0% found this document useful (0 votes)
628 views24 pages

Deviation Reporting Register - Month

This document appears to be a deviation report template for a business project or unit. It includes fields for details of deviations like the date, type of deviation, associated hazards, work location, before and after pictures, level of criticality, actions taken, and remarks. The sample deviation listed is about improper earthing equipment and insufficient discharge rods during a shutdown.

Uploaded by

Twin Bulls
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
628 views24 pages

Deviation Reporting Register - Month

This document appears to be a deviation report template for a business project or unit. It includes fields for details of deviations like the date, type of deviation, associated hazards, work location, before and after pictures, level of criticality, actions taken, and remarks. The sample deviation listed is about improper earthing equipment and insufficient discharge rods during a shutdown.

Uploaded by

Twin Bulls
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
  • Observation Form: Captures observational data related to project deviations, hazards, and work locations.
  • Deviation Report: Records deviations with categories and observations for corrective actions.
  • Monthly Action Report: Details action taken over the month, assessing criticality and status with before and after pictures.

Bussiness

Project / Unit Name


Location

S. No. Date Type of Associated 10HTK Hazard Work


Deviation Location
Deviation Report

Year

Category of Deviation Observation

Improper earthing equipment/


Insufficient discharge rod during
shutdown
Document No. KEC/IMS/EHS/07/F/09
Issue. No. 2 Rev. No.
Issue. Date 8/12/2018 Rev. Date
Page No. 1

Month

Before Picture Level of Action Taken After Picture Status


Criticality
09
0
00-00-00
1

Remarks

You might also like