COMPRESSION TEST ON CONCRETE CUBES LafargeHolcim| FILE NO: 3oaTe [29/10/2039 CLIENT cise pu Umniah PROJECT € stall Umniah PV Plants /dabal) CONSULTANT'S REP.AL3 BELECTRIC Gulf, CONTRACTOR'S REP. cst! SAMT Contracting Company CUBE NOMINAL SIZE 100*100*100 NUMBER OF CUBES 6 ‘SPECIFIED cuse cASTDATE | TEST DATE Density | comp. TR. rbewt, | HOCATION wat cise | CTEM | Tenens | Ase (oars) | oem | cemencar epee 1 Papen 2o/s/2013 | 23/8/2019 3 2372 220 2 2 Pree 2o/s/2019 | 23/8/2019 é) 2358 228 25 3 slg cme 20/8/2019 | 27/8/2019 7 2374 258 25 7 hg cme 2o/s/2019 | 27/8/2019 a 2365 250 25 5 elfone 2ojaj2nig_ | 17/9/2019 28 2368 300 25 6 sel dcme 2o/spoig | 17/9/2019 28 2375 306 25 Notes: ‘Sampling was performed by Lafarge Readymix according to BS EN 12350-1:2000 : Tests were performed according to BS EN 12390:2002 ‘Method for Determination of Compressive Strength of Concrete Cubes according to BS EN 12390-3:2009 The cubes were regular in shape, intact, and all corners and edges were undamaged. + The failure mode was normal in all cubes. Document No [ AM-TSTFIS Page No[ Ot of07 | COMPRESSION TEST ON CONCRETE CUBES LafargeHotcim| FILENO: 3DATE [29/10/2019 CLIENT 543 pas Umniah PROJECT €.s.-tall Umniah PV Plants /dstiali CONSULTANT'S REP.) BELECTRIC Gulf CONTRACTOR'S REP. dstia) SAMT Contracting Company CUBE NOMINAL SIZE 100*100*100 NUMBER OF CUBES 6 wom, | werrowsats | SSE | SRE | accom | ems | ua | Ener 1 elie 19/8/2019 22/8/2019 3 2372 235 25 2 seldom 19/8/2019 22/8/2019 3 2358 222 25 . wel fcpe 1s/aj2019 | 26/8/2019 7 2365 Co 25 5 19/8/2019 16/9/2019 2B (2368 300 2 6 19/8/2019 16/8/2019 2B 2375 315 25 + Sampling was performed by Lafarge Readymix according to BS EN 12350-1:2000 : Tests were performed according to BS EN 12390:2002 in of Compressive Strength of Concrete Cubes according to : Method for Determin: BS EN 12390-3:2009 i The cubes were regular in shape, intact, and all corners and edges were undamaged. The failure mode was normal in all cubes. Document No | RM-TST-FI5 Page No | O1of01 | COMPRESSION TEST ON CONCRETE CUBES |LafargeHolcim| FILE NO: 3DATE | 29/10/2019 CLIENT Cige al Umniah PROJECT £ spall Umniah PV Plants /Jsliail CONSULTANT'S REP.cil 2°) BELECTRIC Gulf CONTRACTOR'S REP. distal! | SAMT Contracting Company CUBE NOMINAL SIZE 100*100*100 NUMBER OF CUBES 6 sr | etronsatoes | SESE | ERNE | accom | ua, [cpus | Snr Ja sol ga ra/e2019 | 21/8/2019 a 2372 240 25 3 elie 18/8/2019 25/8/2019 7 2374 282 25 & sel ite 18/8/2019 25/8/2019 7 (2365 2a, 25 5 ris 18/8/2019 15/9/2019 28 2368 309 2s 6 wel dcy 18/8/2019 15/9/2019 28 2375 320 2s Notes: : Sampling was performed by Lafarge Readymix according to BS EN 12350-1:2000 : Tests were performed according to BS EN 12390:2002 : Method for Determination of Compressive Strength of Concrete Cubes according to BS EN 12390-3:2009 : The cubes were regular in shape, intact, and all corners and edges were undamaged. : The failure mode was normal in all cubes. Document No RM-TST-FI5 Page No_| 01 of 01 COMPRESSION TEST ON CONCRETE CUBES LafargeHolcim| FILE NO: 3DATE 29/10/2019 CLIENT C.gp.3l) aaa Umniah PROJECT € sell - Umniah PV Plants /Jsall CONSULTANT'S REP.sil »23 BELECTRIC Gulf CONTRACTOR'S REP. Jstial) SAMT Contracting Company CUBE NOMINAL SIZE 100*100*100 NUMBER OF CUBES 6 wo, | emonsatce | SERIE | TRE [aceon | guar, | ours | saint 1 sel sice 17/8/2019 20/8/2019 3 2372 220 23 3 elfen 17/8/2019 (24/8/2019 7 2374 250 25 4 sel ficne a7/e/2019 | 24/8/2019 7 2365 248 25 5 eli 17/8/2019 14/9/2019 2B (2368 284 25 6 eld - 17/8/2019 74/9/2018) 28 2375 293 2 Notes: : Sampling was performed by Lafarge Readymix according to BS EN 12350-1:2000 : Tests were performed according to BS EN 12390:2002 : Method for Determination of Compressive Strength of Concrete Cubes according to BS EN 12390-3:2009 : The cubes were regular in shape, intact, and all corners and edges were undamaged. : The failure mode was normal in all cubes. Document No RM-TST-FI5 Page No_| 01 of 01 COMPRESSION TEST ON CONCRETE CUBES LafargeHolcim| FILE NO: 30ATE | 29/10/2019 CLIENT C58 pe Umniah PROJECT £..cu Umniah PV Plants /Jstah CONSULTANT'S REP.GiL 29 BELECTRIC Gulf CONTRACTOR'S REP. Jstiall SAMT Contracting Company CUBE NOMINAL SIZE 100*100*100 NUMBER OF CUBES 6 SPECIFIED cus yu | casTDaTE | Test DATE DENSITY | COMP. STR. went, | Locarionwote | Neatet | atest | ASEOMS) | gmjemay_| tunfmma) | STRENGTH sel$cne 8/8/2019 | 11/8/2019 3 2372 235, 3 ae gjsjois | 11/8/2019 3 2358 224 2 3 eifcne aysj2is | 15/8/2019 7 2374 290 25 ‘ BScne gye/2019 | 15/8/2019 7 2365 268 5 5 shine spears | 9/9/2019 28 2368 336 co 6 ar sprog | 9/9/2019 28 275 | 318 25 Notes: : Sampling was performed by Lafarge Readymix according to BS EN 12350-1:2000 : Tests were performed according to BS EN 12390:2002 : Method for Determination of Compressive Strength of Concrete Cubes according to BS EN 12390-3:2009 : The cubes were regular in shape, intact, and all corners and edges were undamaged. : The failure mode was normal in all cubes. Document No | RM-TST-F15 Page No_| 01 of 01 COMPRESSION TEST ON CONCRETE CUBES LafargeHolcim| FILENO: bate [29/10/2019 CLIENT Cage! at Umniah PROJECT € shall Umniah PV Plants /dstait CONSULTANT'S REP.4il 231 BELECTRIC Gulf CONTRACTOR'S REP. Jthal SAMT Contracting Company CUBE NOMINAL Size 100*100*100 NUMBER OF CUBES 6 SPECIFIED cube ws. | CASTDATE | TEsTDATE pensrry | comp. STR. ten. | LOCATIONwebclSe | Cvgass | sangass | ASECOAYS) | Ogmremay | (KN/men2) ae 1 sig sysj2019_| 8/8/2019 3 2372 230 25 2 eihcne sysjaois | 8/8/2019 3 2358 230 25 3 sel S cine s/s/2019 | 12/8/2019 7 2374 am 25 a sel scne sisi2ois | 12/8/2019 7 2365 280 2 5 widen srepors | 2/9/2019 8 2368 320 25 6 sel i cane spore | 2/9/2019 28 2375 312 25 Notes: : Sampling was performed by Lafarge Readymix according to BS EN 12350-1:2000 : Tests were performed according to BS EN 12390:2002 Method for Determination of Compressive Strength of Concrete Cubes according to. BS EN 12390-3:2009 The cubes were regular in shape, intact, and all corners and edges were undamaged. : The failure mode was normal in all cubes. Document No__| RM-TST-FI5 Page No | 01 of 01 COMPRESSION TEST ON CONCRETE CUBES. LafargeHolcim| FILENO: -3DATE | 29/10/2019 ‘CLIENT C543) aa Umniah PROJECT € spstall Umniah PV Plants /Jsliall CONSULTANT'S REP.dl »2¥1 BELECTRIC Gulf CONTRACTOR'S REP. dytial! SAMI Contracting Company CUBE NOMINAL SIZE 100*100*100 NUMBER OF CUBES 6 Sie, | womonease | Seu | mane | sccowm | gem, | eu | sneer en res wero | vanes > | um | mw | os 2 sel dcue | 4/8/2019 7/8/2019 5 2358 220 2 3 eld cee 4/8/2019 11/8/2019 % 2374 280 2s * self ce apros | 11/8/2019 7 2365 255 2s 5 self cue ajsjaoig_| 1/9/2018 28 2368 316 as 6 pel gd cue 4/8/2019 ayafzmis} 28 Bs | 300 25 Neves: : Sampling was performed by Lafarge Readymix according to BS EN 12350-1:2000 : Tests were performed according to BS EN 12390:2002 : Method for Determination of Compressive Strength of Concrete Cubes according to BS EN 12390-3:2009 ‘The cubes were regular in shape, intact, and all corners and edges were undamaged. : The failure mode was normal in all cubes. DacunentNe [RUSTE Page ne [OT aTOH COMPRESSION TEST ON CONCRETE CUBES. |LafargeHolcim| FILE NO: BDATE | 29/10/2019 CLIENT G9 pa Umniah PROIECT e.g 2al Umniah PV Plants /.30 CONSULTANT'S REP.GAL29} BELECTRIC Gulf CONTRACTOR'S REP. dal | SAMT Contracting Company ‘CUBE NOMINAL SIZE | 100*100*100 NUMBER OF CUBES 6 ‘SPECIFIED cust gs | castoare | testoate vensity | come. str. we, | wearowancts | CR | TEBE | Aston | Gent | omnes | Sever 1 wig gypj2o19 | 12/9/2019 3 2372 208 25 2 es sypreora | 12/9/2019 3 2358 215 25 3 lene sypj2o1s | 16/9/2039 7 2374 250 25 7 sel Scns sens | 16/9/2019 7 2365 240 25 Is selene syjana | 7/10/2019 2 2368 296 25 |s sifcine syraos | 7/20/2019 28 2375 304 5 Notes: : Sampling was performed by Lafarge Readymix according to BS EN 12350-1:2000 : Tests were performed according to BS EN 12390:2002 : Method for Determination of Compressive Strength of Concrete Cubes according to BS EN 12390-3:2009 : The cubes were regular in shape, intact, and all corners and edges were undamaged. : The failure mode was normal in all cubes. [Document No__| RM-TST-F15 Page No | 01 of 01 COMPRESSION TEST ON CONCRETE CUBES LafargeHoicim| SDATE | 29/10/2019 CLIENT Cage pe Umniah PROJECT Epc) Umniah PV Plants / dba! CONSULTANT'S REP.) 29 BELECTRIC Gulf CONTRACTOR'S REP, Jatbal SAMT Contracting Company CUBE NOMINAL SIZE 100*100*100 NUMBER OF CUBES 6 “SPECIFIED cuse ge. | CASTDATE | TESTDATE DENSITY COMP. STR. ie Tones | ate | mttise | ASEM | gmjema) | (en /nma) ine} 1 slice 29/3/2019 | 2/10/2019 3 237 | a6, 3 2 wis cee 29/3/2019 | 2/10/2019 3 2358 25 2 3 Sh cine 29/3/2019 | 6/10/2019 7 2374 286 25 ‘ sig 29/3/2018 | 6/10/2019 7 2365 260 25 5 erro 2/spaois | 27/20/2019 8 2368 328 28 6 slice 2e/epois | 27/10/2019 28 2375 353 Fa Notes: : Sampling was performed by Lafarge Readymix according to BS EN 12350-1:2000 : Tests were performed according to BS EN 12390:2002 : Method for Determination of Compressive Strength of Concrete Cubes according to BS EN 12390-3:2009 ‘The cubes were regular in shape, intact, and all comers and edges were undamaged. : The failure mode was normal in all cubes. [Document No] RM-TST-F15 Page No | 01 of 01

You might also like