Bill of Quantities

1 Provisional Sum
Procument Item Details
SL. Item Description Unit Quantity
No1 A. Provisional Sum: Job 1.0
2 1. Contractor's
A. All Risk Insurance Policy Premium: Insurance
Provisional Sum: Job 1.0
3 2. As Built Drawings:
A. Provisional Sum: Job 1.0
4 2.
A.As Built Drawings:
Provisional Sum: Job 1.0
3. Lab Test: work
2 Construction
2.1 Works for complete or part construction and civil engineering work
2.1.1 Building construction work
2.1.1.1 Civil Works
Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate Bidder's Rate (in
No (NPR) s)
Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No1 A. Performance bond Commissions: Job 1.0 (NPR)
2 B.1. Performance
PROCUREMENT Security Bank Commission
ITEMS: Job 1.0
1. Supply, Installation
3 B. PROCUREMENT ITEMS: of CCTV at Site Job 1.0
4 2.1. General Items: & Protection Works:
Site Clearance SQ.M. 23075.52
5 1.a. Clearing and grubbing
Site Clearance of siteWorks:
& Protection for SQ.M. 9565.12
6 1.b. Site
Building layout&for
Clearance construction
Protection Works:as per SQ.M. 1460.0
7 1.c. Providing and installation
Site Clearance & Protection of Works:
temporay SQ.M. 10527.34
d. Providing and installation of safety net Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No8 1.1 Dismantling the Existing SQ.M. 210.0 (NPR)
Structures
9 1.1 of building,
Dismantling flooring etc as
the Existing SQ.M. 210.0
10 Structures
1.1 of building,
Dismantling flooringStructures
the Existing etc as of SQ.M. 1925.0
11 building,
2. flooring etc as existing at site and CU.M
Earthwork: 103009.87
12 a.
2. Earthwork in
: excavation using machine in CU.M 41203.95
13 b.
2. Earthfilling
Earthwork: with the excavated soil in CU.M 61805.92
c. Disposal of the excavated surplus soill at Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
14 3. Soil Protection Work: SQ.M. 328.68 (NPR)
15 a. Complete shoring
3. Soil Protection Work:works for temporary RM 5070.0
16 b. Construction of cast-in-situ-
3. Soil Protection Work: concrete pile R.M. 23660.0
c. Providing and inserting 76 mm dia. Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
17 3. Soil Protection Work: Nos 4500.0 (NPR)
18 d. Soil
3. Providing and fixing
Protection Work:Fe 500D dowel bars Nos 18500.0
19 e. Providing and fixing
3. Soil Protection Work: Fe 500D dowel bars HR 3240.0
20 f.
4. Complete dewatering
Soil Improvement works by pump if
Works: CU.M 5734.9
21 a. Providing
4. and filling
Soil Improvement in foundations and SQ.M.
Works: 20031.5
22 b. Concrete
5. Antitermite treatment works in foundation, CU.M
Works: 514.4
23 a. Providing,
5. mixing by batching plant,
Concrete Works: CU.M 967.25
a. Providing, mixing by batching plant, Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
24 5. Concrete Works: CU.M 1301.66 (NPR)
25 b. Concrete
5. ProvidingWorks:
and laying automatic batching CU.M 25351.06
b. Providing and laying automatic batching Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
26 5. Concrete Works: CU.M 8326.11 (NPR)
27 b.
6. Providing and laying
Reinforcement Bar: automatic batching MT 8679.0
a. Providing, supplying, Straightening, Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
28 7. Formwork: SQ.M. 78140.89 (NPR)
29 a.
7. Providing,
Formwork:fabricating, erecting and fixing SQ.M. 29488.93
a. Providing, fabricating, erecting and fixing Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
30 7. Formwork: SQ.M. 48554.0 (NPR)
31 a. Providing,
7. Formwork:fabricating, erecting and fixing
Staging works: SQ.M. 1504.7
i. Providing, erecting, fixing of staging for Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
32 8. Water Proofing Membrane: SQ.M. 14287.27 (NPR)
a. Providing applying/laying of Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No system has to be BS 8102: 2009 (NPR)
33 complaint.
8.Water Proofing Membrane: SQ.M. 32154.0
b. Providing and applying of two coats of Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
34 8.Water Proofing Membrane: SQ.M. 7503.0 (NPR)
c. Supplying and the laying of the Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No be sensitive to moisture. The (NPR)
35 membrane
9. Shotcrete:shall be a two component 100% SQM 4824.0
36 a. Providing
10. Anchoring andoflaying Shotcrete of
Re-bar: NOS 40000.0
37 a. Anchoring
11. of re bar
AAC (Aerated of dia from 10 mm to
Autoclaved CU.M 9115.66
Conrete) BLOCK WORKS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
38 12. Brick Works: SQ.M 4113.49 (NPR)
39 a. Providing
12. and laying first class chimney
Brick Works: CUM 3186.54
b. Brickwork in cement and sand mortar of Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
40 12. Brick Works: CU.M 1189.05 (NPR)
41 c.
13.Brickwork in cement and sand mortar of
Plaster Works: SQ.M 20206.67
a. Providing and Plastering with specified Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
42 13. Plaster Works: SQ.M 29184.31 (NPR)
43 a. Providing
13. and Plastering with specified
Plaster Works: SQ.M 127543.75
44 a. Providing and Plastering
13. Cornice plaster works: with specified RM 3910.0
45 b.
13. Chicken Wire Mesh of
Providing and laying plastering with 1:3
works: SQ.M 8926.14
46 c. Providing
14. and fixing
Stone Masonry of 150 mm wide
Works: CUM 615.13
a. Providing and laying Stone Soling Works Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
47 14. Stone Masonry Works: CUM 1580.0 (NPR)
48 b.
15.Providing and laying of Stone (rubble)
Pointing Works: SQ.M 14831.0
49 a. Pointing Work
15. Pointing Works: in Brick Masonry: SQ.M 551.0
50 b. Pointing
16. Work in Stone Masonry:
IPS Works: SQ.M 35287.44
51 i. Providing
16. and laying of IPS floor finish of
IPS Works: R.M 7798.61
52 ii. Providing
16. IPS Works:and laying of 100 mm high 12.5 CUM 769.43
iii. Providing and laying of PCC of Grade Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
53 17. Tile Works: SQ.M 754.0 (NPR)
i. Providing and laying of 8-10 mm thick
54 17. Tile Works: R.M 566.09
55 ii.
17.Providing and laying of (100 -150) mm
Tile Works: SQ.M 1781.19
56 iii. Providing
17.0 Tile Works:and laying 8-10 mm thick SQ.M 7974.04
iv. Providing and laying 8-10 mm thick Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
57 17.0 Tile Works: SQ.M 4916.24 (NPR)
58 v. Providing and
17.0 Tile Works: laying 8-10 mm thick R.M 1264.17
59 vi.
18.Providing and laying of (100- 150 mm) SQ.M
Granite Flooring: 16061.12
60 i. Providing,
18. supplying and laying of 16-18
Granite Flooring: R.M 11515.27
61 ii. Providing
18. and fixing of (100-150 mm)
Granite Flooring: R.M 6552.0
62 iii. Providing
18. and cutting of three nos of
Granite Flooring: R.M 2184.0
iv. Providing and making of double Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
63 18. Granite Flooring: SQ.M 85.0 (NPR)
64 v. providing,
19. supplying and laying of 18-20
Wooden Floor: SQM 2481.64
65 i. Providing
19. Wooden and fixing of best quality Jungly
Floor: RM 1482.0
66 ii. Providing
19. and laying of (100- 150mm)
Wooden Floor: SQM 4538.05
67 iii.
19. Providing and laying of wooden laminate
Wooden Floor: RM 2493.76
iv. Providing and laying of (100- 150mm) Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
68 20. Carved Stone: SQ.M 438.0 (NPR)
69 i. Providing,
21. supplying and laying of 25-37.5 SQ.M
Marble Flooring: 460.42
70 i. Providing
22. and laying in position approved
Pebbles Stone: SQM 26.0
i. Providing and laying Natural Polished Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
71 23. Cladding Works: SQM 440.7 (NPR)
72 i. Providing
23. Claddingand laying 16-18 mm thick
Works: SQM 4192.96
73 ii. Providing
23. Cladding and laying teracotta bricks of
Works: SQ.M 1157.14
74 iii. Providing and
23. Cladding Works: laying of 25-37.5 mm SQ.M 458.02
75 iv.
23.Supply
Cladding& fixing
Works:a carved sal wood 25 mm SQ.M 756.75
v. Supply and fixing of wall cladding with Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
76 24. Italian Marble Flooring: SQ.M 1795.2 (NPR)
77 i. Providing
24. and laying
Italian Marble of mirror polished
Flooring: R.M 149.05
78 ii.
25.Providing and laying of (100-150 mm)
Jhingati Tiles: SQ.M 3150.65
79 i. Providing and
25. Jhingati Tiles:laying of Jhingati tiles of RM 339.14
80 ii. Providing
26. Concrete and laying Jhingati
Chequered Tiles: tiles in ridge SQ.M 509.18
i. Providing and laying of 25 mm thick Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
81 27. Painting Works: SQ.M 175765.7 (NPR)
82 i.
27.Providing
Painting and application of Wall Putty of SQ.M
Works: 156842.73
83 ii. Providing
27. and applying of Plastic
Painting Works: SQ.M 909.37
84 iii. Providing
27. and applying of Weather coat SQ.M
Painting Works: 20815.27
85 iv. Providing
27. and applying approved shade SQ.M
Painting Works: 5172.99
v. Clear silicon water-repellant coating: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
86 27. Painting Works: SQ.M 6868.56 (NPR)
87 vi. Providing
28. Wooden Doorand applying
Frame andfrench polish to CUM
Shutter: 59.45
88 i. Providing
28. Wooden and
Door fixing in and
Frame position Wooden
Shutter: SQM 2216.33
89 ii. Providing
28. and fixing
Wooden Door Frameofand
38mm thick solid SQ.M
Shutter: 29.02
90 iii.
28. Providing
Wooden Doorand fixing
Frameinand
position Swing
Shutter: SQ.M 160.61
iv. Providing and fixing in position Laminate Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No (NPR)
91 28. Wooden Door Frame and Shutter: RM 23992.15
92 v.
28.Providing and fixing
Wooden Door Frameinandposition
Shutter: RM 6022.8
93 vi. Providing
29. Fire Door: and installation of architraves SQ.M 457.69
94 i. Providing
29. and fixing of 50 mm thick Fire SQ.M
Fire Door: 60.2
ii. Providing and fixing of 50 mm thick Panic Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
95 30. Aluminium Works: SQ.M 107.2 (NPR)
96 i.
30.Providing
AluminiumandWorks:
fixing in position aluminum SQ.M 298.49
97 ii. Providing
30. Aluminium andWorks:
fixing in position SQ.M 245.34
98 iii. Providing
30. Aluminium and fixing in position
Works: SQ.M 1756.26
99 iv. Providing
30. Aluminium and fixing of 10mm thick
Works: SQ.M 24.4
v. Providing and fixing of swing doors in SS Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
100 30. Aluminium Works: SQ.M 273.51 (NPR)
101 vi. Providing
30. Aluminium and fixing in position 12 mm SQ.M
Works: 2350.4
102 vii. Aluminium
30. Providing and fixing in position 159 x 60 SQ.M.
Works: 200.0
103 viii.Deorative
31. ProvidingAankhi
and fixing in position glass
Jhyal: SQM 449.26
104 i. Providing and fixing
32. Wooden Partition: in position 1" x1" grid SQM 1179.68
i. Providing, fabricating and fixing wooden Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
105 33. Soundproof Automatic Folding SQ.M. 71.76 (NPR)
106 Partition:
34. Expansion Joint Treatment Works: R.M 46.8
107 i. Providing,
34. Expansionfabricating and installation
Joint Treatment Works: of R.M 142.8
108 ii. Providing and installation of
34. Expansion Joint Treatment Works: pre- R.M 1462.5
iii. Providing and installation of pre- Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
109 34. Expansion Joint Treatment Works: R.M 959.55 (NPR)
110 iv. Providing
34. Expansionand Jointinstallation
TreatmentofWorks:
pre- R.M 279.48
111 v. Providing, fabricating
35. Railing Works: and installation of R.M 409.93
112 i. Providing and
35. Railing Works: fixing decorative wooden RM 409.93
113 ii. Providing
35. and fixing of Decorative
Railing Works: R.M 145.9
iii. Providing and fitting of 75 x 100 cement Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
114 35. Railing Works: SQM 12.0 (NPR)
115 iv.
35.Providing and fixing ss fence work of
Railing Works: RM 123.0
116 v. Providing and
35. Railing Works: fixing ss railing work of RM 25.0
vi. Providing and fixing of Decorative carved Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
117 36. False Ceiling: SQ.M. 6424.19 (NPR)
118 i. Providing and
36. Railing Works: fixing Perforated Mineral SQ.M. 25696.76
ii. Providing and fixing 12mm thick gypsum Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
119 36. False Ceiling: SQ.M. 1781.19 (NPR)
120 iii. Supplying
36. & fixing false ceiling of
False Ceiling: SQM 4230.0
121 iv. Supplying
36. and fixing of POP False
False Ceiling: SQM 1200.0
v. Providing and fixing of wooden false Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
122 37. Skylight or Glass Dome, Glass Canopy: SQ.M. 1012.06 (NPR)
123 i. Providing
38. andWorks:
Kerb Stone fixing glass canopy and R.M 1018.0
124 i. Providing
39. Interlockand fixing
Paving in position precast
Blocks: SQ.M. 1146.0
125 i. Providing and
40. Road Works: laying 60 mm thick heavy CUM 1588.2
126 i.
40.Sub-grade preparation for levelling and
Road Works: CUM 1058.8
127 ii. Providing
40. Road Works:laying & spreading of approved CUM 1058.8
iii. Providing, laying & spreading of aprroved
Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
128 40. Road Works: Litre 6352.8 (NPR)
129 iv. Providing
40. Road Works:and spraying bituminous prime CUM 264.7
130 v. Providing,
40. Road Works:mixing and laying Asphalt R.M 2100.0
131 vi. Supply
41. Sealingand applyCut
of Core of two
Holescoats
in of NOS 1575.0
132 Concrete Slab:
42. Water Stopper: RM 401.98
133 i.
43.Supply andWoks:
Cornice installing hydrophilic resin and RM 3533.25
134 i. Providing,
43. moulding, making die, casting
Cornice Woks: RM 428.99
ii. Providing, moulding, making die, casting Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
135 43. Cornice Woks: RM 124.0 (NPR)
136 iii.44. Providing & fixing of brick cornices of
Pinnacle (Gajur): NOS 1.0
137 44. Pinnacle (Gajur): and Installation of 5'-0"
i. Providing, Placing NOS 4.0
138 44. ii. Providing, Placing and Installation of 3'-
Pinnacle (Gajur): NOS 4.0
139 44. iii. Providing, Placing and Installation of 2'-
Pinnacle (Gajur): NOS 4.0
140 45. iv. Providing,
Water Drip: Placing and Installation of 1'- RM 1417.21
i. Water drip: Providing and Making Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
141 46. Metal Works: KG 83635.49 (NPR)
142 47. i. Providing andExit
Decorative fixing tubular
Gate roofGate:
& Entry trusses SQ.M 60.9
143 47. i. Providing andExit
Decorative fixing Decorative
Gate Iron Gate
& Entry Gate: SQ.M 425.0
144 48. ii. Providing and fixing Plywood
Marine Waterproof of 1200 to 1500 mm SQM 1844.14
Roofing: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
145 49. Asphalt Felt layer: SQM 2766.21 (NPR)
146 50. i. Providing
Clay Tilelaying & fixing of two layer
Roofing: SQ.M 1229.43
147 50. i. Providing
Clay Tileand laying Clay roof tiles of
Roofing: SQ.M 103.54
148 ii. 51.Providing and laying Clay roof tiles in
Sign Boards: SQM 3.0
i. Boards: Supplying
149 52.0 Plantation of Trees & fitting of a sign board
and Grass: SQM 1217.0
150 52. i. Providing and
Plantation offixing
Trees of
andReadymade
Grass: Local NOS 100.0
151 52. ii. Providing
Plantationand planting
of Trees andofGrass:
Selected All NOS 50.0
iii. Providing and planting best quality of Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
152 52. Plantation of Trees and Grass: NOS 100.0 (NPR)
153 iv. 53.Providing and planting
Plinth Protection Works:best quality of R.M 962.0
154 53. i. Providing, laying and
Plinth Protection constructing of
Works: KG 22542.0
155 54. ii. MS grating over
Polysulphide apron drain (12 mm dia
Sealant: R.M 75.0
2.1.1.2 i.Electrical
ProvidingWorks
and applying of Polysulphide
Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No Procument Item Details (NPR)
SL. Item Description Unit Quantity Bidder's Rate
No1 A. ELECTRICAL AND ALLIED Pts. 1350.0 (NPR)
2 WORKS:
A. ELECTRICAL AND ALLIED WORKS: Pts. 3850.0
I. POINT WIRING FOR GENERAL AREA: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No3 A. ELECTRICAL AND ALLIED Pts. 450.0 (NPR)
4 WORKS:
A. ELECTRICAL AND ALLIED Pts. 3450.0
WORKS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No5 A. ELECTRICAL AND ALLIED Pts. 250.0 (NPR)
6 WORKS:
A. ELECTRICAL AND ALLIED Pts. 925.0
WORKS:
Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No7 A. ELECTRICAL AND ALLIED Pts. 10.0 (NPR)
8 WORKS:
A. ELECTRICAL AND ALLIED WORKS: Pts. 580.0
I. POINT WIRING FOR GENERAL AREA: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No9 A. ELECTRICAL AND ALLIED WORKS: Pts. 2800.0 (NPR)
10 I.
A.POINT WIRINGAND
ELECTRICAL FOR ALLIED
GENERAL AREA: Pts. 110.0
WORKS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
11 A. ELECTRICAL AND ALLIED Pts. 325.0 (NPR)
12 WORKS:
A. ELECTRICAL AND ALLIED WORKS: Pts. 1800.0
I. POINT WIRING FOR GENERAL AREA: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
13 A. ELECTRICAL AND ALLIED WORKS: Pts. 2400.0 (NPR)
14 I. POINT
A. WIRINGAND
ELECTRICAL FOR ALLIED
GENERAL AREA:
WORKS: Pts. 120.0
I. POINT WIRING FOR GENERAL AREA: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
15 A. ELECTRICAL AND ALLIED Pts. 25.0 (NPR)
16 WORKS:
A. ELECTRICAL AND ALLIED Pts. 110.0
17 WORKS:
A. ELECTRICAL AND ALLIED WORKS: Pts. 25.0
II. POINT WIRING FOR KITCHEN, Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
18 A. ELECTRICAL AND ALLIED Pts. 150.0 (NPR)
19 WORKS:
A. ELECTRICAL AND ALLIED WORKS: Pts. 10.0
II. POINT WIRING FOR KITCHEN, Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
20 A. ELECTRICAL AND ALLIED WORKS: Pts. 75.0 (NPR)
21 II.
A. POINT WIRINGAND
ELECTRICAL FORALLIED
KITCHEN, Pts. 5.0
22 WORKS:
A. ELECTRICAL AND ALLIED Pts. 40.0
WORKS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
23 A. ELECTRICAL AND ALLIED WORKS: Pts. 15.0 (NPR)
24 II. POINT
A. WIRINGAND
ELECTRICAL FORALLIED
KITCHEN,
WORKS: Pts. 50.0
25 II. POINT WIRING FOR KITCHEN,
A. ELECTRICAL AND ALLIED WORKS: Pts. 5.0
II. POINT WIRING FOR KITCHEN, Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
26 A. ELECTRICAL AND ALLIED WORKS: Pts. 16.0 (NPR)
27 II. POINT
A. WIRINGAND
ELECTRICAL FORALLIED
KITCHEN,
WORKS: Pts. 40.0
28 II. POINT WIRING FOR KITCHEN,
A. ELECTRICAL AND ALLIED WORKS: Pts. 35.0
II. POINT WIRING FOR KITCHEN, Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
29 A. ELECTRICAL AND ALLIED Pts. 11.0 (NPR)
30 WORKS:
A. ELECTRICAL AND ALLIED WORKS: Pts. 32.0
31 II. POINT
A. WIRINGAND
ELECTRICAL FORALLIED
KITCHEN,
WORKS: Pts. 35.0
II. POINT WIRING FOR KITCHEN, Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
32 A. ELECTRICAL AND ALLIED Pts. 3.0 (NPR)
33 WORKS:
A. ELECTRICAL AND ALLIED Pts. 1.0
34 WORKS:
A. ELECTRICAL AND ALLIED RM 25000.0
WORKS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
35 A. ELECTRICAL AND ALLIED RM 18750.0 (NPR)
WORKS:
36 A. ELECTRICAL AND ALLIED WORKS: RM 50.0
37 IV. CIRCUIT CUMAND
A. ELECTRICAL POINT WIRING:
ALLIED WORKS: RM 50.0
38 IV. CIRCUIT CUM POINT
A. ELECTRICAL AND ALLIED WIRING:
WORKS: RM 50.0
39 IV.ELECTRICAL
A. CIRCUIT CUMAND POINT WIRING:
ALLIED WORKS: RM 50.0
IV. CIRCUIT CUM POINT WIRING: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
40 A. ELECTRICAL AND ALLIED WORKS: RM 3500.0 (NPR)
41 IV. CIRCUIT CUMAND
A. ELECTRICAL POINT WIRING:
ALLIED WORKS: RM 50.0
42 IV.RACEWAY
B. CIRCUIT CUM POINT WIRING:
& JUNCTION RM 50.0
43 BOXES:
B. RACEWAY & JUNCTION RM 600.0
BOXES: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
44 B. RACEWAY & JUNCTION RM 800.0 (NPR)
45 BOXES:
B. RACEWAY & JUNCTION RM 450.0
46 BOXES:
B. RACEWAY & JUNCTION BOXES: Nos. 4.0
47 2. Providing
B. RACEWAY and&fixing 350 x 350
JUNCTION x 40 mm
BOXES: Nos. 4.0
48 3. Providing
B. RACEWAY and&fixing 250 x 250
JUNCTION x 40 mm
BOXES: Nos. 10.0
49 4. Providing and fixing 200
B. RACEWAY & JUNCTION BOXES:x 200 x 40 mm Nos. 15.0
5. Providing and fixing 150 x 150 x 40 mm Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
50 C. CABLES, MAINS, SUB MAINS AND RM 1800.0 (NPR)
51 CABLE
C. TRAYS:
CABLES, MAINS, SUB MAINS AND RM 450.0
52 CABLE
C. TRAYS:
CABLES, MAINS, SUB MAINS AND RM 850.0
53 CABLE TRAYS:
C. CABLES, MAINS, SUB MAINS AND RM 550.0
54 CABLE TRAYS:
C. CABLES, MAINS, SUB MAINS AND RM 450.0
CABLE TRAYS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
55 C. CABLES, MAINS, SUB MAINS AND RM 135.0 (NPR)
56 CABLE TRAYS:
C. CABLES, MAINS, SUB MAINS AND RM 880.0
57 CABLE TRAYS:
C. CABLES, MAINS, SUB MAINS AND RM 680.0
58 CABLE
C. TRAYS:
CABLES, MAINS, SUB MAINS AND RM 300.0
59 CABLE
C. TRAYS:
CABLES, MAINS, SUB MAINS AND RM 350.0
CABLE TRAYS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
60 C. CABLES, MAINS, SUB MAINS AND RM 130.0 (NPR)
61 CABLE TRAYS:
C. CABLES, MAINS, SUB MAINS AND RM 195.0
62 CABLE
C. TRAYS:
CABLES, MAINS, SUB MAINS AND RM 1550.0
63 CABLE
C. TRAYS:
CABLES, MAINS, SUB MAINS AND RM 2500.0
64 CABLE
C. TRAYS:
CABLES, MAINS, SUB MAINS AND RM 5800.0
CABLE TRAYS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
65 C. CABLES, MAINS, SUB MAINS AND RM 300.0 (NPR)
66 CABLE
C. TRAYS:
CABLES, MAINS, SUB MAINS AND RM 150.0
67 CABLE
C. TRAYS:
CABLES, MAINS, SUB MAINS AND RM 3030.0
68 CABLE
C. TRAYS:
CABLES, MAINS, SUB MAINS AND RM 240.0
69 CABLE TRAYS:
C. CABLES, MAINS, SUB MAINS AND RM 240.0
CABLE TRAYS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
70 C. CABLES, MAINS, SUB MAINS AND RM 200.0 (NPR)
71 CABLE
C. TRAYS:
CABLES, MAINS, SUB MAINS AND RM 250.0
72 CABLE TRAYS:
C. CABLES, MAINS, SUB MAINS AND RM 175.0
73 CABLE TRAYS:
C. CABLES, MAINS, SUB MAINS AND RM 175.0
74 CABLE
C. TRAYS:
CABLES, MAINS, SUB MAINS Nos. 1.0
AND CABLE TRAYS:
Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
75 C. CABLES, MAINS, SUB MAINS Nos. 84.0 (NPR)
76 AND
C. CABLEMAINS,
CABLES, TRAYS:SUB MAINS Nos. 20.0
77 AND
C. CABLEMAINS,
CABLES, TRAYS:SUB MAINS Nos. 34.0
78 AND
C. CABLEMAINS,
CABLES, TRAYS:SUB MAINS Nos. 18.0
79 AND CABLE TRAYS:SUB MAINS
C. CABLES, MAINS, Nos. 6.0
80 AND CABLE TRAYS:SUB MAINS
C. CABLES, MAINS, Nos. 24.0
AND CABLE TRAYS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
81 C. CABLES, MAINS, SUB MAINS Nos. 12.0 (NPR)
82 AND
C. CABLEMAINS,
CABLES, TRAYS:SUB MAINS Nos. 10.0
83 AND CABLE TRAYS:SUB MAINS
C. CABLES, MAINS, Nos. 8.0
84 AND CABLE TRAYS:SUB MAINS
C. CABLES, MAINS, Nos. 26.0
85 AND
C. CABLEMAINS,
CABLES, TRAYS:SUB MAINS Nos. 4.0
86 AND
C. CABLEMAINS,
CABLES, TRAYS:SUB MAINS Nos. 46.0
AND CABLE TRAYS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
87 C. CABLES, MAINS, SUB MAINS Nos. 96.0 (NPR)
88 AND
C. CABLEMAINS,
CABLES, TRAYS:SUB MAINS Nos. 180.0
89 AND
C. CABLEMAINS,
CABLES, TRAYS:SUB MAINS Nos. 144.0
90 AND
C. CABLEMAINS,
CABLES, TRAYS:SUB MAINS Nos. 54.0
91 AND
C. CABLEMAINS,
CABLES, TRAYS:SUB MAINS Nos. 202.0
92 AND CABLE TRAYS:SUB MAINS
C. CABLES, MAINS, Nos. 8.0
AND CABLE TRAYS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
93 C. CABLES, MAINS, SUB MAINS Nos. 12.0 (NPR)
94 AND
C. CABLEMAINS,
CABLES, TRAYS:SUB MAINS Nos. 12.0
95 AND CABLE TRAYS:SUB MAINS
C. CABLES, MAINS, Nos. 12.0
96 AND CABLE TRAYS:SUB MAINS
C. CABLES, MAINS, Nos. 8.0
97 AND
C. CABLEMAINS,
CABLES, TRAYS:SUB MAINS Nos. 8.0
98 AND
C. CABLEMAINS,
CABLES, TRAYS:SUB MAINS AND RM 20.0
CABLE TRAYS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
99 C. CABLES, MAINS, SUB MAINS AND RM 50.0 (NPR)
100 CABLE TRAYS:
C. CABLES, MAINS, SUB MAINS RM 50.0
101 AND
C. CABLEMAINS,
CABLES, TRAYS:SUB MAINS RM 50.0
102 AND
C. CABLEMAINS,
CABLES, TRAYS:SUB MAINS AND RM 60.0
103 CABLE
C. TRAYS:
CABLES, MAINS, SUB MAINS AND RM 1000.0
104 CABLE TRAYS:
C. CABLES, MAINS, SUB MAINS AND RM 350.0
105 CABLE TRAYS:
C. CABLES, MAINS, SUB MAINS AND RM 150.0
CABLE TRAYS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
106 C. CABLES, MAINS, SUB MAINS AND RM 350.0 (NPR)
107 CABLE
C. TRAYS:
CABLES, MAINS, SUB MAINS AND RM 1200.0
108 CABLE TRAYS:
C. CABLES, MAINS, SUB MAINS AND RM 1500.0
109 CABLE TRAYS:
C. CABLES, MAINS, SUB MAINS AND RM 900.0
110 CABLE
C. TRAYS:
CABLES, MAINS, SUB MAINS AND RM 550.0
111 CABLE
C. TRAYS:
CABLES, MAINS, SUB MAINS AND RM 200.0
CABLE TRAYS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
112 D. DISTRIBUTION BOARDS/RISING Set 1.0 (NPR)
MAINS: Design, fabrication, assembling, Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No viii. Breaker control switch ;1 nos. (NPR)
ix. 2500/5 amp, 5VA CL : 1.0 CTS for Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No v. 250 amps 4 pole MCCB- 3 No Spare (NPR)
MCCB’s for the following: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No power blocking, Under/Over Voltage, (NPR)
Under/Over Frequency, Current Unbalance, Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No b. Digital electronic ammeter with (NPR)
selector switch and 3 Nos. CT’s. Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
113 D. DISTRIBUTION Set 2.0 (NPR)
BOARDS/RISING MAINS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
114 D. DISTRIBUTION Set 1.0 (NPR)
BOARDS/RISING MAINS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
115 D. DISTRIBUTION BOARDS/RISING Set 1.0 (NPR)
MAINS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
116 D. DISTRIBUTION BOARDS/RISING Set 10.0 (NPR)
MAINS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
117 D. DISTRIBUTION Set 5.0 (NPR)
BOARDS/RISING MAINS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
118 D. DISTRIBUTION BOARDS/RISING Set 1.0 (NPR)
MAINS: LIFT PANEL- 1: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
119 D. DISTRIBUTION BOARDS/RISING Set 2.0 (NPR)
120 MAINS:
D. DISTRIBUTION BOARDS/RISING Set 1.0
MAINS: SDB -TERRACE Incoming: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
121 D. DISTRIBUTION RM 80.0 (NPR)
122 BOARDS/RISING
D. DISTRIBUTIONMAINS: RM 40.0
BOARDS/RISING MAINS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
123 D. DISTRIBUTION BOARDS/RISING Nos. 10.0 (NPR)
124 MAINS:
D. DISTRIBUTION BOARDS/RISING Nos. 10.0
125 MAINS:
D. DISTRIBUTION BOARDS/RISING Nos. 2.0
126 MAINS:
D. DISTRIBUTION BOARDS/RISING Nos. 2.0
MAINS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
127 D. DISTRIBUTION BOARDS/RISING RM 140.0 (NPR)
128 MAINS:
D. DISTRIBUTION BOARDS/RISING Nos. 12.0
129 MAINS:DISTRIBUTION BOARDS:
FINAL Nos. 10.0
Supply, installation, testing and Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
130 D. DISTRIBUTION BOARDS/RISING Nos. 48.0 (NPR)
131 MAINS:
D. DISTRIBUTION BOARDS/RISING Nos. 24.0
MAINS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
132 D. DISTRIBUTION BOARDS/RISING Nos. 24.0 (NPR)
133 MAINS:
D. DISTRIBUTION BOARDS/RISING Nos. 10.0
MAINS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
134 D. DISTRIBUTION Nos. 10.0 (NPR)
135 BOARDS/RISING
D. DISTRIBUTIONMAINS: BOARDS/RISING Sets 4.0
MAINS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
136 E. CAPACITOR BANKS WITH Sets 2.0 (NPR)
AUTOMATIC CONTROL PANELS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No to carry expected current continuosly. (NPR)
137 f. Necessary control
EARTHING and firing card
INSTALLATION: with
(FOR RM 80.0
138 POWER DISTRIBUTION
EARTHING INSTALLATION: SYSTEMS,
(FOR UPS RM 200.0
139 POWER DISTRIBUTION
EARTHING INSTALLATION: SYSTEMS,
(FOR UPS RM 750.0
POWER DISTRIBUTION SYSTEMS, UPS Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
140 EARTHING INSTALLATION: (FOR RM 400.0 (NPR)
141 POWER DISTRIBUTION
EARTHING INSTALLATION: SYSTEMS,
(FOR UPS RM 800.0
142 POWER DISTRIBUTION
EARTHING INSTALLATION: SYSTEMS,
(FOR UPS Nos. 30.0
143 POWER DISTRIBUTION
EARTHING INSTALLATION: SYSTEMS,
(FOR UPS RM 350.0
POWER DISTRIBUTION SYSTEMS, UPS Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
144 EARTHING INSTALLATION: (FOR RM 550.0 (NPR)
145 POWER DISTRIBUTION
EARTHING INSTALLATION: SYSTEMS,
(FOR UPS RM 800.0
146 POWER DISTRIBUTION
EARTHING INSTALLATION: SYSTEMS,
(FOR UPS RM 2500.0
147 POWER DISTRIBUTION
EARTHING INSTALLATION: SYSTEMS,
(FOR UPS Nos. 14.0
148 POWER
EARTHING INSTALLATION: (FOR UPS
DISTRIBUTION SYSTEMS, RM 450.0
POWER DISTRIBUTION SYSTEMS, UPS Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
149 EARTHING INSTALLATION: (FOR RM 50.0 (NPR)
150 POWER DISTRIBUTION
EARTHING INSTALLATION: SYSTEMS,
(FOR UPS RM 1400.0
151 POWER DISTRIBUTION
EARTHING INSTALLATION: SYSTEMS,
(FOR UPS RM 40.0
152 POWER
EARTHING INSTALLATION: (FOR UPS
DISTRIBUTION SYSTEMS, RM 100.0
153 POWER
EARTHING DISTRIBUTION
INSTALLATION: SYSTEMS,
(FOR UPS RM 100.0
154 POWER
G. DISTRIBUTION
LIGHTNING PROTECTION SYSTEMS, UPS
SYSTEM: No. 3.0
1. Supply and fixing of following Erico/LPI Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
155 G. LIGHTNING PROTECTION SYSTEM: No. 3.0 (NPR)
156 1.
G.Supply and fixing
LIGHTNING of following SYSTEM:
PROTECTION Erico/LPI No. 3.0
157 1. Supply
G. and fixing
LIGHTNING of following Erico/LPI
PROTECTION No. 3.0
158 SYSTEM:
G. LIGHTNING PROTECTION SYSTEM: No. 3.0
159 1. Supply
G. and fixing
LIGHTNING of following Erico/ LPI
PROTECTION RM 150.0
160 SYSTEM:
G. LIGHTNING PROTECTION No. 3.0
161 SYSTEM:
G. LIGHTNING PROTECTION No. 3.0
162 SYSTEM:
G. LIGHTNING PROTECTION Nos. 20.0
163 SYSTEM:
G. LIGHTNING PROTECTION Nos. 20.0
SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
164 G. LIGHTNING PROTECTION No. 9.0 (NPR)
165 SYSTEM:
G. LIGHTNING PROTECTION No. 3.0
166 SYSTEM:
G. LIGHTNING PROTECTION RM 30.0
SYSTEM:
167 G. LIGHTNING PROTECTION No. 3.0
168 SYSTEM:
G. LIGHTNING PROTECTION SYSTEM: No. 3.0
169 3.
G.Supply and installation
LIGHTNING of following
PROTECTION RM 15.0
170 SYSTEM:
G. LIGHTNING PROTECTION No. 1.0
SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
171 H. SUPPLY AND INSTALLATION Nos. 3893.0 (NPR)
172 OF LIGHTING
H. SUPPLY AND FIXTURES:
INSTALLATION Nos. 3000.0
173 OFSUPPLY
H. LIGHTING
AND FIXTURES:
INSTALLATION OF Nos. 600.0
LIGHTING FIXTURES: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
174 H. SUPPLY AND INSTALLATION OF Nos. 75.0 (NPR)
175 LIGHTING
H. SUPPLY FIXTURES:
AND INSTALLATION Nos. 40.0
176 OF LIGHTING
H. SUPPLY AND FIXTURES:
INSTALLATION Nos. 10.0
OF LIGHTING FIXTURES: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
177 H. SUPPLY AND INSTALLATION Nos. 80.0 (NPR)
178 OF LIGHTING
H. SUPPLY AND FIXTURES:
INSTALLATION Nos. 10.0
179 OF LIGHTING
H. SUPPLY AND FIXTURES:
INSTALLATION Nos. 50.0
OF LIGHTING FIXTURES: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
180 H. SUPPLY AND INSTALLATION Nos. 75.0 (NPR)
181 OFSUPPLY
H. LIGHTING
AND FIXTURES:
INSTALLATION Nos. 100.0
182 OF LIGHTING FIXTURES:
H. SUPPLY AND INSTALLATION OF No. 3.0
LIGHTING FIXTURES: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
183 I. CABLING AND INSTALLATION Nos. 75.0 (NPR)
184 OFCABLING
I. LIGHTINGANDFIXTURE FOR
INSTALLATION Nos. 10.0
185 OF LIGHTING FIXTURE
I. CABLING AND INSTALLATIONFOR Nos. 100.0
OF LIGHTING FIXTURE FOR Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
186 I. CABLING AND INSTALLATION Nos. 100.0 (NPR)
187 OFCABLING
I. LIGHTINGANDFIXTURE FOR
INSTALLATION Nos. 50.0
188 OFCABLING
I. LIGHTINGANDFIXTURE FOR
INSTALLATION RM 400.0
189 OF LIGHTING FIXTURE
I. CABLING AND INSTALLATIONFOR OF RM 500.0
LIGHTING FIXTURE FOR Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
190 I. CABLING AND INSTALLATION RM 400.0 (NPR)
191 OFCABLING
I. LIGHTINGANDFIXTURE FOR
INSTALLATION RM 500.0
192 OF LIGHTING FIXTURE
I. CABLING AND INSTALLATIONFOR RM 500.0
193 OF LIGHTING FIXTURE
I. CABLING AND INSTALLATIONFOR RM 600.0
OF LIGHTING FIXTURE FOR Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
194 I. CABLING AND INSTALLATION RM 300.0 (NPR)
195 OFCABLING
I. LIGHTINGANDFIXTURE FOR
INSTALLATION RM 300.0
196 OF LIGHTING FIXTURE
I. CABLING AND INSTALLATIONFOR RM 300.0
197 OF LIGHTING FIXTURE
I. CABLING AND INSTALLATIONFOR Nos. 75.0
OF LIGHTING FIXTURE FOR Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
198 I. CABLING AND INSTALLATION Nos. 75.0 (NPR)
199 OF LIGHTING
I. CABLING ANDFIXTURE FOR
INSTALLATION Nos. 50.0
200 OF LIGHTING FIXTURE
I. CABLING AND INSTALLATIONFOR OF RM 100.0
201 LIGHTING
I. CABLINGFIXTURE FOR
AND INSTALLATION OF RM 50.0
LIGHTING FIXTURE FOR
202 I. CABLING AND INSTALLATION OF RM 100.0
LIGHTING FIXTURE FOR Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
203 I. CABLING AND INSTALLATION OF RM 50.0 (NPR)
204 LIGHTING
I. CABLINGFIXTURE FOR
AND INSTALLATION OF RM 50.0
205 LIGHTING
I. CABLINGFIXTURE FOR
AND INSTALLATION Nos. 50.0
206 OF LIGHTING
I. CABLING ANDFIXTURE FOR
INSTALLATION OF Nos. 75.0
207 LIGHTING FIXTURE FOR
I. CABLING AND INSTALLATION OF Nos. 50.0
LIGHTING FIXTURE FOR Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
208 A. HV INSTALLATION: Set 1.0 (NPR)
I. SUPPLY AND INSTALLATION OF Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No mechanism rated at 230 volt single (NPR)
209 phase
A. HVAC supply while closing and tripping
INSTALLATION: Nos. 2.0
I. SUPPLY AND INSTALLATION OF Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
210 A. HV INSTALLATION: Set 2.0 (NPR)
211 I.
A.SUPPLY AND INSTALLATION OF
HV INSTALLATION: Set 1.0
212 I. SUPPLY
A. AND INSTALLATION OF
HV INSTALLATION: Nos. 2.0
213 I. SUPPLY
A. AND INSTALLATION OF
HV INSTALLATION: Nos. 2.0
214 I. SUPPLY
A. AND INSTALLATION OF
HV INSTALLATION: Nos. 2.0
215 I. SUPPLY
A. AND INSTALLATION OF
HV INSTALLATION: RM 10.0
216 I. SUPPLY AND INSTALLATION OF
A. HV INSTALLATION: Sets 2.0
217 I. SUPPLY AND INSTALLATION OF
A. HV INSTALLATION: Nos. 2.0
I. SUPPLY AND INSTALLATION OF Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
218 A. HV INSTALLATION: Nos. 2.0 (NPR)
219 I.
A.SUPPLY AND INSTALLATION OF
HV INSTALLATION: Nos. 2.0
220 I. SUPPLY
B. HT CABLES:AND INSTALLATION OF RM 130.0
221 1. Supplying
B. HT CABLES:and laying following size 11KV Nos. 6.0
222 2. Supplying
B. HT CABLES:& making cable end RM 20.0
223 3. Supplying,
B. HT CABLES: laying GI sleeves of following RM 30.0
224 3. Supplying,
C. EARTHING laying
FORGI sleeves of following
SUB-STATION RM 100.0
225 EQUIPMENT:
C. EARTHING FOR SUB-STATION RM 150.0
EQUIPMENT: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
226 C. EARTHING FOR SUB-STATION Nos. 10.0 (NPR)
227 EQUIPMENT:
DG SET WITH ACCESSORIES: Set 2.0
228 A. SUPPLY
DG SET WITH AND INSTALLATION OF DG
ACCESSORIES: RM 50.0
A. SUPPLY AND INSTALLATION OF DG Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
229 DG SET WITH ACCESSORIES: RM 160.0 (NPR)
230 A. SUPPLY
DG SET WITH AND INSTALLATION OF DG
ACCESSORIES: L.S. 1.0
231 A. HSD
B. SUPPLY AND SYSTEM:
SUPPLY INSTALLATION OF DG Nos. 2.0
1. Supply, installation, testing & Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
232 B. HSD SUPPLY SYSTEM: Sets 2.0 (NPR)
233 2. Supply,
B. installation,
HSD SUPPLY testing &
SYSTEM: RM 15.0
234 3. Supply
B. & Installation
HSD SUPPLY SYSTEM:of M.S. class ‘C’ RM 120.0
3. Supply & Installation of M.S. class ‘C’ Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
235 B. HSD SUPPLY SYSTEM: RM 50.0 (NPR)
3. Supply & Installation of M.S. class ‘C’
236 B. HSD SUPPLY SYSTEM: RM 15.0
237 3.
B. Supply & Installation
HSD SUPPLY SYSTEM:of M.S. class ‘C’ RM 20.0
4. Supply, laying, jointing & testing in Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
238 B. HSD SUPPLY SYSTEM: RM 50.0 (NPR)
239 4. Supply,
B. laying, jointing
HSD SUPPLY SYSTEM: & testing in RM 60.0
240 4A. Supply trenching
B. HSD SUPPLY SYSTEM: for embedded Nos. 13.0
241 5.
B. Supply & Installation
HSD SUPPLY SYSTEM:of Cast Steel Ball Nos 3.0
242 5. Supply
B. & Installation
HSD SUPPLY SYSTEM:of Cast Steel Ball Nos. 3.0
243 5. Supply
B. & Installation
HSD SUPPLY SYSTEM:of Cast Steel Ball Nos. 3.0
244 5. Supply
B. & Installation
HSD SUPPLY SYSTEM:of Cast Steel Ball Nos. 2.0
6. Supply & Installation of F.S non return Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
245 B. HSD SUPPLY SYSTEM: Nos. 2.0 (NPR)
246 6. Supply
B. & Installation
HSD SUPPLY SYSTEM:of F.S non return Nos. 2.0
247 7. Supply
B. & Installation
HSD SUPPLY SYSTEM:of Gun metal foot Nos. 2.0
248 8. Providing
B. HSD SUPPLY and fixing Y strainer/ Basket
SYSTEM: No. 1.0
249 9.
B. Supply & Installation
HSD SUPPLY SYSTEM:of GM collection Nos. 2.0
250 10. Supply & Installation
B. HSD SUPPLY SYSTEM: of Pressure switch Set 1.0
251 11.HSD
B. Supply, installation
SUPPLY testing &
SYSTEM: Sets 3.0
12. Supply, installation, testing & Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
252 C. DISTRIBUTION BOARDS/RISING Set 1.0 (NPR)
MAINS: Design, fabrication, assembling, Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No following protection. (NPR)
a. Voltage restrained over current protection Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No and bus coupler relay of DEIF/equivalent (NPR)
make (Model No. AGC-244 for Bus coupler ) Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No xii. Trip circuit supervision relay. (NPR)
xiii. Engine cranking relay. Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No hinged type door. (NPR)
253 xi. Space provision for
C. DISTRIBUTION voltage transducer of
BOARDS/RISING Set 1.0
MAINS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
254 C. DISTRIBUTION BOARDS/RISING Set 1.0 (NPR)
255 MAINS:
UPS WORKS: Nos. 3.0
A. UPS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
256 UPS WORKS: No. 3.0 (NPR)
257 A. UPS:
UPS WORKS: No. 3.0
258 A. UPS:
UPS WORKS: Lot 1.0
259 A. UPS:
LV WORKS: No. 5.0
A. CLOSE CIRCUIT TELEVISION Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
260 LV WORKS: No. 12.0 (NPR)
261 A. CLOSE
LV WORKS: CIRCUIT TELEVISION No. 70.0
262 A. CLOSE
LV WORKS: CIRCUIT TELEVISION Lot 1.0
263 A. CLOSE
LV WORKS: CIRCUIT TELEVISION RM 6000.0
A. CLOSE CIRCUIT TELEVISION Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
264 LV WORKS: RM 3000.0 (NPR)
265 A.
LVCLOSE
WORKS: CIRCUIT TELEVISION RM 1500.0
266 A. CLOSE
LV WORKS: CIRCUIT TELEVISION Lot 1.0
267 B. DIGITAL
LV WORKS:MATV SYSTEM: Nos. 3.0
268 B. DIGITAL
LV WORKS:MATV SYSTEM: Nos. 3.0
269 B.
LV WORKS:MATV SYSTEM:
DIGITAL Nos. 6.0
270 B.
LVDIGITAL
WORKS:MATV SYSTEM: Nos. 3.0
271 B. DIGITAL
LV WORKS:MATV SYSTEM: Nos. 3.0
B. DIGITAL MATV SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
272 LV WORKS: Nos. 3.0 (NPR)
273 B.
LVDIGITAL
WORKS:MATV SYSTEM: Nos. 1.0
274 B.
LV WORKS:MATV SYSTEM:
DIGITAL Nos. 1.0
275 B. DIGITAL
LV WORKS:MATV SYSTEM: No. 1.0
276 B. DIGITAL
LV WORKS:MATV SYSTEM: Lot 1.0
277 B. DIGITAL
LV WORKS:MATV SYSTEM: RM 1550.0
278 B.
LV WORKS:MATV SYSTEM:
DIGITAL RM 5000.0
279 B.
LVDIGITAL
WORKS:MATV SYSTEM: Nos. 25.0
280 B. DIGITAL
LV WORKS:MATV SYSTEM: Nos. 5.0
281 B. DIGITAL
LV WORKS:MATV SYSTEM: Nos. 100.0
282 B. DIGITAL
LV WORKS:MATV SYSTEM: Nos. 700.0
283 B. DIGITAL
LV WORKS:MATV SYSTEM: Nos. 100.0
B. DIGITAL MATV SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
284 LV WORKS: Nos. 20.0 (NPR)
285 B. DIGITAL
LV WORKS:MATV SYSTEM: Nos. 20.0
286 B. DIGITAL
LV WORKS:MATV SYSTEM: Nos. 360.0
287 B.
LV WORKS:MATV SYSTEM:
DIGITAL Nos. 1.0
288 B.
LVDIGITAL
WORKS:MATV SYSTEM: Nos. 1.0
289 B. DIGITAL
LV WORKS:MATV SYSTEM: Nos. 8.0
290 B. DIGITAL
LV WORKS:MATV SYSTEM: Lot 1.0
291 B. DIGITAL
LV WORKS:MATV SYSTEM: Nos. 360.0
292 B. DIGITAL
LV WORKS:MATV SYSTEM: RM 3500.0
293 B.
LV WORKS:MATV SYSTEM:
DIGITAL RM 1000.0
B. DIGITAL MATV SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
294 LV WORKS: Nos. 2.0 (NPR)
C. INTELLIGENT ANALOGUE Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
295 LV WORKS: Nos. 1.0 (NPR)
296 C. INTELLIGENT
LV WORKS: ANALOGUE Nos. 80.0
297 C. INTELLIGENT
LV WORKS: ANALOGUE Nos. 48.0
298 C. INTELLIGENT
LV WORKS: ANALOGUE Nos. 48.0
C. INTELLIGENT ANALOGUE Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
299 LV WORKS: Nos. 24.0 (NPR)
300 C. INTELLIGENT
LV WORKS: ANALOGUE Nos. 50.0
301 C. INTELLIGENT
LV WORKS: ANALOGUE Nos. 250.0
302 C. INTELLIGENT
LV WORKS: ANALOGUE Nos. 1100.0
C. INTELLIGENT ANALOGUE Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
303 LV WORKS: Nos. 25.0 (NPR)
C. INTELLIGENT ANALOGUE
304 LV WORKS: Nos. 4.0
305 C.
LVINTELLIGENT
WORKS: ANALOGUE Nos. 1.0
306 C. INTELLIGENT
LV WORKS: ANALOGUE Nos. 48.0
C. INTELLIGENT ANALOGUE Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
307 LV WORKS: Nos. 48.0 (NPR)
308 C.
LVINTELLIGENT
WORKS: ANALOGUE Nos. 990.0
309 C. INTELLIGENT
LV WORKS: ANALOGUE Nos. 48.0
310 C. NTELLIGENT
LV WORKS: ANALOGUE Sets 6.0
311 C. INTELLIGENT
LV WORKS: ANALOGUE Nos. 45.0
C. INTELLIGENT ANALOGUE Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
312 LV WORKS: Nos. 350.0 (NPR)
313 C.
LVINTELLIGENT
WORKS: ANALOGUE RM 23000.0
314 C. INTELLIGENT
LV WORKS: ANALOGUE RM 300.0
315 C. INTELLIGENT
LV WORKS: ANALOGUE RM 3360.0
C. INTELLIGENT ANALOGUE Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
316 LV WORKS: RM 2900.0 (NPR)
317 C. INTELLIGENT
LV WORKS: ANALOGUE RM 7800.0
318 C. INTELLIGENT
LV WORKS: ANALOGUE RM 23800.0
319 C. INTELLIGENT
LV WORKS: ANALOGUE No. 1.0
C. INTELLIGENT ANALOGUE Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
320 LV WORKS: No. 1.0 (NPR)
321 C. INTELLIGENT
LV WORKS: ANALOGUE No. 1.0
322 C. INTELLIGENT
LV WORKS: ANALOGUE Set 1.0
323 C. INTELLIGENT
LV WORKS: ANALOGUE Nos. 1.0
D. DATA NETWORKING COMPONENTS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
324 LV WORKS: Nos. 2.0 (NPR)
325 D. DATA
LV WORKS:NETWORKING COMPONENTS: Nos. 24.0
326 D. DATA
LV WORKS:NETWORKING COMPONENTS: Nos. 5.0
327 D. DATA
LV WORKS:NETWORKING COMPONENTS: Nos. 20.0
328 D. DATA
LV WORKS: NETWORKING COMPONENTS: Nos. 2.0
329 D. DATA
LV WORKS: NETWORKING COMPONENTS: Nos. 6.0
D. DATA NETWORKING COMPONENTS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
330 LV WORKS: Nos. 5.0 (NPR)
331 D.
LVDATA
WORKS:NETWORKING COMPONENTS: Nos. 44.0
332 D. DATA
LV WORKS: NETWORKING COMPONENTS: Nos. 15.0
333 D. DATA
LV WORKS:NETWORKING COMPONENTS: Nos. 2.0
334 D. DATA
LV WORKS:NETWORKING COMPONENTS: Nos. 1.0
335 D. DATA NETWORKING
STRUCTURED CABLINGCOMPONENTS:
FOR DATA Mtrs. 40000.0
336 SYSTEM:
STRUCTURED CABLING FOR DATA Nos 85.0
SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
337 STRUCTURED CABLING FOR Nos 1860.0 (NPR)
338 DATA SYSTEM:CABLING FOR
STRUCTURED Nos 600.0
339 DATA SYSTEM:CABLING FOR
STRUCTURED Nos 600.0
340 DATA SYSTEM:CABLING FOR
STRUCTURED Nos 84.0
341 DATA SYSTEM:CABLING FOR DATA
STRUCTURED Nos 600.0
342 SYSTEM:
STRUCTURED CABLING FOR Nos 600.0
DATA SYSTEM:
343 STRUCTURED CABLING FOR Mtrs. 800.0
344 DATA SYSTEM:CABLING FOR DATA
STRUCTURED Mtrs. 500.0
345 SYSTEM:
STRUCTURED CABLING FOR DATA Nos 6.0
SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
346 STRUCTURED CABLING FOR DATA Nos 27.0 (NPR)
347 SYSTEM:
STRUCTURED CABLING FOR Nos 94.0
348 DATA SYSTEM CABLING FOR
STRUCTURED Nos 3.0
349 DATA SYSTEM: CABLING FOR
STRSTRUCTURED Nos 6.0
350 DATA SYSTEM:CABLING FOR
STRUCTURED Nos 13.0
351 DATA SYSTEM:CABLING FOR DATA
STRUCTURED Nos 15.0
352 SYSTEM:
STRUCTURED CABLING FOR Nos 10.0
DATA SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
353 STRUCTURED CABLING FOR RM 20000.0 (NPR)
DATA SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
354 E. TELEPHONE EQUIPMENT: Nos. 1.0 (NPR)
1) Supply, unloading at site, handling, Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No and is scalable and secure. (NPR)
355 NEW
E. IP EPABX EQUIPMENT:
TELEPHONE Should be: Nos. 20.0
356 2) IP-
E. Phone (Licences):
TELEPHONE Licences in the
EQUIPMENT: Nos. 990.0
357 3) Analog extension:
E. TELEPHONE EQUIPMENT: Ports Nos. 25.0
358 4)
E. Digital Ports EQUIPMENT:
TELEPHONE Nos. 2.0
359 5) PRI
E. lines (60 channel
TELEPHONE each)
EQUIPMENT: Nos. 8.0
6) Analog Trunks Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
360 E. TELEPHONE EQUIPMENT: Nos. 2.0 (NPR)
361 7)
E. Supply,
TELEPHONE installation, testing &
EQUIPMENT: Nos. 2.0
362 8) Supply,
E. TELEPHONE installation, testing &
EQUIPMENT: Nos. 10.0
363 9) Supply
E. TELEPHONE, installation, testing &
EQUIPMENT: Nos. 10.0
364 10)TELEPHONE
E. Supply, installation, testing &
EQUIPMENT: Nos. 950.0
365 11)TELEPHONE
E. Analog CLI Phones.
EQUIPMENT: Nos. 1.0
366 12) MDF 1500 Pair
E. TELEPHONE Krone with Box.
EQUIPMENT: Nos. 1.0
367 13) Call billing software
E. TELEPHONE EQUIPMENT: as per specification. Nos. 1.0
368 14) Supply and installation
STRUCTURED CABLINGofFOR following 19 Mtrs. 36600.0
TELEPHONE SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
369 STRUCTURED CABLING FOR Nos 61.0 (NPR)
370 TELEPHONE
STRUCTURED SYSTEM:
CABLING FOR Nos 1225.0
371 TELEPHONE SYSTEM:
STRUCTURED CABLING FOR Nos 1225.0
372 TELEPHONE SYSTEM:
STRUCTURED CABLING FOR Nos 1225.0
373 TELEPHONE SYSTEM:
STRUCTURED CABLING FOR Mtrs. 3000.0
374 TELEPHONE SYSTEM:
STRUCTURED CABLING FOR Nos 61.0
375 TELEPHONE SYSTEM:
STRUCTURED CABLING FOR Nos 1608.0
376 TELEPHONE
STRUCTURED SYSTEM:
CABLING FOR Nos 1.0
377 TELEPHONE SYSTEM:
STRUCTURED CABLING FOR Nos 1.0
378 TELEPHONE SYSTEM:
STRUCTURED CABLING FOR Nos 35.0
TELEPHONE SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
379 F. Providing and fixing of analog tower clock Nos. 4.0 (NPR)
380 of diaWORKS:
STP 3000 mm with all accessories ready for Set 1.0
A. MBBR BASED SEWAGE
381 LIFTS: Set 8.0
382 1. Supply, Instalaltion,
BOOSTER PUMPS & Testing,
WTP WORKS: No. 3.0
A) WATER TREATMENT PLANT: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
383 BOOSTER PUMPS & WTP WORKS: Set 1.0 (NPR)
384 A) WATERPUMPS
BOOSTER TREATMENT& WTPPLANT:
WORKS: Set 2.0
385 A) WATER TREATMENT
BOOSTER PUMPS & WTP PLANT: Set 2.0
WORKS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
386 BOOSTER PUMPS & WTP Set 2.0 (NPR)
387 WORKS: PUMPS & WTP
BOOSTER No. 1.0
388 WORKS: PUMPS & WTP WORKS:
BOOSTER No. 1.0
389 A) WATERPUMPS
BOOSTER TREATMENT& WTPPLANT:
WORKS: Lot 1.0
A) WATER TREATMENT PLANT: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
390 BOOSTER PUMPS & WTP No. 1.0 (NPR)
391 WORKS: PUMPS & WTP WORKS:
BOOSTER Set 2.0
392 A) WATERPUMPS
BOOSTER TREATMENT& WTPPLANT: No. 4.0
393 WORKS:
BOOSTER PUMPS & WTP No. 6.0
WORKS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
394 BOOSTER PUMPS & WTP No. 3.0 (NPR)
395 WORKS: PUMPS & WTP WORKS:
BOOSTER No. 3.0
396 A) WATERPUMPS
BOOSTER TREATMENT& WTPPLANT:
WORKS: No. 2.0
397 A)
BOOSTER PUMPS & WTPPLANT:
WATER TREATMENT No. 2.0
398 WORKS: PUMPS & WTP WORKS:
BOOSTER No. 3.0
399 A) WATERPUMPS
BOOSTER TREATMENT& WTPPLANT:
WORKS: No. 2.0
A) WATER TREATMENT PLANT: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
400 BOOSTER PUMPS & WTP No. 4.0 (NPR)
401 WORKS: PUMPS & WTP
BOOSTER No. 2.0
402 WORKS: PUMPS & WTP
BOOSTER No. 3.0
403 WORKS: PUMPS & WTP
BOOSTER Set 20.0
WORKS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
404 BOOSTER PUMPS & WTP WORKS: Set 1.0 (NPR)
405 B. HYDROPNEUMATIC
BOOSTER PUMPS & WTP SYSTEM No. 6.0
WORKS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
406 BOOSTER PUMPS & WTP No. 2.0 (NPR)
407 WORKS:
BOOSTER PUMPS & WTP No. 4.0
408 WORKS: PUMPS & WTP WORKS:
BOOSTER Set 2.0
C. SUBMERSIABLE PUMP: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
409 BOOSTER PUMPS & WTP WORKS: Set 1.0 (NPR)
C. SUBMERSIABLE PUMP: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
410 BOOSTER PUMPS & WTP WORKS: No. 1.0 (NPR)
D. CONTROL PANEL: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No feeder to Borewell pumping system (NPR)
panels. Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No (NPR)
411 BOOSTER PUMPS & WTP WORKS: No. 2.0
D. CONTROL PANEL: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No with Automatic float type level (NPR)
412 controller.
E. WATER BODY, FOUNDATION lot 1.0
413 & GARDEN
E. WATER BODY,IRRIGATION:
FOUNDATION lot 1.0
414 & GARDEN
F. DEEP WELL: IRRIGATION: mtr 600.0
Supply, Instalaltion, testing and Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
415 HEATING PUMP: Nos. 2.0 (NPR)
A. Screw/Scroll Aircooled Heat Pump: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
416 HEATING PUMP: No. 1.0 (NPR)
A. Screw/Scroll Aircooled Heat Pump: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
417 HEATING PUMP: Set 2.0 (NPR)
418 A. Screw/Scroll
HEATING PUMP:Aircooled Heat Pump: Nos. 2.0
A. Screw/Scroll Aircooled Heat Pump: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
419 HEATING PUMP: Nos. 2.0 (NPR)
420 A. Screw/Scroll
HEATING PUMP:Aircooled Heat Pump: RM 125.0
421 A. Screw/Scroll
HEATING PUMP:Aircooled Heat Pump: RM 150.0
422 A. Screw/Scroll
HEATING PUMP:Aircooled Heat Pump: RM 250.0
A. Screw/Scroll Aircooled Heat Pump: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
423 HEATING PUMP: RM 50.0 (NPR)
424 A. Screw/Scroll
HEATING PUMP:Aircooled Heat Pump: RM 75.0
425 A. Screw/Scroll
HEATING PUMP:Aircooled Heat Pump: RM 75.0
426 A. Screw/Scroll
HEATING PUMP: Aircooled Heat Pump: Nos. 2.0
427 A. Screw/Scroll
HEATING PUMP: Aircooled Heat Pump: Nos. 12.0
A. Screw/Scroll Aircooled Heat Pump: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
428 HEATING PUMP: Nos. 6.0 (NPR)
429 A. Screw/Scroll
HEATING PUMP:Aircooled Heat Pump: Nos. 2.0
430 A. Screw/Scroll
HEATING PUMP: Aircooled Heat Pump: Nos. 2.0
431 A. Screw/Scroll
HEATING PUMP: Aircooled Heat Pump: Nos. 26.0
432 A. Screw/Scroll
HEATING PUMP:Aircooled Heat Pump: Nos. 3.0
433 A. Screw/Scroll
HEATING PUMP:Aircooled Heat Pump: Nos. 3.0
434 A. Screw/Scroll
HEATING PUMP:Aircooled Heat Pump: Nos. 3.0
435 A. Screw/Scroll
HEATING PUMP: Aircooled Heat Pump: Nos. 3.0
436 A. Screw/Scroll
HEATING PUMP: Aircooled Heat Pump: No. 12.0
A. Screw/Scroll Aircooled Heat Pump: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
437 HEATING PUMP: No. 6.0 (NPR)
438 A. Screw/Scroll
HEATING PUMP:Aircooled Heat Pump: Nos. 6.0
439 A. Screw/Scroll
HEATING PUMP: Aircooled Heat Pump: Nos. 2.0
440 A. Screw/Scroll
HEATING PUMP: Aircooled Heat Pump: Nos. 18.0
441 A. Screw/Scroll
HEATING PUMP:Aircooled Heat Pump: Nos. 18.0
442 A. Screw/Scroll
HEATING PUMP:Aircooled Heat Pump: Nos. 2.0
443 A. Screw/Scroll
HEATING PUMP:Aircooled Heat Pump: RM 125.0
444 A. Screw/Scroll
HEATING PUMP: Aircooled Heat Pump: RM 150.0
A. Screw/Scroll Aircooled Heat Pump: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No (NPR)
445 HEATING PUMP: RM 250.0
446 A. Screw/Scroll
HEATING PUMP:Aircooled Heat Pump: RM 50.0
447 A. Screw/Scroll
HEATING PUMP: Aircooled Heat Pump: RM 75.0
448 A. Screw/Scroll
HEATING PUMP:Aircooled Heat Pump: RM 75.0
A. Screw/Scroll Aircooled Heat Pump: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
449 17. HVAC Panel: Set 1.0 (NPR)
Incoming- 1: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
450 SOLAR WATER HEATING Nos. 140.0 (NPR)
SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
451 SOLAR WATER HEATING SYSTEM: Nos. 1.0 (NPR)
452 2. Solar Water
SOLAR WATER Storage Cum Calorifier
HEATING SYSTEM: Tank: Nos. 2.0
2. Solar Water Storage Cum Calorifier Tank: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
453 SOLAR WATER HEATING SYSTEM: RM 10.0 (NPR)
3. CPVC (Chlorinated Poly Vinyl Chloride) Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
454 SOLAR WATER HEATING SYSTEM: RM 20.0 (NPR)
3. CPVC (Chlorinated Poly Vinyl Chloride) Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
455 SOLAR WATER HEATING SYSTEM: RM 10.0 (NPR)
3. CPVC (Chlorinated Poly Vinyl Chloride) Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
456 SOLAR WATER HEATING SYSTEM: RM 100.0 (NPR)
3. CPVC (Chlorinated Poly Vinyl Chloride) Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
457 SOLAR WATER HEATING SYSTEM: RM 20.0 (NPR)
458 3. CPVCWATER
SOLAR (Chlorinated Poly Vinyl Chloride)
HEATING Lot 1.0
459 SYSTEM:
SOLAR WATER HEATING Nos. 6.0
SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
460 SOLAR WATER HEATING SYSTEM: Nos. 6.0 (NPR)
461 6. Temprature
SOLAR WATERGauges with isolation valve:
HEATING Nos. 1.0
462 SYSTEM:
SOLAR WATER HEATING SYSTEM: Set 2.0
8. Insulated pumps: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
463 SOLAR WATER HEATING SYSTEM: Set 1.0 (NPR)
9. Indoor Type Motor Control Centre : Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No Notes: (NPR)
464 a. All
PV MPCBs
Solar shall be of 10 KA breaking
System: Set 381.0
465 A. Supply,
PV Installation, Testing and
Solar System: Set 384.0
466 A. Supply,
PV Installation, Testing and
Solar System: Set 2.0
467 A. Supply, Installation, Testing and
PV Solar System: Set 1.0
468 A. Supply, Installation,
PV Solar System: Testing
Supply, and
Installation, Lot 1.0
469 Testing
PV Solarand Commissioning of PV Solar
System: Lot 1.0
A. Supply, Installation, Testing and Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
470 PV Solar System: Set 1.0 (NPR)
471 A. Supply,CONTROL
ACCESS Installation,SYSTEM:
Testing and(All Nos 7.0
472 Access Control
ACCESS SystemSYSTEM:
CONTROL includes of all
(All Nos 26.0
Access Control System includes of all
Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
473 ACCESS CONTROL SYSTEM: (All Nos 20.0 (NPR)
474 Access Control
ACCESS SystemSYSTEM:
CONTROL includes of all
(All Nos 6.0
475 Access Control
ACCESS SystemSYSTEM:
CONTROL includes of all
(All Nos 26.0
Access Control System includes of all Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
476 ACCESS CONTROL SYSTEM: (All Nos 26.0 (NPR)
Access Control
477 ACCESS SystemSYSTEM:
CONTROL includes of all
(All Nos 200.0
Access Control
478 ACCESS SystemSYSTEM:
CONTROL includes of all
(All Set 1.0
Access Control System includes of all Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
479 ACCESS CONTROL SYSTEM: (All No 2.0 (NPR)
480 Access
ACCESS Control SystemSYSTEM:
CONTROL includes of all
(All No. 3.0
Access Control
481 ACCESS SystemSYSTEM:
CONTROL includes of all
(All No 1.0
Access Control
482 ACCESS SystemSYSTEM:
CONTROL includes of all
(All m 1500.0
Access Control System includes of all Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
483 ACCESS CONTROL SYSTEM: (All m 1200.0 (NPR)
Access Control
484 ACCESS SystemSYSTEM:
CONTROL includes of all
(All m 1600.0
Access Control
485 ACCESS SystemSYSTEM:
CONTROL includes of all
(All m 100.0
Access Control
486 ACCESS SystemSYSTEM:
CONTROL includes of all
(All Job 1.0
Access Control System includes of all Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
487 Reverse Osmosis System: Nos 1.0 (NPR)
1. Supplying,
488 Reverse fixing,
Osmosis testing and
System: Nos 2.0
489 A. 2. Providing and fixing S.S.
Supply, Installation, R.O.&water
Testing set 1.0
Commissioning of Crash Rated Automatic Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
490 A. Supply, Installation, Commissioning and Set 8.0 (NPR)
testing of COURT ROOM DISPLAY Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
491 A. Supply, Installation, Set 2.0 (NPR)
492 A. Commissioning and testing
Supply, Installation, of COURT and
Commissioning Set 2.0
testing of COURT ROOM DISPLAY Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
493 A. Supply, Installation, Commissioning and Set 4.0 (NPR)
494 A. testing of COURT
Supply, ROOM DISPLAY
Installation, Each 2.0
495 A. Commissioning and testing
Supply, Installation, of COURT and
Commissioning Each 2.0
testing of COURT ROOM DISPLAY
496 A. Supply, Installation, Commissioning and M 1200.0
testing of COURT ROOM DISPLAY Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
497 A. Supply, Installation, Each 4.0 (NPR)
498 A. Commissioning and testing of COURT
Supply, Installation, Each 2.0
Commissioning and testing of COURT Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
499 A. Supply, Installation, Lot 1.0 (NPR)
Commissioning and testing of COURT Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
500 A. Supply, Installation, Lot 1.0 (NPR)
2.1.1.3 Commissioning
Sanitary Worksand testing of COURT
Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No (NPR)
1 HVAC WORKS: Nos. 4.0
A. EQUIPMENT: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No2 HVAC WORKS: EQUIPMENT: Nos 33.0 (NPR)
1. VARIABLE REFRIGERATNT FLOW Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No3 HVAC WORKS: Nos 2.0 (NPR)
4 A. EQUIPMENT:
HVAC WORKS: Nos. 55.0
5 A. EQUIPMENT:
HVAC WORKS: Nos. 18.0
A. EQUIPMENT: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No6 HVAC WORKS: Nos. 35.0 (NPR)
7 A. EQUIPMENT
HVAC WORKS: Nos. 10.0
8 A. EQUIPMENT:
HVAC WORKS: Nos. 12.0
9 A. EQUIPMENT:
HVAC WORKS: Nos. 7.0
10 A. EQUIPMENT:
HVAC WORKS: Nos. 1.0
A. EQUIPMENT: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
11 HVAC WORKS: Nos. 7.0 (NPR)
12 A. EQUIPMENT:
HVAC WORKS: Nos. 35.0
13 A. EQUIPMENT:
HVAC WORKS: Nos. 64.0
14 A. EQUIPMENT:
HVAC WORKS: Nos. 14.0
15 A. EQUIPMENT:
HVAC WORKS: Nos. 18.0
A. EQUIPMENT: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
16 HVAC WORKS: Lot 1.0 (NPR)
17 A. EQUIPMENT:
HVAC WORKS: Lot 1.0
18 A. EQUIPMENT:
HVAC WORKS: Lot 1.0
19 A. EQUIPMENT:
HVAC WORKS: Lot 1.0
20 A. EQUIPMENT:
HVAC WORKS: Lot 1.0
A. EQUIPMENT: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
21 HVAC WORKS: Nos. 1.0 (NPR)
B. Minor Equipment: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
22 HVAC WORKS: Nos. 1.0 (NPR)
B. Minor Equipment: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
23 HVAC WORKS: Nos. 1.0 (NPR)
24 B. Minor
HVAC Equipment:
WORKS: No. 1.0
B. Minor Equipment: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
25 HVAC WORKS: No. 1.0 (NPR)
26 B. Minor
HVAC Equipment:
WORKS: No. 1.0
B. Minor Equipment: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
27 HVAC WORKS: No. 1.0 (NPR)
28 B. Minor
HVAC Equipment:
WORKS: No. 1.0
B. Minor Equipment: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
29 HVAC WORKS: No. 1.0 (NPR)
30 B. Minor
HVAC Equipment:
WORKS: No. 1.0
B. Minor Equipment: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
31 HVAC WORKS: No. 1.0 (NPR)
32 B. Minor
HVAC Equipment:
WORKS: No. 1.0
B. Minor Equipment: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
33 HVAC WORKS: No. 1.0 (NPR)
34 B. Minor
HVAC Equipment:
WORKS: No. 1.0
B. Minor Equipment: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
35 HVAC WORKS: No. 1.0 (NPR)
36 B. Minor
HVAC Equipment:
WORKS: No. 1.0
B. Minor Equipment: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
37 HVAC WORKS: No. 1.0 (NPR)
38 B. Minor
HVAC Equipment:
WORKS: No. 1.0
B. Minor Equipment: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
39 HVAC WORKS: No. 1.0 (NPR)
40 B. Minor
HVAC Equipment:
WORKS: No. 1.0
B. Minor Equipment: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
41 HVAC WORKS: No. 1.0 (NPR)
42 B. Minor
HVAC Equipment:
WORKS: No. 1.0
B. Minor Equipment: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
43 HVAC WORKS: No. 1.0 (NPR)
44 B. Minor
HVAC Equipment:
WORKS: No. 1.0
B. Minor Equipment: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
45 HVAC WORKS: Nos. 2.0 (NPR)
46 B. Minor
HVAC Equipment:
WORKS: No. 1.0
47 B. Minor
HVAC Equipment:
WORKS: No. 1.0
48 B. Minor
HVAC Equipment:
WORKS: No. 1.0
B. Minor Equipment: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
49 HVAC WORKS: Nos. 2.0 (NPR)
50 B. Minor
HVAC Equipment:
WORKS: Nos. 4.0
B. Minor Equipment: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
51 HVAC WORKS: Nos. 2.0 (NPR)
52 B. Minor
HVAC Equipment:
WORKS: Nos. 1.0
B. Minor Equipment: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
53 HVAC WORKS: Nos. 1.0 (NPR)
54 B. Minor
HVAC Equipment:
WORKS: Nos. 1.0
B. Minor Equipment: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
55 HVAC WORKS: Nos. 1.0 (NPR)
56 B. Minor
HVAC Equipment:
WORKS: No. 1.0
B. Minor Equipment: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
57 HVAC WORKS: No. 1.0 (NPR)
58 B. Minor
HVAC Equipment:
WORKS: No. 1.0
B. Minor Equipment:
Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
59 HVAC WORKS: No. 1.0 (NPR)
60 B. Minor
HVAC Equipment:
WORKS: No. 8.0
B. Minor Equipment: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
61 HVAC WORKS: Set 1.0 (NPR)
C. Control Panel Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No MCB and toggle switch for ‘ON/ OFF' status (NPR)
62 of VRVWORKS:
HVAC No. 8.0
9. Control Panel in AHU Room (With Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
63 HVAC WORKS: No. 1.0 (NPR)
9. Control Panel in AHU Room (With Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
64 HVAC WORKS: No. 13.0 (NPR)
9. Control Panel in AHU Room (With Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
65 HVAC WORKS: No. 11.0 (NPR)
9. Control Panel in AHU Room (With Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
66 HVAC WORKS: No. 2.0 (NPR)
10. CONTROL PANELS FOR FANS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
67 HVAC WORKS: No. 2.0 (NPR)
10. CONTROL PANELS FOR FANS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
68 HVAC WORKS: No. 2.0 (NPR)
10. CONTROL PANELS FOR FANS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
69 HVAC WORKS: No. 2.0 (NPR)
10. CONTROL PANELS FOR FANS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
70 HVAC WORKS: No. 4.0 (NPR)
10. CONTROL PANELS FOR FANS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
71 HVAC WORKS: No. 10.0 (NPR)
10. CONTROL PANELS FOR FANS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
72 HVAC WORKS: No. 20.0 (NPR)
10. CONTROL PANELS FOR FANS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
73 HVAC WORKS: No. 2.0 (NPR)
10. CONTROL PANELS FOR FANS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
74 HVAC WORKS: No. 2.0 (NPR)
10. CONTROL PANELS FOR FANS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
75 HVAC WORKS: No. 6.0 (NPR)
10. CONTROL PANELS FOR FANS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
76 HVAC WORKS: No. 16.0 (NPR)
10. CONTROL PANELS FOR FANS:
Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
77 HVAC WORKS: sq.m 8723.0 (NPR)
78 D. AIR WORKS:
HVAC DISTRIBUTION: (FOR FACTORY sq.m 4832.0
79 D. AIR WORKS:
HVAC DISTRIBUTION: (FOR FACTORY sq.m 2283.0
80 D. AIR WORKS:
HVAC DISTRIBUTION: (FOR FACTORY sq.m 1185.0
D. AIR DISTRIBUTION: (FOR FACTORY Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
81 HVAC WORKS: sq.m 860.0 (NPR)
82 D. AIR WORKS:
HVAC DISTRIBUTION: (FOR FACTORY sq.m 200.0
83 D. AIR WORKS:
HVAC DISTRIBUTION: (FOR FACTORY sq.m 150.0
84 D. AIR WORKS:
HVAC DISTRIBUTION: (FOR FACTORY sq.m 35.0
D. AIR DISTRIBUTION: (FOR FACTORY Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
85 HVAC WORKS: Nos. 100.0 (NPR)
86 D. AIR WORKS:
HVAC DISTRIBUTION: (FOR FACTORY Nos. 100.0
87 D. AIR WORKS:
HVAC DISTRIBUTION: (FOR FACTORY sq.m 5.0
88 D. AIR DISTRIBUTION: (FOR FACTORY
HVAC WORKS: sq.m 150.0
89 D. AIR DISTRIBUTION: (FOR FACTORY
HVAC WORKS: sq.m 150.0
D. AIR DISTRIBUTION: (FOR FACTORY Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
90 HVAC WORKS: sq.m 100.0 (NPR)
91 D. AIR WORKS:
HVAC DISTRIBUTION: (FOR FACTORY sq.m 100.0
92 D. AIR DISTRIBUTION: (FOR FACTORY
HVAC WORKS: sq.m 175.0
93 D. AIR DISTRIBUTION: (FOR FACTORY
HVAC WORKS: sq.m 175.0
94 D. AIR WORKS:
HVAC DISTRIBUTION: (FOR FACTORY sq.m 175.0
D. AIR DISTRIBUTION: (FOR FACTORY Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
95 HVAC WORKS: sq.m 75.0 (NPR)
96 D. AIR WORKS:
HVAC DISTRIBUTION: (FOR FACTORY sq.m 75.0
97 D. AIR WORKS:
HVAC DISTRIBUTION: (FOR FACTORY sq.m 200.0
98 D. AIR WORKS:
HVAC DISTRIBUTION: (FOR FACTORY sq.m 16.0
99 D. AIR WORKS:
HVAC DISTRIBUTION: (FOR FACTORY sqm 15.0
D. AIR DISTRIBUTION: (FOR FACTORY Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
100 HVAC WORKS: Nos. 44.0 (NPR)
101 D. AIR WORKS:
HVAC DISTRIBUTION: (FOR FACTORY sq.m 10.0
102 D. AIR WORKS:
HVAC DISTRIBUTION: (FOR FACTORY sq.m 15.0
103 D. AIR WORKS:
HVAC DISTRIBUTION: (FOR FACTORY sqm 15.0
104 D. AIR DISTRIBUTION: (FOR FACTORY
HVAC WORKS: sqm 15.0
105 D. AIR DISTRIBUTION: (FOR FACTORY
HVAC WORKS: RM 300.0
106 D. AIR WORKS:
HVAC DISTRIBUTION: (FOR FACTORY sq.m 450.0
E. THERMAL INSULATION: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
107 HVAC WORKS: sq.m 350.0 (NPR)
108 E. THERMAL
HVAC WORKS: INSULATION: sq.m 18000.0
109 E. THERMAL
HVAC WORKS: INSULATION: sq.m 1400.0
110 E. THERMAL
HVAC WORKS: INSULATION: RM 400.0
111 E. THERMAL
HVAC WORKS: INSULATION: RM 750.0
112 E. THERMAL
HVAC WORKS: INSULATION: LOT 1.0
F. TESTING, BALANCING AND Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
113 FIRE FIGHTING WORKS: Set 2.0 (NPR)
A. ELECTRICAL INSTALLATION FOR
Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No MCC-1 as described above. (NPR)
114 FIRE FIGHTING WORKS: RM 50.0
115 A. ELECTRICAL
FIRE INSTALLATION FOR
FIGHTING WORKS: RM 55.0
116 A. ELECTRICAL
FIRE INSTALLATION FOR
FIGHTING WORKS: RM 35.0
117 A. ELECTRICAL
FIRE FIGHTING WORKS: INSTALLATION FOR RM 40.0
A. ELECTRICAL INSTALLATION FOR Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
118 FIRE FIGHTING WORKS: RM 25.0 (NPR)
119 A. ELECTRICAL
FIRE INSTALLATION FOR
FIGHTING WORKS: Nos. 8.0
120 A. ELECTRICAL
FIRE INSTALLATION FOR
FIGHTING WORKS: Nos. 8.0
121 A. ELECTRICAL
FIRE FIGHTING WORKS: INSTALLATION FOR Nos. 8.0
122 A. ELECTRICAL
FIRE FIGHTING WORKS: INSTALLATION FOR Nos. 10.0
A. ELECTRICAL INSTALLATION FOR Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
123 FIRE FIGHTING WORKS: Nos. 6.0 (NPR)
124 A.
FIREELECTRICAL INSTALLATION FOR
FIGHTING WORKS: RM 20.0
125 A. ELECTRICAL
FIRE FIGHTING WORKS: INSTALLATION FOR RM 35.0
126 A. ELECTRICAL
FIRE INSTALLATION FOR
FIGHTING WORKS: RM 30.0
127 A. ELECTRICAL
FIRE INSTALLATION FOR
FIGHTING WORKS: RM 65.0
A. ELECTRICAL INSTALLATION FOR Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
128 FIRE FIGHTING WORKS: Nos. 2.0 (NPR)
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
129 FIRE FIGHTING WORKS: Nos. 1.0 (NPR)
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No iv. Suitable cement concrete foundation with (NPR)
130 plaster,FIGHTING
FIRE (design andWORKS:
drawing to be provided Nos. 1.0
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
131 FIRE FIGHTING WORKS: Nos. 1.0 (NPR)
132 B.
FIREFIRE PROTECTION
FIGHTING SYSTEM:
WORKS: RM 18.0
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
133 FIRE FIGHTING WORKS: Nos. 2.0 (NPR)
134 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: Set 10.0
135 B. FIRE PROTECTION
FIRE FIGHTING WORKS: SYSTEM: Nos 50.0
136 B. FIRE PROTECTION
FIRE FIGHTING WORKS: SYSTEM: Nos 2.0
137 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: Nos 2.0
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
138 FIRE FIGHTING WORKS: RM 95.0 (NPR)
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
139 FIRE FIGHTING WORKS: RM 450.0 (NPR)
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
140 FIRE FIGHTING WORKS: RM 920.0 (NPR)
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No (NPR)
141 FIRE FIGHTING WORKS: RM 150.0
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
142 FIRE FIGHTING WORKS: RM 90.0 (NPR)
143 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: RM 95.0
144 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: RM 450.0
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
145 FIRE FIGHTING WORKS: RM 920.0 (NPR)
146 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: RM 150.0
147 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: RM 90.0
148 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: RM 95.0
149 B. FIRE PROTECTION
FIRE FIGHTING WORKS:SYSTEM: RM 450.0
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
150 FIRE FIGHTING WORKS: RM 920.0 (NPR)
151 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: RM 150.0
152 B. FIRE PROTECTION
FIRE FIGHTING WORKS:SYSTEM: RM 90.0
153 B. FIRE PROTECTION
FIRE FIGHTING WORKS:SYSTEM: No. 2.0
154 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: No. 2.0
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
155 FIRE FIGHTING WORKS: No. 4.0 (NPR)
156 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: No. 5.0
157 B. FIRE PROTECTION
FIRE FIGHTING WORKS:SYSTEM: No 2.0
158 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: No. 2.0
159 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: No. 14.0
160 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: No. 22.0
161 B. FIRE PROTECTION
FIRE FIGHTING WORKS:SYSTEM: No. 6.0
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
162 FIRE FIGHTING WORKS: No. 2.0 (NPR)
163 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: Set 80.0
164 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: No 2.0
165 B. FIRE PROTECTION
FIRE FIGHTING WORKS:SYSTEM: No. 3.0
166 B. FIRE PROTECTION
FIRE FIGHTING WORKS:SYSTEM: No. 1.0
167 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: No. 2.0
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
168 FIRE FIGHTING WORKS: No. 5.0 (NPR)
169 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: No. 4.0
170 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: No. 6.0
171 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: No. 2.0
172 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: No. 2.0
173 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: No. 2.0
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
174 FIRE FIGHTING WORKS: No. 6.0 (NPR)
175 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: No. 4.0
176 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: No. 3.0
177 B. FIRE PROTECTION
FIRE FIGHTING WORKS:SYSTEM: Nos. 3.0
178 B. FIRE PROTECTION
FIRE FIGHTING WORKS:SYSTEM: Nos. 55.0
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
179 FIRE FIGHTING WORKS: Nos. 55.0 (NPR)
180 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: Nos. 70.0
181 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: Nos 2.0
182 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: Nos. 70.0
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
183 FIRE FIGHTING WORKS: Nos. 17.0 (NPR)
184 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: Nos. 17.0
185 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: Nos. 55.0
186 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: Nos. 17.0
187 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: Nos. 1.0
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
188 FIRE FIGHTING WORKS: Nos. 1.0 (NPR)
189 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: Set 1.0
190 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: Nos. 1.0
191 B. FIRE PROTECTION
FIRE FIGHTING WORKS:SYSTEM: No. 55.0
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
192 FIRE FIGHTING WORKS: RM 20.0 (NPR)
193 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: RM 15.0
194 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: RM 5.0
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
195 FIRE FIGHTING WORKS: RM 30.0 (NPR)
196 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: RM 30.0
197 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: RM 40.0
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
198 FIRE FIGHTING WORKS: RM 20.0 (NPR)
199 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: RM 15.0
200 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: RM 5.0
201 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: RM 30.0
202 B. FIRE PROTECTION
FIRE FIGHTING WORKS:SYSTEM: RM 30.0
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
203 FIRE FIGHTING WORKS: RM 40.0 (NPR)
204 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: RM 20.0
205 B. FIRE PROTECTION
FIRE FIGHTING WORKS:SYSTEM: No. 5.0
206 B. FIRE PROTECTION
FIRE FIGHTING WORKS:SYSTEM: No. 8.0
207 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: Cum 15.0
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
208 FIRE FIGHTING WORKS: RM 50.0 (NPR)
209 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: RM 50.0
210 B. FIRE PROTECTION
FIRE FIGHTING WORKS:SYSTEM: Nos. 4.0
211 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: Nos. 2.0
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
212 FIRE FIGHTING WORKS: RM 6000.0 (NPR)
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No (NPR)
213 FIRE FIGHTING WORKS: RM 900.0
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
214 FIRE FIGHTING WORKS: RM 500.0 (NPR)
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
215 FIRE FIGHTING WORKS: RM 200.0 (NPR)
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
216 FIRE FIGHTING WORKS: RM 800.0 (NPR)
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
217 FIRE FIGHTING WORKS: RM 200.0 (NPR)
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
218 FIRE FIGHTING WORKS: RM 550.0 (NPR)
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
219 FIRE FIGHTING WORKS: RM 900.0 (NPR)
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
220 FIRE FIGHTING WORKS: RM 100.0 (NPR)
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
221 FIRE FIGHTING WORKS: RM 50.0 (NPR)
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
222 FIRE FIGHTING WORKS: RM 50.0 (NPR)
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
223 FIRE FIGHTING WORKS: RM 60.0 (NPR)
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
224 FIRE FIGHTING WORKS: RM 350.0 (NPR)
225 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: No. 7.0
226 B. FIRE PROTECTION
FIRE FIGHTING WORKS:SYSTEM: RM 10500.0
227 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: RM 1800.0
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
228 FIRE FIGHTING WORKS: RM 1200.0 (NPR)
229 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: RM 1650.0
230 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: RM 1800.0
231 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: RM 1600.0
232 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: RM 550.0
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
233 FIRE FIGHTING WORKS: RM 2500.0 (NPR)
234 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: RM 100.0
235 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: No. 2.0
236 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: No. 16.0
237 B. FIRE PROTECTION
FIRE FIGHTING WORKS:SYSTEM: No. 2.0
238 B. FIRE PROTECTION
FIRE FIGHTING WORKS:SYSTEM: Nos 50.0
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
239 FIRE FIGHTING WORKS: Nos 100.0 (NPR)
240 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: Nos 8.0
241 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: Nos. 5200.0
242 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: Nos. 100.0
243 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: Nos. 40.0
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
244 FIRE FIGHTING WORKS: No. 3400.0 (NPR)
245 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: No. 2.0
246 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: No. 2.0
247 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: No. 26.0
248 B. FIRE PROTECTION
FIRE FIGHTING WORKS: SYSTEM: No. 25.0
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
249 FIRE FIGHTING WORKS: Each 36.0 (NPR)
250 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: Each 10.0
251 B. FIRE PROTECTION
FIRE FIGHTING WORKS: SYSTEM: Each 40.0
252 B. FIRE PROTECTION
FIRE FIGHTING WORKS: SYSTEM: Each 6.0
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
253 FIRE FIGHTING WORKS: Each 2.0 (NPR)
254 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: Each 30.0
255 B. FIRE PROTECTION
FIRE FIGHTING WORKS: SYSTEM: Each 20.0
B. FIRE PROTECTION SYSTEM: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
256 FIRE FIGHTING WORKS: Each 2.0 (NPR)
257 B. FIRE
FIRE PROTECTION
FIGHTING SYSTEM:
WORKS: Nos. 12.0
258 B.
PLUMBING WORKS: SYSTEM:
FIRE PROTECTION Nos. 230.0
A. SANITARY FIXTURES & FITTINGS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
259 PLUMBING WORKS: Nos. 230.0 (NPR)
260 A. SANITARY
PLUMBING FIXTURES & FITTINGS:
WORKS: Nos. 230.0
261 A. SANITARY
PLUMBING FIXTURES & FITTINGS:
WORKS: Nos. 5.0
262 A. SANITARY
PLUMBING WORKS: FIXTURES & FITTINGS: Nos. 210.0
263 A. SANITARY
PLUMBING WORKS: FIXTURES & FITTINGS: Nos. 210.0
A. SANITARY FIXTURES & FITTINGS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
264 PLUMBING WORKS: Nos. 95.0 (NPR)
265 A. SANITARY
PLUMBING FIXTURES & FITTINGS:
WORKS: Nos. 45.0
266 A. SANITARY
PLUMBING WORKS: FIXTURES & FITTINGS: Nos. 95.0
267 A. SANITARY
PLUMBING FIXTURES & FITTINGS:
WORKS: Nos. 10.0
268 A. SANITARY
PLUMBING FIXTURES & FITTINGS:
WORKS: Nos. 10.0
269 A. SANITARY
PLUMBING FIXTURES & FITTINGS:
WORKS: Nos. 4.0
A. SANITARY FIXTURES & FITTINGS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
270 PLUMBING WORKS: Sq.m 100.0 (NPR)
271 A. SANITARY
PLUMBING FIXTURES & FITTINGS:
WORKS: No. 230.0
272 A. SANITARY
PLUMBING FIXTURES & FITTINGS:
WORKS: No. 230.0
273 A. SANITARY
PLUMBING FIXTURES & FITTINGS:
WORKS: No. 230.0
274 A. SANITARY
PLUMBING WORKS: FIXTURES & FITTINGS: No. 230.0
275 A. SANITARY
PLUMBING WORKS: FIXTURES & FITTINGS: No. 430.0
276 A. SANITARY
PLUMBING FIXTURES & FITTINGS:
WORKS: No. 430.0
A. SANITARY FIXTURES & FITTINGS:
277 PLUMBING WORKS: No. 95.0
A. SANITARY FIXTURES & FITTINGS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
278 PLUMBING WORKS: Set 35.0 (NPR)
279 A. SANITARY
PLUMBING FIXTURES & FITTINGS:
WORKS: No. 230.0
280 A. SANITARY
PLUMBING FIXTURES & FITTINGS:
WORKS: No. 230.0
281 A. SANITARY
PLUMBING WORKS: FIXTURES & FITTINGS: No. 230.0
A. SANITARY FIXTURES & FITTINGS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
282 PLUMBING WORKS: RM 3500.0 (NPR)
B. COLD WATER SUPPLY: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
283 PLUMBING WORKS: RM 800.0 (NPR)
B. COLD WATER SUPPLY : (INTERNAL / Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
284 PLUMBING WORKS: RM 2200.0 (NPR)
B. COLD WATER SUPPLY : (INTERNAL / Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
285 PLUMBING WORKS: RM 300.0 (NPR)
B. COLD WATER SUPPLY : (INTERNAL / Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
286 PLUMBING WORKS: RM 285.0 (NPR)
B. COLD WATER SUPPLY : (INTERNAL / Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
287 PLUMBING WORKS: RM 350.0 (NPR)
B. COLD WATER SUPPLY : (INTERNAL / Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
288 PLUMBING WORKS: RM 400.0 (NPR)
B. COLD WATER SUPPLY : (INTERNAL / Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
289 PLUMBING WORKS: RM 200.0 (NPR)
B. COLD WATER SUPPLY : (INTERNAL / Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
290 PLUMBING WORKS: RM 350.0 (NPR)
B. COLD WATER SUPPLY : (INTERNAL / Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
291 PLUMBING WORKS: RM 300.0 (NPR)
292 B. COLD WATER
PLUMBING WORKS:SUPPLY: RM 20.0
293 B. COLD WATER
PLUMBING WORKS:SUPPLY: Nos. 90.0
294 B. COLD WATER
PLUMBING WORKS: SUPPLY: Nos. 210.0
295 B. COLD WATER
PLUMBING WORKS: SUPPLY: No. 2.0
B. COLD WATER SUPPLY: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
296 PLUMBING WORKS: No. 8.0 (NPR)
297 B. COLD WATER
PLUMBING WORKS:SUPPLY: No. 8.0
298 B. COLD WATER
PLUMBING WORKS: SUPPLY: No. 4.0
299 B. COLD WATER
PLUMBING WORKS: SUPPLY: No. 1.0
B. COLD WATER SUPPLY: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
300 PLUMBING WORKS: No. 2.0 (NPR)
301 B. COLD WATER
PLUMBING WORKS:SUPPLY: No. 1.0
302 B. COLD WATER
PLUMBING WORKS: SUPPLY: No. 2.0
B. COLD WATER SUPPLY: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
303 PLUMBING WORKS: No. 2.0 (NPR)
304 B. COLD WATER
PLUMBING WORKS:SUPPLY: No. 4.0
305 B. COLD WATER
PLUMBING WORKS:SUPPLY: No. 20.0
306 B. COLD WATER
PLUMBING WORKS:SUPPLY: No. 10.0
B. COLD WATER SUPPLY: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
307 PLUMBING WORKS: No. 20.0 (NPR)
308 B. COLD WATER
PLUMBING WORKS:SUPPLY: No. 60.0
309 B. COLD WATER
PLUMBING WORKS:SUPPLY: No. 5.0
310 B. COLD WATER
PLUMBING WORKS:SUPPLY: Set 6.0
311 B. COLD WATER
PLUMBING WORKS:SUPPLY: No. 50.0
312 B. COLD WATER
PLUMBING WORKS: SUPPLY: No. 2.0
B. COLD WATER SUPPLY: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
313 PLUMBING WORKS: No. 50.0 (NPR)
314 B. COLD WATER
PLUMBING WORKS:SUPPLY: LS 1.0
B. COLD WATER SUPPLY: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
315 C. HOT WATER SUPPLY: HOT WATER RM 1800.0 (NPR)
SUPPLY WITH COPPER PIPES: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
316 C. HOT WATER SUPPLY: HOT WATER RM 300.0 (NPR)
SUPPLY WITH COPPER PIPES: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
317 C. HOT WATER SUPPLY: HOT WATER RM 2500.0 (NPR)
SUPPLY WITH COPPER PIPES: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
318 C. HOT WATER SUPPLY: HOT WATER RM 900.0 (NPR)
SUPPLY WITH COPPER PIPES: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
319 C. HOT WATER SUPPLY: HOT WATER RM 285.0 (NPR)
SUPPLY WITH COPPER PIPES: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
320 C. HOT WATER SUPPLY: HOT WATER RM 350.0 (NPR)
SUPPLY WITH COPPER PIPES: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
321 C. HOT WATER SUPPLY: HOT WATER RM 600.0 (NPR)
SUPPLY WITH COPPER PIPES: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
322 C. HOT WATER SUPPLY: HOT WATER RM 200.0 (NPR)
SUPPLY WITH COPPER PIPES: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
323 C. HOT WATER SUPPLY: HOT WATER RM 350.0 (NPR)
324 SUPPLY
C. WITH COPPER
HOT WATER SUPPLY:PIPES: RM 2600.0
325 2. Providing and fixing
C. HOT WATER SUPPLY: nitrle rubber RM 4000.0
2. Providing and fixing nitrle rubber Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
326 C. HOT WATER SUPPLY: RM 2500.0 (NPR)
327 2. Providing
C. HOT WATER and fixing nitrle rubber
SUPPLY: RM 900.0
328 2. Providing and fixing
C. HOT WATER SUPPLY: nitrle rubber RM 285.0
329 2. Providing and fixing
C. HOT WATER SUPPLY: nitrle rubber RM 350.0
330 2. Providing
C. HOT WATER and fixing nitrle rubber
SUPPLY: RM 600.0
2. Providing and fixing nitrle rubber
331 C. HOT WATER SUPPLY: RM 200.0
332 2.
C. Providing
HOT WATER and fixing
SUPPLY:nitrle rubber RM 350.0
333 2. Providing and fixing
C. HOT WATER SUPPLY: nitrle rubber RM 110.0
334 3. Providing
C. HOT WATER and fixing
SUPPLY:proprietary RM 110.0
3. Providing and fixing proprietary Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
335 C. HOT WATER SUPPLY: No. 100.0 (NPR)
336 4.
C. Providing
HOT WATER and SUPPLY:
fixing male/female screw No. 220.0
337 4. Providing
C. HOT WATER and SUPPLY:
fixing male/female screw No. 10.0
338 4. Providing
C. HOT WATER and SUPPLY:
fixing male/female screw No. 40.0
4. Providing and fixing male/female screw Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
339 C. HOT WATER SUPPLY: No. 10.0 (NPR)
340 4.
C. Providing
HOT WATER and SUPPLY:
fixing male/female screw No. 500.0
341 5. Providing
C. HOT WATER & fixing screw ended gun
SUPPLY: No. 50.0
342 5. Providing
C. HOT WATER & fixing screw ended gun
SUPPLY: No. 20.0
5. Providing & fixing screw ended gun Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
343 C. HOT WATER SUPPLY: No. 10.0 (NPR)
344 5. Providing
C. HOT WATER & fixing screw ended gun
SUPPLY: No. 5.0
345 5. Providing
C. HOT WATER & fixing screw ended gun
SUPPLY: No. 10.0
346 5. Providing
C. HOT WATER & fixing screw ended gun
SUPPLY: No. 6.0
6. Providing and fixing heavy duty floating Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
347 C. HOT WATER SUPPLY: No. 4.0 (NPR)
348 6. Providing
C. HOT WATER and fixing
SUPPLY:heavy duty floating No. 2.0
349 6. Providing
C. HOT WATER and fixing
SUPPLY:heavy duty floating No. 4.0
350 6. Providing
C. HOT WATER and fixing
SUPPLY:heavy duty floating No. 5.0
351 7. Providing and fixing
C. HOT WATER SUPPLY: auto air vent for Hot No. 4.0
352 7. Providing and fixing
C. HOT WATER SUPPLY: auto air vent for Hot No. 5.0
353 8. Making
C. water supply
HOT WATER SUPPLY:connection to No. 10.0
8. Making water supply connection to Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
354 D. INTERNAL DRAINAGE: (SOIL, RM 836.0 (NPR)
355 WASTE & VENT):
D. INTERNAL DRAINAGE: (SOIL, RM 3200.0
WASTE & VENT): Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
356 D. INTERNAL DRAINAGE: (SOIL, RM 50.0 (NPR)
357 WASTE
D. & VENT):
INTERNAL DRAINAGE: (SOIL, RM 1200.0
358 WASTE & VENT):
D. INTERNAL DRAINAGE: (SOIL, RM 600.0
WASTE & VENT): Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
359 D. INTERNAL DRAINAGE: (SOIL, RM 100.0 (NPR)
360 WASTE
D. & VENT):
INTERNAL DRAINAGE: (SOIL, RM 200.0
361 WASTE
D. & VENT):
INTERNAL DRAINAGE: (SOIL, RM 75.0
WASTE & VENT): Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
362 D. INTERNAL DRAINAGE: (SOIL, RM 1200.0 (NPR)
363 WASTE
D. & VENT):
INTERNAL DRAINAGE: (SOIL, RM 1800.0
364 WASTE
D. & VENT):
INTERNAL DRAINAGE: (SOIL, RM 20.0
WASTE & VENT): Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
365 D. INTERNAL DRAINAGE: (SOIL, RM 50.0 (NPR)
WASTE & VENT):
366 D. INTERNAL DRAINAGE: (SOIL, No. 230.0
367 WASTE & VENT):
D. INTERNAL DRAINAGE: (SOIL, No. 230.0
368 WASTE & VENT):
D. INTERNAL DRAINAGE: (SOIL, No. 210.0
WASTE & VENT): Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
369 D. INTERNAL DRAINAGE: (SOIL, No. 210.0 (NPR)
370 WASTE & VENT):
D. INTERNAL DRAINAGE: (SOIL, No. 210.0
371 WASTE & VENT):
D. INTERNAL DRAINAGE: (SOIL, No. 1030.0
372 WASTE
D. & VENT):
INTERNAL DRAINAGE: (SOIL, No. 150.0
373 WASTE
D. & VENT):
INTERNAL DRAINAGE: (SOIL, No. 100.0
WASTE & VENT): Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
374 D. INTERNAL DRAINAGE: (SOIL, No. 20.0 (NPR)
375 WASTE & VENT):
D. INTERNAL DRAINAGE: (SOIL, No. 20.0
376 WASTE
D. & VENT):
INTERNAL DRAINAGE: (SOIL, No. 50.0
377 WASTE
D. & VENT):
INTERNAL DRAINAGE: (SOIL, No. 100.0
378 WASTE
D. & VENT):
INTERNAL DRAINAGE: (SOIL, No. 230.0
WASTE & VENT): Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
379 D. INTERNAL DRAINAGE: (SOIL, No. 10.0 (NPR)
380 WASTE
INTD. & VENT): DRAINAGE:
INTERNAL No. 10.0
381 (SOIL, INTERNAL
INTD. WASTE & VENT):
DRAINAGE: No. 48.0
382 (SOIL, INTERNAL
INTD. WASTE & VENT):
DRAINAGE: No. 1.0
(SOIL, WASTE & VENT): Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
383 E. EXTERNAL SEWAGE/STORM RM 450.0 (NPR)
384 WATER
E. DRAINAGE:
EXTERNAL SEWAGE/STORM RM 800.0
385 WATER
E. DRAINAGE:
EXTERNAL SEWAGE/STORM RM 900.0
WATER DRAINAGE: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
386 E. EXTERNAL SEWAGE/STORM WATER No. 10.0 (NPR)
DRAINAGE: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
387 E. EXTERNAL SEWAGE/STORM WATER No. 18.0 (NPR)
DRAINAGE: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
388 E. EXTERNAL SEWAGE/STORM WATER No. 18.0 (NPR)
DRAINAGE: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
389 E. EXTERNAL SEWAGE/STORM WATER No. 4.0 (NPR)
DRAINAGE: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
390 E. EXTERNAL SEWAGE/STORM No. 11.0 (NPR)
391 WATER
E. DRAINAGE:
EXTERNAL SEWAGE/STORM No. 7.0
392 WATER
E. DRAINAGE:
EXTERNAL SEWAGE/STORM WATER No. 11.0
393 DRAINAGE:
EXTERNAL SEWAGE/STORM No. 38.0
WATER DRAINAGE: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
394 E. EXTERNAL SEWAGE/STORM WATER No. 18.0 (NPR)
395 DRAINAGE:
E. EXTERNAL SEWAGE/STORM No. 2.0
396 WATER DRAINAGE:
E. EXTERNAL SEWAGE/STORM WATER Job 1.0
DRAINAGE: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No (NPR)
397 G. CIVIL WORKS/MISCELLANEOUS Nos. 6.0
398 ITEMS:
G. CIVIL WORKS/MISCELLANEOUS Nos. 4.0
399 ITEMS:
G. CIVIL WORKS/MISCELLANEOUS Nos. 5.0
400 ITEMS:
G. CIVIL WORKS/MISCELLANEOUS Nos. 8.0
ITEMS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
401 G. CIVIL WORKS/MISCELLANEOUS Nos. 6.0 (NPR)
402 ITEMS:
G. CIVIL WORKS/MISCELLANEOUS Nos. 12.0
403 ITEMS:
G. CIVIL WORKS/MISCELLANEOUS Nos. 16.0
404 ITEMS:
G. CIVIL WORKS/MISCELLANEOUS Nos. 8.0
ITEMS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
405 G. CIVIL WORKS/MISCELLANEOUS Nos. 6.0 (NPR)
406 ITEMS:
G. CIVIL WORKS/MISCELLANEOUS Nos. 2.0
407 ITEMS:
G. CIVIL WORKS/MISCELLANEOUS No. 150.0
408 ITEMS:
G. CIVIL WORKS/MISCELLANEOUS RM 50.0
ITEMS: Procument Item Details
SL. Item Description Unit Quantity Bidder's Rate
No
409 G. CIVIL WORKS/MISCELLANEOUS RM 50.0 (NPR)
410 ITEMS:
G. CIVIL WORKS/MISCELLANEOUS RM 20.0
411 ITEMS:
G. CIVIL WORKS/MISCELLANEOUS RM 200.0
412 ITEMS:
G. CIVIL No. 4.0
413 WORKS/MISCELLANEOUS
G. CIVIL ITEMS: No. 4.0
WORKS/MISCELLANEOUS ITEMS: Bidder's Rate
414 G. CIVIL No. 4.0 (NPR)
415 WORKS/MISCELLANEOUS
G. CIVIL ITEMS: No. 2.0
WORKS/MISCELLANEOUS ITEMS: Procument Item Details
Total Item Price
VAT
Grand Total
es
Unit Rate(NPR) Amount(NPR)
2.593433923E7 25,934,339.23
1197700.0 1,197,700.00
158100.0 158,100.00
2424973.0 2,424,973.00

Bidder's Rate (in Total Amount


s) (NPR)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)
Bidder's Rate (in Total Amount (NPR)
words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

Bidder's Rate (in Total Amount (NPR)


words)

You might also like