coordination with Client’s
Project-in-Charge.
4) Insure that all materials to be used shall be subject to inspection and approval by
Client’s Project-In-Charge prior to actual use. Rejected materials shall be denied
entry at Job Site. Inspection and approval at The Source is better, wise and right.
5) All Excess, Unused and Scrap Materials brought into Job Site to execute Project,
are the Legal Property and Responsibility of The Partners, and should be taken
out prior to Final Departure from Job Site.
6) The Partners shall provide required full manpower component that are qualified
and technically competent to complete the work within the required time frame.
Manpower Schedule shall be provided, indicating the number of personnel at Job
Site - - and their qualifications relative to the Work Schedule.
Any defect appearing within the aforesaid period shall be remedied by The
Partners at their own account, which is part of the Work Agreement.
9) In addition to all of the above, The Partners shall observe Superior Quality
Workmanship Standards in all their tasks, and shall recognize Client’s Project
Engineering Services’ inherent right and prerogative to reject, or disapprove, any
part of, or all, works stipulated in the Contract.
10) Change Order(s) during Project execution, as and when required, necessary, or
warranted, for whatever cause or reason, shall be resolved based on Minutes of
Meeting between The Client and The Partners to address such issue, and shall be
binding to The Partners and The Client.
The Minutes of Meeting (MoM) becomes a de-facto part and parcel of the Terms &
Conditions of the Contract, and shall become the basis and Reference Point for
the issuance of a Supplementary Purchase Order to the Original Purchase Order
that The Client will issue to The Partners - - - to cover for the additional payment
attendant with, and attached to, such Change Order(s).
The Partners must be painfully aware that one of the most important
features of this Memorandum of Understanding, or any similar Document
for that matter, is the issue on Confidentiality, Non-disclosure and
Privileged Information - - - that is solely based on Good Faith, Honor, Mutual
Trust, Integrity, Confidence and Loyalty - - - which are the Bedrocks of
Foundation of this MoU.
As such, The Partners are sworn-in to, and bound to live by, this Honor Code
of Confidentiality, Non-disclosure and Privileged Information.
Manpower Schedule
Each Partner shall be responsible for his Own Organization’s Manpower
Schedule and Timeline.
Materials
Each Partner shall be responsible to provide for his Own Organization’s
Material Requirements, ranging from Office Supplies and Equipment, to
other Consumable Items needed to carry out their Assigned Tasks. These
Materials, Supplies and Equipment are for “Own Use” by each Partner.
Sharing such Resources, which include On-Site Enhancement Training
and Manpower Development of Project Personnel, shall be at the
discretionary judgment of The Partners, based on the precept that it will
generate goodwill among their Staff and Personnel, and promote and
enhance each other’s capability to execute The Project.
Materials For Building The Project, as and when they are provided for by
The Client, shall be treated on a different mode, as they are Inherent
Components of The Project, and will be fully accounted for and audited
after they are consumed - - since they are exempted from payment by
The Client to The Partners.
Methodology
Any Project to be executed, or product to be made, employs Certain
Methodologies, the main objective of which is the successful, cost-
The Internet and YouTube abound with postings of New Methods and
Equipment for doing things - - with superior results, compared to
Traditional Methods. Nowhere is this fact more highlighted than in the
Automobile Manufacturing Industry.
Today’s cars were built totally different than they were, some 20 years
ago: Progressive Car Manufacturers employ Robotic Methodologies,
driven by Computer Programs, known in the industry as “Soft
Manufacturing”.
Article - 12 : Miscellaneous
:: Each Partner shall, sixty calendar (60) days before the Official Date of
Expiration of this MoU, initiate and transmit a Written Notice of
Renewal and Extension of the MoU, to each other, to form the Official
Reference Point for the Renewal and Extension of the MoU.
:: Either Partner can, or shall, in the course of time, initiate action for the
revision and up-date of this MoU, citing, among other things, the need,
changed status or circumstance(s), cause(s) and reason(s) that have
him called for - - - prompted him - - and compelled him to seek for - - -
this MoU’s prompt revision and up-date to reflect current, and factual,
events on The Ground.
Copies
Each Partner shall keep an Original Copy of this MoU, after it has been
notarized by a Public Attorney.
Article - 13 : Annexures
To follow - - - once they are available - - - after they have been discussed,
and agreed to, by The Partners.
* * * End of Page 15 of 15 * * *
Signatures
___________________ ________________________
Xxxxx Y. Zzzzzzzzzz Xxxxx Y. Zzzzzzzzzz
Chairman Emeritus President / CEO
& Project Manager