Professional Documents
Culture Documents
Concessionaire
Independent Engineer
EPC Contractor
Total tests conducted upto No. of tests conducted during No. of tests conducted upto this
previous month this month month Test Witnessed by IE
S.No. Name of test Reference as per Quantity executed Remarks
IS / MORTH during this month Upto
During this
Tested Passed Failed Tested Passed Failed Tested Passed Failed previous month Total
month
1.0 OGL samples MoRTH 305
1.1 Free Swell Index (FSI) IS : 2720 (P-40) 52 52 0 0 0 0 52 52 0 0 0 0
1.2 Grain size analysis IS : 2720 (P-4) 52 52 0 0 0 0 52 52 0 0 0 0
1.3 Atterberg limits (LL & PI) IS : 2720 (P-5) 52 52 0 - 0 0 0 52 52 0 0 0 0 -
1.4 Proctor test (MDD Vs OMC) IS : 2720 (P-8) 52 52 0 0 0 0 52 52 0 0 0 0
1.5 4 days soaked CBR IS : 2720 (P-16) 0 0 0 0 0 0 0 0 0 0 0 0
2.0 Existing Shoulder Samples MoRTH 305
2.1 Free Swell Index (FSI) IS : 2720 (P-40) 52 52 0 0 0 0 52 52 0 0 0 0
2.2 Grain size analysis IS : 2720 (P-4) 52 52 0 0 0 0 52 52 0 0 0 0
2.3 Atterberg limits (LL & PI) IS : 2720 (P-5) 52 52 0 - 0 0 0 52 52 0 0 0 0 -
2.4 Proctor test (MDD Vs OMC) IS : 2720 (P-8) 52 52 0 0 0 0 52 52 0 0 0 0
2.5 4 days soaked CBR IS : 2720 (P-16) 26 26 0 0 0 0 26 26 0 0 0 0
3.0 Borrow area samples MORTH 305
3.1 Natural Moisture Content (NMC) IS : 2720 (P-1) 0 0 0 0 0 0 0 0 0 0 0 0
3.2 Free Swell Index (FSI) IS : 2720 (P-40) 174 174 0 0 0 0 174 174 0 35 0 35
3.3 Grain size analysis IS : 2720 (P-4) 194 194 0 76 76 0 270 270 0 31 25 56
3.4 Atterberg limits (LL & PI) IS : 2720 (P-5) 194 194 0 76 76 0 270 270 0 31 25 56 Tests carried on
00.00 CUM. control tests of
3.5 Proctor test (MDD Vs OMC) IS : 2720 (P-8) 194 194 0 76 76 0 270 270 0 31 25 56 Borrow Areas
3.6 4 days soaked CBR IS : 2720 (P-16) 47 47 0 39 39 0 86 86 0 14 9 23
8.19 for 7 days MORT&H 513 513 0 144.000 CUM 36 36 0 549 549 0 211 7 218 trial cubes+RFI
Concrete cubes
For PQC (Cube)
8.20 for 7 days IS : 516 701 701 0 63 63 0 764 764 0 198 13 211 trial cubes+RFI
790.910 CUM
8.21 for 28 days IS : 516 936 936 0 27 27 0 963 963 0 252 6 258 Concrete cubes
For PQC (Beam)
8.22 for 7 days IS : 516 620 617 3 63 63 0 683 680 3 189 13 202 trial cubes+RFI
790.910 CUM Concrete cubes
8.23 for 28 days IS : 516 936 933 3 27 27 0 963 960 3 264 6 270
9.0 Cement tests MORTH 1000
9.1 Fineness of cement IS : 4031 (P-1) 179 179 0 11 11 0 190 190 0 74 6 80
9.2 Normal consistency IS : 4031 (P-4) 179 179 0 11 11 0 190 190 0 74 6 80
9.3 Initial, final setting times IS : 4031 (P-5) 179 179 0 11 11 0 190 190 0 74 6 80
9.4 Soundeness IS : 4031 (P-3) 167 167 0 11 11 0 178 178 0 45 6 51 Independent/In
Compressive strength - 3 days IS : 4031 (P-6) 486 486 0 33 33 0 519 519 0 192 12 204 house Lab test
9.5 - 7 days " 501 501 0 30 30 0 531 531 0 189 12 201
- 28 days " 480 480 0 30 30 0 510 510 0 210 12 222
9.6 Chemical properties IS : 4031 21 21 0 2 2 0 23 23 0 0 2 2
10.0 Cement grout
10.1 for 3 days IS : 516 72 72 0 0 0 0 72 72 0 0 0 0
10.2 for 7 days IS : 516 72 72 0 Nil 0 0 0 72 72 0 0 0 0
10.3 for 28 days IS : 516 72 72 0 0 0 0 72 72 0 0 0 0
11.0 Steel MORTH 1000
11.1 Physical properties IS : 1786 67 67 0 8 8 0 75 75 0 7 0 7
0 Independent Lab
11.2 Chemical properties IS : 1786 67 67 0 8 8 0 75 75 0 7 0 7 test
11.3 MTC IS : 1786 263 263 0 0 0 0 263 263 0 0 0 0
12.0 Water MORTH 1000
Independent Lab
12.1 Suitability for construction IS : 456 7 7 0 0 0 0 7 7 0 0 0 0 test
13.0 Admixture MORTH 1000
Independent Lab
13.1 Suitability for concrete (MTC) IS : 9103 22 22 0 0 0 0 22 22 0 0 0 0
test
14.0 SUB-BASE (GSB) MORTH 400
23 . FLYASH
Independent/In
23.1 PHYSICAL & CHEMICAL TESTS IS : 3812 212 205 7 7 7 0 219 212 7 54 3 57 house Lab test
24 . DRY LEAN CONCRETE (DLC)
Independent/In
24.1 GRADATION MORTH 600 98 98 0 5 5 0 103 103 0 32 2 34
house Lab test
25 . EMUSLION (RS1 & SS1)
25.1 RS1 (MTC) IS:8887 8 8 0 0 0 0 8 8 0 5 0 5 Independent/In
house Lab test
Independent/In
25.2 SSI (MTC) IS:8887 9 9 0 0 0 0 9 9 0 5 0 5 house Lab test
26 . PAVE QUALITY CONCRETE (PQC)