PROJEK JALAN AKSES KE EMPANGAN BALEH, BAHAGIAN KAPIT, SARAWAK PAKE] C (FASA 3)
Summary of Non-Conformances in the Works
(As of October 2020)
Description of Non-Conformances | Contractor’s Response | Consultant’s Response
+ Contractor to justify Change of
Design Slope to Normal Slope
+ Soil Nail Application with
required where the
Design Slope is steeper than
\n of Soil Nail Notmal Slope of 1:1.
Without Guniting due to It should be noted that Design
Site Discussion with of Cut Slopes with slope
Consultant RE. gradient of 4:1 were due to
eG cut slope change to Normal Slope 2. Propose for Consultant to restrictions imposed by ROW,
and application of Soil Nail without guni Issue Omission of Guniting and also due to high cut slope
Works. at some locations. Hence, the
3. If Guniting Work is requirements for applications
required, then Contractor of soll nails with gu
to proceed. + If Contractor was able to cut
the slopes with a gradient of
1:1 or flater, there may not
have been a requirement to.
apply soil nails with guniting.PROJEK JALAN AKSES KE EMPANGAN BALEH, BAHAGIAN KAPIT, SARAWAK PAKEJ C (FASA 3)
Summary of Non-Conformances in the Works
(As of October 2020)
bor TaaT ste M ed Molt elfen ALCAN Le US ee os eli id
ta Overcut on Norrnal cut slope from 2 tiers to 1. Contractorto rectifyasper + Reconstruct to Construction
single tier Consultant Requirements. Drawing required profiles.
= Contractor to justify Change
of Design Slope to Normal
Slope
+ Scil Nail Application with
guniting is required where
i the Design Slope is steeper
Aether than Normal Slope of 1:1.
Without Guniting due to
: + Itshould be noted that
Site Discussion with
Design of Cut Slopes with
consultant RE: slope gradient of 4:1 were
2. Propose for Consultant to ea Fi
if due to restrictions imposed
2 Issue Omission of Guniting
by ROW, and also due to high
cut slope at some locations.
Hence, the requirements for
applications of soil nails with
uniting.
+ If Contractor was able to cut
the slopes with a gradient of
1:1 or flater, there may not
have been a requirement to
apply soil nails with guniting.
Nail spacing and dimensions of Soil
Head differs from design
Works.
If Guniting Work is
required, then Contractor
to proceed.PROJEK JALAN AKSES KE EMPANGAN BALEH, BAHAGIAN KAPIT, SARAWAK PAKEJ C (FASA 3)
Summary of Non-Conformances in the Works
(As of October 2020)
Description of Non-
CS Contractor’s Response Consultant’s Response
en aura)
1, MSE Embankment completed.
2. Works at Site constructed
F Change of MSE Embankment based on discussion with * Construction works are not ecco ai
2 Design requirer Consultant RE. to the Drawings.
3. Contractor to rectify any * Contractor is required to rectify.
Defects as per Consultant
Requirements.
+ The slope
rectified fully
1, Contractor to rectify as per Contractor has identified Ref. Nos. 42
Consultant Requirements & 44 also under the subject. Such are
related to Br. Sepanggil & Viaduct.
Refer our comments under Item 17.
res are required to be
Normal cut slope failure.
4 Rectification works yet to be
carried outPROJEK JALAN AKSES KE EMPANGAN BALEH, BAHAGIAN KAPIT, SARAWAK PAKEJ C (FASA 3)
Summary of Non-Conformances in the Works
(As of October 2020)
>YCyolgl atte m o]
Ce Tela}
Coa Contractor’s Response Consultant’s Response
* Contractor to justify Change of
Design Slope to Normal Slope
Nail Application with gunitingis
required where the Design Slope is
steeper than Normal Slope of 1:1.
+ It should be noted that Design of Cut
Slopes with slope gradient of 4:1
were due to restrictions imposed by
ROW, and also due to high cut slope
‘at some locations. Hence, the
requirements for applications of soil
nails with guniting.
*+ If Contractor was able to cut the
slopes with a gradient of 1:1 or flater,
there may not have been a
requirement to apply soil nails with
guniting.
1. Application of Soil Nail
Without Guniting due to Site
Discussion with Consultant RE.
a 2. Propose for Consultant to
nall without guniting on normal cut Issue Omission of Guniting
top) Works.
3. If Guniting Work is required,
then Contractor to proceed.Coa
Sa
PROJEK JALAN AKSES KE EMPANGAN BALEH, BAHAGIAN KAPIT, SARAWAK PAKEJ C (FASA 3)
Summary of Non-Conformances in the Works
(As of October 2020)
Description of Non-Conformances
Change of horizontal alignment
Localised slope failure on normal cut slope
Cee ee To celac)
ty oolat
1. Contractor has already
completed the As Built
Survey Works by a
Licensed Surveyor.
2. The Horizontal Alignment
is Within the ROW.
3. Consultant has engaged a
36 Party Consultant to
verify the Safety
Compliance of RSA.
1. Contractor to rectify as
per Consultant
Requirements.
: Profe:
Consultant’s Response
Contractor should have notified
SO his intention to deviate
alignment during Construction
Stage, justifying his intention for
agreement.
Itshould be Contractor's
responsibility to engage a
nal Engineer (PE) to
prove to RSA that the deviated
alignment can comply to RSA's
safety requirements, with
regards to road users driving
safety, and safety and stability of
as constructed road works both
of LHS and RHS of the New
Alignment.
The slope failures are required to
be rectified fully.
Contractor has identified Ref.
Nos. 42 & 44 also under the
subject. Such are related to Br.
Sepanggil & Viaduct. Refer our
comments under Item 17.8,98&10
1
PROJEK JALAN AKSES KE EMPANGAN BALEH, BAHAGIAN KAPIT, SARAWAK PAKEJ C (FASA 3)
Summary of Non-Conformances in the Works
(As of October 2020)
Description of Non-Conformances
Application of Rock Pin with Guniting on slopes
designed for Soil N:
Normal cut slope overcut to a flat ground
formation
3 tiers of fill embankment slope change to single
tier of fill slope.
Contractor’s
Liye
1. Rock Pin was done
Without Guniting. ACS has
been Approved with All
Documehtations in place (RFI
and Rock Pin Logs al
compiled in the QAQC and
ACS) i
1. Contractor to submit
Documents to show as
evidence that the
lagers requested for
the Extended Cut for
their Future Purpose.
2. Contractor to rectify any
Defects as per Consultant
Requirements.
1. Contractor to rectify as
per Consultant
Requirements.
Cee yee
Contractor to ju:
change. Change of design
requirement shall be as a
proposal endorsed by a
Professional Engineer (PE).
Submission shall be to SO for his
review.
Contractor to submit
Document(s) to SO to show
evidence that over cut is due to
Non-Com)
Design.
Reconstruction to construction
drawing required profiles.PROJEK JALAN AKSES KE EMPANGAN BALEH, BAHAGIAN KAPIT, SARAWAK PAKEJ C (FASA 3)
Summary of Non-Conformances in the Works
(As of October 2020)
DpYsrotg feel m Cela
RT Tro
Contractor’s
stl ats
Consultant’s Response
2 without soil nailing
Bottom tiers of the cut slope are 2.
Application of Soil Nail
Without Guniting due
to Site Discussion with
Consultant RE.
Propose for Consultant
to Issue Omission of
Guniting Works.
If Guniting Work is
required, then
Contractor to proceed.
Contractor is required to apply soil nails with
uniting as per construction drawing.
‘SOR2's Assessment of ACS for soil nail and
guniting works as of October 2020 identifies
Provisional Quantities have not been exceeded,
Guniting works shall be carried out as a
combined activity with soil nailing. As such
1g works cannot be deleted where soil
nailing is designed for cut slopes.
Any change to soil nailing activity on cut slopes
requires to be justified by the Contractor, and
should be as a proposal endorsed by a
Professional Engineer (PE), if Soil Nailing with
Guniting Works are to be omitted.
If the Contractor foresee that the Provisional
Quantities allocated for soil nail and guniting
works will be exceeded during application
process, he is required to inform SO in wr
before exceeding the allocated quantities.14
PROJEK JALAN AKSES KE EMPANGAN BALEH, BAHAGIAN KAPIT, SARAWAK PAKEJ C (FASA 3)
Summary of Non-Conformances in the Works
(As of October 2020)
beytteg lle Celie
CCT LUE}
Contractor’s
Response
insultant’s Response
Soil nail cut slope change to
normal cut slope
Change of spur road location
on
Application of Soil Nail
Without Guniting due
to Site Discussion with
Consultant RE,
Propose for Consultant
to Issue Omission of
Guniting Works.
If Guniting Work is
required, then
Contractor to proceed.
The changed of Spur
Road Location was a
Request by the Tuai
Rumah. Consultant RE
also aware.
Contractor to provide
evidence (Letter from
Tuai Rumah).
Contractor to justify Change of Design Slope to
Normal Slope
Soil Nail Application with guniting is required
where the Design Slope is steeper than Normal
Slope of 1:1.
It should be noted that Design of Cut Slopes with
slope gradient of 4:1 were due to restrictions
imposed by ROW, and also due to high cut slope
at some locations. Hence, the requirements for
applications of soil nails with guniting
Hf Contractor was able to cut the slopes with a
gradient of 1:1 or flater, there may not have been
a requirement to apply with guniting,
Contractor to justify by notifying SO of “Tuai
Rumah’s” request with evidence (letters, etc.)ES Description of Non-Conformances
15
16
aw
PROJEK JALAN AKSES KE EMPANGAN BALEH, BAHAGIAN KAPIT, SARAWAK PAKEJ C (FASA 3)
Summary of Non-Conformances in the Works
(As of October 2020)
5 tiers of embankment fill slope change to 2 tiers of
fil slope without complying to design requirements
shown in the construction drawing.
3 tiers of cut slope overcut to single tier cut slope.
Loose earth material from cut slope dumping
without compaction and proper slope formation
(etic lace)
Response
«Contractor to rectify as
per Consultant
Requirements.
|. Contractor to rectify as
per Consultant
Requirements,
- Contractor to trim the
erosion of loose
materials and make
good on the Slope.
. Contractor to desilt the
Road Side Drains.
ole besa}
Response
+ Reconstruct to construction
drawing required profiles.
* Reconstruct to construction
drawing required profiles.
+ Contractor to attend to
Triming & Compaction of
the loose fill and apply
turfing to exposed surfaces
‘on completion, to SO’s
satisfaction.18
PROJEK JALAN AKSES KE EMPANGAN BALEH, BAHAGIAN KAPIT, SARAWAK PAKEJ C (FASA 3)
Summary of Non-Conformances in the Works
(As of October 2020)
Description of Non-
feted elias
Cel irra cl m Co ela
Consultant’s Response
+ Soil Nailing with
guniting not applied at
the middle tier
+ Slope failure observed
on middle tiers.
+ Soil Nailing without
guniting observed on
top tiers
. 1. Application of Soil Nail
Without Guniting due to
Site Discussion with
Consultant RE. :
Propose for Consultant to
Issue Omission of Guniting
Works.
If Guniting Work is
required, then Contractor
to proceed.
Contractor to rectify as
per Consultant
Requirements.
Contractor is required to apply soil nails with gu
as per construction drawing.
‘SOR2’s Assessment of ACS for soil nail and gur
works as of October 2020 identifies Provisional
Quantities have not been exceeded.
ing works shall be carried out as a combined
activity with soil nailing. As such guniting works
cannot be deleted where soil nailing is designed for
cut slopes.
requires to be justified by the Contractor, and should
be as a proposal endorsed by @ Professional Engineer
(PE), if Soil N
omitted.
Ifthe Contractor foresee that the Provi
‘Quantities allocated for soil nail and guniting works
be exceeded during application process, he is
required to inform SO in writing before exceeding the
allocated quantities.
The slope failures are required to be rectified fully,
Contractor has identified Ref. Nos. 42 & 44 also under
the subject. Such are related to Br. Sepanggil &
Viaduct. Refer our comments under Item 17,Loa
19, 20
20a
PROJEK JALAN AKSES KE EMPANGAN BALEH, BAHAGIAN KAPIT, SARAWAK PAKE) C(FASA 3)
Summary of Non-Conforma
(As of October 2020)
ysraal li leh Nerd Levies
Rouen
Normal cut slope overcut
to single tier.
Change of vertical
alignment at the
approach to bridge.
Contractor’s Lit Yeye to)
1
Contractor to rectify as
er Consultant
Requirements,
Contractor has already
completed the As Built
Survey Works by a
Ucensed Surveyor,
The Vertical Alignment is
Within the Row,
Consultant has engaged a
314 Party Consultant to
verify the Safety
Compliance of RSA.
nces in the Works
Leones Lith sTen tad
Reconstruct to Construction Drawing required
Profiles,
intention to
deviate alignment during Construction Stage,
Justifying his intention for agreement,
It should be Contractor's esponsibility to engage a
Professional Engineer (PE) to prove to Rn that the
Gleviated alignment can comply to RSA. safety
requirements, with regards to road users driving
safety, and safety and stability of as Constructed road
‘works both on LHS and RHS of the New Alignment.PROJEK JALAN AKSES KE EMPANGAN BALEH, BAHAGIAN Kap
Summary of Non-Conformanc
(As of October 2020)
Description of Non-
Contractor’s LIT)
Conformances
1. Contractor has already
completed the As Built
Survey Works by a Licensed
Surveyor.
20p Change of horizontal alignment of 2. The Horizontal Alignment is
approach to the bridge Within the Row,
3. Consultant has engaged a 3
Party Consultant to verify
the Safety Compliance of
RSA.
1. Contractor constructed the
Rock Fil,
2. Works at Site constructed
based on discussion with
Consultant RE.
3. Contractor to rectify any
Defects as per Consultant
Requirements.
Rock fill embankment change to
normal fill embankment
20¢
IT, SARAWAK PAKEJC (FASA 3)
es in the Works
Consultant’s Leena
Contractor should have Notified SO his
intention to deviate alignment during
Construction Stage, justifying his intention
for agreement.
It should be Contractor's responsi
engage a Professional Engineer (PE) to
Prove to RSA that the deviated alignment
Gan comply to RSA\s safety requirements,
with regards to road users driving safety,
and safety and stability of as constructed
road works both on LHS and RHS of the
New Alignment,
Contractor is required to engage a
Professional Engineer (PE) to submit an
endorsed New Design to SO, if the
pustructed works differs from the Design
Drawings.
Cross section of As-Constructed
Embankment Slopes requires to be
Provided to SO for review,PROJEK JALAN AKSES KE EMPANGAN BALEH, BAHAGIAN KAPIT, SARAWAK PAKEJ C (FASA 3)
Summary of Non-Conformances in the Works
(As of October 2020)
Description of Non-
ee UU)
Ceara
Cee Cee el
a
Soil nail cut slope not done
21
3.
Application of Soil Ni
Without Guniting due to Site
Discussion with Consultant
RE,
Propose for Consultant to
Issue Omission of Guniting
Works.
If Guniting Work is required,
then Contractor to proceed.
Contractor is required to apply soil n
with guniting as per construction drawing.
SOR2's Assessment of ACS for soil nail and
guniting works as of October 2020
identifies Provisional Quantities have not
been exceeded.
Guniting works shall be carried out as a
combined activity with soil nailing. As
such guniting works cannot be deleted
where soil nailing is designed for cut
slopes.
Any change to soil nailing activity on cut
slopes requires to be justified by the
Contractor, and should be as a proposal
be omitted.
If the Contractor foresee that the
Provisional Quantities allocated for soil
ye exceeded
hes required
in writing before exceeding
the allocated quantities.Cot
21a
PROJEK JALAN AKSES KE EMPANGAN BALEH, BAHAGIAN KAPIT, SARAWAK PAKEJ C (FASA 3)
Summary of Non-Conformances in the Works
(As of October 2020)
Description of Non-
Cen lire}
Change of horizontal alignment
Soil nail cut slope change to normal
cut slope
1
Ze
ontractor’s Response
Contractor has already
_completed the As Built
“Survey Works by a Licensed
Surveyor.
The Horizontal Alignment is
Within the ROW.
Consultant has engaged a 3"
Party Consultant to verify
‘the Safety Compliance of
RSA.
Application of Soil Nai
Without Guniting due to Site
Discussion with Consultant
RE.
Propose for Consultant to
Issue Omission of Guniting
Works.
If Guniting Work is required,
then Contractor to proceed.
Consultant’s Response
Contractor should have notified SO his
intention to deviate alignment during
Construction Stage, justifying his intention
for agreement.
It should be Contractor's responsi
engage a Professional Engineer (PE) to
prove to RSA that the deviated alignment
can comply to RSA’s safety requirements,
with regards to road users driving safety,
and safety and stability of as constructed
road works both on LHS and RHS of the
New Alignment.
Contractor to justify Change of Design
Slope to Normal Slope
Soil Nail Application with guniting is
steeper than Normal Slope of 1:1
It should be noted that Design of Cut
Slopes with slope gradient of 4:1 were due
to restrictions imposed by ROW, and also
due to high cut slope at some locations.
Hence, the requirements for appl
of soil nails with guniting.
If Contractor was able to cut the slopes
with a gradient of 1:1 or flater, there may
not have been a requirement to apply soi
nails with guniti| ei
23
PROJEK JALAN AKSES KE EMPANGAN BALEH, BAHAGIAN KAPIT, SARAWAK PAKEJ C (FASA 3)
Summary of Non-Conformances in the Works
Description of Non-
ei US
Soil nail cut slope change to
normal cut slope without RC.
bench drains
Application of rock bolt and / or
soil nail without guniting.
(As of October 2020)
Cte CaCle ae
1. Application of Soil Nail
Without Guniting due to Site
Discussion with Consultant
RE.
2. Propose for Consultant to
Issue Omission of Guniting
Works.
3. If Guniting Work is required,
then Contractor to proceed.
Consultant’s Response
Contractor to justify
Slope to Normal Slope
Soil Nail Application with guniti
required where the Design Slope is.
steeper than Normal Slope of 1:1.
It should be noted that Design of Cut
Slopes with slope gradient of 4:1 were due
to restrictions imposed by ROW, and also
due to high cut slope at some locations.
Hence, the requirements for applications
of soil nails with guniting.
If Contractor was able to cut the slopes
with a gradient of 1:1 or flater, there may
not have been a requirement to apply soi
nails with guniting.PROJEK JALAN AKSES KE EMPANGAN BALEH, BAHAGIAN KAPIT, SARAWAK PAKEJ C (FASA 3)
Summary of Non-Conformances in the Works
(As of October 2020)
Description of Non- Contractor’s 5
ean Li Consultant’s Response
Conformances Lh Teli
1, Contractor Waiting for
New Proposal from its * Contractor to justify Design Change.
eee eronmall Geotechnical Consultant. + Proposal for the change is required to be.
awe i 2. Propose for Rectification provided to SO for review, if Contractor intends to
23a Over dumping of fill material 7 :
withodl Broper comaeaion at Works to be carried out adopt a Design Change. Proposal shall be within
bliin scl into the DLP. an endorsement by a Professional Engineer (PE)
3. Contractor to provide a together with design calculations.
Letter of Undertaking.
* Contractor to justify Change of Design Slope to
Normal Slope
1. Application of Soil ait _-*--S0l! Nail Application with gunitingis required
where the Design Slope is steeper than Normal
Without Guniting due to Seer
ae ih + Itshould be noted that Design of Cut Slopes with
2. Propose for Consultantto __S!0Pe gradient of 4:1 were due to restrictions
Soil nail cut slope change to ae imposed by ROW, and also due to high cut slope
normal cut slope without RC nthe at some locations. Hence, the requirements for
24 bench drains. met ‘ applications of soil nails with guniting.
3. If Guniting Work is.
required, then Contractor
to proceed
4. Contractor to rectify as
per Consultant
Requirements,
+ If Contractor was able to cut the slopes with a
gradient of 1:1 or flater, there may not have been
a requirement to apply soil nails with guniting.
+ The slope failures are required to be rectified
full
* Contractor has identified Ref. Nos. 42 & 44 also
under the subject. Such are related to Br.
Sepanggil & Viaduct. Refer our comments under
Item 17.
Localise slope failures
observed.PROJEK JALAN AKSES KE EMPANGAN BALEH, BAHAGIAN KAPIT, SARAWAK PAKEJ C (FASA 3)
Summary of Non-Conformances in the Works
(As of October 2020)
Contractor’s
Consultant’s Response
Ceol as Response
* Contractor to justify Change of Design Slope to
Normal Slope
+ Soil Nail Application with guniting is required
1. Application of Soil Nail
Without Guniting dueto where the Design Slope is steeper than Normal
Slope of 1:1.
Sane ae Ko) 3 pe to‘ Itshould be noted that Design of Cut Slopes with
25(1) application of rock bolt/soil nail Issue Omission of stovesralent) 41 pe due foretcions
re Saar! imposed by ROW, and also due to high cut slope
ieee asee at some locations. Hence, the requirements for
- ut 4 ute Contractor __@PPlications of soil nails with guni
fe reese + If Contractor was able to cut the slopes with a
Er gradient of 1:1 oF flater, there may not have been
a requirement to apply soil nails
1. Contractor We
New Proposal from its
Very high and steep cut slope Geotechnical Consultant. Very high and steep cut slopes requires to be
f 2. Propose for Rectification
25(2) not cut according to recut to Design profiles shown in the
Works to be carried out
into the DLP.
3. Contractor to provide a
Letter of Undertaking.
construction drawing Construction Drawings.PROJEK JALAN AKSES KE EMPANGAN BALEH, BAHAGIAN KAPIT, SARAWAK PAKEJ C (FASA 3)
Summary of Non-Conformances in the Works
(As of October 2020)
Es Loy Syoig | oh e(eSa mem Cols) Contractor’s ener oe
Conformances Response
1. Contractor has already + Contractor should have notified SO his intention
completed the As Built to deviate alignment during Construction Stage,
Survey Works by a ing his interition for agreement.
Licensed Surveyor. + Ithould be Contractor's responsibility to engage
4 5: 2. TheHorizontal Alignment a Professional Engineer (PE) to prove to RSA that
a hea Tonos Reno Deas is Within the ROW. the deviated aligriment can comply to RSA’s
3. Consultanthasengageda safety requirements, with regards to road users
3° Party Consultant to driving safety, and safety and stability of as
verify the Safety constructed road works both on LHS and RHS of
Compliance of RSA. the New Alignment.
1. Contractor Waiting for. Construction works shall be according to the
New Proposal from its ae
RC retaining wall change to Geotechnical Consultant. Cortrnctor may make a design change proposal,
asp -hormalembankment filand 2. Propose for Rectification Fe SEH te SOc ROSIE RSIS
over dumping of fill materi Works to be carried out es esaional Eeaicos (ool Ree tr
road level. into the DLP.
Contractor, with the new design endorsed by PE.
3. Contractor te id
ees Submission shall be to SO for review.
Letter of Undertaking.27
PROJEK JALAN AKSES KE EMPANGAN BALEH, BAHAGIAN KAPIT, SARAWAK PAKEJ C (FASA 3)
Summary of Non-Conformances in the Works
Description of Non-
Ce laure
(As of October 2020)
Contractor’s Response
Consultant’s Response
Change of vertical
alignment of the bridge.
nail cut slope change
to normal cut slope and
application of soil nai
and/or rock bolt without
guniting.
By
2
3.
Contractor has alread
completed the As Bui
Survey Works by a Licensed
Surveyor. .
The Vertical Alignment is
Within the ROW.
Consultanthas engageda +
3" Party Consultant to
verify the Safety
Compliance of RSA.
Application of Soil Nail
Without Guniting due to .
Site Discussion with
Consultant RE. .
Propose for Consultant to
Issue Omission of Guniting
Works.
If Guniting Work is
required, then Contractor =
to proceed.
Identification of Ref. No. 26, which relates to Vertical,
Profiles of the Bridge & Viaduct under this activity No.
10 relating to Road Works, is inappropriate. Such is
commented upon by SOR2 under Item 17.
Contractor is required to confirm that as constructed
vertical profiles of the Bridge and Viaduct are as per
Design.
Any deviation(s) shall be checked by a Professional,
Engineer (PE) with Bridge Design experience, and a
proposal for rectifications shall be provided to SO for
review, if deemed necessary. A report with
endorsement is to be provided by the PE.
Contractor to justify Change of Design Slope to Normal
Slope
Soil Nail Application with guniting is required where
the Design Slope is steeper than Normal Slope of 1:
It should be noted that Design of Cut Slopes with slope
gradient of 4:1 were due to restrictions imposed by
ROW, and also due to high cut slope at some locations.
Hence, the requirements for applications of soil nai
with guniting.
If Contractor was able to cut the slopes with a gradient
of 1:1 or flater, there may not have been a
requirement to apply soil nails with guniting.PROJEK JALAN AKSES KE EMPANGAN BALEH, BAHAGIAN KAPIT, SARAWAK PAKEJ C (FASA 3)
Summary of Non-Conformances in the Works
(As of October 2020)
Description of Non-
(Tara M oo elie Consultant’s Response
Cetera
1. Contractor Waiting for New.
Proposal fromh its
Very high and steep slope, Sectech ;
2. Propose for Rectification * Very high and steep cut slopes requires to be recut to
27a beside one side of bridge y . <
Works to be carried out into Design profiles shown in the Construction Drawings.
abutment
the DLP.
3. Contractor to provide a
Letter of Undertaking.
1. Contractor has already
completed the As Buil * Contractor should have notified SO his intention to
Survey Works bya Licensed deviate alignment during Construction Stage, justifying
Surveyor. his intention for agreement.
Change of horizontal 2. The Vertical Alignment is * It should be Contractor’s responsibility to engage a
27b alignment approach to the Within the ROW. Professional Engineer (PE) to prove to RSA that the
bridge 3. Consultant has engaged a deviated alignment can comply to RSA’s safety
3 party Consultant to requirements, with regards to road users di
verify the Safety safety, and safety and stability of as constructed road
Compliance of RSA. works both on LHS and RHS of the New Alignment.
tiers cut slope overcut to 1. Contractor to rectify as per
28 Rake i
single tier Consultant Requirements.
+ Reconstruct to Construction Drawing required profiles.PROJEK JALAN AKSES KE EMPANGAN BALEH, BAHAGIAN KAPIT, SARAWAK PAKEJ C (FASA 3)
Summary of Non-Conformances in the Works
(As of October 2020)
Description of Non-
Cee Tau)
Contractor’s Response Consultant’s Response
eS Comractor has already * Contractor should have notified SO his intention to
completed the As Built fyi
Survey Works by a Licensed poe alignment during Construction Stage, justifying
Stevan saree for agreement. i
A as + Itshould be Contractor's responsibility to engage a
Change of the horizontal 2. The Vertical Alignment is " -
29 uctech he reaal Seni nenon Professional Engineer (PE) to prove to RSA that the
deviated alignment can comply to RSA’s safety
requirements, with regards to road users driving
safety, and safety and stability of as constructed road
works both on LHS and RHS of the New Alignment.
3. Consultant has engaged a
3% Party Consultant to
verify the Safety
Compliance of RSA.
1. Contractor constructed the
Rock Fil + Contractor is required to engage a Professional
Gabion wall and rock fil 2" Works at Site constructed Engineer (PE) to submit an endorsed New Design to
based on discussion with SO, if the constructed works differs from the Design
29a change to normal
Consultant RE. Drawings.
embankment fl
rl 3. Contractorto rectify any Cross section of As-Constructed Embankment Slopes
Defects as per Consultant requires to be provided to SO for review.
Requirements.30, 31, 32,
33
34
PROJEK JALAN AKSES KE EMPANGAN BALEH, BAHAGIAN KAPIT, SARAWAK PAKEJ C (FASA 3)
Summary of Non-Conformances in the Works
Description of Non-
Ceol aay
Cut slope overcut to single
tier cut slope
Soil nail cut slope change to
normal cut slope
Application of si
without guniting.
nail
(As of October 2020)
Cee lacl eM Cy Lely
Contractor to rectify as per
Consultant Requirements.
Without Guniting due to
Site Discussion with
Consultant RE.
Propose for Consultant to
Issue Omission of Gur
Works.
If Guniting Work is
required, then Contractor
to proceed.
Consultant’s Response
Reconstruct to Construction Drawing required
profiles.
Contractor to justify Change of Design Slope to
Normal Slope
Soil Nail Application with guniting is required
where the Design Slope is steeper than Normal
Slope of 1:1.
It should be noted that Design of Cut Slopes with
slope gradient of 4:1 were due to restrictions
imposed by ROW, and also due to high cut slope
at some locations. Hence, the requirements for
applications of soil nails with guniting.
If Contractor was able to cut the slopes with a
gradient of 1:1 or flater, there may not have been
a requirement to apply soil nails with guniting.35
36
37
PROJEK JALAN AKSES KE EMPANGAN BALEH, BAHAGIAN KAPIT, SARAWAK PAKEJ C (FASA 3)
Summary of Non-Conformances in the Works
Dyas
Lia
Cera)
(As of October 2020)
(Ciera oo ea
Cee cae ely
Single tier of Soil
nail cut slope
change to 5 tiers of
normal cut slope
MSE wall change
to normal fill
embankment
Rock fill
embankment
change to normal
fill embankment
Application of Soil Nail Without
Guniting due to Site Discussion with
Consultant RE.
Propose for Consultant to Issue
‘Omission of Guniting Works.
If Guniting Work is required, then
Contractor to proceed.
Contractor Waiting for New Proposal
from its Geotechnical Consultant.
Propose for Rectification Works to be
carried out into the DLP.
Contractor to provide a Letter of
Undertaking.
Contractor constructed the Rock
‘Works at Site constructed based on
discussion with Consultant RE.
Contractor to rectify any Defects as per
Consultant Requirements.
Contractor to justify Change of Design Slone to
Normal Slope
Soil Nail Application with guniting is required where
the Design Slope is steeper than Normal Slope of 1:1.
It should be noted that Design of Cut Slopes with
slope gradient of 4:1 were due to restrictions
imposed by ROW, and also due to high cut slope at
some locations. Hence, the requirements for
applications of soil nails with guniting.
If Contractor was able to cut the slopes with a
gradient of 1:1 or flater, there may not have been a
requirement to apply soil nails with guniting.
Contractor to justify Design Change.
Proposal for the change is required to be provided to
SO for review, if Contractor intends to adopt a Design
Change. Proposal shall be within an endorsement by
a Professional Engineer (PE) together with design
calculations.
Contractor is required to engage a Professional
Engineer (PE) to submit an endorsed New Design to
SO, if the constructed works differs from the Design
Drawings.
Cross section of As-Constructed Embankment Slopes
requires to be provided to SO for review.38
39
40
PROJEK JALAN AKSES KE EMPANGAN BALEH, BAHAGIAN KAPIT, SARAWAK PAKEJ C (FASA 3)
Summary of Non-Conformances in the Works
(As of October 2020)
Det oa oa
Leen tc Taco
Xo lel d
Ce ie a)
rs elel ght d
Gabion mattress with a layer geotextile and gabion box
wall with geotextile not constructed as per drawing
observed that the pile cap level is higher than the
level designed for it. We observe erosion in front of pile
cap taking place and eventual collapse o* pile cap
foundation can be expected.
Gabion mattress with a layer geotextile and gabion box
wall with geotextile not constructed as per drawing.
1, Contractor to rectify as
per Consultant
Requirements.
1. Contractor to rectify as
per Consultant
Requirements.
1. Contractor to rectify as
per Consultant
Requirements.
Contractor to construct
as per construction
drawing.
Contractor to confirm
that the pile cap level is
as per design.
Heavy erosion is
required to be rectified
soonest.
Contractor to construct
as per construction
drawing.PROJEK JALAN AKSES KE EMPANGAN BALEH, BAHAGIAN KAPIT, SARAWAK PAKEJ C (FASA 3)
Summary of Non-Conformances in the Works
(As of October 2020)
Leela clay
Description of Non-Conformances Consultant’s Response
Response
+ Identification of Ref. No. 26 and 41,
which relates to Vertical Profiles of
the Bridge & Viaduct under this
1. Contractor has already ac ity No. 10 relating to Road Works,
completed the As Built is inappropriate. Such is commented
Survey Works by a upon by SOR2 under Item 17.
tae eeat SS ae eae Licensed Surveyor. + Contractor is required to confirm that
5 2. The Vertical Alignment is as constructed vertical profiles of the
41 the top levels of the abutments and the piers. j : :
: Within the ROW. Bridge and Viaduct are as per Design.
ae 3. Consultant has engaged + Any deviation(s) shall be checked by a
23% Party Consultantto __Professional Engineer (PE) with Bridge
verify the Safety Design experience, and a proposal for
Compliance of RSA. rectifications shall be provided to SO
for review, if deemed necessary. A
report with endorsement is to be
provided by the PE.
1. Contractor to rectify as
per Consultant * Contractor to rectify erosions soonest.
Requirements,
Ground profile seem to have eroded
42 Immediate rectification of slope is requiredPROJEK JALAN AKSES KE EMPANGAN BALEH, BAHAGIAN KAPIT, SARAWAK PAKEJ C (FASA 3)
Summary of Non-Conformances in the Works
(As of October 2020)
celiac la celacy Peco ET Tc Ua
Response Pyles)
ion of Non-Conformances
Roadside drain incomplete. Water drainage diverted 1. Contractor to rectify as
8 towards pier 1 may give rise to erosion of earthwork per Consultant
surrounding pier 1. Requirements.
* Contractor to complete
drainage works
Heavy erosion is observed to take place at the location. 1 Sontractortorectifyas * Contractor to rectify
iy Immediate rectification is required per Consultant erosions soonest.
Requirements.
Formworks left underneath the bridge deck requires to. + Comtractortorectifyas . Contractor to remove
45 per Consultant
be removed ‘temporary formwork.
Requirements.