SET PER 10 BLOWS

Model: DROP HAMMER 14 tone PILE LENGTH (m) P n Cp+Cq (mm)


(kN) 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
R = Ultimate driving resistance, (2 x Design Load ) 15 85.16 0.656
= 1800 x2 16 89.97 0.645
= 3600 kN 17 94.78 0.633
W = Weight of used Hammer. ( kN ) 18 99.59 0.623
= 137.34 kN 19 104.40 0.612
E = Energy output Drop (M) = 1.5 20 109.21 0.602
= 206.01 kNm 21 114.02 0.593
22 118.83 0.584
n = Efficiency of blow 23 123.64 0.575 50 50
P = Weight of Pile, Anvil & Helmet. 24 128.45 0.566 50 50 50 50
( Weight of Helmet, AH = 4.2 kN ) 25 133.26 0.558 50 50 50 50 50
C = Sum of the Temporary Elastic Compression of the Pile ( Cp), 26 138.07 0.550 50 50 50 50 50 50 50
the Ground ( Cq ) and the Pile Head ( Cc ). ( mm ) 27 142.89 0.542 50 50 50 50 50 50 50 50 50
= Cc + Cp + Cq 28 147.70 0.535 50 50 50 50 50 50 50 50 50 50
where: Cc = 2.5 mm 29 152.51 0.528 50 50 50 50 50 50 50 50 50 50 49 44
Cp + Cq to be recorded on site. 30 157.32 0.521 50 50 50 50 50 50 50 50 50 50 46 41 36 31
K = Value of Hammer Coefficient 31 162.13 0.514 50 50 50 50 50 50 50 50 50 50 48 43 38 33 28
= 0.7 ( Without follower ) 32 166.94 0.508 50 50 50 50 50 50 50 50 50 50 46 41 36 31 26
e = Value of the Coefficient of Restitution 33 171.75 0.501 50 50 50 50 50 50 50 50 50 50 48 43 38 33 28
= 0.32 34 176.56 0.495 50 50 50 50 50 50 50 50 50 50 46 41 36 31 26
Pile used = 490 kg/m (For Concrete Pile) 35 181.37 0.489 50 50 50 50 50 50 50 50 50 50 48 43 38 33 28
36 186.18 0.483 50 50 50 50 50 50 50 50 50 50 46 41 36 31 26
Weight of = 8.80 kN 37 190.99 0.478 50 50 50 50 50 50 50 50 50 50 49 44 39 34 29
Follower 38 195.80 0.472 50 50 50 50 50 50 50 50 50 50 47 42 37 32 27
39 200.61 0.467 50 50 50 50 50 50 50 50 50 50 50 45 40 35 30
Example for calculating the set value: 40 205.42 0.462 50 50 50 50 50 50 50 50 50 50 48 43 38 33 28
41 210.23 0.457 50 50 50 50 50 50 50 50 50 50 46 41 36 31 26
Pile length = 37m Cp + Cq = 23 mm Set value = 50 mm 42 215.04 0.452 50 50 50 50 50 50 50 50 50 50 49 44 39 34 29
S = (KEn/R - C/2)*10 43 219.85 0.448 50 50 50 50 50 50 50 50 50 50 47 42 37 32 27
= (( 0.7*206.01*0.478*1000 / 3600) - ( 23 + 2.5 ) / 2 ))*10 44 224.66 0.443 50 50 50 50 50 50 50 50 50 50 50 45 40 35 30
= 64 45 229.48 0.438 50 50 50 50 50 50 50 50 50 50 48 43 38 33 28
46 234.29 0.434 50 50 50 50 50 50 50 50 50 50 46 41 36 31 26
NOTE: 4 m IN LENGTH OF THE FOLLOWER SHALL BE ADDED TO 47 239.10 0.430 50 50 50 50 50 50 50 50 50 50 50 45 40 35 30
THE PILE LENGTH WHEN VERIFYING READING FROM THE 48 243.91 0.426 50 50 50 50 50 50 50 50 50 50 48 43 38 33 28
SET TABLE 49 248.72 0.422 50 50 50 50 50 50 50 50 50 50 46 41 36 31 26
50 253.53 0.418 50 50 50 50 50 50 50 50 50 50 50 45 40 35 30