NOTA TEKNIKAL 3
TECHNICAL NOTES

JADUAL 1 : HARGA UNIT PURATA BAGI KELULI DAN SIMEN 7


TABLE 1 : AVERAGE UNIT PRICES FOR STEEL AND CEMENT

JADUAL 2 : HARGA UNIT PURATA BAGI : 12


TABLE 2 : AVERAGE UNIT PRICES FOR :
-PASIR / SAND
-BATU BAUR/ AGGREGATES
-PREMIX
-FABRIC REINFORCEMENT
-GUARDRAIL

JADUAL 3 : HARGA UNIT PURATA BAGI BITUMEN, MINYAK BAHAN API DAN DIESEL 34
TABLE 3 : AVERAGE UNIT PRICES FOR BITUMEN, FUEL OIL AND DIESEL

LAMPIRAN A KOD KAWASAN 39


APPENDIX A REGION CODE

i
NOTA TEKNIKAL HARGA UNIT PURATA BAGI BAR KELULI, SIMEN, BITUMEN,
MINYAK BAHAN API, DIESEL, PASIR, BATU BAUR, PREMIX,
FABRIC REINFORCEMENT DAN GUARDRAIL

Harga bagi minyak diesel adalah harga kawalan kerajaan yang ditentukan oleh
Kementerian Perdagangan Dalam Negeri, Koperasi dan Kepenggunaan.

Harga bar keluli dan simen yang diterbitkan dalam Siaran Khas 1 ini diperoleh dari
Lembaga Pembangunan Industri Pembinaan Malaysia (CIDB).

Harga yang dilaporkan mengikut 3 kawasan di Sabah dan 3 kawasan di Sarawak


seperti berikut :-

Sabah = Kota Kinabalu, Sandakan dan Tawau

Sarawak = Kuching, Sibu dan Miri

Harga bitumen dan minyak bahan api diterbitkan mulai Jun 2008. Harga ini diperoleh
dari Shell Malaysia. Harga bitumen penembusan 80/100 adalah berdasarkan harga purata ex-
Sepangar Bay bagi Sabah dan ex-Kuching bagi Sarawak.

Mulai Ogos 2008, harga pasir dan batu baur diterbitkan dalam Siaran Khas 1 ini.

Mulai September 2008, harga Premix Asphaltic Concrete, Premix Bituminous


Macadam dan fabric reinforcement diterbitkan dalam Siaran Khas 1 ini. Harga bagi fabric
reinforcement diperoleh dari CIDB.

Mulai Oktober 2008, harga Guardrail diterbitkan dalam Siaran Khas 1 ini.

Semua harga yang tersebut di atas adalah bagi tujuan pengiraan kadar perubahan
harga sahaja dan tidak boleh digunakan untuk mewakili kedudukan harga yang sebenar.

-3-
TECHNICAL NOTES ON THE AVERAGE UNIT PRICES FOR STEEL, CEMENT,
BITUMEN, FUEL OIL, DIESEL, SAND, AGGREGATES, PREMIX,
FABRIC REINFORCEMENT AND GUARDRAIL

The price for diesel is government controlled price as established by the Ministry of
Domestic Trade, Co-operatives and Consumerism.

The prices for steel bars and cement published in this Special Release 1 are obtained
from Construction Industry Development Board Malaysia (CIDB).

Prices are reported according to 3 regions in Sabah and 3 regions in Sarawak as


follows:-

Sabah = Kota Kinabalu, Sandakan and Tawau

Sarawak = Kuching, Sibu and Miri

The prices for bitumen and fuel oil are published starting from June 2008. The prices
are obtained from Shell Malaysia. The bitumen 80/100 penetration is based on the average
ex-Sepangar Bay for Sabah and ex-Kuching for Sarawak.

Starting from August 2008, the prices for sand and aggregates are published in this
Special Release 1.

Starting from September 2008, the prices for Premix Asphaltic Concrete, Premix
Bituminous Macadam and fabric reinforcement are published in this Special Release 1. The
prices for fabric reinforcement are obtained from CIDB.

Starting from October 2008, the prices for Guardrail are published in this Special
Release 1.

All prices mentioned above are relevant for escalation purposes only and should not be
used to represent actual price levels.

-4-
Jadual 1 - Harga Unit Purata Bagi Bar Keluli dan Simen
Table 1 - Average Unit Prices for Steel Bars and Cement
Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(1) Bar Bulat Keluli Lembut BS-4449 RM Setan Metrik


Mild Steel Round Bars BS-4449 RM Per Metric Ton

10mm (3/8") 2008 DIS 2250.00 2300.00 2350.00 2150.00 2220.00 2285.00
2009 JAN 2300.00 2293.33 2350.00 2175.00 2240.00 2295.00
FEB 2300.00 2280.00 2330.00 2150.00 2220.00 2270.00
MAC 2326.67 2306.67 2370.00 2180.00 2250.00 2296.67
APR 2350.00 2306.67 2380.00 2193.33 2253.33 2278.33
MEI 2330.00 2300.00 2350.00 2200.00 2245.00 2270.00
JUN 2350.00 2335.00 2370.00 2225.00 2265.00 2300.00
JUL 2350.00 2340.00 2370.00 2230.00 2278.33 2300.00
OGO 2380.00 2375.00 2390.00 2265.00 2310.00 2333.33
SEP 2400.00 2375.00 2390.00 2270.00 2310.00 2348.33
OKT 2426.67 2400.00 2430.00 2270.00 2350.00 2383.33
NOV 2350.00 2300.00 2330.00 2191.67 2285.00 2300.00
DIS 2343.33 2300.00 2330.00 2193.33 2285.00 2293.33

12mm (1/2") 2008 DIS 2190.00 2230.00 2280.00 2120.00 2170.00 2215.00
2009 JAN 2200.00 2230.00 2280.00 2145.00 2190.00 2235.00
FEB 2200.00 2210.00 2260.00 2120.00 2170.00 2210.00
MAC 2226.67 2250.00 2300.00 2150.00 2200.00 2250.00
APR 2250.00 2250.00 2330.00 2173.33 2200.00 2230.00
MEI 2230.00 2230.00 2300.00 2173.33 2200.00 2220.00
JUN 2250.00 2265.00 2320.00 2200.00 2225.00 2250.00
JUL 2250.00 2275.00 2320.00 2210.00 2230.00 2250.00
OGO 2280.00 2300.00 2350.00 2240.00 2270.00 2283.33
SEP 2293.33 2300.00 2350.00 2243.33 2270.00 2300.00
OKT 2293.33 2350.00 2380.00 2243.33 2300.00 2343.33
NOV 2193.33 2250.00 2280.00 2163.33 2285.00 2280.00
DIS 2200.00 2250.00 2280.00 2166.67 2285.00 2280.00

* Lihat lampiran A / See appendix A

-7-
Jadual 1 (Samb.) - Harga Unit Purata Bagi Bar Keluli dan Simen
Table 1 (Cont'd.) - Average Unit Prices for Steel Bars and Cement
Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L
(1) Bar Bulat Keluli Lembut BS-4449 (Samb.) RM Setan Metrik
Mild Steel Round Bars BS-4449 (Cont'd.) RM Per Metric Ton

16mm (5/8") 2008 DIS 2100.00 2170.00 2185.00 2100.00 2130.00 2200.00
2009 JAN 2100.00 2170.00 2200.00 2125.00 2150.00 2220.00
FEB 2100.00 2150.00 2180.00 2100.00 2130.00 2200.00
MAC 2125.00 2180.00 2210.00 2126.67 2156.67 2228.33
APR 2150.00 2200.00 2230.00 2140.00 2153.33 2223.33
MEI 2130.00 2185.00 2210.00 2140.00 2153.33 2200.00
JUN 2150.00 2215.00 2230.00 2160.00 2178.33 2230.00
JUL 2150.00 2225.00 2230.00 2165.00 2190.00 2230.00
OGO 2180.00 2255.00 2280.00 2200.00 2230.00 2265.00
SEP 2193.33 2255.00 2280.00 2206.67 2230.00 2280.00
OKT 2200.00 2280.00 2320.00 2206.67 2250.00 2300.00
NOV 2100.00 2180.00 2220.00 2196.67 2185.00 2200.00
DIS 2100.00 2180.00 2220.00 2196.67 2185.00 2200.00

20mm - 25mm 2008 DIS 2100.00 2170.00 2185.00 2100.00 2130.00 2200.00
(3/4" - 1") 2009 JAN 2100.00 2170.00 2200.00 2125.00 2150.00 2220.00
FEB 2100.00 2150.00 2180.00 2100.00 2130.00 2200.00
MAC 2125.00 2180.00 2210.00 2126.67 2156.67 2228.33
APR 2150.00 2200.00 2230.00 2140.00 2153.33 2223.33
MEI 2130.00 2185.00 2210.00 2140.00 2153.33 2200.00
JUN 2150.00 2215.00 2230.00 2160.00 2178.33 2230.00
JUL 2150.00 2225.00 2230.00 2165.00 2190.00 2230.00
OGO 2180.00 2255.00 2280.00 2200.00 2230.00 2265.00
SEP 2193.33 2255.00 2280.00 2206.67 2230.00 2280.00
OKT 2200.00 2280.00 2320.00 2206.67 2250.00 2300.00
NOV 2100.00 2180.00 2220.00 2206.67 2185.00 2200.00
DIS 2100.00 2180.00 2220.00 2206.67 2185.00 2200.00

* Lihat lampiran A / See appendix A

-8-
Jadual 1 (Samb.) - Harga Unit Purata Bagi Bar Keluli dan Simen
Table 1 (Cont'd.) - Average Unit Prices for Steel Bars and Cement
Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L
(2) Mycon 60 RM Setan Metrik
High Tensile Deformed Bars RM Per Metric Ton

10mm (3/8") 2008 DIS 2200.00 2250.00 2300.00 2220.00 2160.00 2235.00
2009 JAN 2200.00 2250.00 2300.00 2240.00 2280.00 2255.00
FEB 2200.00 2230.00 2280.00 2220.00 2260.00 2230.00
MAC 2230.00 2250.00 2315.00 2250.00 2281.67 2253.33
APR 2261.67 2250.00 2350.00 2268.33 2301.67 2250.00
MEI 2235.00 2240.00 2330.00 2260.00 2285.00 2230.00
JUN 2265.00 2275.00 2350.00 2285.00 2305.00 2250.00
JUL 2275.00 2280.00 2360.00 2295.00 2305.00 2250.00
OGO 2300.00 2300.00 2380.00 2325.00 2305.00 2276.67
SEP 2300.00 2300.00 2380.00 2325.00 2305.00 2276.67
OKT 2300.00 2300.00 2420.00 2350.00 2335.00 2325.00
NOV 2200.00 2300.00 2400.00 2280.00 2275.00 2278.33
DIS 2200.00 2300.00 2400.00 2280.00 2275.00 2278.33

12mm (1/2") 2008 DIS 2150.00 2300.00 2380.00 2170.00 2220.00 2285.00
2009 JAN 2150.00 2300.00 2380.00 2190.00 2240.00 2235.00
FEB 2150.00 2280.00 2360.00 2170.00 2220.00 2230.00
MAC 2180.00 2300.00 2390.00 2200.00 2250.00 2248.33
APR 2200.00 2300.00 2420.00 2233.33 2258.33 2240.00
MEI 2165.00 2280.00 2400.00 2220.00 2250.00 2220.00
JUN 2195.00 2315.00 2425.00 2240.00 2275.00 2240.00
JUL 2200.00 2325.00 2430.00 2250.00 2275.00 2240.00
OGO 2230.00 2350.00 2450.00 2281.67 2275.00 2261.67
SEP 2230.00 2350.00 2450.00 2281.67 2275.00 2261.67
OKT 2230.00 2350.00 2450.00 2300.00 2305.00 2300.00
NOV 2130.00 2250.00 2350.00 2220.00 2245.00 2225.00
DIS 2130.00 2250.00 2350.00 2220.00 2245.00 2225.00

* Lihat lampiran A / See appendix A

-9-
Jadual 1 (Samb.) - Harga Unit Purata Bagi Bar Keluli dan Simen
Table 1 (Cont'd.) - Average Unit Prices for Steel Bars and Cement
Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L
(2) Mycon 60 (Samb.) RM Setan Metrik
High Tensile Deformed Bars (Cont'd.) RM Per Metric Ton

16mm - 25mm 2008 DIS 2120.00 2280.00 2315.00 2115.00 2185.00 2220.00
(5/8" - 1") 2009 JAN 2130.00 2260.00 2325.00 2135.00 2195.00 2220.00
FEB 2130.00 2240.00 2300.00 2115.00 2175.00 2200.00
MAC 2150.00 2265.00 2330.00 2131.67 2203.33 2228.33
APR 2165.00 2250.00 2350.00 2150.00 2200.00 2230.00
MEI 2140.00 2225.00 2320.00 2140.00 2185.00 2210.00
JUN 2175.00 2260.00 2345.00 2160.00 2205.00 2225.00
JUL 2190.00 2270.00 2350.00 2175.00 2205.00 2225.00
OGO 2220.00 2316.67 2400.00 2208.33 2205.00 2240.00
SEP 2220.00 2316.67 2400.00 2208.33 2205.00 2240.00
OKT 2240.00 2316.67 2400.00 2240.00 2245.00 2280.00
NOV 2140.00 2213.33 2300.00 2160.00 2180.00 2200.00
DIS 2150.00 2213.33 2300.00 2160.00 2183.33 2200.00

32mm (1 1/4") 2008 DIS 2120.00 2280.00 2315.00 2115.00 2185.00 2220.00
2009 JAN 2130.00 2260.00 2325.00 2135.00 2195.00 2220.00
FEB 2130.00 2240.00 2300.00 2115.00 2175.00 2200.00
MAC 2150.00 2265.00 2330.00 2131.67 2203.33 2228.33
APR 2165.00 2250.00 2350.00 2150.00 2200.00 2230.00
MEI 2140.00 2225.00 2320.00 2140.00 2185.00 2210.00
JUN 2175.00 2260.00 2345.00 2160.00 2205.00 2225.00
JUL 2190.00 2270.00 2350.00 2175.00 2205.00 2225.00
OGO 2220.00 2316.67 2400.00 2208.33 2205.00 2240.00
SEP 2220.00 2316.67 2400.00 2208.33 2205.00 2240.00
OKT 2240.00 2316.67 2400.00 2240.00 2245.00 2280.00
NOV 2140.00 2213.33 2300.00 2160.00 2180.00 2200.00
DIS 2150.00 2213.33 2300.00 2160.00 2183.33 2200.00

* Lihat lampiran A / See appendix A

- 10 -
Jadual 1 (Samb.) - Harga Unit Purata Bagi Bar Keluli dan Simen
Table 1 (Cont'd.) - Average Unit Prices for Steel Bars and Cement
Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L
(3) Simen RM Sekarung 50 Kg
Cement RM Per 50 Kg. Bag

Portland Biasa 2008 DIS 16.50 16.60 16.77 14.53 15.80 16.00
BS 12 2009 JAN 16.50 16.60 16.80 14.53 15.80 16.00
Ordinary Portland FEB 16.30 16.30 16.50 14.30 15.50 15.80
BS 12 MAC 16.30 16.30 16.50 14.30 15.50 15.80
APR 16.30 16.30 16.50 14.30 15.50 15.80
MEI 16.30 16.30 16.50 14.30 15.50 15.80
JUN 16.30 16.30 16.50 14.30 15.50 15.80
JUL 16.30 16.30 16.50 14.30 15.50 15.80
OGO 16.30 16.30 16.50 14.30 15.50 15.80
SEP 16.30 16.30 16.50 14.30 15.50 15.80
OKT 16.30 16.30 16.50 14.30 15.50 15.80
NOV 16.30 16.30 16.50 14.30 15.50 15.80
DIS 16.30 16.30 16.50 14.30 15.50 15.80

* Lihat lampiran A / See appendix A

- 11 -
Jadual 2 - Harga Unit Purata Bagi Pasir, Batu Baur, Premix , Fabric Reinforcement dan Guardrail
Table 2 - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail
Kawasan*
Region
Sabah Sarawak **
Perkara Tempoh Sabah Sarawak **
Item Period
G H I J K L
(1) Pasir RM Setan Metrik
Sand RM Per Metric Ton
Pasir Sungai 2008 DIS 34.20 55.40 40.00 38.30 23.60 34.50
River Sand 2009 JAN 34.20 55.40 40.00 38.30 23.60 34.50
FEB 33.60 55.40 40.00 38.30 23.60 31.00
MAC 33.60 55.40 40.00 38.30 23.60 31.00
APR 33.30 55.40 40.00 37.70 23.60 31.00
MEI 32.80 55.40 40.00 37.70 23.60 31.00
JUN 32.80 55.40 40.00 36.70 23.60 31.00
JUL 32.80 55.40 40.00 36.70 23.60 31.00
OGO 32.80 54.20R 40.00 36.70 23.60 31.00
SEP 32.80 54.20 40.00 36.70 23.60 30.90
OKT 32.80 54.20 40.00 35.70 23.60 31.00
NOV 32.80 56.20 40.00 35.70 23.60 31.00
DIS 32.80 58.30 40.00 35.70 23.60 31.00
(2) Batu Baur
Aggregates
Granite 10mm (3/8") 2008 DIS 38.80 64.00 31.50 23.80 51.50 47.00
Granite 10mm (3/8") 2009 JAN 39.00 63.00 31.50 23.80R 52.00R 47.00
FEB 39.00 63.00 31.50 23.80 52.00 47.00
MAC 39.00 63.00 31.50 23.80 51.30 47.00
APR 39.00 59.00 31.00 23.80 51.30 47.00
MEI 39.00 59.00 31.00 23.80 51.30 47.00
JUN 39.00 59.00 31.50 23.80 51.30 47.00
JUL 39.00 59.00 31.50 23.80 50.30 47.00
OGO 39.00 59.00 32.00 23.80 50.30 47.00
SEP 39.00 59.00 32.50 23.80 50.30 47.00
OKT 39.00 59.00 32.50 23.80 50.30 47.00
NOV 39.00 59.00 32.50 23.80 50.30 47.00
DIS 39.00 59.00 32.50 23.80 50.30 47.00
Harga bagi pasir, batu baur dan premix adalah termasuk kos pengangkutan bagi jarak 30km dari outlet.
The prices for sand, aggregates and premix are inclusive of transportation charge for 30km from the outlets.
R = Kemaskini / Revised
* Lihat lampiran A / See appendix A
** Harga pasir di Sarawak adalah untuk tujuan kerja-kerja konkrit sahaja.
** The sand price in Sarawak is for the purpose of concrete works only.
- 12 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(2) Batu Baur (Samb.) RM Setan Metrik


Aggregates (Cont'd.) RM Per Metric Ton

Granite 20mm (3/4") 2008 DIS 53.00 75.00 38.50 29.00 29.00 29.00
Granite 20mm (3/4") 2009 JAN 53.00 73.00 38.50 29.00 29.00 29.00
FEB 53.00 73.00 38.50 29.00 29.00 29.00
MAC 53.00 73.00 38.50 29.00 29.00 29.00
APR 53.00 70.00 38.50 29.00 29.00 29.00
MEI 53.00 70.00 38.50 29.00 29.00 29.00
JUN 53.00 70.00 38.50 29.00 29.00 29.00
JUL 53.00 70.00 38.50 29.00 29.00 29.00
OGO 53.00 70.00 38.50R 29.00 29.00 29.00
SEP 53.00 70.00 40.00 29.00 29.00 29.00
OKT 53.00 70.00 40.00 29.00 29.00 29.00
NOV 53.00 70.00 40.00 29.00 29.00 29.00
DIS 53.00 70.00 40.00 29.00 29.00 29.00

Granite 40mm ( 11/2") 2008 DIS 51.50 na 36.00 18.10 43.60 41.00
Granite 40mm (11/2") 2009 JAN 51.50 na 36.00 18.10R 43.60 41.00
FEB 51.50 na 36.00 18.10 43.60 41.00
MAC 51.50 na 36.00 18.10 43.60 41.00
APR 51.50 na 38.00 18.10 43.60 41.00
MEI 51.50 na 38.00 18.10 43.60 41.00
JUN 51.50 na 38.00 18.10 43.60 41.00
JUL 51.50 na 38.00 18.10 43.60 41.00
OGO 51.50 na 38.00 18.10 43.60 41.00
SEP 51.50 na 38.00 18.10 43.60 41.00
OKT 51.50 na 38.00 18.10 43.60 41.00
NOV 51.50 na 38.00 18.10 43.60 41.00
DIS 51.50 na 38.00 18.10 43.60 41.00

na = Tidak diperoleh / Not available


R = Kemaskini / Revised
* Lihat lampiran A / See appendix A

- 13 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L
(2) Crushed Aggregate (Crusher Run) RM Setan Metrik
Crushed Aggregates (Crusher Run) RM Per Metric Ton

Crusher Run 2008 DIS 39.00 60.00 32.50 20.20 na 41.00


Crusher Run 2009 JAN 39.80 57.50 32.50 20.20R 38.40 41.00
FEB 39.80 57.50 32.50 20.20 37.90 41.00
MAC 39.80 57.50 32.50 20.20 37.90 41.00
APR 39.80 55.50 32.50 20.20 37.00 41.00
MEI 39.80 55.50 32.50 20.20 37.00 41.00
JUN 39.80 49.50 32.50 20.20 37.00 41.00
JUL 39.80 47.50 32.50 20.20 37.00 41.00
OGO 39.80 47.00 32.50 20.20 37.00 41.00
SEP 39.80 47.00 33.00R 20.20 37.00 41.00
OKT 39.80 47.00 33.00 20.20 37.00 41.00
NOV 39.80 47.00 33.00 20.20 37.00 41.00
DIS 39.80 47.00 33.00 20.20 37.00 41.00

na = Tidak diperoleh / Not available


R = Kemaskini / Revised
* Lihat lampiran A / See appendix A

- 14 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(2) Batu Baur RM Setan Metrik


Aggregates RM Per Metric Ton

Sandstone 20mm(3/4") 2008 DIS 46.50 68.00 32.00 na na na


Sandstone 20mm(3/4") 2009 JAN 46.50 68.00 32.00 na na na
FEB 46.50 68.00 32.00 na na na
MAC 46.00 68.00 32.00 na na na
APR 46.00 68.00 32.00 na na na
MEI 46.00 68.00 32.00 na na na
JUN 46.00 50.00R 32.00 na na na
JUL 46.00 50.00 32.00 na na na
OGO 46.00 50.00R 32.00 na na na
SEP 46.00 49.00 35.00 na na na
OKT 46.00 49.00 35.00 na na na
NOV 46.00 49.00 35.00 na na na
DIS 46.00 49.00 35.00 na na na

Limestone 20mm (3/4") 2008 DIS na na na 20.00 20.00 36.50


Limestone 20mm (3/4") 2009 JAN na na na 20.00 20.00 36.50
FEB na na na 20.00 20.00 36.50
MAC na na na 20.00 20.00 37.00
APR na na na 20.00 20.00 37.00
MEI na na na 20.00 20.00 37.00
JUN na na na 20.00 20.00 37.00
JUL na na na 20.00 20.00 37.00
OGO na na na 20.00 20.00 37.00
SEP na na na 20.00 20.00 37.00
OKT na na na 20.00 20.00 37.00
NOV na na na 20.00 20.00 37.00
DIS na na na 20.00 20.00 37.00

na = Tidak diperoleh / Not available


R = Kemaskini / Revised
* Lihat lampiran A / See appendix A

- 15 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(3) Premix Asphaltic Concrete RM Setan Metrik


Premix Asphaltic Concrete RM Per Metric Ton

AC 10(Wearing Course) 2008 DIS 265.00 300.00 na 193.00 200.00 205.00


2009 JAN 246.70 300.00 na 190.50 200.00 205.00
FEB 246.70 300.00 na 186.00 197.25 205.00
MAC 240.00 300.00 na 172.50 197.50 205.00
APR 240.00 300.00 na 172.50 192.50 190.00
MEI 240.00 300.00 na 172.50 192.50 190.00
JUN 233.30 300.00 na 172.50 187.50 190.00
JUL 233.30 300.00 na 177.00 187.50 190.00
OGO 233.30 300.00 na 177.00 187.50 190.00
SEP 233.30 300.00 na 177.00 187.50 190.00
OKT 233.30 300.00 na 177.00 187.50 190.00
NOV 238.30 300.00 na 177.00 187.50 190.00
DIS 238.30 300.00 na 177.00 187.50 190.00

AC 14(Wearing Course) 2008 DIS 265.00 300.00 264.30 193.00 200.00 205.00
2009 JAN 246.70 300.00 224.50 190.50 200.00 205.00
FEB 246.70 300.00 223.00 186.00 197.25 205.00
MAC 240.00 300.00 220.00 172.50 197.50 205.00
APR 240.00 300.00 215.00 172.50 192.50 190.00
MEI 240.00 300.00 217.00 172.50 190.00 190.00
JUN 233.30 300.00 217.00 172.50 187.50 190.00
JUL 233.30 300.00 225.00 177.00 187.50 190.00
OGO 233.30 300.00 223.00 177.00 187.50 190.00
SEP 233.30 300.00 223.00 177.00 187.50 190.00
OKT 233.30 300.00 217.00 177.00 187.50 190.00
NOV 238.30 300.00 217.00 177.00 187.50 190.00
DIS 238.30 300.00 217.00 177.00 187.50 190.00

na = Tidak diperoleh / Not available


* Lihat lampiran A / See appendix A

- 16 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(3) Premix Asphaltic Concrete (Samb.) RM Setan Metrik


Premix Asphaltic Concrete (Cont'd.) RM Per Metric Ton

AC 28 (Binder Course) 2008 DIS 260.70 300.00 259.30 185.50 200.00 205.00
2009 JAN 240.70 300.00 219.00 183.00 200.00 205.00
FEB 240.70 300.00 217.50 178.50 197.25 205.00
MAC 235.00 300.00 217.50 167.50 197.50 205.00
APR 235.00 300.00 217.50 167.50 192.50 190.00
MEI 235.00 300.00 217.50 167.50 190.00 190.00
JUN 226.70 300.00 217.50 167.50 187.50 190.00
JUL 226.70 300.00 217.50 172.00 187.50 190.00
OGO 226.70 300.00 217.50 172.00 187.50 190.00
SEP 226.70 300.00 217.50 172.00 187.50 190.00
OKT 226.70 300.00 217.50 172.00 187.50 190.00
NOV 235.00 300.00 217.50 172.00 187.50 190.00
DIS 235.00 300.00 217.50 172.00 187.50 190.00

ACW 20 (Wearing Course) 2008 DIS 261.70 300.00 261.30 193.00 200.00 205.00
2009 JAN 243.30 300.00 221.00 190.50 200.00 205.00
FEB 243.30 300.00 219.50 186.00 197.25 205.00
MAC 236.70 300.00 217.50 172.50 197.50 205.00
APR 236.70 300.00 208.00 172.50 192.50 190.00
MEI 236.70 300.00 211.00 172.50 190.00 190.00
JUN 228.30 300.00 211.00 172.50 187.50 190.00
JUL 228.30 300.00 217.00 177.00 187.50 190.00
OGO 228.30 300.00 220.00 177.00 187.50 190.00
SEP 228.30 300.00 220.00 177.00 187.50 190.00
OKT 228.30 300.00 213.00 177.00 187.50 190.00
NOV 236.70 300.00 213.00 177.00 187.50 190.00
DIS 236.70 300.00 213.00 177.00 187.50 190.00

* Lihat lampiran A / See appendix A

- 17 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L
(4) Fabric Reinforcement RM Per Kg
Fabric Reinforcement RM Per Kg

A4, MS145 2008 DIS 5.60 6.02 6.16 5.55 5.44 5.35
2009 JAN 5.63 6.02 6.16 5.55 5.44 5.35
FEB 5.63 6.02 6.00 5.55 5.44 5.35
MAC 5.63 6.10 6.00 5.72 5.47 5.41
APR 5.63 6.10 6.00 5.49 5.44 5.35
MEI 5.63 6.10 6.00 5.51 5.44 5.44
JUN 5.63 6.10 5.97 5.44 5.44 5.44
JUL 5.26 5.70 5.58 5.13 5.13 5.13
OGO 5.26 5.70 5.58 5.13 5.13 5.13
SEP 5.26 5.70 5.58 5.13 5.13 5.13
OKT 4.77 5.17 5.06 4.77 4.77 4.77
NOV 4.77 5.17 5.06 4.77 4.77 4.77
DIS 4.77 5.17 5.06 4.77 4.77 4.77

A5, MS145 2008 DIS 3.99 4.29 4.39 3.99 3.91 3.85
2009 JAN 4.01 4.29 4.39 3.99 3.91 3.85
FEB 4.01 4.29 4.28 3.99 3.91 3.85
MAC 4.01 4.35 4.28 4.11 3.94 3.89
APR 4.01 4.35 4.28 3.95 3.91 3.85
MEI 4.01 4.35 4.28 3.96 3.91 3.91
JUN 4.01 4.35 4.26 3.91 3.91 3.91
JUL 4.01 4.35 4.26 3.91 3.91 3.91
OGO 4.01 4.35 4.26 3.91 3.91 3.91
SEP 4.01 4.35 4.26 3.91 3.91 3.91
OKT 4.24 4.59 4.50 4.24 4.24 4.24
NOV 4.24 4.59 4.50 4.24 4.24 4.24
DIS 4.24 4.59 4.50 4.24 4.24 4.24

* Lihat lampiran A / See appendix A

- 18 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(4) Fabric Reinforcement (Samb.) RM Per Kg


Fabric Reinforcement (Cont'd.) RM Per Kg

A6, MS145 2008 DIS 3.74 4.19 4.41 4.05 3.92 3.83
2009 JAN 3.75 4.05 4.41 4.05 3.92 3.83
FEB 3.77 4.05 4.29 4.05 3.92 3.83
MAC 3.86 4.05 4.29 4.05 3.96 3.83
APR 3.83 4.05 4.29 3.90 3.83 3.74
MEI 3.83 4.05 4.29 3.94 3.83 3.60
JUN 3.83 4.05 4.28 3.87 3.83 3.60
JUL 3.83 4.05 4.28 3.87 3.83 3.60
OGO 3.83 4.05 4.28 3.92 3.83 3.60
SEP 3.83 4.05 4.28 3.92 3.83 3.60
OKT 4.11 4.45 4.36 4.11 4.11 4.11
NOV 4.11 4.45 4.36 4.11 4.11 4.11
DIS 4.11 4.45 4.36 4.11 4.11 4.11

A7, MS145 2008 DIS 3.95 4.30 4.35 4.17 3.97 3.91
2009 JAN 3.97 4.30 4.35 4.17 3.97 3.91
FEB 3.97 4.30 4.24 4.17 3.97 3.91
MAC 3.97 4.30 4.24 4.17 4.00 3.95
APR 3.97 4.30 4.24 4.01 3.97 3.97
MEI 3.97 4.30 4.24 4.02 3.97 3.97
JUN 3.97 4.30 4.22 3.97 3.97 3.97
JUL 3.97 4.30 4.22 3.97 3.97 3.97
OGO 3.97 4.30 4.22 3.97 3.97 3.97
SEP 3.97 4.30 4.22 3.97 3.97 3.97
OKT 3.97 4.30 4.22 3.97 3.97 3.97
NOV 3.97 4.30 4.22 3.97 3.97 3.97
DIS 3.97 4.30 4.22 3.97 3.97 3.97

* Lihat lampiran A / See appendix A

- 19 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(4) Fabric Reinforcement (Samb.) RM Per Kg


Fabric Reinforcement (Cont'd.) RM Per Kg

A8, MS145 2008 DIS 4.05 4.25 4.32 4.05 4.05 4.05
2009 JAN 4.05 4.25 4.32 4.05 4.05 4.05
FEB 4.05 4.25 4.22 4.05 4.05 4.05
MAC 4.05 4.25 4.22 4.05 4.05 4.05
APR 4.05 4.18 4.22 3.94 3.97 3.91
MEI 4.05 4.18 4.22 3.95 3.97 3.91
JUN 4.05 4.18 4.17 3.92 3.92 3.89
JUL 4.05 4.18 4.17 3.92 3.92 3.89
OGO 4.05 4.18 4.17 3.92 3.92 3.89
SEP 4.05 4.18 4.17 3.92 3.92 3.89
OKT 3.96 4.29 4.20 3.96 3.96 3.96
NOV 3.96 4.29 4.20 3.96 3.96 3.96
DIS 3.96 4.29 4.20 3.96 3.96 3.96

A9, MS145 2008 DIS 4.01 4.41 4.40 4.21 4.10 4.11
2009 JAN 4.01 4.41 4.40 4.21 4.10 4.11
FEB 4.01 4.41 4.32 4.21 4.10 4.11
MAC 4.01 4.41 4.32 4.21 4.11 4.13
APR 4.01 4.41 4.32 4.07 4.01 4.01
MEI 4.01 4.41 4.32 4.06 4.01 4.01
JUN 4.01 4.41 4.28 4.01 4.01 4.01
JUL 4.01 4.41 4.28 4.01 4.01 4.01
OGO 4.01 4.41 4.28 4.01 4.01 4.01
SEP 4.01 4.41 4.28 4.01 4.01 4.01
OKT 3.87 4.19 4.10 3.87 3.87 3.87
NOV 3.87 4.19 4.10 3.87 3.87 3.87
DIS 3.87 4.19 4.10 3.87 3.87 3.87

* Lihat lampiran A / See appendix A

- 20 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(4) Fabric Reinforcement (Samb.) RM Per Kg


Fabric Reinforcement (Cont'd.) RM Per Kg

A10, MS145 2008 DIS 4.06 4.25 4.22 4.06 4.14 4.11
2009 JAN 4.06 4.25 4.22 4.06 4.14 4.11
FEB 4.06 4.25 4.15 4.06 4.14 4.11
MAC 4.06 4.25 4.15 4.06 4.14 4.12
APR 4.06 4.18 4.15 3.89 4.06 4.06
MEI 4.06 4.18 4.15 3.90 4.06 4.01
JUN 4.06 4.22 4.15 3.89 4.06 4.03
JUL 4.06 4.22 4.15 3.89 4.06 4.03
OGO 4.06 4.22 4.15 3.89 4.06 4.03
SEP 4.06 4.22 4.15 3.89 4.06 4.03
OKT 4.11 4.45 4.36 4.11 4.11 4.11
NOV 4.11 4.45 4.36 4.11 4.11 4.11
DIS 4.11 4.45 4.36 4.11 4.11 4.11

B5, MS145 2008 DIS 2.83 3.05 3.12 2.83 2.78 2.73
2009 JAN 2.85 3.05 3.12 2.83 2.78 2.73
FEB 2.85 3.05 3.04 2.83 2.78 2.73
MAC 2.85 3.09 3.04 2.92 2.79 2.76
APR 2.85 3.09 3.04 2.80 2.78 2.73
MEI 2.85 3.09 3.04 2.81 2.78 2.78
JUN 2.85 3.09 3.02 2.78 2.78 2.78
JUL 2.85 3.09 3.02 2.78 2.78 2.78
OGO 2.85 3.09 3.02 2.78 2.78 2.78
SEP 2.85 3.09 3.02 2.78 2.78 2.78
OKT 4.04 4.38 4.29 4.04 4.04 4.04
NOV 4.04 4.38 4.29 4.04 4.04 4.04
DIS 4.04 4.38 4.29 4.04 4.04 4.04

* Lihat lampiran A / See appendix A

- 21 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L
(4) Fabric Reinforcement (Samb.) RM Per Kg
Fabric Reinforcement (Cont'd.) RM Per Kg

B6, MS145 2008 DIS 3.26 3.51 3.59 3.26 3.19 3.14
2009 JAN 3.28 3.51 3.59 3.26 3.19 3.14
FEB 3.28 3.51 3.49 3.26 3.19 3.14
MAC 3.28 3.55 3.49 3.35 3.21 3.18
APR 3.28 3.55 3.49 3.22 3.19 3.14
MEI 3.28 3.55 3.49 3.23 3.19 3.19
JUN 3.28 3.55 3.48 3.19 3.19 3.19
JUL 3.28 3.55 3.48 3.19 3.19 3.19
OGO 3.28 3.55 3.48 3.19 3.19 3.19
SEP 3.28 3.55 3.48 3.19 3.19 3.19
OKT 4.04 4.38 4.29 4.04 4.04 4.04
NOV 4.04 4.38 4.29 4.04 4.04 4.04
DIS 4.04 4.38 4.29 4.04 4.04 4.04

B7, MS145 2008 DIS 3.72 4.01 4.10 3.82 3.74 3.68
2009 JAN 3.75 4.01 4.10 3.82 3.74 3.68
FEB 3.75 4.01 3.99 3.82 3.74 3.68
MAC 3.75 4.06 3.99 3.93 3.76 3.72
APR 3.75 4.06 3.99 3.77 3.74 3.68
MEI 3.75 4.06 3.99 3.79 3.74 3.74
JUN 3.75 4.06 3.97 3.74 3.74 3.74
JUL 3.75 4.06 3.97 3.74 3.74 3.74
OGO 3.75 4.06 3.97 3.74 3.74 3.74
SEP 3.75 4.06 3.97 3.74 3.74 3.74
OKT 4.04 4.38 4.29 4.04 4.04 4.04
NOV 4.04 4.38 4.29 4.04 4.04 4.04
DIS 4.04 4.38 4.29 4.04 4.04 4.04

* Lihat lampiran A / See appendix A

- 22 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(4) Fabric Reinforcement (Samb.) RM Per Kg


Fabric Reinforcement (Cont'd.) RM Per Kg

B8, MS145 2008 DIS 3.63 3.91 4.00 3.66 3.58 3.52
2009 JAN 3.65 3.91 4.00 3.66 3.58 3.52
FEB 3.65 3.91 3.90 3.66 3.58 3.52
MAC 3.65 3.96 3.90 3.76 3.60 3.56
APR 3.65 3.96 3.90 3.61 3.58 3.52
MEI 3.65 3.96 3.90 3.63 3.58 3.58
JUN 3.65 3.96 3.87 3.58 3.58 3.58
JUL 3.65 3.96 3.87 3.58 3.58 3.58
OGO 3.65 3.96 3.87 3.58 3.58 3.58
SEP 3.65 3.96 3.87 3.58 3.58 3.58
OKT 3.97 4.30 4.22 3.97 3.97 3.97
NOV 3.97 4.30 4.22 3.97 3.97 3.97
DIS 3.97 4.30 4.22 3.97 3.97 3.97

B9, MS145 2008 DIS 4.00 4.30 4.40 4.07 3.99 3.92
2009 JAN 4.02 4.30 4.40 4.07 3.99 3.92
FEB 4.02 4.30 4.29 4.07 3.99 3.92
MAC 4.02 4.36 4.29 4.18 4.01 3.96
APR 4.02 4.36 4.29 4.02 3.99 3.92
MEI 4.02 4.36 4.29 4.04 3.99 3.99
JUN 4.02 4.36 4.27 3.99 3.99 3.99
JUL 4.02 4.36 4.27 3.99 3.99 3.99
OGO 4.02 4.36 4.27 3.99 3.99 3.99
SEP 4.02 4.36 4.27 3.99 3.99 3.99
OKT 4.07 4.41 4.31 4.07 4.07 4.07
NOV 4.07 4.41 4.31 4.07 4.07 4.07
DIS 4.07 4.41 4.31 4.07 4.07 4.07

* Lihat lampiran A / See appendix A

- 23 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(4) Fabric Reinforcement (Samb.) RM Per Kg


Fabric Reinforcement (Cont'd.) RM Per Kg

B10, MS145 2008 DIS 4.21 4.53 4.64 4.29 4.20 4.13
2009 JAN 4.24 4.53 4.64 4.29 4.20 4.13
FEB 4.24 4.53 4.52 4.29 4.20 4.13
MAC 4.24 4.59 4.52 4.41 4.23 4.18
APR 4.24 4.59 4.52 4.24 4.20 4.13
MEI 4.24 4.59 4.52 4.26 4.20 4.20
JUN 4.24 4.59 4.50 4.20 4.20 4.20
JUL 4.24 4.59 4.50 4.20 4.20 4.20
OGO 4.24 4.59 4.50 4.20 4.20 4.20
SEP 4.24 4.59 4.50 4.20 4.20 4.20
OKT 4.19 4.53 4.44 4.19 4.19 4.19
NOV 4.19 4.53 4.44 4.19 4.19 4.19
DIS 4.19 4.53 4.44 4.19 4.19 4.19

B12, MS145 2008 DIS 3.88 4.17 4.27 4.29 4.20 4.13
2009 JAN 3.90 4.17 4.27 4.29 4.20 4.13
FEB 3.90 4.17 4.16 4.29 4.20 4.13
MAC 3.90 4.23 4.16 4.41 4.23 4.18
APR 3.90 4.23 4.16 4.24 4.20 4.13
MEI 3.90 4.23 4.16 4.26 4.20 4.20
JUN 3.90 4.23 4.14 4.20 4.20 4.20
JUL 3.90 4.23 4.14 4.20 4.20 4.20
OGO 3.90 4.23 4.14 4.20 4.20 4.20
SEP 3.90 4.23 4.14 4.20 4.20 4.20
OKT 4.17 4.52 4.43 4.17 4.17 4.17
NOV 4.17 4.52 4.43 4.17 4.17 4.17
DIS 4.17 4.52 4.43 4.17 4.17 4.17

* Lihat lampiran A / See appendix A

- 24 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(4) Fabric Reinforcement (Samb.) RM Per Kg


Fabric Reinforcement (Cont'd.) RM Per Kg

C5, MS145 2008 DIS 4.62 4.97 5.08 4.74 4.64 4.56
2009 JAN 4.64 4.97 5.08 4.74 4.64 4.56
FEB 4.64 4.97 4.95 4.74 4.64 4.56
MAC 4.64 5.03 4.95 4.87 4.67 4.62
APR 4.64 5.03 4.95 4.68 4.64 4.56
MEI 4.64 5.03 4.95 4.70 4.64 4.64
JUN 4.64 5.03 4.92 4.64 4.64 4.64
JUL 4.64 5.03 4.92 4.64 4.64 4.64
OGO 4.64 5.03 4.92 4.64 4.64 4.64
SEP 4.64 5.03 4.92 4.64 4.64 4.64
OKT 4.00 4.33 4.24 4.00 4.00 4.00
NOV 4.00 4.33 4.24 4.00 4.00 4.00
DIS 4.00 4.33 4.24 4.00 4.00 4.00

C6, MS145 2008 DIS 4.61 4.97 5.08 4.73 4.64 4.56
2009 JAN 4.64 4.97 5.08 4.73 4.64 4.56
FEB 4.64 4.97 4.95 4.73 4.64 4.56
MAC 4.64 5.03 4.95 4.87 4.66 4.61
APR 4.64 5.03 4.95 4.68 4.64 4.56
MEI 4.64 5.03 4.95 4.70 4.64 4.64
JUN 4.64 5.03 4.92 4.64 4.64 4.64
JUL 4.64 5.03 4.92 4.64 4.64 4.64
OGO 4.64 5.03 4.92 4.64 4.64 4.64
SEP 4.64 5.03 4.92 4.64 4.64 4.64
OKT 4.28 4.63 4.54 4.28 4.28 4.28
NOV 4.28 4.63 4.54 4.28 4.28 4.28
DIS 4.28 4.63 4.54 4.28 4.28 4.28

* Lihat lampiran A / See appendix A

- 25 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(4) Fabric Reinforcement (Samb.) RM Per Kg


Fabric Reinforcement (Cont'd.) RM Per Kg

C7, MS145 2008 DIS 4.61 4.97 5.08 4.73 4.64 4.56
2009 JAN 4.64 4.97 5.08 4.73 4.64 4.56
FEB 4.64 4.97 4.95 4.73 4.64 4.56
MAC 4.64 5.03 4.95 4.87 4.66 4.61
APR 4.64 5.03 4.95 4.68 4.64 4.56
MEI 4.64 5.03 4.95 4.70 4.64 4.64
JUN 4.64 5.03 4.92 4.64 4.64 4.64
JUL 4.64 5.03 4.92 4.64 4.64 4.64
OGO 4.64 5.03 4.92 4.64 4.64 4.64
SEP 4.64 5.03 4.92 4.64 4.64 4.64
OKT 4.21 4.56 4.47 4.21 4.21 4.21
NOV 4.21 4.56 4.47 4.21 4.21 4.21
DIS 4.21 4.56 4.47 4.21 4.21 4.21

C8, MS145 2008 DIS 4.60 4.95 5.06 4.72 4.63 4.55
2009 JAN 4.63 4.95 5.06 4.72 4.63 4.55
FEB 4.63 4.95 4.93 4.72 4.63 4.55
MAC 4.63 5.01 4.93 4.86 4.65 4.60
APR 4.63 5.01 4.93 4.66 4.63 4.55
MEI 4.63 5.01 4.93 4.68 4.63 4.63
JUN 4.63 5.01 4.91 4.63 4.63 4.63
JUL 4.63 5.01 4.91 4.63 4.63 4.63
OGO 4.63 5.01 4.91 4.63 4.63 4.63
SEP 4.63 5.01 4.91 4.63 4.63 4.63
OKT 4.28 4.63 4.54 4.28 4.28 4.28
NOV 4.28 4.63 4.54 4.28 4.28 4.28
DIS 4.28 4.63 4.54 4.28 4.28 4.28

* Lihat lampiran A / See appendix A

- 26 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(4) Fabric Reinforcement (Samb.) RM Per Kg


Fabric Reinforcement (Cont'd.) RM Per Kg

C9, MS145 2008 DIS 4.61 4.96 5.07 4.72 4.63 4.55
2009 JAN 4.63 4.96 5.07 4.72 4.63 4.55
FEB 4.63 4.96 4.94 4.72 4.63 4.55
MAC 4.63 5.02 4.94 4.86 4.66 4.61
APR 4.63 5.02 4.94 4.67 4.63 4.55
MEI 4.63 5.02 4.94 4.69 4.63 4.63
JUN 4.63 5.02 4.91 4.63 4.63 4.63
JUL 4.63 5.02 4.91 4.63 4.63 4.63
OGO 4.63 5.02 4.91 4.63 4.63 4.63
SEP 4.63 5.02 4.91 4.63 4.63 4.63
OKT 4.17 4.52 4.43 4.17 4.17 4.17
NOV 4.17 4.52 4.43 4.17 4.17 4.17
DIS 4.17 4.52 4.43 4.17 4.17 4.17

C10, MS145 2008 DIS 4.61 4.96 5.07 4.73 4.63 4.56
2009 JAN 4.63 4.96 5.07 4.73 4.63 4.56
FEB 4.63 4.96 4.94 4.73 4.63 4.56
MAC 4.63 5.02 4.94 4.87 4.66 4.61
APR 4.63 5.02 4.94 4.67 4.63 4.56
MEI 4.63 5.02 4.94 4.69 4.63 4.63
JUN 4.63 5.02 4.92 4.63 4.63 4.63
JUL 4.63 5.02 4.92 4.63 4.63 4.63
OGO 4.63 5.02 4.92 4.63 4.63 4.63
SEP 4.63 5.02 4.92 4.63 4.63 4.63
OKT 4.23 4.58 4.48 4.23 4.23 4.23
NOV 4.23 4.58 4.48 4.23 4.23 4.23
DIS 4.23 4.58 4.48 4.23 4.23 4.23

* Lihat lampiran A / See appendix A

- 27 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(4) Fabric Reinforcement (Samb.) RM Per Kg


Fabric Reinforcement (Cont'd.) RM Per Kg

DA4, MS145 2008 DIS 4.65 5.01 5.12 4.78 4.68 4.60
2009 JAN 4.68 5.01 5.12 4.78 4.68 4.60
FEB 4.68 5.01 4.99 4.78 4.68 4.60
MAC 4.68 5.07 4.99 4.91 4.71 4.65
APR 4.68 5.07 4.99 4.72 4.68 4.60
MEI 4.68 5.07 4.99 4.74 4.68 4.68
JUN 4.68 5.07 4.97 4.68 4.68 4.68
JUL 4.68 5.07 4.97 4.68 4.68 4.68
OGO 4.68 5.07 4.97 4.68 4.68 4.68
SEP 4.68 5.07 4.97 4.68 4.68 4.68
OKT 4.33 4.69 4.60 4.33 4.33 4.33
NOV 4.33 4.69 4.60 4.33 4.33 4.33
DIS 4.33 4.69 4.60 4.33 4.33 4.33

DA5, MS145 2008 DIS 4.63 4.98 5.09 4.75 4.65 4.58
2009 JAN 4.65 4.98 5.09 4.75 4.65 4.58
FEB 4.65 4.98 4.96 4.75 4.65 4.58
MAC 4.65 5.04 4.96 4.89 4.68 4.63
APR 4.65 5.04 4.96 4.69 4.65 4.58
MEI 4.65 5.04 4.96 4.71 4.65 4.65
JUN 4.65 5.04 4.94 4.65 4.65 4.65
JUL 4.65 5.04 4.94 4.65 4.65 4.65
OGO 4.65 5.04 4.94 4.65 4.65 4.65
SEP 4.65 5.04 4.94 4.65 4.65 4.65
OKT 4.38 4.75 4.65 4.38 4.38 4.38
NOV 4.38 4.75 4.65 4.38 4.38 4.38
DIS 4.38 4.75 4.65 4.38 4.38 4.38

* Lihat lampiran A / See appendix A

- 28 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(4) Fabric Reinforcement (Samb.) RM Per Kg


Fabric Reinforcement (Cont'd.) RM Per Kg

DA6, MS145 2008 DIS 4.15 4.47 4.57 4.26 4.17 4.10
2009 JAN 4.17 4.47 4.57 4.26 4.17 4.10
FEB 4.17 4.47 4.45 4.26 4.17 4.10
MAC 4.17 4.52 4.45 4.38 4.20 4.15
APR 4.17 4.52 4.45 4.21 4.17 4.10
MEI 4.17 4.52 4.45 4.23 4.17 4.17
JUN 4.17 4.52 4.43 4.17 4.17 4.17
JUL 4.17 4.52 4.43 4.17 4.17 4.17
OGO 4.17 4.52 4.43 4.17 4.17 4.17
SEP 4.17 4.52 4.43 4.17 4.17 4.17
OKT 4.25 4.61 4.51 4.25 4.25 4.25
NOV 4.25 4.61 4.51 4.25 4.25 4.25
DIS 4.25 4.61 4.51 4.25 4.25 4.25

DA7, MS145 2008 DIS 4.15 4.47 4.57 4.26 4.17 4.10
2009 JAN 4.17 4.47 4.57 4.26 4.17 4.10
FEB 4.17 4.47 4.45 4.26 4.17 4.10
MAC 4.17 4.52 4.45 4.38 4.20 4.15
APR 4.17 4.52 4.45 4.21 4.17 4.10
MEI 4.17 4.52 4.45 4.23 4.17 4.17
JUN 4.17 4.52 4.43 4.17 4.17 4.17
JUL 4.17 4.52 4.43 4.17 4.17 4.17
OGO 4.17 4.52 4.43 4.17 4.17 4.17
SEP 4.17 4.52 4.43 4.17 4.17 4.17
OKT 4.12 4.46 4.37 4.12 4.12 4.12
NOV 4.12 4.46 4.37 4.12 4.12 4.12
DIS 4.12 4.46 4.37 4.12 4.12 4.12

* Lihat lampiran A / See appendix A

- 29 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(4) Fabric Reinforcement (Samb.) RM Per Kg


Fabric Reinforcement (Cont'd.) RM Per Kg

DA8, MS145 2008 DIS 4.15 4.47 4.57 4.26 4.18 4.11
2009 JAN 4.18 4.47 4.57 4.26 4.18 4.11
FEB 4.18 4.47 4.45 4.26 4.18 4.11
MAC 4.18 4.52 4.45 4.38 4.20 4.15
APR 4.18 4.52 4.45 4.21 4.18 4.11
MEI 4.18 4.52 4.45 4.23 4.18 4.18
JUN 4.18 4.52 4.43 4.18 4.18 4.18
JUL 4.18 4.52 4.43 4.18 4.18 4.18
OGO 4.18 4.52 4.43 4.18 4.18 4.18
SEP 4.18 4.52 4.43 4.18 4.18 4.18
OKT 4.05 4.39 4.30 4.05 4.05 4.05
NOV 4.05 4.39 4.30 4.05 4.05 4.05
DIS 4.05 4.39 4.30 4.05 4.05 4.05

DA9, MS145 2008 DIS 4.15 4.47 4.57 4.26 4.17 4.10
2009 JAN 4.17 4.47 4.57 4.26 4.17 4.10
FEB 4.17 4.47 4.45 4.26 4.17 4.10
MAC 4.17 4.52 4.45 4.38 4.20 4.15
APR 4.17 4.52 4.45 4.21 4.17 4.10
MEI 4.17 4.52 4.45 4.22 4.17 4.17
JUN 4.17 4.52 4.43 4.17 4.17 4.17
JUL 4.17 4.52 4.43 4.17 4.17 4.17
OGO 4.17 4.52 4.43 4.17 4.17 4.17
SEP 4.17 4.52 4.43 4.17 4.17 4.17
OKT 4.04 4.38 4.29 4.04 4.04 4.04
NOV 4.04 4.38 4.29 4.04 4.04 4.04
DIS 4.04 4.38 4.29 4.04 4.04 4.04

* Lihat lampiran A / See appendix A

- 30 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(4) Fabric Reinforcement (Samb.) RM Per Kg


Fabric Reinforcement (Cont'd.) RM Per Kg

DA10, MS145 2008 DIS 4.15 4.47 4.57 4.26 4.17 4.10
2009 JAN 4.17 4.47 4.57 4.26 4.17 4.10
FEB 4.17 4.47 4.45 4.26 4.17 4.10
MAC 4.17 4.52 4.45 4.38 4.20 4.15
APR 4.17 4.52 4.45 4.21 4.17 4.10
MEI 4.17 4.52 4.45 4.22 4.17 4.17
JUN 4.17 4.52 4.43 4.17 4.17 4.17
JUL 4.17 4.52 4.43 4.17 4.17 4.17
OGO 4.17 4.52 4.43 4.17 4.17 4.17
SEP 4.17 4.52 4.43 4.17 4.17 4.17
OKT 4.21 4.56 4.47 4.21 4.21 4.21
NOV 4.21 4.56 4.47 4.21 4.21 4.21
DIS 4.21 4.56 4.47 4.21 4.21 4.21
* Lihat lampiran A / See appendix A

- 31 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(5) Guardrail RM Per Meter


Guardrail RM Per Metre

Single Mounted 2008 DIS 311.50 327.08 342.65 311.50 327.08 342.65
i)1.95m Post Spacing 2009 JAN 311.50 327.08 342.65 311.50 327.08 342.65
FEB 311.50 327.08 342.65 311.50 327.08 342.65
MAC 311.50 327.08 342.65 311.50 327.08 342.65
APR 311.50 327.08 342.65 311.50 327.08 342.65
MEI 311.50 327.08 342.65 311.50 327.08 342.65
JUN 311.50 327.08 342.65 311.50 327.08 342.65
JUL 311.50 327.08 342.65 311.50 327.08 342.65
OGO 311.50 327.08 342.65 311.50 327.08 342.65
SEP 311.50R 327.08R 342.65R 311.50R 327.08R 342.65R
OKT 311.50R 327.08R 342.65R 311.50R 327.08R 342.65R
R R R R R
NOV 311.50 327.08 342.65 311.50 327.08 342.65R
DIS 311.50 327.08 342.65 311.50 327.08 342.65

ii) 3.8m Post Spacing 2008 DIS 227.00 238.35 249.70 247.00 259.35 271.70
2009 JAN 227.00 238.35 249.70 247.00 259.35 271.70
FEB 227.00 238.35 249.70 247.00 259.35 271.70
MAC 227.00 238.35 249.70 247.00 259.35 271.70
APR 227.00 238.35 249.70 247.00 259.35 271.70
MEI 227.00 238.35 249.70 247.00 259.35 271.70
JUN 227.00 238.35 249.70 247.00 259.35 271.70
JUL 227.00 238.35 249.70 247.00 259.35 271.70
OGO 227.00 238.35 249.70 247.00 259.35 271.70
SEP 227.00R 238.35R 249.70R 247.00R 259.35R 271.70R
OKT 227.00R 238.35R 249.70R 247.00R 259.35R 271.70R
R R R R R
NOV 227.00 238.35 249.70 247.00 259.35 271.70R
DIS 227.00 238.35 249.70 247.00 259.35 271.70

R = Kemaskini / Revised
* Lihat lampiran A / See appendix A

- 32 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Perkara Tempoh Sabah Sarawak
Item Period Sabah Sarawak
G H I J K L

(5) Guardrail (Samb.) RM Per Meter


Guardrail (Cont'd.) RM Per Metre

Double Mounted 2008 DIS 409.00 429.45 449.90 422.25 443.36 464.48
i) 1.95m Post Spacing 2009 JAN 409.00 429.45 449.90 422.25 443.36 464.48
FEB 409.00 429.45 449.90 422.25 443.36 464.48
MAC 409.00 429.45 449.90 422.25 443.36 464.48
APR 409.00 429.45 449.90 422.25 443.36 464.48
MEI 409.00 429.45 449.90 422.25 443.36 464.48
JUN 409.00 429.45 449.90 422.25 443.36 464.48
JUL 409.00 429.45 449.90 422.25 443.36 464.48
OGO 409.00 429.45 449.90 422.25 443.36 464.48
SEP 409.00 429.45 449.90 422.25 443.36 464.48
OKT 409.00 429.45 449.90 422.25 443.36 464.48
NOV 409.00 429.45 449.90 422.25 443.36 464.48
DIS 409.00 429.45 449.90 422.25 443.36 464.48

ii) 3.8m Post Spacing 2008 DIS 325.00 341.25 357.50 350.75 368.29 385.83
2009 JAN 325.00 341.25 357.50 350.75 368.29 385.83
FEB 325.00 341.25 357.50 350.75 368.29 385.83
MAC 325.00 341.25 357.50 350.75 368.29 385.83
APR 325.00 341.25 357.50 350.75 368.29 385.83
MEI 325.00 341.25 357.50 350.75 368.29 385.83
JUN 325.00 341.25 357.50 350.75 368.29 385.83
JUL 325.00 341.25 357.50 350.75 368.29 385.83
OGO 325.00 341.25 357.50 350.75 368.29 385.83
SEP 325.00R 341.25R 357.50R 350.75R 368.29R 385.83R
OKT 325.00R 341.25R 357.50R 350.75R 368.29R 385.83R
R R R R R
NOV 325.00 341.25 357.50 350.75 368.29 385.83R
DIS 325.00 341.25 357.50 350.75 368.29 385.83

R = Kemaskini / Revised
* Lihat lampiran A / See appendix A

- 33 -
Jadual 3 - Harga Unit Purata Bagi Bitumen, Minyak Bahan Api dan Diesel
Table 3 - Average Unit Prices for Bitumen, Fuel Oil and Diesel

Perkara Tempoh Sabah Sarawak


Item Period Sabah Sarawak

(1) Minyak Bahan Api RM Seliter


Fuel Oil RM Per Litre

Sederhana 2008 DIS 2.10 na


Medium 2009 JAN 2.10 na
FEB 1.23 na
MAC 1.14 na
APR 1.28 na
MEI 1.61 na
JUN 1.65 na
JUL 1.73 na
OGO 1.73 na
SEP 1.78 na
OKT 1.83 na
NOV 1.82 na
DIS 1.78 na

(2) Bitumen Penembusan 80/100 RM Setan Metrik


Bitumen 80/100 Penetration RM Per Metric Ton

2008 DIS 1950.00 1900.00


2009 JAN 1850.00 1900.00
FEB 1850.00 1900.00
MAC 1700.00 1800.00
APR 1700.00 1800.00
MEI 1750.00 1850.00
JUN 1900.00 1850.00
JUL 1950.00 1900.00
OGO 1780.00 1900.00
SEP 1780.00 1900.00
OKT 1780.00 1900.00
NOV 1900.00 1980.00
DIS 1900.00 1980.00

Harga Bitumen Penembusan 80/100 adalah berdasarkan harga purata ex-Sepangar Bay bagi Sabah dan
ex-Kuching bagi Sarawak (pada setiap 1hb).
The Bitumen 80/100 Penetration is based on average ex-Sepangar Bay for Sabah and ex-Kuching for
Sarawak (first day of the month).

na = Tidak diperoleh
= Not available

- 34 -
Jadual 3 (Samb.) - Harga Unit Purata Bagi Bitumen, Minyak Bahan Api dan Diesel
Table 3 (Cont'd.) - Average Unit Prices for Bitumen, Fuel Oil and Diesel

Perkara Tempoh Sabah Sarawak


Item Period Sabah Sarawak

RM Seliter RM Seliter
(1) Minyak Gas Automotif RM Per Litre RM Per Litre
Automotive Gas Oil Runcit* Sebenar Runcit* Sebenar
Retail Actual Retail Actual

Diesel 2008 JAN 1.584 2.596 1.58 2.588


Diesel FEB 1.584 2.646 1.58 2.637
MAC 1.584 2.945 1.58 2.937
APR 1.584 3.170 1.58 3.162
MEI 1.584 3.605 1.58 3.596
JUN 2.584 3.843 2.58 3.834
JUL 2.584 3.861 2.58 3.852
OGO (1-22 Ogos) 2.584 3.221 2.58 3.213
(23-31 Ogos) 2.500 3.221 2.500 3.213
SEP (1-24 Sept) 2.500 3.015 2.500 3.007
(25-30 Sept) 2.400 3.015 2.400 3.007
OKT (1-14 Okt) 2.400 2.316 2.400 2.307
(15-31 Okt) 2.200 2.316 2.200 2.307
NOV (1-17 Nov) 2.050 1.983 2.050 1.974
(18-30 Nov) 1.900 1.983 1.900 1.974
DIS (1-2 Dis) 1.900 1.720 1.900 1.711
(3-15 Dis) 1.800 1.720 1.800 1.711
(16-31 Dis) 1.700 1.720 1.700 1.711

2009 JAN 1.700 1.724 1.700 1.716


FEB 1.700 1.760 1.700 1.752
MAC 1.700 1.843 1.700 1.835
APR 1.700 1.961 1.700 1.953
MEI 1.700 2.052 1.700 2.044
JUN 1.700 2.333 1.700 2.324
JUL 1.700 2.221 1.700 2.213
OGO 1.700 2.388 1.700 2.379
SEP 1.700 2.290 1.700 2.282
OKT 1.700 2.362 1.700 2.354
NOV 1.700 2.441 1.700 2.433
DIS 1.700 2.389 1.700 2.380

Harga diesel diperoleh daripada Kementerian Perdagangan Dalam Negeri, Koperasi dan Kepenggunaan.
Diesel price is obtained from Ministry of Domestic Trade, Co-operatives and Consumerism.

* Harga runcit ialah harga selepas ditolak subsidi kerajaan.


Retail price is the price less government subsidy.

- 35 -
LAMPIRAN A
APPENDIX A

* Kawasan / Region

Sabah / Sabah

G - Kota Kinabalu
H - Sandakan
I - Tawau

Sarawak / Sarawak

J - Kuching
K - Sibu
L - Miri

- 39 -