Professional Documents
Culture Documents
particular year.
41. The production-volume variance is affected by the choice of capacity concept used to
determine the denominator level.
43. Master-budget capacity utilization can be more reliably estimated than normal capacity
utilization.
44. Unused capacity is considered wasted resources and the result of poor planning.