Jordan Orange Jordan common engineer -Energy Energy-Power

SystemConcrete floor(With base)NewScene


Copyright © Huawei Technologies Co.,Ltd.2014.All rights reserved.
No part of this document may be reproduced or transmitted in any form or by any means without prior written consent of Huawei Technologies Co.,Ltd.

Trademark Notice
is trademarks or registered trademarks of Huawei Technologies Co.,Ltd.

Other trademarks,product,service and company names mentioned are the property of their respective owners.

Version Prepared by Reviewed by Reviewed by Revision Record

V1.0 XXX XXX XXX First issue

Huawei Technologies Co., Ltd.


Address: Huawei Industrial Base
Bantian, Longgang
Shenzhen 518129
People's Republic
of China
Website: http://www.huawei.com
Email: support@huawei.com

Issue Date: 2014-XX-XX Effective Date: 2014-XX-XX


Description
Scenario Description:

Preconditon:

Scenario Schematic Drawing:


Total work
Manpower: Work hours Downtime
Standard Process (Person)
4
(Hours)
1.78 hours(Person* 7.12
(Hours):
Hours):

Remark : Operartions mark in yellow are forbidden in case of thunder storm day

1 2 3 4.1 5.1 7 8.1 10


Prepare the Install storage
Install a TP48200A
Make preparations installation for new batteries and related Clean the site before
Check the materials for Energy Install a power input cable for a TP48200A
monitoring signal Prepare labels
before site visit network deployment cables in a leaving
cable
scenarios TP48200A
0:00 0:00 0:00 0:15 0:15 0:22 0:22 0:37 0:37 1:07 1:07 1:22 1:22 1:34 1:42 1:47
0Person*Minute 60Person*Minute 30Person*Minute 30Person*Minute 30Person*Minute 15Person*Minute 25Person*Minute 20Person*Minute
Person ABCD Person ABCD Person ABCD Person AB Person A Person A Person AD Person ABCD

4.2 5.2 6 8.2 9


Install a PGND
Install alarm cable Check the hardware Conduct a power-on
Install a TP48200A cable for a
for TP48200A installation check (energy)
TP48200A

0:22 0:37 0:37 0:52 0:52 1:22 1:22 1:32 1:32 1:42
30Person*Minute 30Person*Minute 30Person*Minute 20Person*Minute 20Person*Minute
Person CD Person BC Person B Person BC Person BC
Duration
Installation
SN Task Description Person*min
Personnel
utes/Unit
1
Make preparations
4 0
before site visit

Procedure
1.1. Before visiting a site, check site preparations based on
Site Preparation Checklist. For example, check whether
materials arrive at the site, whether site access is
permitted, and whether transmission information, design
files, and tools are ready.

Notes
1. If onsite conditions are inconsistent with the conditions
described in the design file, contact Huawei site engineers
for confirmation.
2. If you encounter site access problems, contact Huawei
site engineers.

Tools

1 2 3

4 5 6

Materials
1 2

3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
1 2 Prepare the utes/Unit
installation for new
network 4 60
deployment
scenarios
Procedure
1. After you arrive at a site, check and confirm related
information based on Site Preparation Checklist Onsite. For
example, check whether the site information and
installation environment are consistent with the design,
whether the materials are a whole set, and whether the
tools are a whole set, and check the responsibility scope.
2. Move installation auxiliaries and tools to the site, and
Material and tool transportation neatly arrange them by type.
to the site 3. Assign tasks based on actual situations.
4. Wear protective cloths and gloves, and set warning
signs.

Notes
1. If onsite conditions are inconsistent with the conditions
described in the design file, contact Huawei site engineers
Responsibility division
3 4 for confirmation.
2. Gently move the materials and protect the product
components from colliding with the door, wall, or goods
EHS protection shelf.

Tools
Helmet&Safet Paper and
1 Compass 2 y Shoes 3 pencil
Long
4 Seat belts 5 measuring 6
tape
Materials
1 2

3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
utes/Unit
Material packaging check Unpacking inspection
Check the
materials for 4 30
1 2 Energy

Procedure
1. Check whether the model and number of onsite main
equipment, such as the cabinet, antennas, RRUs, BBU,
and DCDU, are consistent with that specified in the
engineering design file and material checklist (there is a
packing list attached to the equipment packaging), and
whether the appearance of packaging is intact.
2. If the inspection passes, unpack the packaging, and
check whether the number of materials is correct and
whether they are intact. In addition, request the logistics
service provider and implementation team to sign the DN.
3. Provide the NMC with the BBU ESN, which can be
obtained from the left mounting ear of the BBU.
4. Sort the materials and classify them as main equipment
and materials for the antenna system.

Notes
1. Do not unpack the packaging, and report the problem to
the project team in either of the following scenarios:
The model and number of onsite equipment are
Material placement inconsistent with the design file.
3 The packaging is seriously damaged or soaked.
4

Tools

1 2 3

4 5 6

Materials
1 2

3 4

5 6
Duration
Installation
SN Task Description Person*min
Installed storage Personnel
utes/Unit
batteries 1 Install storage
batteries and
2 30
related cables in a
TP48200A
Procedure
1. Turn off the BAT power switch on the ETP to avoid large
current.
BAT 2. Install storage batteries into the battery compartment of
2 switch the cabinet in sequence.
3. Remove the protective cover from the storage batteries,
and install a copper bar on the poles of adjacent storage
batteries.
4. Connect the other end of the power cable of the storage
batteries to the positive and negative poles of the storage
batteries. After the exhaust pipe is installed, install the
removed protective cover and turn on the BAT power
switch.

3
Notes
1. During installation, prevent the exposed metal conductor
of the power cable from contacting the metal housing of the
cabinet.
2. Add an insulation cover when using a wrench and
screwdriver. Otherwise, the storage batteries may be
burned out and cause human injuries.

4 Tools
Phillips
screwdriver and
1 flat-head 2 Diagonal pliers 3 Socket wrench
screwdriver (6
mm)
4 5 6

Materials
1 Storage batteries 2 Copper bar/pole cable

3 Cable tie 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
utes/Unit
Install alarm cable
2 30
for TP48200A

Procedure
1. Connect FE to BBU(UPEU) MON1,Route the FE to
TPA SMU02B board 10101(RS485) port.
2. Connect transmission FE to BBU LTE FE/GE0
1 port,Route to SLPU(UFLP) inside FE/GE0 port.

Notes

Tools

1 2 3

4 5 6

Materials
1 2

3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
1 utes/Unit
Install a power
input cable for a 1 30
TP48200A

Procedure
1. Determine the length of the power cable based on the
designed circuit route and then prepare AC power cables.
2. Route the power cables into the cabinet from the cable
outlet at the left front part of the cabinet, install a terminal
on the power cable, and connect the power cables to the
AC wiring terminals on the PDU as follows: a. Three-phase
power: Connect the brown, black, gray, and blue power
cables to the L1, L2, L3, and N wiring terminals,
respectively. b.Single-phase power: Install the short-
circuiting bars and L and N wires before cable connection.
3. Route the power cables into the AC power cabinet (a
PVC pipe is recommended for the power cable outside the
cabinet), trim off the excess of the power cables, prepare
connectors, and connect the power cables to the specified
3 positions.

Notes
1. The color of the power cable differs in different countries.
The procurement of the power cable must comply with local
regulations.
2. The OT terminal must be coated by PVC insulation tape
during cable routing to avoid contacting with the electrode.
3. The electrode to be connected to the power cabinet must
be powered off (the circuit breaker is turned off or the fuse
is pulled out) before the power cabinet is powered on.
2 During the power-on operation, the operation personnel
must wear a pair of insulation gloves and use insulated
Tools
tools. If a voltage monitoring cable is installed, connect it
and Measuring
the powertape
cable
(5 to the Cable
circuitcutter
breaker. Hydraulic pliers
1 m) 2 and utility knife 3 and heat gun

4 5 6

Materials
1 PGND cable for cabinet 2 14-8 OT terminal

3 Heat shrink tube 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
Installed TP48200A 1 utes/Unit

Install a TP48200A 2 30

Procedure
1. Determine the position for installing the cabinet,Use a
hammer drill to drill holes, and hammer expansion bolts into
the holes. Then, rotate the expansion bolts clockwise for
two or three circles and remove the bolts counterclockwise
from the holes. (If attachment plates for U steel or universal
bases are adopted onsite, skip this step.)
2. Move the cabinet onto the required installation
position,.Add spacers to ensure level.then use a torque
wrench to tighten the bolts.

4-M12x60 Notes
1. Newly installed cabinets must be level with existing ones.
2. Do not use a hammer drill to drill holes from the base.
3. After disassembling an expansion bolt, ensure that the
2 top of the expansion tube is level with the concrete floor. If
they are not level with each other, the cabinet cannot be
securely installed on the concrete floor.

Hammer drill,
1.Bolt 2.Spring washer vacuum
Tools
cleaner,
3.Flat washer 4.Expansion tube
Goggle,
Measuring tape (5
1 m) 2 Earplug, claw 3 Socket wrench
hammer, level
meter, marker
4 5 (marking-off 6
template)
Materials
1 TP48200A 2 Expansion bolt

3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
utes/Unit
Connection of a
1 PGND cable Install a PGND
cable for a 1 30
2 TP48200A

Procedure
1. Prepare a cable with a proper length based on the actual
route and install an OT terminal at both ends of the cable.
2. Connect one end of the PGND cable to the ground bar
on the inner side of the cabinet.
3. Route and connect the other end of the PGND cable to
the external cabinet copper bar for grounding.

Notes
1. Grounding principles: An equipotential cable is used to
3 connect the BTS3900AL AC cabinet and another cabinet,
and the PGND cable in the BTS3900AL AC cabinet is
connected to an outdoor ground bar.
2. When installing the PGND cable, tightly press the OT
terminal in the correct direction.

External Tools
ground bar Measuring tape (5 Cable cutter Hydraulic pliers
1 m) 2 and utility knife 3 and heat gun

4 5 6

Materials
1 PGND cable for cabinet 2 14-8 OT terminal

3 Heat shrink tube 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
utes/Unit
Install a TP48200A
monitoring signal 1 15
cable

Procedure
1. prepare signal cable, connect this cable from
RS485/RS232 port of SMU to MON1 port of BBU/UPEU

Notes

Tools

1 Diagonal pliers 2 3

4 5 6

Materials
1 Alarm signal cable 2 Cable tie

3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
utes/Unit
1
Prepare labels 1 25

Procedure
1. Choose proper labels (labels are classified into labels of
signal cables and labels of power cables) based on
application scenarios.
2. Fill in/prepare labels following label content rules agreed
by the customer.
3. Attach/secure prepared labels. Fold labels of signal
cables in the way specified in the figure, and bind labels of
power cables using in the delivered cable ties.
4.Ensure that the label orientation and installation location
is easy for information query.
2 Labels of signal cables Labels of power cables

Notes
cable cable
Adhesive side 1. Labels are attached at the position 20 mm away from a
right folding connector by default.
right folding

2. The Label content facilitates maintenance and correctly


partial
maps the cables.
3. Labels are neatly attached.

3 4

Tools
cable

1 Paper and pencil 2 Diagonal pliers 3 Scissor

Three procedures 4 5 6

for attaching Materials


labels of signal 1 Label 2
cables
3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
1 utes/Unit
Check the
hardware 2 20
installation

Procedure
1.Check the hardware installation based on the design
drawings and Hardware Installation Quality Checklist.
2. Check whether the equipment, cabinets, antennas, and
BBU are securely installed at specified positions and
whether their appearances are intact.
3. Check whether the cable routes are correct, whether the
feeder connectors are securely installed, and whether cable
labels are legible.
4. Check whether the downtilt angle and azimuth of the
antennas are correct.
5. Check whether the installation position and route of the
PGND cable are correct and whether the cable connectors
are securely installed.
6. Check whether connectors are reliably and securely
waterproofed.

2 3

Notes
1. The design drawings may be a TSSR for projects outside
China.
2. The project team needs to confirm and sign Hardware
Installation Quality Checklist with the customer and
subcontractors in advance.

4 5 6 Tools

1 Inclinometer 2 Compass 3 Multimeter

4 5 6

Materials
1 2

3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
1 Tool sorting 2 Material sorting utes/Unit
Clean the site
4 20
before leaving

Procedure
1. Sort onsite tools.
2. Remove the redundant materials.
3. Clean the equipment room and the area for installing the
antenna system. Then, pack onsite garbage and take it
when leaving the site.
4. Based on requirements in Project PAT Document, take
photos, which will be used for preparing acceptance
documents.
5. Fill in the registration form for equipment room visit.
6. Lock the door of the equipment room, and notify the
3 Cleaning
Photograph
NMC engineer of alarm information checking. If no alarm is
4 generated, leave the site.

Notes
1. Customize Project PAT Document based on project
requirements before using it.
2. Ensure that no sundries are reserved onsite after project
implementation.
3. Before leaving the equipment room, check whether the
Registration form for equipment room live network works properly with the OMC engineer.
5 visit 6 Door locking before leaving the site

Tools
Broom and
1 dustpan 2 Camera 3

4 5 6

Materials
1 2

3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
1 utes/Unit
2
Conduct a power-
1 20
on check (energy)

Procedure
1. Use a multimeter to measure the voltage of the storage
battery group and record the value.
2. Turn off the circuit breaker for AC power and check
whether the voltage between the DC busbar and the
negative busbar is the same as that displayed on the
monitoring module. Decrease the float charging voltage on
the monitoring module to ensure that it is about 1 V higher
than the voltage of the storage battery group.
3. Use an insulated handle to install the fuse for storage
batteries and restore the float charging voltage on the
monitoring module. Then, check whether the indicators on
each module indicate an alarm.

Notes
3
1. The float charging voltage must be decreased on the
monitoring module. Otherwise, the sparking that may be
generated when the fuse is installed for storage batteries
will cause human injuries.
2. If an exception occurs, shut down the power switch,
rectify the fault, and power on the equipment.

Tools

1 Multimeter 2 3

4 5 6

Materials
1 2

3 4

5 6
Main Item NO 条目

Prepare the installation Site


for new network 1.1 Clockin
deployment scenarios on site

first
Prepare the installation aid kit
for new network 1.1 and fire
deployment scenarios extingui
sher

Prepare the installation


for new network 1.1 Drinking
water
deployment scenarios

Prepare the installation


for new network 1.1 Tool bag
deployment scenarios
Prepare the installation
for new network 1.1 Site
type
deployment scenarios

Prepare the installation Warning


for new network 1.1
deployment scenarios tape

Prepare the installation EHS


for new network 1.1 kickoff
deployment scenarios meeting

Prepare the installation HW


for new network 1.1 working
deployment scenarios ID
Rigger's
working
Prepare the installation
for new network 1.1 at
height
deployment scenarios certific
ation

Prepare the installation Rigger's


for new network 1.1 PPE
deployment scenarios check

Prepare the installation Rigger's


for new network 1.1 PPE
deployment scenarios check

Pre-
Prepare the installation climbing
for new network 1.1 tower
deployment scenarios EHS
checking
Check
whether
the
storage
Install storage
batteries and related 1.1 batterie
s are
cables in a TP48200A installe
d
correctl
y

Check
the
Install alarm cable for alarm
1.1
TP48200A cable
connecti
on

Check
the
Install alarm cable for alarm
TP48200A 1.1 cable
connecti
on

Check
the
power
cable
Install a power input connecti
cable for a TP48200A 1.1 on is
installe
d
properly
.
Check
the
power
cable
Install a power input 1.1 connecti
cable for a TP48200A on is
installe
d
properly
.

Check
whether
the
cabinet
is
installe
Install a TP48200A 1.1
d
accordin
g to the
construc
tion
drawing.

Check
whether
the
cabinet
is
installe
Install a TP48200A 1.1 d
accordin
g to the
construc
tion
drawing.

Check
whether
the
appearan
ce of
Install a TP48200A 1.1 the
cabinet
is in
good
conditio
n
Check
whether
the
appearan
ce of
Install a TP48200A 1.1 the
cabinet
is in
good
conditio
n

Check
whether
the
appearan
ce of
Install a TP48200A 1.1 the
cabinet
is in
good
conditio
n

Check
whether
the
appearan
ce of
Install a TP48200A 1.1 the
cabinet
is in
good
conditio
n

Check
whether
the
groundin
g cable
Install a PGND cable for
a TP48200A 1.1 route
is
installe
d
correctl
y
Check
whether
the
groundin
g cable
Install a PGND cable for 1.1 route
a TP48200A
is
installe
d
correctl
y

Check
whether
the
equipote
Install a PGND cable for ntial
1.1 cables
a TP48200A are
installe
d
correctl
y

Check
whether
the
equipote
ntial
Install a PGND cable for
a TP48200A 1.1 cables
are
installe
d
correctl
y

Check
the
Install a TP48200A monitori
monitoring signal cable 1.1 ng
signal
cable
Check
whether
the
environm
Clean the site before 1.1 ent of
leaving
site is
clean
before
leaving

Clean the site before Turn


1.1
leaving Signals?

Fire
Clean the site before extingui
leaving 1.1 sher in
Vehicle?

Oil/Fuel
Clean the site before
leaving 1.1 /Water
Levels?
Windshie
Clean the site before 1.1 ld
leaving
Wipers ?

Brakes
Clean the site before (Pedal
1.1
leaving Pressure
)?

Clean the site before Hand


leaving 1.1 Brake?

Sides/Ce
ntral
Mirrors
Clean the site before
leaving 1.1 (adjust
before
driving)
?
Site
Clean the site before 1.1 Clockin
leaving or punch
in done?

Both
Clean the site before Headligh
1.1 ts (High
leaving & Low
Beam)

Installa
Clean the site before tion
leaving 1.1 tools
check

Conduct a power-on check Chek the


(energy) 1.1 voltage
Check
Conduct a power-on check 1.1 the BBU
(energy)
Light

Conduct a power-on check Check


1.1
(energy) the PMU
输出项名
1. After you arrive指导 at a site, check and 标准 APP采集 站点类型

confirm related information based on Site
Preparation Checklist Onsite. For example,
check whether the site information and
installation environment are consistent
with the design, whether the materials are
a whole set, and whether the tools are a
whole set, and check the responsibility Site
Clockin N ALL Picture
scope. on site
2. Move installation auxiliaries and tools
to the site, and neatly arrange them by
type.
3. Assign tasks based on actual
situations.
1. After you arrive at a site, check and
4. Wear protective cloths andbased
confirm related information gloves, and
on Site
set warning signs.
Preparation Checklist Onsite. For example,
check whether the site information and Is fire
installation environment are consistent first
with the design, whether the materials are
aid kit
a whole set, and whether the tools are a and
whole set, and check the responsibility
scope. fighting N ALL Picture
system
2. Move installation auxiliaries and tools availabl
to the site, and neatly arrange them by
type. e at
site?
3. Assign tasks based on actual Photo
situations.
1. After you arrive at a site, check and requirem
4. Wear related
confirm protective cloths andbased
information gloves, and
on Site ents:1、
set warning
Preparation Checklist signs.For example,
Onsite. Show the
check whether the site information and full
installation environment are consistent view of
with the design, whether the materials are Does the faciliti
a whole set, and whether the tools are a implemen es;2、Ph
whole set, and check the responsibility tation N ALL oto is
scope. have not
2. Move installation auxiliaries and tools drinking ambiguou
to the site, and neatly arrange them by water? s;
type. Photo
3、The
3. Assign tasks based on actual requirem
bucket
situations.
1. After you arrive at a site, check and isents:
clean
4. Wear protective cloths andbased
confirm related information gloves, and
on Site 1、Show
with
set warning signs.
Preparation Checklist Onsite. For example, the full
plenty
check whether the site information and view of
of water
faciliti
installation environment are consistent es; 2、
with the design, whether the materials are Does the
a whole set, and whether the tools are a team Photo is
not
whole set, and check the responsibility have N ALL ambiguou
scope. tool bag
2. Move installation auxiliaries and tools on s; 3、
The bag
to the site, and neatly arrange them by tower? is neat;
type.
3. Assign tasks based on actual 4、All
tools
situations.
4. Wear protective cloths and gloves, and orderly
placed
set warning signs. in the
tool
bag.
1. After you arrive at a site, check and
confirm related information based on Site Take the
Preparation Checklist Onsite. For example, full Photo
check whether the site information and view of requirem
installation environment are consistent site ents:
with the design, whether the materials are type:
a whole set, and whether the tools are a Tower, 1、Photo
is not
whole set, and check the responsibility monopole N ALL ambiguou
scope. , Plam
2. Move installation auxiliaries and tools tree, s; 2、
Easy to
to the site, and neatly arrange them by Roof top recogniz
type. tower,
3. Assign tasks based on actual OSP, e site
Warning type.
situations.
1. After you arrive at a site, check and CW, DC,
tape
4. Wear protective cloths andbased
confirm related information gloves, and
on Site IBS
Does the Photo
set warning signs.
Preparation Checklist Onsite. For example, implemen requirem
check whether the site information and tation ents:
installation environment are consistent set the 1、Photo
with the design, whether the materials are warning is not
a whole set, and whether the tools are a tape to ambiguou
whole set, and check the responsibility mark the s; 2、
N ALL
scope. dangerou
Take a Easy
2. Move installation auxiliaries and tools sgroup
area, recogniz
to the site, and neatly arrange them by photoand of 100%e
type. prohibit
all warning
check
3. Assign tasks based on actual other
implemen tape in
supplier
situations.
1. After you arrive at a site, check and team
tation the
EHS
4. Wear related
confirm protective cloths andbased
information gloves, and
on Site enter
team photo
equipmen
set warning
Preparation Checklist signs.For example,
Onsite. this
member t and
check whether the site information and toarea?
show tool
installation environment are consistent everybod are
with the design, whether the materials are y' wear qualifie
a whole set, and whether the tools are a qualifie d or
whole set, and check the responsibility d PPE notEHS
scope. equipmen N ALL check
2. Move installation auxiliaries and tools ts(Safet listHW
to the site, and neatly arrange them by y working
type. harness, IDThird
3. Assign tasks based on actual helmet, party
situations.
1. After you arrive at a site, check and glove, certific
Photo
4. Wear protective cloths andbased
confirm related information gloves, and
on Site Shwo
shoes,Vi ationEHS
requirem
set warning signs. every
sibility kick off
Preparation Checklist Onsite. For example, implemen ents:
check whether the site information and Vest, meeting
1、Photo
installation environment are consistent tation
etc.) in group
is not
with the design, whether the materials are team
good photo
ambiguou
member
conditio
a whole set, and whether the tools are a HW s;
whole set, and check the responsibility n? 2、Take
scope. working N ALL a group
ID. No
2. Move installation auxiliaries and tools HW photo of
to the site, and neatly arrange them by all team
type. working member's
ID No
3. Assign tasks based on actual permit frontal
situations. HW
4. Wear protective cloths and gloves, and to HW working
site
set warning signs. ID
height
Safety
Photo :
Helmet
requirem
EN
1. After you arrive at a site, check and ents:
397,EN12
confirm related information based on Site 1、Show
492 ;
Preparation Checklist Onsite. For example, the full
Safety
check whether the site information and Shoes of
view :
installation environment are consistent third
EN20345
with the design, whether the materials are Rigger's party

a whole set, and whether the tools are a working certific
Visibili
whole set, and check the responsibility at N ALL ation;
ty Vest
Working
scope. Is the
height 2、Photo
rigger's :
at
2. Move installation auxiliaries and tools certific is not
EN471
height
to the site, and neatly arrange them by PPE
ation ambiguou
;Safety
(Safety Safety
type. s;
Helmet3、
Gloves ::
3. Assign tasks based on actual harness, Within
EN388
double EN
situations.
1. After you arrive at a site, check and the
;Full
397,EN12
4. Wear protective cloths andbased
gloves, and lanyard, period
confirm related information on Site body;
492
set warning signs.
Preparation Checklist Onsite. For example, helmet, of
glove, Safety
check whether the site information and validity
Harness
Shoes :
shoes,Vi ;
installation environment are consistent :EN
EN20345
with the design, whether the materials are sibility 361,EN
Vest,Ful ;
a whole set, and whether the tools are a l Body 358
Visibili
whole set, and check the responsibility ;Work
ty Vest
Safety
Is the N ALL
scope. Harness, Position

2. Move installation auxiliaries and tools rigger's ing
Work
PPE EN471
to the site, and neatly arrange them by Lanyard
;Safety
Position
(Safety
type. ing :EN :
Gloves
3. Assign tasks based on actual harness, 358
EN388
situations. Lanyard,
double ;Double
1. After you arrive at a site, check and Fall
lanyard, ;Full
4. Wear related
confirm protective cloths andbased
information gloves, and
on Site arrestor Leg
body
set warning
Preparation Checklist signs.For example,
Onsite. helmet, Lanyard
Safety
,Eye
glove, :EN
check whether the site information and Protecti
shoes,Vi Harness
installation environment are consistent 355,EN
:EN
on etc.)
sibility 354,EN
with the design, whether the materials are in good 361,EN
Vest,Ful 362
a whole set, and whether the tools are a conditio
l Body 358
whole set, and check the responsibility ;Self
;Work
n?
Safety N ALL
scope. Retracti
Position
Harness, ng
2. Move installation auxiliaries and tools Work ing
to the site, and neatly arrange them by Arrestor
Lanyard
type. Position :EN353-
:EN
ing 2:2002;F
3. Assign tasks based on actual 358
situations. Lanyard, all
;Double
1. After you arrive at a site, check and Fall Photo
4. Wear protective cloths andbased
confirm related information gloves, and
on Site Pre- arrestor
Leg
requirem
arrestor
climbing for
set warning signs.
Preparation Checklist Onsite. For example, Lanyard
ents:
,Eye
tower steel
:EN
check whether the site information and Protecti 1、Photo
installation environment are consistent EHS rail :EN
355,EN
is not
on etc.)
checking 353-
with the design, whether the materials are 354,EN
ambiguou
in good
: check 1;Telesc
362
a whole set, and whether the tools are a conditio
full s;
whole set, and check the responsibility ope
;Self
2、Rigge :
n?
body N ALL 7X50;
Retracti
scope. r hang
lanyard ng
2. Move installation auxiliaries and tools and on tower
to the site, and neatly arrange them by Arrestor
without
type. double :EN353-
his
lanyard 2:2002;F
3. Assign tasks based on actual is hands
situations. all
catch
4. Wear protective cloths and gloves, and qualifie arrestor
the
d for
set warning signs. tower
steel
rail :EN
353-
1;Telesc
ope :
7X50;
wiring
terminal
on the
storage
1. Turn off the BAT power switch on the battery
ETP to avoid large current. stands
2. Install storage batteries into the properly
battery compartment of the cabinet in without
sequence. any
3. Remove the protective cover from the damage,
storage batteries, and install a copper and the storage
bar on the poles of adjacent storage post is N ALL batterie
batteries. not s photo
4. Connect the other end of the power covered
cable of the storage batteries to the with any
positive and negative poles of the storage acid
batteries. After the exhaust pipe is substanc
installed, install the removed protective es.
cover and turn on the BAT power switch. 4、The
pressure
relief
valve The of
1. Connect FE to BBU(UPEU) MON1,Route the cable
the alarm
FE to TPA SMU02B board 10101(RS485) port. connecti
battery cable
onismeets
not connecti
2. Connect transmission FE to BBU LTE N ALL
FE/GE0 port,Route to SLPU(UFLP) inside the
deformed on on
FE/GE0 port. ,design
and no the BBU
requirem
liquid side
ents.
leaks.
5、The
1、Power
power
cables
cables
must
for the be
installe
storage
dbatterie
inThethe
position
cable alarm
1. Connect FE to BBU(UPEU) MON1,Route the s are cable
specifie
connecti
correctl
FE to TPA SMU02B board 10101(RS485) port. connecti
ondmeets
yin
2. Connect transmission FE to BBU LTE engineer
the N ALL on on
FE/GE0 port,Route to SLPU(UFLP) inside connecte the
ingthe
ddesign
to
FE/GE0 port. design
requirem TP48200A
positive side
1. Determine the length of the power cable document
ents.
and
based on the designed circuit route and s.
negative
then prepare AC power cables. 2、OT
poles.
2. Route the power cables into the cabinet terminal
from the cable outlet at the left front to
part of the cabinet, install a terminal on ensure a
the power cable, and connect the power solid
cables to the AC wiring terminals on the installa power
PDU as follows: a. Three-phase power: tion, OT
Connect the brown, black, gray, and blue terminal cable
terminal
power cables to the L1, L2, L3, and N contact N ALL photo(i
wiring terminals, respectively. b.Single- surface
phase power: Install the short-circuiting without nclude
cabinet)
bars and L and N wires before cable deformat
connection. ion,
3. Route the power cables into the AC good
power cabinet (a PVC pipe is recommended contact.
for the power cable outside the cabinet), 3、Label
trim off the excess of the power cables, s are
prepare connectors, and connect the power correct,
cables to the specified positions. legible,
and
complete
.
4、The
protecti
ve cover
is
installe
d
design
1. Determine the length of the power cable document
based on the designed circuit route and s.
then prepare AC power cables. 2、OT
2. Route the power cables into the cabinet terminal
from the cable outlet at the left front to
part of the cabinet, install a terminal on ensure a
the power cable, and connect the power 1、The
solid
cables to the AC wiring terminals on the installa
installa
PDU as follows: a. Three-phase power: tionOT
tion, power
Connect the brown, black, gray, and blue position
terminal cable
power cables to the L1, L2, L3, and N of the
contact N ALL terminal
wiring terminals, respectively. b.Single- cabinet
surface photo(A
phase power: Install the short-circuiting is in
without C BOX)
bars and L and N wires before cable strict
deformat
connection. accordan
ion,
3. Route the power cables into the AC cegood
with
power cabinet (a PVC pipe is recommended the
contact.
for the power the
cable outsidefor
theinstalling
cabinet), design
3、Label
1. Determine position drawings
trimcabinet,Use
the off the excess of thedrill
a hammer powertocables,
drill s are
prepareand
holes, connectors, and connect
hammer expansion boltsthe power
into the , to
1、The
correct,
cablesThen,
to the specified positions. meet
installa
legible,the
holes. rotate the expansion bolts installa
clockwise for two or three circles and tion
and
remove the bolts counterclockwise from the tion
position
complete
space
of .the Cabinet
holes. (If attachment plates for U steel N ALL
or universal bases are adopted onsite, requirem
cabinet
4、The Location
ents.
is in
protecti
skip this step.) 2、The
2. Move the cabinet onto the required strict
ve cover
installation position,.Add spacers to cabinet
accordan
is
ensure level.then use a torque wrench to cecanwith
installe
normally
the
d
tighten the bolts.
open
design
properlyand
1. Determine the position for installing close
drawings
the cabinet,Use a hammer drill to drill the, todoor
holes, and hammer expansion bolts into the 3、A
meet the
holes. Then, rotate the expansion bolts variety
installa
clockwise for two or three circles and of
remove the bolts counterclockwise from the tion
nameplat
space Cabinet
holes. (If attachment plates for U steel e logo
requirem N ALL signs
or universal bases are adopted onsite, correct,
skip this step.) ents.
clear,
2、The
2. Move the cabinet onto the required complete
installation position,.Add spacers to cabinet
.
can
ensure level.then use a torque wrench to normally
tighten the bolts.
open and
1. Determine the position for installing close
the cabinet,Use a hammer drill to drill the door
holes, and hammer expansion bolts into the Cabinet
3、A
no
holes. Then, rotate the expansion bolts variety
deformat
clockwise for two or three circles and of no Cabinet
remove the bolts counterclockwise from the ion, Overall
nameplat
depressi
holes. (If attachment plates for U steel e on,
logo N ALL View
or universal bases are adopted onsite, correct, (front
skip this step.) paint )
clear,
decorati
2. Move the cabinet onto the required complete
on
installation position,.Add spacers to .
ensure level.then use a torque wrench to intact
tighten the bolts.
1. Determine the position for installing
the cabinet,Use a hammer drill to drill
holes, and hammer expansion bolts into the Cabinet
holes. Then, rotate the expansion bolts no
deformat
clockwise for two or three circles and ion, no Cabinet
remove the bolts counterclockwise from the
holes. (If attachment plates for U steel depressi N ALL Overall
on, View
or universal bases are adopted onsite, paint (rear)
skip this step.)
2. Move the cabinet onto the required decorati
on
installation position,.Add spacers to intact
ensure level.then use a torque wrench to
tighten the bolts.
1. Determine the position for installing
the cabinet,Use a hammer drill to drill
holes, and hammer expansion bolts into the Cabinet
no
holes. Then, rotate the expansion boltsdeformat
clockwise for two or three circles and
remove the bolts counterclockwise from the ion, no Cabinet
depressi Overall
holes. (If attachment plates for U steel N ALL
or universal bases are adopted onsite, on, View
paint (left)
skip this step.) decorati
2. Move the cabinet onto the required
installation position,.Add spacers to on
intact
ensure level.then use a torque wrench to 1、The
tighten the bolts. PGND
1. Determine the position for installing cables
the cabinet,Use a hammer drill to drill must be
holes, and hammer expansion bolts into the Cabinet
connecte
no
holes. Then, rotate the expansion bolts d
deformat
clockwise for two or three circles andreliably Cabinet
remove the bolts counterclockwise from the ion, no Overall
to
depressi
holes. (If attachment plates for U steelgroundin
on, N ALL View
or universal bases are adopted onsite, gpaint
bar. (right
skip this step.) 2、OT
decorati )
2. Move the cabinet onto the required terminal
installation position,.Add spacers to on
s are
intact
ensure level.then use a torque wrench to securely
tighten the bolts. mounted
and in
good
1. Prepare a cable with a proper length contact.
based on the actual route and install an 3、Equip
OT terminal at both ends of the cable. otential
2. Connect one end of the PGND cable to cable
groundin
the ground bar on the inner side of the length N ALL g bar
cabinet. should
3. Route and connect the other end of the not
PGND cable to the external cabinet copper exceed
bar for grounding. 2m.(if
installa
tion)
4、Equip
otential
cable
diameter
to meet
the
equipmen
t
distribu
tion
requirem
ents.
(if
2、OT
terminal
s are
securely
1、The
mounted
PGND
and in
cables
mustgoodbe
1. Prepare a cable with a proper length contact.
connecte
based on the actual route and install an 3、Equipd
OT terminal at both ends of the cable. otential
reliably cabinet
2. Connect one end of the PGND cable to cable
to
the ground bar on the inner side of the length N ALL ground
groundin point(O
cabinet. gshould
bar. T)
3. Route and connect the other end of the not
2、OT
PGND cable to the external cabinet copper exceed
terminal
bar for grounding. 2m.(if
s are
installa
securely
1、The
tion)
mounted
PGND
4、Equip
and
cablesin
otential
good
must be
1. Prepare a cable with a proper length cable
contact.
connecte
based on the actual route and install an diameter
3、Equipd
OT terminal at both ends of the cable. to meet equipote
otential
reliably
2. Connect one end of the PGND cable to the
cable ntial
to cables(
the ground bar on the inner side of the equipmen
length
groundin N ALL
cabinet. t
should stacked
g bar. cabinets
3. Route and connect the other end of the distribu
not
2、OT
tion )
PGND cable to the external cabinet copper exceed
terminal
bar for grounding. requirem
2m.(if
s are
ents.
installa
securely
(if
tion)
mounted
installa
4、Equip
and in
tion)
otential
good
1. Prepare a cable with a proper length cable
contact.
diameter equipote
based on the actual route and install an 3、Equip ntial
OT terminal at both ends of the cable. to meet
otential
2. Connect one end of the PGND cable to the
cable cables(
equipmen cabinets
the ground bar on the inner side of the length N ALL installe
cabinet. t
should
3. Route and connect the other end of the distribu
not d side
tion by side
PGND cable to the external cabinet copper exceed
bar for grounding. requirem
2m.(if )
ents.
installa
(if
tion)
installa
4、Equip
tion)
otential
cable
The
diameter
cable
to meet monitori
1. prepare signal cable, connect this connecti
the ng
on meets
equipmen signal
cable from RS485/RS232 port of SMU to MON1 the N ALL cable
port of BBU/UPEU t
design
distribu connecti
requirem
tion on
ents.
requirem
ents.
(if
installa
tion)
room
should
be
clean,
1. Sort onsite tools. obsolete
2. Remove the redundant materials. crates
3. Clean the equipment room and the area and
for installing the antenna system. Then, other
pack onsite garbage and take it when debris
leaving the site. should environm
4. Based on requirements in Project PAT be ent of
Document, take photos, which will be used removed. N ALL site
for preparing acceptance documents. Install before
5. Fill in the registration form for the leaving
equipment room visit. remainin
6. Lock the door of the equipment room, g spare
and notify the NMC engineer of alarm items
information checking.
1. Sort onsite If no alarm is
tools. should
generated,
2. Remove leave thematerials.
the redundant site. be neat
3. Clean the equipment room and the area and
for installing the antenna system. Then, reasonab
pack onsite garbage and take it when le
leaving the site. stacking
Need to Need to
4. Based on requirements in Project PAT .
answer answer
Document, take photos, which will be used by N ALL by
for preparing acceptance documents. Yes/No/N Yes/No/N
5. Fill in the registration form for A A
equipment room visit.
6. Lock the door of the equipment room,
and notify the NMC engineer of alarm
information checking.
1. Sort onsite If no alarm is
tools.
generated, leave the site.
2. Remove the redundant materials.
3. Clean the equipment room and the area
for installing the antenna system. Then,
pack onsite garbage and take it when
leaving the site. Need to Need to
4. Based on requirements in Project PAT answer answer
Document, take photos, which will be used by N ALL by
for preparing acceptance documents. Yes/No/N Yes/No/N
5. Fill in the registration form for A A
equipment room visit.
6. Lock the door of the equipment room,
and notify the NMC engineer of alarm
information checking.
1. Sort onsite If no alarm is
tools.
generated, leave the site.
2. Remove the redundant materials.
3. Clean the equipment room and the area
for installing the antenna system. Then,
pack onsite garbage and take it when
leaving the site. Need to Need to
4. Based on requirements in Project PAT answer answer
Document, take photos, which will be used by N ALL by
for preparing acceptance documents. Yes/No/N Yes/No/N
5. Fill in the registration form for A A
equipment room visit.
6. Lock the door of the equipment room,
and notify the NMC engineer of alarm
information checking. If no alarm is
generated, leave the site.
1. Sort onsite tools.
2. Remove the redundant materials.
3. Clean the equipment room and the area
for installing the antenna system. Then,
pack onsite garbage and take it when
leaving the site. Need to Need to
4. Based on requirements in Project PAT answer answer
Document, take photos, which will be used by N ALL by
for preparing acceptance documents. Yes/No/N Yes/No/N
5. Fill in the registration form for A A
equipment room visit.
6. Lock the door of the equipment room,
and notify the NMC engineer of alarm
information checking.
1. Sort onsite If no alarm is
tools.
generated,
2. Remove leave thematerials.
the redundant site.
3. Clean the equipment room and the area
for installing the antenna system. Then,
pack onsite garbage and take it when
leaving the site. Need to Need to
4. Based on requirements in Project PAT answer answer
Document, take photos, which will be used by N ALL by
for preparing acceptance documents. Yes/No/N Yes/No/N
5. Fill in the registration form for A A
equipment room visit.
6. Lock the door of the equipment room,
and notify the NMC engineer of alarm
information checking.
1. Sort onsite If no alarm is
tools.
generated, leave the site.
2. Remove the redundant materials.
3. Clean the equipment room and the area
for installing the antenna system. Then,
pack onsite garbage and take it when
leaving the site. Need to Need to
4. Based on requirements in Project PAT answer answer
Document, take photos, which will be used by N ALL by
for preparing acceptance documents. Yes/No/N Yes/No/N
5. Fill in the registration form for A A
equipment room visit.
6. Lock the door of the equipment room,
and notify the NMC engineer of alarm
information checking.
1. Sort onsite If no alarm is
tools.
generated, leave the site.
2. Remove the redundant materials.
3. Clean the equipment room and the area
for installing the antenna system. Then,
pack onsite garbage and take it when
leaving the site. Need to Need to
4. Based on requirements in Project PAT answer answer
Document, take photos, which will be used by N ALL by
for preparing acceptance documents. Yes/No/N Yes/No/N
5. Fill in the registration form for A A
equipment room visit.
6. Lock the door of the equipment room,
and notify the NMC engineer of alarm
information checking. If no alarm is
generated, leave the site.
1. Sort onsite tools.
2. Remove the redundant materials.
3. Clean the equipment room and the area
for installing the antenna system. Then,
pack onsite garbage and take it when
leaving the site. Need to Need to
4. Based on requirements in Project PAT answer answer
Document, take photos, which will be used by N ALL by
for preparing acceptance documents. Yes/No/N Yes/No/N
5. Fill in the registration form for A A
equipment room visit.
6. Lock the door of the equipment room,
and notify the NMC engineer of alarm
information checking.
1. Sort onsite If no alarm is
tools.
generated,
2. Remove leave thematerials.
the redundant site.
3. Clean the equipment room and the area
for installing the antenna system. Then,
pack onsite garbage and take it when
leaving the site. Need to Need to
4. Based on requirements in Project PAT answer answer
Document, take photos, which will be used by N ALL by
for preparing acceptance documents. Yes/No/N Yes/No/N
5. Fill in the registration form for A A
equipment room visit.
6. Lock the door of the equipment room,
and notify the NMC engineer of alarm
information checking.
1. Sort onsite If no alarm is
tools.
generated, leave the site.
2. Remove the redundant materials.
3. Clean the equipment room and the area
for installing the antenna system. Then,
pack onsite garbage and take it when Tool
leaving the site. Installa photo(to
4. Based on requirements in Project PAT tion rque
Document, take photos, which will be used tools N ALL wrench,c
for preparing acceptance documents. are ompass,i
5. Fill in the registration form for ready. nclinome
equipment room visit. ter)
6. Lock the door of the equipment room,
and notify the NMC engineer of alarm
1. Use a multimeter
information to measure
checking. If no the voltage
alarm is
of thegenerated,
storage battery group and
leave the site. record
the value.
2. Turn off the circuit breaker for AC
power and check whether the voltage
between the DC busbar and the negative
the
busbar is the same as that displayed on Voltage Rctifier
the monitoring module. Decrease the float rating
charging voltage on the monitoring module must N ALL display
follow
to ensure that it is about 1 V higher than standar photo
the voltage of the storage battery group.
3. Use an insulated handle to install the
fuse for storage batteries and restore the
float charging voltage on the monitoring
module. Then, check whether the indicators
on each module indicate an alarm.
1. Use a multimeter to measure the voltage
of the storage battery group and record
the value.
2. Turn off the circuit breaker for AC
power and check whether the voltage
between the DC busbar and the negative
busbar is the same as that displayed on BBU
BBU
the monitoring module. Decrease the float light N ALL frontvie
charging voltage on the monitoring module should
to ensure that it is about 1 V higher than be green w photo
the voltage of the storage battery group.
3. Use an insulated handle to install the
fuse for storage batteries and restore the
1.float
Use acharging voltage
multimeter on the the
to measure monitoring
voltage
module. Then, check whether the
of the storage battery group and indicators
record
on each module
the indicate
value. an alarm.
2. Turn off the circuit breaker for AC
power and check whether the voltage
between the DC busbar and the negative
busbar is the same as that displayed on PMU show PMU
the monitoring module. Decrease the float
DC N ALL frontvie
charging voltage on the monitoring module output w photo
to ensure that it is about 1 V higher than
the voltage of the storage battery group.
3. Use an insulated handle to install the
fuse for storage batteries and restore the
float charging voltage on the monitoring
module. Then, check whether the indicators
on each module indicate an alarm.
图片压缩 距离偏差 是否KCP
类型 精度 最小值 最大值 枚举值 是否必填
比 值 控制

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N
是否是
条目类型 默认值 严重级别 样例图片
EHS

N Critical

N Critical

N Critical

N Critical
N Critical

N Critical

N Critical

N Critical
N Critical

N Critical

N Critical

N Critical
N Critical

N Critical

N Critical

N Critical
N Critical

N Critical

N Critical

N Critical
N Critical

N Critical

N Critical

N Critical
N Critical

N Critical

N Critical

N Critical
N Major

N Critical

N Critical

N Critical
N Critical

N Critical

N Critical

N Critical
N Critical

N Critical

N Critical

N Major
N Critical

N Major
Installation Quick Guide
1.Make preparations before site visit:Before visiting a site, check site
preparations, especially site access, design files, and materials, based 5.Install alarm cable for TP48200A: 9.Install a TP48200A monitoring signal cable:
on Site Preparation Checklist Before Site Visit.

6.Install a power input cable for a TP48200A:Prepare a power cable


2.Prepare the installation for new network deployment according to the cable route and route the cable into the cabinet.
scenarios:Check and confirm related information, especially site Install the corrugated pipe for the cable outside the cabinet and then 10.Prepare labels:Correctly fill in/prepare labels in compliance with the
information, installation environment, and materials required onsite, route the cable towards the power supply equipment. Then, prepare a specifications and attach/install them to cables and equipment.
based on Site Preparation Checklist Before Installation. connector for the cable and connect the connector to the power
supply equipment.

3.Check the materials for Energy:Unpack the packaging, check the 7.Install a TP48200A:Determine the position for installing the cabinet, 11.Check the hardware installation:Check hardware installation based
materials, and place them based on installation positions and drill holes, and install the base. Then, adjust the base and secure the
on the design drawings and quality requirements.
sequences. cabinet to the base.

4.Install storage batteries and related cables in a TP48200A:Install 8.Install a PGND cable for a TP48200A:Cut off a PGND cable based on 12.Clean the site before leaving:Clean the construction area, take
storage batteries and copper bars, and then connect the batteries to the actual cable route, prepare connectors for the cable, and use the
photos based on the requirements, and take records.
preconfigured charging cables for storage batteries. cable to connect the cabinet ground point and outdoor ground bar.
Installation Quick Guide
13.Conduct a power-on check (energy):Power on the equipment after
verifying that the equipment and cables are correctly installed.
Standard Inspect Procedure(SIP)
Site name: Date: Construction team: Supervisor: Overseer:

Busines Audit Audit score Audit Improvemen


Audit
No. s Owner Quality Standards or Requirements Audit method (100 Resul t
item suggestions
Activity method Tools/IT ) t
Equipment for outdoor installation should be waterproof, anticorrosive management;
Equipme RRU equipment maintenance cavity waterproof rubber plug can not be cut, fail to Visually Audit onsite 8
Subcont Equipm cabling interface to use waterproof glue stick plug;
nt cabinet
1 ractor / ent Visually
installatio Rack (shelf ) reliable fixation, bolt loaded full, according to the insulation plate/flat
Huawei cabinet Audit+Torque onsite 8
n washer/spring washer/nut installation order properly installed;
wrench
Cabinet inlet holes shall be closed disposal; Visually Audit onsite 4
Power line, ground line used whole material, intermediate are not allowed to have
tab;Connection are correct and reliable; RRU equipment power line feeding the Visually Audit onsite 8
power window grounding and waterproofing disposal, have drip loop ;
Subcont
cable Power line, ground wire onsite pressure connection, solder or crimp should be solid
ractor / Visually Audit onsite 4
/ground and reliable, no exposed copper wire;
Huawei
cable Visually Audit(Focus on
Power line/ground line and signal line should be separate lay; central equipment room ) onsite 4

Cable Pole screw of battery line should be sure to tighten Visually Audit onsite 4
2 installatio Subcont
Signal Signal cable should not be damaged, fracture, tab, signal cable plug without
n ractor / Visually Audit onsite 4
cable damage, the plug connection are correct and reliable;
Huawei
Pigtail routed outside the cabinet, must take protective measures, such as adding
protection tube or channel.RRU equipment optical fiber (CPRI) into the window Visually Audit onsite 4
Subcont before have drip loop;
Without use of optical fiber head and single board interface should be protected by
ractor / Cable Visually Audit onsite 4
protective cap (plug);
Huawei
A tail fiber in the cabinet shall be neatly coiled fiber in disc box or wound into a
Visually Audit+Tape onsite 4
diameter greater than 8cm ring fixed;
Feeder, lightning arrester connection is reliable, outdoor do waterproof processing.
Feeder Subcont Visually Audit onsite 8
Should done drip loop before inter room.
3 installatio ractor / Feeder Feeder grounding in accordance with design, and waterproofing. Visually Audit onsite 4
n Huawei
Bending radius is not less than the diameter of the feeder 10 times. Visually Audit+Tape onsite 4
For 1.2m and above the microwave antenna must be installed reinforcing bar
Visually Audit onsite 4
Antenna Subcont correctly.
4 installatio ractor / Antenna Compare design
n Huawei Microwave /radio antenna model, caliber, hanging high file,visually audit or use onsite 8
telescope to check
Tag Subcont
Power line, ground line, signal cable , optical fiber sticking reliable and neat, label
5 specificat ractor / Tag Visually Audit onsite 4
filled out correctly, meet customer requirements.
ion Huawei
Check the site self-inspection
Hardware Subcont Self- After the subcontractor complete the site installation , according to installation reports,whether self-inspection onsite/
6 self- ractor / inspect standards on the site for the 100% self-inspect and output reports. results is the same whit onsite, remot 8
whether self-inspection
inspect Huawei report qualified to cutover network e
Subcont
Finished Site
7 ractor / The rack should be clean, no debris. Visually Audit onsite 4
cleaning cleaning
Huawei
Standard Tools

Antenna
install
ation
tool
Compass 1PCS

Auxilia
ry
Tools
Paper and Broom and
Scissor 1PCS Camera 1PCS
pencil 1PCS dustpan 1PCS

Cable
connect
or
process
ing and
Phillips
connect
ion Long measuring Cable cutter screwdriver and Diagonal pliers Hydraulic pliers
Tools and utility knife flat-head and heat gun
tape 1PCS 1PCS
1SET screwdriver (6 2SET
mm) 1SET
Cabinet
s &
Module Hammer drill,
Install vacuum cleaner,
ation Goggle,
Tools Inclinometer Multimeter Measuring tape Socket wrench Earplug, claw
1PCS 1PCS (5 m) 1PCS 1PCS hammer, level
meter, marker
(marking-off
template) 1SET
EHS
Tools

Helmet&Safety
Seat belts 2PCS
Shoes 4SET
Main Equipment List

No. Name Picture Function No Name Picture Function

1 Label 2 Expansion bolt

Provide 220V AC to
DC -48V DC, the DC
3 TP48200A power supply PGND
4 cable for cabinet
equipment, outdoor
ac scene allotment

5 14-8 OT terminal 6 Heat shrink tube

Store electrical
7Storage batteries energy, emergency 8 Cable tie
power during a power
outage

Copper
9 bar/pole cable 10
Alarm signal cable
Special Requirement
CraftName Custom Requirement