University of Engineering & Management, Jaipur: Group-A
University of Engineering & Management, Jaipur: Group-A
No.
University Examination
MBA 2nd year, 4thsemester
Subject Code- MB-401 Total Marks-100
Subject-Project management & Entrepreneurship Development Time Duration -3hrs.
All the answers should be in brief and to the point.
Strike off all the blank pages of copy, after completing your work.
The students are advised not to write anything on the question paper other than Enrolment No.
Group-A
(Answer any fifteen questions) [15*1=15]
1. Choose the correct option:
a. The essence of decision making is
i) choosing between alternatives
ii) problem solving
iii) developing alternative courses of action
iv) monitoring.
b. Commissioning of a project
i) precedes installation of the projects
ii) succeeds installation of the projects
iii) has no relationship with installation of the projects
iv) the relationship depends on specific situation
c. On which factors do the plant layout is based on
i) Location
ii) Availability of resources
iii) Environment
iv) All of these
d. The five element in the management process are
i) Plan ,direct , update, lead & surprise
ii) Accounting /finance , marketing, operations and management
iii) Organize , plan , control, staff and manage
iv) Plan, organize, staff , lead and control
v) Plan, lead, organize , manage and control
e. Measure of efficiency of a productive system is also known as
i) Utility
ii) Efficacy
iii) Effectiveness
v) productivity.
f. PM must perceive sufficient technical knowledge to
a) Outsiders
b) Clients
c) Senior Executives
d) Both B & C
g. Cause of change that cannot be managed by PM is
MBA/Even/MB401/2018-19(Regular) Enrolment
No.
a) Technological Uncertainty
b) Innovation
c) Change in environment
d) Increased client knowledge
h. Despite of how carefully a project is planned, it is almost certain to be changed before
a) Execution
b) Planning
c) Completion
d) Assigning resources
i. Problem of changing scope or performance, expected of a project is a major
a) Drawback
b) Issue
c) Downfall
d) Success
j. Causes for change in projects are basically of
a) 2 types
b) 3 types
c) 4 types
d) 6 types
k. Any patents, trademarks, copyright or trade secrets held by the entrepreneur is known as
a) Disclosure document
b) Patent
c) Intellectual property
d) None of the mentioned
l. The organization will never be able to make the necessary changes without_________
a) Top management commitment
b) Employees
c) Workers
d) None of the mentioned
m. The ways entrepreneurs make decisions.
a) Entrepreneurial domain.
b) Reverse brain storming
c) Heuristics
d) Reverse brain storming
n. A trademark is a word, symbol, name or device that a business usesto identify its goods.
a) A legal protection for information on foreign products.
b) Legal protection for intellectual works.
c) Legal protection for a U.S. product exported to another country.
o. locus of control is
a) A feeling
b) Attitude
c) Attribute
d) None of the above
p. Licensing arrangements have
a) Low risk process involved
b) Easy way to generate incremental income
MBA/Even/MB401/2018-19(Regular) Enrolment
No.
c) Several pitfalls
d) All of the above
q. Personal characteristics to be a successful entrepreneur includes
a) Understanding environment
b) Creating management options
c) Encourage open discussion
d) All of the above
r. International entrepreneurship is
a) Licensing
b) Exporting
c) Both of the mentioned options
d) None of the two mentioned
s. Which of the following is not a characteristic that is helpful for an entrepreneur to have?
a) Self-esteem b)Caution c) Drive d)Optimism
t. Which of the following inputs is NOT involved in entrepreneurship?
a). Opportunity b). Proactive individual(s)
c). Risk d). External locus of control
Group-B
(Answer any five questions) [5*5=25]
2. Differentiate between market risk and operational risk.
3. Discuss the significance of project management in organization.
4. Discuss the characteristics of a successful entrepreneur.
5. What is the role played by venture capital finance in promoting entrepreneurship?
6. Discuss any six function of SISI?
7. What are the important phases of a project life cycle?
8. Do you feel the service sector creates more job opportunities than the manufacturing sector
— if yes, give reasons?
9. Discuss McClelland’s N-Ach theory.
10. Discuss HRD issues at time of buying the project.
Group-C
(Answer any four questions) [4*15=60]
11. What are the technical aspects of a typical project as distinct from commercial, financial,
economic and managerial feasibility? Discuss three important issues that managers must
consider while conducting technical analysis.
12. Technology and processes play crucial role in certain projects. What the key issues are in
regards to choice of technology, equipment and processes at the stage of formulation of DPR?
13. What are the objectives of project management information systems? What are the types of
data sets used in integrated project management information system Discuss briefly how these
date sets are used for decision making?
14. How important is the role of government in promoting entrepreneurship. Support your answer
with example.
15. Explain the activities involved in scheduling and monitoring the project.
16. “Developing countries need imitative, humbler entrepreneurs rather than innovative
entrepreneurs”. Do you agree? Give reasons.
17. Draw a network diagram for the activities given below and determine the critical path
MBA/Even/MB401/2018-19(Regular) Enrolment