SALIENT FEATURES OF THE PROJECT

Client Ministry of Road Transport & Highways,


Government of India

AECOM Asia Company Limited In Joint


I.E : Venture with RODIC Consultants Private
Limited.

Concessionaire : Navayuga Dibang Infra Project Private


Limited.

 Total Project value : 764 Cr.

 Cash support from MoRT&H : 516 Cr.

 Date of Sign the Agreement : 03rd Nov-2010

Appointed Date : 11th June-2011

Project Completion Date 54 Months from the Appointed


Date. (07th Dec-2015)
●Execution
BRAHMAPUTRA RIVER BRIDGE
SALIENT FEATURES

Number of Spans  182 Nos.

Span Length  50 M

Foundation – PILES  1700 mm dia

Total Nos. of Piles  716 Nos.

Foundation - WELLS  3 Nos.

Nos. of Pile Caps / Well Caps  182 Nos.

Nos. of Piers  182 Nos.

Width of Deck  12.9 M

Nos. of Segments  2730 Nos.


3D MODEL LONGITUDINAL VIEW OF THE
PROPOSED BRIDGE
3D MODEL TRANSVERSE VIEW OF THE
PROPOSED BRIGE
Brhmaputra River Bridge – Piling work
Progress
Brhmaputra River Bridge – Piling work
Progress
Brhmaputra River Bridge – Piling work
Progress
Brhmaputra River Bridge – Piling work
Progress
Brhmaputra River Bridge – Piling work
Progress
Brhmaputra River Bridge – Pilecap work
Progress
Brhmaputra River Bridge – Pilecap work
Progress
Brhmaputra River Bridge – Pilecap work
Progress
Brhmaputra River Bridge – Pilecap work
Progress
Brhmaputra River Bridge – Pilecap work
Progress
Brhmaputra River Bridge – Pilecap work
Progress
Brhmaputra River Bridge – Pier cap work
Progress
Brhmaputra River Bridge – Pier cap work
Progress
Brhmaputra River Bridge – Pier cap work
Progress
Brhmaputra River Bridge – Pier cap work
Progress
Brhmaputra River Bridge – Pier cap work
Progress
Brhmaputra River Bridge – Segment work Progress
Brhmaputra River Bridge – Segment work Progress
Brhmaputra River Bridge – Segment work Progress
Brhmaputra River Bridge – Segment work Progress
Brhmaputra River Bridge – Segment work Progress
Brhmaputra River Bridge – Segment work Progress
Brhmaputra River Bridge – Segment work Progress
Brhmaputra River Bridge – Segment work Progress
Construction Administration

Designing

Implementation
Planning

Execution
Monitoring
Organization Chart
Key persons
Chairman

Managing
Director

General Manager

Project Manager

Deputy project
Manager
Organization Chart
Site Key persons
PM

DPM

APM

Senior Engineer Senior engineeer

Site engineer Site engineer

Site engineer Site engineer


Senior
engineer

Site engineer

Junior engineer

DTE GTE

Foremen, Foremen,
Supervisor Supervisor

All type of All type of


labours labours
Engineers Organization
Chart
Senior
engineer

Site engineer

Junior engineer

DTE GTE

Foremen, Foremen,
Supervisor Supervisor

All type of All type of


labours labours
Accounts Organization
Chart
Accounts
Manager

Store,Material, D.A.M
Purchasing

A.M
A.M

Sr.Accountant
Store keeper

Accountant
Sr.Store Asst

Trainees,Helpers Trainees
HR Organization Chart

HR Manager

HR Executive

Asst.HR

Trainees
Project Site TechnicalDepartments

Planning Dept Casting yard

Billing Dept Mechanical


Dept
Structures
Dept Electricalcal
Dept

Highway Dept

Fabrication
QA/QC Dept yard

Survey Dept
Steel Yard
Project Site Non-TechnicalDepartments

HR Dept Foremen

Accounts Dept
Supervisors

Material Dept
Technical Ast

Store Dept

Operators
Safety Dept

Labour Dept
Piling Equipment&Labours

Bauer BG(Mat) welders

25 T Crane
Riggers

12T Hydra Bentonite


operators

Excavator
Transit mixer
Trimi
Pipe,Hauper
Chain

Sub contractor
labour
Pilecap Equipment & Labours

excavator Compressor

12T Hydra
Breakers

Concrete pump
Labour

Transit mixer

Sub contractor
Vibrator Needle labour
Pier cap Equipment & Labours

12T Hydra

25T Crane

Concrete pump

Transit mixer

Vibrator Needle

Sub contractor
labour
Casting yard Equipment & Labours

10T EOT Pressure jack

80T EOT Anchor haeds

Inner shutter Permanent


wedges
Outer shutter
Anchor cones

Grouting Pipe
Sheathing,HDPE
Pipe

ZIG
Site office work

Study the Plan & Profile

Study concession Agrement

Study the Drawing

Prepare the Bar bending schedules

Prepare the Quantity’s


Site office work

Prepare the sub contractor bills

Prepare the banker bills

Prepare the Milestone bills

Prepare the labour bills

Prepare the daily progress report

Prepare the weekly progress report


NAME OF THE PROJECT:FOUR LANING OF
CHHATTISGARH/ORISSA BORDER – AURANG SECTION FROM
KM 88/000 TO KM 239/000 OF NH-6 IN THE STATE OF
CHHATTISGARH TO BE EXECUTED AS BOT (TOLL) ON DBFOT
PATTERN UNDER NHDP PHASE-IV
SALIENT FEATURES OF THE PROJECT

Client:National Highway Authoritie of India

IE: Aarvee Associates Architects Engineers


& Consultants Private Ltd.

Concessionaire: BSCPL Aurang Tollway


Limited

EPC:BSCPL Infrastructure Limited

Cost: 1000 Cores Approx


SALIENT FEATURES OF THE PROJECT

Number of Spans  5 Nos.

Span Length  21.3 M

No of Abutments  2 Nos.

Foundation – PILES  1200 mm dia

Total Nos. of Piles  20 Nos.

Nos. of Pile Caps  4 Nos.

Nos. of Piers  4 Nos.

Width of Deck  12 M

Nos. of RCC(I) Girders  25 Nos.


MAJOR BRIDGE-174+025

Abutments  A1,A2.

Pier,Piercap  P1,P2,P3,P4

RCC Girders  End girder,Middle Girder.


 A1-P1,P1-P2,P2-P3,
Slabs
P3-P4,P4-A2
Finishing Items  Kerb,Handrail,Crashbarrier.

Independent walls  IR1,IR2.

Others  Approach slabs,Toe walls.

Bearings  Elastomeric bearings

Expansion Joint  Reinforced.


MAJOR BRIDGE-174+025
MAJOR BRIDGE-174+025

Excavation&PCC
Completed
MAJOR BRIDGE-174+025
MAJOR BRIDGE-174+025
MAJOR BRIDGE-174+025
MAJOR BRIDGE-174+025
MAJOR BRIDGE-174+025
MAJOR BRIDGE-174+025
Major Bridge-174+025
Major Bridge-174+025
Major Bridge-174+025
Major Bridge-174+025
Major Bridge-174+025
Major Bridge-174+025
Major Bridge-174+025
Major Bridge-174+025
Major Bridge-174+025
Major Bridge-174+025
Major Bridge-174+025
Major Bridge-174+025
Major Bridge-174+025
Major Bridge-174+025
Site office work

Study the Plan & Profile

Study concession Agrement

Study the Drawing

Prepare the Bar bending schedules

Prepare the Quantity’s


Site office work

Prepare the sub contractor bills

Prepare the banker bills

Prepare the Milestone bills

Prepare the labour bills

Prepare the daily progress report

Prepare the weekly progress report