You are on page 1of 16

Building’s journey

Reinvented

SAFETY
!

CONSTRUCTION
!

OPERATION
!

QUALITY

January 2015
What is FINALCAD?
Versatile and
easy-to-use solution
f o r p r o j e c t m o n i t o r i n g,
d e l i v e r i n g i n s t a n t R O I.
!

High quality.Delivered.
Innovative technologies designed to improve efficiency, incr
rease productivity and enable informed decision making.
!

A global drive.
!

Launched late 2011. Flexible. Simple. Powerful.


A massive adoption.
!

4,000 2 new projects per


projects day

22 20,000,000 sf.
countries managed / month

50,000
+2 observations added
users
every second

Within the last 3 years, F I N A L C A D has achieved a global reach


to better serve clients. Mastering 21 languages gives organisations the
opportunity to use an unique system spreading productivity gains,
quality standards and costs optimisation across companies.

Carrying out a paradigm shift
for operational performance
and cost effectiveness.


!

T h e J o u r n e y F r o m T h e S t a r t.
Addressing each need.

Increasing productivity with innovative technology for planning,


design, construction and operation.
!

Structural
Handover Refurbi-
Works DLP shment

Design Finishings
Operation
Commissioning

QUALITY CONTROL

SAFETY-ENVIRONMENT

Empowering managers. Helping Championing process. R&D in-


organisations over the entire project house engineers captures on-field
lifecycle. From design until handover, processes for improvements as well
going through operation phase, the as integrating BIM within an unique
simple system allows clients to platform. Committed to making
monitor progress with real time people’s life easier on site, the R&D
information. A dedicated offer is team listens to our clients and users’
designed for each stage addressing feedbacks for continuous
each need. improvement of the system.

!

Increasing building’s quality.


Reducing its cost.
Make it accessible to all.


BRINGING VALUE FROM DAY ONE
!
!
Reducing costs
Managing projects is complex and delivering in time challenging. Delays are
costly for every stakeholders such as developers, architects, contractors and
subcontractors. By enabling workers with our solutions, reactivity is increased,
work is done quicker, better and on time. Digitalised on mobile devices, need
to printing documents out is significantly reduced playing a part in
environmental issues.
!
!
Boosting productivity
Time is key. Providing people with turnkey project ready-to-use on mobile
devices ease their job. Unique features across platforms allow users to have
instant reports after visits. When it was taking hours before, doing paperwork
and reports on desktop, it now takes one minute to have everything compiled,
structured and beautiful. We believe the ! added value of site’s people is to be
on field getting the job done.
!
!
!
Increasing quality
!
The application of quality assurance, quality control and service level
management are all important factors to ensure customer satisfaction is
maintained and indeed surpassed. A new quality standard is possible for
projects’ lifecycle with 100% of controls achieved. Quality is no concession.
!
!
Simplicity first
Technology has changed the face of many industries. Construction and
property management industries offer tremendous potentials of improvements
by bringing adaptive technology. In 3 years, the system has been used by
over 50,000 professionals either trained remotely or on site. Adoption is
massive thanks to the simplicity of our tools.
!
!
Connecting the dots.
With over 3,000 daily workers at The Singapore Sports Hub project,
management and communication is paramount. Connecting people through
our system is easy allowing managers to have the right information at the right
time. Accessing information in real time with always updated and accurate
data.
FREEING PEOPLE WITH SUITABLE SERVICES
!

Ready-to-use solution with intelligent drawing integration


Unlimited users and access to projects
!
Drawing modifications
Professional support !

iOS & Windows 8


!
KPI’s & Analysis
Process control and progress
Immediate reports. No paperwork.
Hardware monitoring. Tracking. No boundaries.

Since !

Desktop. Tablets. Smartphones.


Observations. Add photos. Report it.
Offline use. Secure. Cloud-based.
91%
CUSTOMER SATISFACTION

43
DEVICES

2
DEFECTS/M2

14k
CONTROLS
CASE STUDY - FINALCAD VALUE
!

SKYSCRAPER - EASING COMMUNICATION


!
Designed by Anthony Béchu and Tom Sheehan, the Tour D² is a high-rise
building under construction in La Défense, Paris. The tower is 180 meters
high, and can accommodate 3,700 people on 37 stories.
!
Reaching a level of energy efficiency 30% lower than HQE® performance level
was our client’s objective. Environmental requirements, outstanding quality,
complex logistic were challenges our client faced. Widely used on a daily
basis, the system brought its simplicity allowing a smooth communication
between stakeholders with 43 devices synchronised on the project.

HOSPITAL - PER ROOM MONITORING


!
The New Hospital of Orleans is the largest medical facility in France with
1,304 beds and 600 meters long. Engaged in HQE (High Environmental
Quality) approach, the NHO is will be fully running at the end of 2015.
!
FINALCAD brings its flexibility and detailed-drawing-unique approach.
Hospitals require room-by-room monitoring since nomenclature of rooms
significantly varies among services and departments. The system is used for
managing different handovers and has levelled up all requirements. On
average, two snags/defects per M2 is solved.

STADIUM - TURN POSSIBLE INTO TANGIBLE


!
The new Bordeaux stadium (70,000 m²), a multipurpose facility is selected to
host the 2016 European football cup. Designed by architects Herzog and de
Meuron, this 45,000 seats stadium combines a "bowl" for games with a forest
of columns supporting the structure to give a sense of freedom.
!
Technical challenge appears with the number of columns. Tens of thousands
controls are necessary for handovers. Unthinkable mission without a mobile
tool enabling detailed and precise controls, Vinci Construction used
FINALCAD Quality Control solutions with automatic reports (zone, element…).
The Philharmonic, Paris,France

Berjaya Central Park,


Malaysia

Zurich Airport Hotel,Switzerland

Sports Hub, Singapore

Project portfolio …
!
Housing : Ilot T8 Tolbiac Chevaleret, La Défense Hôtel Pullman, Créteil les bleuets 500
accomodations, Prince de Galles George V… — Offices : Health Ministry, Finance Ministry,
R&D Technicolor center, R&D Chanel Center, Courcellor, Manitowok…
— Sky scraper : D² Tower, Moroccan Telecom Tower, Berjaya Tower, Euravenir Tower… —
Landmarks : The Louvre, The Eiffel Tower, Paris Philharmonic, Vincennes Zoo, Exchange
hub of Chatelêt Les Halles, Grévin Museum of Prague, Charles de Gaulle, Zurich Airport…
— Health : Robert Ballanger hospital, New hospital of Orléans, Assisted living facilities of
Venissieux, Saint Just in Le Havre, Morangis… — Sport arenas : Sports Hub Singapore,
Bordeaux stadium,Nice Allianz Riviera, Havre stadium, Sport arena of Rouen, bicycle park of
Saint-Quentin-en-Yvelines… — Education : Student hall of Compiègne, Accommodations.
1,304 -beds hospital, France

T e l e c Central
Berjaya o m T oPark,
w e rMalaysia
, Morocco

The Eiffel Tower, France

N i c e S t a d i u m , F r a nSports
c e Hub, Singapore

Interested ? Let’s start the conversation


Call us: +33 169 819 708
Email us: contact@finalcad.com
Look at us: www.finalcad.com
Visit us: Paris - London - Singapore
Follow us: Linkedin - Twitter - Facebook - Google +
PARIS - LONDON - SINGAPORE -
www.finalcad.com contact@finalcad.com
+33 169 819 708

You might also like