You are on page 1of 23
Piping materia! shall be in accordance with tne ciping clessitic: Use tee with swage nipple, weldciet, sockolet or threadciet cer S.assification branch connection Location of oll vents is at high point ond fer drains at iow ecint Uniess noted otherwise on the ciping assembly drawings. Use PG-301 for carbon steel and PC—306 for stainless stee! vip Use concentric reducers for verti Strainer blow-off vaive size: 1/2” for 3/4" stainers; 3 ang 1-1/2" strainers; i" for 2” ond larger strainers. Steam trap piping shown Is fer 1-1/2" ond smaller traps ona larger steam fier ond will be of or flanged construction A separate stroiner shall be installed upstream if the trap goes not have an integral strainer. See 4.5 STO-18 for steam ‘rai installation details. or 1-1/2" IF © the steam trap, use ¢ '-1/2" diock Drip leg size to be header size for 2” ond smaller header, 3" thru 8" steam header, 4” fr 10” thru 14” steam header ‘and 6” for 16" ond larger steam header. See piging ciassification fer branch connection to steam header. Orifice flanges shall be the weiding neck type for a Use orifice flanges with 1/2" size taps for Cioss 0C, flanges ond 3/4” taps for Cioss 900 and 1500 fianges. drilled for socket welding. Threadea tops wii Se used on.y approved by owner. volvoiet may be used in lieu of o regular gate vaive ond ST-O1KY for carbon steel piping with pressure rating up ass. Use GT-O7KY for 3C4 stainiess stee: ciping 26 stainiess steei pising with pressure rot use PG-302 for carbe:: steei and PG-307 ‘or stcinlegs stee! pipin STAI BRESSURE amie CONNECTION @) @) 3/4" 6000# PRESS GAUGE YMA (NOTE 4) ™— 2 oY (NOTE 2) HEjoe ! Ji oa _ ro 1/2” SCR'D a TYPE A 1/2" x 3° LG. NIPPLE eee 1/2" SCR'D GATE VALVE —~| WITH PLUG TEE 3, 74 1/2" SCR'D D: SCREWED PIPE ae : (NOTE 1) 1" _& LARGER HEAt 4" HEAL DRAIN CONNECTION — TYPE A TT === \ T ! | NN i NOTE 2 , SN 3/4” GATE VALVE er SLIP-ON race 3/4" BLIND FLANGE 1"_& LARGER HEADER 4" HEAL DRAIN CONNECTION — TYPE 8 FOR NOTES SEE 4.5 STD-0 DATE REV. NO. 0 fyi TRACER MANIFOLD CONNECTOR TRACER MANIFOLD SUPPLY TRACED ITEM a a CONNECTOR TRACER MANIFOLD SUPPLY \ peace RETURN ON TRACER CONDENSATE TRACER CONDENSATE HEADER. antum Chemical Corp 4.5 STD TYPICAL TRACER MANIFOLD. 1/2" TRACER SUPPLY aes [ise ti rh f SPARE CONNECTION 3/4" TRACER D MANIFOLD DRAIN J UNION TRAP / (NOTE 8) ‘TRACER MANIFOLD SUPPLY (NOTE 1) USE 1° TO SUPPLY UP TO 3 TRACERS USE 1-1/2"-TO SUPPLY 4 THRU 6 TRACERS USE 2” TO SUPPLY 7 THRU 12 TRACERS TRACER MANIFOLD (NOTE 1) USE 1” TO SUPPLY UP TO 3 TRACERS USE 1-1/2" TO SUPPLY 4 THRU 6 TRACERS USE 2” TO SUPPLY 7 THRU 12 TRACERS FOR NOTES SEE 4.5 STD.-0 AWIN —Quantum Chemical Corp. NI é TYPICAL TR. CONDENSATE HEADER 4.5 STD - 7 1/2" TRACER CONDENSATE LINES UNION 4. TRAP (NOTE 8) a UNION T ca SLOPE — cap TRACER CONDENSATE HEADER (NOTE 1) USE 1" PIPE UP TO 3 LINES USE 1-1/2" PIPE FOR 4 THRU 6 LINES USE 2" PIPE FOR 7 THRU 12 LINES FOR NOTES SEE 4.5 STD.-0 antum Chemical Corp. ARDS_& TRACER LOCATIONS INSULATION ~ SUPPORTS on GE | SINGLE TRACERS DOUBLE TRACERS TRIPLE TRACERS antum Chemical Corp. RAWIN. OPS TYPICAL TRACER LO! PLAN VIEW BANDS HORIZONTAL LOOP mi. \ 7 | a = 3a |><]a3. a4 \Lcourune reson —/ \Lcoupuine AT EXPANSION AT AT CHANGES, FLANGES LOOP VALVES. IN DIRECTION PLAN LOCATE THE TOP OF THE STACK ABOVE HEADROOM, BUT NOT UNDER PLATFORMS OR PIPE RACKS REV. NO. ELEVATION ‘TRACER CONDENSATE I {moe —— VENT STACK /2° FOR 2 OR 3 HEADERS 2° FOR 4 TO 6 HEADERS cU 3” FOR 7 TO 12 HEADERS 4.5 STD - 10 ~Quantum Chemical Corp. & WIN: TRAP_ARRANGEMENT OPEN DISCHARGE, 1/2” LINE (NOTE 1) 1/2” STEAN TRACER ——1/2" VALVE (NOTE 1) j—-—— 1/2" TRAP (NOTE 8) —— GRADE 6” OR 8” DIAMETER SCRAP PIPE_APPROX. 2’ —0" LONG FILLED WITH LOOSE SHELL OR GRAVEL FOR NOTES SEE 4.5 STD.-0 REV. NO. 0 gau-— DATE PAGE 1 OF 1 antum Chemical Corp. NDAI TRAP_ARRANGEMENT — CLOSED SYSTEM 1/2" STEAM eel Xo, Se 1/2” VALVE (NOTE 1) 1/2" une” a (NOTE 1) Aang TRAP (NOTE 8) lees HEADER (NOTE 1) FOR NOTES SEE 4.5 STD.-0 Bee— _ DATE SERVICE A. STEAM TRACING, JACKETED PIPING 1. TRAP PROTECTED FROM FREEZING 2. TRAP EXPOSED TO FREEZING 8. HEADER DRAINS 1. TRAP PROTECTED FROM FREEZING 2. TRAP EXPOSED TO FREEZING HEAT EXCHANGERS, REBOILERS PLATE COILS, SUBMERGED TANK HEATING COILS D. STEAM UNIT HEATERS OPERATING 0 - 200 0 - 25 26 - 200 0 - 300 301 - 600 0 - 200 125 - 600 © - 200 0 - 125 RECOMMENDED STEAM TRAPS FOR SERVICE APPLICATIONS STEAM TRAP Tyre INVERTED BUCKET BI-METAL, THERMOSTATIC psc THERMODYNAMIC INVERTED BUCKET j DISC THERMODYNAMIC BELLOWS THERMOSTATIC Disc THERMODYNAMIC BELLOWS THERMOSTATIC INVERTED BUCKET 4.5 STD — 14 TYPE OF CONSTRUCTION SEE 4.5 STD-15 CORD AOR B E ORF CORD E OR F AOR B AOR B antum Chemical Corp. Tee TRAP INSTALLATION Boy TO_CONDENSATE ——~| FROM STEAM HEADER DRIP LEG OR EQUIPMENT RETURN SYSTEM (NOTE 1} WA (wore 1) ' coaiend 3/4", 1", OR 1-1/2" ——=| (NOTE 7) | —— vin ———- MiN—| BY-PASS NOT REQUIRED FOR STEAM HEADER TRAPS—— GATE VALVE \ ed (NOTE 1) = Fy ‘STEAM mar STRAINER —— —SWAGE (TBE) MIN GATE VALVeE— (NOTE 6) = 4+] 1/2" GATE L/ Valve 18” INSULATE. (NOTE 1) MIN SWAGE IAG (LINE SIZE x 1/2", TBE) WORK ELEVATION . TYPE A — THREAI ONSTRUCTION THERMOSTATIC STEAM TRAP FOR NOTES SEE 4.5 STD.-0 DATE REV. NO. 0 yee — Quantum Chemical Corp. ARD. aes TRAP INSTALLATION 4.5 STD - 15 @ bow TO_CONDENSATE ——~| FROM STEAM HEADER RETURN SYSTEM | ORIP LEG OR meen] (NOTE 1) 4 (NOTE 1) 3/47, 17, OR 1-1/27 —>| a (NOTE 7) INS} { | BY-PASS NOT REQUIRED ‘ FOR STEAM HEADER TRAPS— GATE ve (NOTE 1) SERS — + | STRAINER —— in GATE VALVE — ————|—SWAGE (PLE x TSE) | (NOTE 6) | 1/2” GATE D0 NOT VALVE 18° INSULATE oF A (NOTE 1) (UNE SIZE x 1/2", P8E) | WORK ELEVATION Tet = ONSTRUCTION THERMOSTATIC STEAM TRAP FOR NOTES SEE 4.5 STD.-0 REV. NO. 0 TYPICAL TRAP INSTAI v--4 eu TO_CONDENSATE ——=| RETURN SYSTEM FROM STEAM HEADER ———| (NOTE 1) ORIP LEG OR EQUIPMENT (NOTE 1) 3/4", 17, OR 1-1/2" ———| (NOTE 7) BY-PASS NOT REQUIRED MIN FOR STEAM HEADER TRAPS GATE_VALVE 7 are vA ~ per ——-—-— 4 iS "SE x 1/2") —— — ~~ — “s STEAM a ae — DO NOT INSULATE SWAGE (TBE) ai \Coate vauve (NOTE 6) | WOR! K ELEVATION De = THREADED CONSTRUCTION BUCKET STEAM TRAP FOR NOTES SEE 4.5 STD.-0 NO. 0 Ayaz- ‘DATE REV. antum Chemical Corp. TO_CONDENSATE — RETURN SYSTEM (NOTE 1) FROM STEAM HEADER ————=| DRIP LEG OR EQUIPMENT (NOTE 1) BY-PASS NOT REQUIRED bo) FOR STEAM HEADER TRAPS GATE VALVE ee ty (NOTE 1) _\ > SWAGE (LINE SIZE x 1/2") —_— —- q~— — too bo Niy2" oat VALVE, ty SWAGE, (PLE x TSE) | [x — D0 NOT INSULATE MIN a CATE VALVE (NOTE 6) | WORK ELEVATION = INSTRUCTION BUCKET STEAM TRAP FOR NOTES SEE 4.5 STD.-0 ‘URN SYSTEM M HEADER ——= OR EQUIPMENT = STEAM TRAP 402 1D PIny 789} 40 auD sainssasg ysa1 aigomoyy— soumo fq payloads asimiouyg ssaiur) “g¢y WISY — 1uA}OW— S'S'POF Wdo4O40,} “UONIP| 4S9}O1 ELPA INSW/ISNY “Jeu (squvia) sow, paunbay wn osot 0631 Gre Ove ogee S08 G6EL_ GHOSE DOD. GEEZ GAYE 69 Geol GihL Szzt_ Suse ORS 065 G26 OLZL_ OAL GeO oer sev ose = SiOl SezLSwet Geez oly Spo FH = :DODL. G¥HL azz ore ozs oS OLR HLL Geet soz Sly OPS v9 006 GUE oz sig Sly 06 = 069 SOL ost sez Sov ose OLS ge, sot Sol Olg—osté se aes, se oct OZ GOzgaz oy, 02 Sol Sei ot zz os og GOs eccl = Gi = og7, ov og 08, 06 oct = o6t oF ov S so 06 set og ov 09 se 8,91 1 8b 8,01 6,8 ES vOE ydosbosog ‘vou!pyz 4say7 LCG IWSV/ISNY ‘SPUIIE] PUZ 40 Ssed04q Joy SassOUAIy) IG SAY} ASH you oq ~X\uo syuD|E) dis 404 antum Chemical Corp. PRODUC’ 00, 400 ANI LANGES AND VALVE FOR ©. antum Chemical Corp. TAI ORIP_LEG It ! —— SEE NOTE 10 an | = x \ | — PROVIDE 1” x 3/4" } SWAGE WHERE 1/27 | STEAM TRAP IS USED 1-1/2" BLOCK VALVE ———= | (NOTE 1) a BLOCK VALVE (SEE NOTE 9) ! ' [ TO STEAM TRAP MIN. (SEE 4.5 STD-15) FOR NOTES SEE 4.5 STD-O

You might also like