You are on page 1of 2
(Mi inimum_and Mandatory Machinery ) S.No Type of Equipment Maximam’ Number ‘Age as on Required 14,2019 1. | Drum Mix Hot Mix Plant having minimum | 15 Years | 40-60 TPH 1 capacity of 40 to 60 TPH with SCADA arrangement (The plant must be within 60 Km from farthest of the work site.) 2 | Sensor Paver with SCADA arragement 15 Years 1 3 | Static Road Roller with SCADA 1s Yeas | S:10MT 7 arrangement 4 _ | Vibratory Road Roller with SCADA 1sYears | 810 MT 1 arrangement 3 _ | Self propelled Mechanical Sapryer with | i5Years 1 SCADA arrangement Contractor Flot mix plant having minimum capacity 40-60 TPH Veriieation cerliicates valid for one year certified by Assistant Mechanical Chief Engineer P.W Region Nagpur for Hot Mix Plant( Documents shall be uploaded) Root map of Hot mix plant having minimum capacity 40-60 TPH showing the distance of plant from farthest point of worksite Self Signature ( Documents shall be uploaded) The contractor who owns Hot Mix plant having capacity minimum 40-60 TPH with SCADA arrangement but not established within 60 Km from the farthest point of work the contractor shall upload the scanned copy of "Term Deposit Receipt” /F.D.R. duly pledged in the name of Executive Engineer P.W. Division,No Il Nagpur for a period of one year of Rs. 10,00,000- (Rs. Ten lakh only) of schedule bank duly enclosed in envelope No. 1 as a additional security deposit for mobilization and commissioning of the plant with the undertaking that he/they shall have to mobilize the Hot mix plant having capacity minimum 40-60 TPH with SCADA arrangement within 60 Km distance as directed by Engineer-in-charge from the farthest point of the work site within 60 days from the date of issue of the work order failing which work order will be cancelled and security deposit along with additional security shall be for‘eited to government. If SCADA arrangement is not readly avaialible with Sensor Paver Satatic Roller, Vibratory Roller, Self propelled Mechnical Sprayer, then contarctor shall upload scanned copy of “Term Deposit Receipt’ /F.D.R. duly pledged in the name of Executive Engineer P.W. Division, No Ill Nagpur for a period of one year of Rs. 5,00,000/- (Rs. Five lakh only) of schedule bank duly enclosed in envelope No. 1 as a additional security deposit with undertaking to procurement and installing and commissioning SCADA arargement for Sensor Paver Satatic Roller, Vibratory Roller, Self propelled Mechnical Sprayer, procument mobilization and commissioning on Machinery with the Undertaking within 30 days from the date of issue of the work order failing which work order will be cancelled and security deposit along with additional security shall be forfeited to government. No.of cortection Bxceutive Engineer STATEMENT NO. 2-A Give the following information of above machineries. Type of No.of | Name fworks on | Location | Output | Balance quantty in 19inan for Machinery | machinery | which deployed at ‘execution on works in hand present 1 2 3 4 3 8 Note: Note 1.The machineries specified under Sr. No.1 to4 shall be owned by the contractor. Scanned from ‘original copy of Registered Sale Deed in case of second hand purchase of machinery / plant should be uploaded, Scanned from original copy of Maufacturer/ Supplier Tax Invoice in case of First hand purchase ‘of machinery / plant should be uploaded, Proforma Invoice /Retaillnvoice shall not be accepted. Note: 2. The Documents in support of ownership of machinery shall be genuine and shall be convincing to the tender opening authority Note -3 Allowable life of machinery to be used on works — (1) The life of new machinery will be considered as 15 years. (@) For Hot Mix PlantBatch Mix Plant veritication certificate valid for one year issued by ‘SE(Mechanicaly/ Assistant Chief Engineer ((Mechanical) is essential (@) There will be no need of checking by SE (Mechanical)/ Assistant Chief Engineer ((Mechanicalfor first 6 years Except hot mix /Batch Mix Plant (@) After 6” year, the machinery shall be checked and certified for its fitness by SE Mechanical / ACE (Mechanical) every 3" year tl the 15" year. After the 15" year, the contractor will get machinery certified every year {rom SE/ACE (Mechanical) and produce the certificate of fitness. The certificate will be required for and not issued by RTO. of fitness by SE / ACE (Mechanical) within machinery where itis necesss Lowest bidder shall submit such certific ‘one month of opening of financial bid. 1.47 Scanned ftom original of Registration documents of fim ( Firm, Proprietorship frm! Partnership firm /Registration of Private limited company / Registration of Public imited ‘company or any other company or any other Company as the case may be. 1.48 Scanned trom original of ist of works completed and_in hand and works tendered along with supporting cerifcates. 1.49 Scanned from original ist of plants and Machinery duly signed by the contractor 4.410 Scanned from original List of Technical Persons femeloyee. Duly signed by the contractor SL.NO Personnel Qualification No. of Personnel B.E Civil +3 years Exp. in 1 | Site Engineor Building! Bridge / Road 1 onstruction Work Contractor No.of cortection Baceutive Engineer

You might also like