OF THE
DEPARTMENT OF SPACE
GOVERNMENT OF INDIA
2010-2011
(i)
EXECUTIVE SUMMARY
3. The overall thrust of the Space programme during 11th plan will be to
sustain and strengthen the already established space based services towards
socio-economic development of the country and undertake advanced space
missions including Human Space Flight Programme and Planetary
Exploration. The details of the programmes envisaged in the 11th five year
plan is dealt in para 4 of Chapter 1.
EXECUTIVE SUMMARY
3. The overall thrust of the Space programme during 11th plan will be to
sustain and strengthen the already established space based services towards
socio-economic development of the country and undertake advanced space
missions including Human Space Flight Programme and Planetary
Exploration. The details of the programmes envisaged in the 11th five year
plan is dealt in para 4 of Chapter 1.
8. The Department has five Grant-in-aid Institutions under its fold viz.,
Physical Research Laboratory, National Atmospheric Research Laboratory,
Semi-conductor Laboratory, North-East Space Applications Centre and
Indian Institute of Space Science and Technology. A review of the
performance of these institutions is presented in Chapter VI.
10. Periodical review of the physical and financial performance of all the
projects/schemes is an integral part of the planning and implementation
strategy in DOS/ISRO. Quarterly targets are fixed for each major
project/scheme during the beginning of the year and Additional Secretary
& IFA of the Department takes a rigorous review of the
expenditure/commitment status on a monthly basis to ensure that the
financial and programmatic targets are realized. With this, the Department
has been able to meet most of the programmatic targets and also utilize
more than 99% of the budget allocated in RE.
The Indian Space Programme, over the years, has paved the way for
creating cost-effective space infrastructure for the country in a self-reliant
manner and the economic and social benefits brought in by the application
of space technology to the national development have been significant. The
Space Programme is poised to play a pivotal role in the national
development in the coming years.
*****
CHAPTER-I
INTRODUCTION
1
space for vital applications in communications, broadcasting,
meteorology and natural resource information are of direct relevance
for national development. The diverse roles of space technology &
services in various fronts – social, economic, commercial and strategic
– have made the space systems an important component of our national
infrastructure.
2
2. Organisational Set-up
3
industries. The establishment of space systems and their utilization are
co-ordinated by national Committees, namely the INSAT Co-
ordination Committee (ICC), the Planning Committee of National
Natural Resources Management System (PC-NNRMS) and the
Advisory Committee on Space Sciences (ADCOS). Five Regional
Remote Sensing Service Centres (RRSSCs) undertake remote sensing
application projects relevant to the concerned region. Recently these
five RRSSCs have been merged with National Remote Sensing Centre
(NRSC), one of the constituent Centres of DOS/ISRO. The ISRO
Headquarters co-ordinates the overall programmes like launch vehicle,
satellite communication, earth observation, space science, atmospheric
science, space-industry development, disaster management support,
international co-operation etc.,
4
Programme planning & evaluation, technology transfer & industrial co-
ordination, human resources development, safety & personnel and general
administration groups support the Centre. The Space Physics Laboratory
(SPL) at VSSC carries out research in atmospheric and related space
sciences. Apart from this, the Construction & Maintenance Division
(CMD) carries out planning, execution and maintenance of all civil works
related to the Centre.
5
B. Liquid Propulsion Systems Centre (LPSC)
6
support the Centre. Apart from this, the Construction & Maintenance
Division (CMD) takes care of planning, execution and maintenance of all
civil works of the Centre. The Centre has two launch pads from where the
rocket launching operations on PSLV & GSLV are carried out.
7
F. Space Applications Centre (SAC)
8
activities of DECU include: EDUSAT pilot projects, their implementation
and utilisation; Training and Development Communication Channel (TDCC),
Village Resource Centres (VRC), Tele-Health (TH), Tele-Education (TE)
mission and new satellite communication development and applications.
9
multi-mission Spacecraft Control Centre at Bangalore. It has a network of
ground stations at Bangalore, Lucknow, Sriharikota, Port Blair and
Thiruvananthapuram in India besides stations at Mauritius, Bearslake
(Russia), Brunei and Biak (Indonesia). ISTRAC activities are organised into
network operations, network augmentation, mission operation and
spacecraft health monitoring, communications & computers & control
centre facilities and development projects. Programme planning and
reliability groups support ISTRAC activities. ISTRAC also operates the
Local User Terminal/Mission Control Centre (LUT/MCC) under the
international programme for satellite aided search and rescue. An Indian
Deep Space Tracking Network station at Byalalu near Bangalore for India’s
mission to moon, Chandrayaan-1, has been recently established by
ISTRAC.
10
K. ISRO Inertial Systems Unit (IISU)
11
& astrophysics & earth, planetary & atmospheric sciences. The activities
cover a wide spectrum of competitive research in all these areas. PRL is
also involved in conducting extensive academic programmes for Doctoral
and Post Doctoral research and also has an Associateship programme for
University teachers. It is also entrusted with the management of the
Udaipur Solar Observatory (USO).
12
D. Semi-conductor Laboratory (SCL)
13
2.7 Antrix Corporation Limited (ACL)
3.2 Over the years, India has established two operational Space
Systems - the Indian National Satellite (INSAT) System providing services
14
for telecommunications, TV broadcasting and meteorology including
disaster warning support and the Indian Remote Sensing Satellite (IRS)
System for natural resource monitoring and management. The Polar
Satellite Launch Vehicle (PSLV) is well proven through Fifteen successive
successful flights and has emerged as a reliable cost-effective launch
vehicle. The successful launch of two developmental flights of
Geosynchronous Satellite Launch Vehicle, GSLV-D1 & D2 in 2001 &
2003, followed by first operational flight in 2004 and launch of GSLV-F04
carrying INSAT-4CR launched in 2007 was a major achievement in the
Indian Space Programme.
15
providing vital inputs during Khariff season for various agricultural and
disaster management applications is also in progress and it will be launched
onboard PSLV during 2010-2011.
16
of a multi-wave length astronomy satellite ASTROSAT has also been taken
up. The Indian Space programme has enabled a significant role for national
industries in realisation of space systems. A strong bond with academic
institutions exists through extensive research partnership. Unique
organisational systems have been evolved in the national space programme
for fulfilling diverse functions like development, operations and applications
of complex space systems. The space programme has enabled significant
technology growth in multiple disciplines as spin-off benefits.
4.2 The overall thrust of the Space programme during 11th plan will
be to sustain and strengthen the already established space based services
towards socio-economic development of the country. The following are the
brief summary of the plan programmes envisaged during the Eleventh Plan
17
in the area of Launch Vehicle Development, Earth Observation Systems,
Satellite Communications & Navigation (INSAT, GSAT & IRNSS), Space
Science Programme, Atmospheric Science Programme and Disaster
Management Support.
18
with improved quality duly addressing the current gap areas and the urge to
maintain the global leadership in EO systems. The EO series of satellites,
both in IRS and INSAT/METSAT series, addressed broadly the thematic
applications in three streams viz., Resourcesat series, Cartosat series and
Atmosphere series. An important specific target for 11th plan is to realize
the Microwave remote sensing satellite RISAT-1 which provides day and
night all-weather remote sensing capability critical for applications in
Agriculture and Disaster Management. Strengthening ground segment to
ensure and enhance effective utilization of the remote sensing data will be
an important thrust area. Creation of Natural Resource Inventory and Data
bases, Food security, Water security, Disaster Management support,
Infrastructure development, Weather forecasting, Ocean State Forecasting,
Environment protection, Climate variability and change are some of the
thrust areas of EO systems applications identified for 11th plan.
19
4.7 Satellite Navigation is emerging as a vital area not only for
civil aviation but in many other areas such as mobile telephones, surface
transport, intelligent highway system, maritime transport, rail, oil and gas,
precision agriculture, fisheries, survey and marine engineering, science,
electricity networks and leisure. Besides completing the ground
augmentation system GAGAN (GPS And GEO Augmented Navigation), a
major target for 11th plan is to establish Indian Regional Navigational
Satellite System with a constellation of 7 satellites. Co-operation and
participation in global navigational systems will also be pursued.
20
for newer missions such as Mars Orbitor, Asteroid Orbitor and Fly by
Missions to Comets and Outer Solar System with a primary interest to
understand the origin and evolution of solar system.
21
(IIST) with a view to capture the talent at ‘plus two’ level in order to create
quality human resources in the country for ISRO. The Institute has already
started functioning from the academic year 2007-2008 around the existing
infrastructure adjacent to VSSC, Thiruvananthapuram and the annual intake
of the Institute is about 150-200 students. A permanent infrastructure for
the Institute is in progress near LPSC, Valiamala.
4.12 The budgetary resource for the missions planned during 11th
plan period as well as the advance investments required for the missions
planned for the beginning years of 12th plan period is fixed at to Rs.34883
crores (at current prices). Out of this, the Plan outlay for 11th plan would be
Rs.30883 crores while the non-plan budgetary support is expected to be
Rs.4000 crores (approx).
4.13 The Indian Space Programme has paved the way for creating
cost-effective space infrastructure for the country in a self-reliant manner
and the economic and social benefits brought in by the application of space
technology to the national development have been significant. The Space
Programme is poised to play a pivotal role in the national development in
the forthcoming decade.
22
(iii) provide satellite imagery and specific products and
services required for application of space technology for
natural resource management/developmental purposes to
the Central Government, State Governments, Quasi
Governmental Organisations, NGOs and the private
sector;
(iv) Promote Research & Development in space sciences and
technology;
23
Leasing of INSAT transponders to private users, launching
of foreign satellites by Indian Launch Vehicles
(PSLV/GSLV), TTC support for foreign satellites, design
and development of communication satellite for
International customers.
24
NNRMS) and Advisory Committee on Space Sciences
(ADCOS).
The above policy framework has paved the way for creating cost
effective space infrastructure for the country in a self reliant manner, its
efficient utilisation for national development, enabled a significant role for
Indian Industries and technology growth in multiple disciplines as spinoff
benefits.
*****
25
CHAPTER II
1.1 The Budget proposals for the Department of Space have been
formulated under the frame work of Decade Profile 2010-20 and proposals
for Eleventh Five Year plan (2007-12). The BE 2010-11 for Department of
Space stands at Rs. 5778.00 crores comprising of Rs. 5000 crores Plan
outlay and Rs. 778.00 crores Non-plan outlay. The outlay has been arrived
at taking into account the Programmatic targets set for 2010-11.
1.3 Table 2.1 has been organised as per the Statement of Budget
Estimates (SBE) submitted by the Department. However, the order in
which various Schemes/ Project appear has been slightly modified in
Outcome budget (as compared to SBE) with a view to bring related
projects together. For example, under Launch Vehicle Technology, GSLV
operational project has been brought immediately after GSLV project in
order to bring all GSLV related projects together.
26
2. Projects / Mission Mode Working
3. Intermediate Outputs :
27
specific subsystems / sub assemblies for the project in the area of their
expertise / specialisation. Therefore, the output of the ISRO Centres /
Units ( other than the lead centre), related to realisation of subsystems for
satellites and launch vehicles, are of intermediate products in nature, which
will get integrated with the work of lead centre. This has been suitably
reflected in the Outcome budget.
4. Partial Outcome :
28
Physical Output. However, the time frame for the final outcome is also
specified in the Outcome budget.
*****
29
Department of Space
TABLE-2.1
30
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
3 GSLV To fabricate 16 3550.96 --- 250.00 --- Realisation of subsystems for Augmenting INSAT PAM-G was GSLV has so far
Operational operational GSLV GSLV F06. system with additional successfully completed two
launch vehicles transponders to meet tested and operational flights
(GSLV F1 - 16) Realisation & testing of PAM-G the communication qualified. successfully.(GSLV
and take advance structure. requirements. GSLV F05 F01 and F04)
procurement Mission is
actions for Mission planning, Vehicle planned in
additional integration and launch of GSLV 2010-11.
vehicles and F05 Mission carrying GSAT-5
launch into orbit.
communication
satellites planned
for 10th plan,
11th plan and
beyond.
31
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
4 GSLV Mk III To develop a 2498.00 --- 152.96 --- Completion of static test-02 on Partial Outcome: First
Development Geosynchronous S 200. Realisation of developmental
satellite launch technical facilities and / test flight
vehicle capable Realisation of C20 engine and development targeted for
of launching conduct of engine tests. hardware required for 2011-12.
4Ton class INSAT GSLV Mk III. The
type of satellites L 110 stage readiness for project is currently in
to GTO. propellant mockup. intermediate stage.
The final outcome of
Completion of structural tests. achieving self reliance
in launching 4T class
Functional tests on separation of INSAT satellites will
systems. accrue upon
successful flight
Main Engine Test Facility testing of GSLV Mk III
augmentation. vehicle.
32
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
5 PSLV-C To fabricate 15 1518.00 --- 250.00 --- Final Assembly, Testing and Launching of Cartosat Three flights PSLV had so far 15
PSLV operational Launch of C15 with Cartosat 2B 2B and Resourcesat-2 of PSLV are successive
launch vehicles Satellite and C16 with satellites to augment planned successful flights
(PSLV C14 - C28) Resourcesat-2 satellite. the remote sensing during 2010- and has emerged as
for launching space segment 11. a versatile, reliable
Remote Sensing Realisation of Structures, Sub infrastructure of the and cost-effective
and Scientific systems for C17 & C18. country. launch vehicle. Its
satellites of 10th launch capability has
plan and beyond. Mission planning, Vehicle been progressively
assembly, integration, testing enhanced from 850
and launch of PSLV C15 & 15 kgs to 1500 kg
through continous
improvements in the
launch vehicle.
6 Space Capsule Develop a 76.20 --- 4.93 --- Realisation of Flight Model Outcome: SRE-2 will SRE-2 will be SRE-1 was
Recovery recovery capsule payloads. demonstrate the launched as a successfully
Experiment and demonstrate critical technologies co-passanger launched on 10th
(SRE-1& 2) the technology Flight model integration and required for in PSLV. Jaunary 2007
for recovery and readiness for launch. recoverable launch onboard PSLV C7
conduct micro- vehicles. and recovered on
gravity 22nd January 2007.
experiments This unique mission
through two has demonstrated
flights viz., SRE-1 the capability to
& 2.. recover a satellite
from orbit at a
predetermined
location and the
associated
technologies.
33
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
7 Vikram To develop N.A 200.54 383.12 --- Dev of active scramjet engine Technology RLV-TD and As a part of Air
Sarabhai Space critical and module and realisation of ATV development air breathing Breathing Propulsion
Centre (VSSC) advanced DMRJ-FTD flight for scramjet initiatives and propulsion are technology,
technologies engine characterisation. hardware targeted for Supersonic
related to satellite development and demonstration combustion has been
launch vehicles Installation of 6MW Plasma realisation lead to during 2010- successfully
including Wind tunnel facility. state-of-art launch 11. demonstrated
Reusable Launch vehicles for Indian through ground tests
Vehicles (RLV), Installation and Commissioning Space Programme. in Nov-Dec 2005,
Sounding rockets of indigenous 250kN Vibration which is a major
and allied Shaker system. achievement in the
satellite area of launch
subsystems and Hardware realisation for vehicle technology
provide Reusable Launch Vehicle development.
infrastructure technology demonstrator.
support for
development and Technology development
fabrication / initiatives in the area of
testing of Indian avionics, aeronautics, advanced
launch vehicles. materials, propulsion systems,
mechanisms, control and
guidance and manufacturing
technology.
34
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
8 ISRO Inertial Research, NA --- 28.78 --- Delivery of flight and flight Realisation of tested Technology
Systems Unit. Development and standby systems of RESINS and and qualified inertial development,
(IISU) realisation of GAINS for five PSLV and two systems such as improvement
inertial sensors GSLVs. Inertial Navigation and scaling up
and systems for systems, Servo is a
launch vehicles Flight testing of Mini RESINS Accelerometers, continuous
and allied and MEMS RGP in GSLV Mission management process to
satellite mission in piggyback mode. unit, Momentum remain state-
elements. Wheels, Reaction of-art in
Realisation of MEMS based Wheels, Solar Array satellite and
aided INS. Drive Assembly, launch vehicle
Gyros, inertial technology
Realisation of Flight and Flight reference units, scan and to achieve
spare Momentum Wheels for mechanisms, etc., for maximum self-
INSAT and GSAT projects. Launch Vehicles and reliance in this
Satellites. strategic area.
Realisation of Flight and Flight
spare Reaction Wheels for Inertial systems are
Cartosat, Astrosat and IRNSS intermediate products
satellites. / subsystems used in
satellites and launch
Realisation of IRU with small vehicles.
ILG for application in future
spacecraft missions.
35
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
9 Liquid Development of NA 58.92 244.62 --- Delivery of integrated Realisation of tested Technology Liquid Propulsion
Propulsion earth storable propulsion system for satellite and qualified (a) liquid development, Systems Centre is
Systems Unit liquid propulsion missions. and cryogenic stages improvement the lead centre for
(LPSC) and cryogenic for PSLV and GSLV and scaling up development of liquid
propulsion Completion of integration and (b) Reaction is a and cryogenic
technology/syste engine development test in C-25 control systems for continuous propulsion systems
ms for launch Project. IRS and GEOSAT process to and has established
vehicles and Satellites. remain state- unique technical
satellites. Realisation of qualification of-art in infrastructure (test
stage with Aluminium alloy Liquid and Cryogenic satellite and and fabrication
propellant tanks in L110 Project. propulsion systems launch vehicle facilities) at
are intermediate technology Mahendragiri,
Realisation and qualification of products / and to achieve Valiamala and
75mN thruster for SPT. subsystems used in maximum self- Bangalore.
satellites and launch reliance in this
Commissioning of second test vehicles. strategic area.
stand for AOCS thrusters.
36
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
10 Human Space Develop a fully 95.00 --- 150.00 --- Initiate development of core The final outcome, in The project It is now proposed to
Flight Program autonomous (Pre- technologies for Human Space terms of availability of proposal is take up the Human
manned space project Flight like Crew Module technologies for currently Space Flight
vehicle to carry phase) development, Service Module, manned mission under Programme in
crew to low earth ECLSS, Crew escape system, would take about 3-4 consideration Phases and the intial
orbit and safe etc., years. of the phase would focus
return to earth. Government on development of
Design and development of for approval. core technologies
separation system for Crew such as crew
escape system. module, service
module, crew escape
Design, layout finalisation of system, ECLSS, etc,
Service Module and and tested in
Requirement finalisation and Unmanned PSLV
system design of propulsion flight.
system.
Finalisation of internal
architecture and ergonomic
model of crew module.
37
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
11 Semi-cryogenic Developing a 1798.00 --- 250.00 --- Thrust Chamber Test Facility The project is in initial The project Semicryogenic
Engine / Stage higher thrust Augmentation stages. The final was approved engine is expected to
Deveopment semi-cryogenic outcome, in terms of in Jan 2009. bringdown the
core stage for the Hot tests on single element availability of higher launch cost.
unified modular preburner and thrust chamber. thrust semi-cryogenic
launch vehicle. stage is expected
Award of EPC contract for Semi after six years.
cryo test system.
12 Indian Institute To develop high NA --- 140.00 --- Completion of admissions for The institute is in Government IIST has started the
of Space quality manpower the academic year 2010-11, initial stages. The have approved courses from the
Science and required for through a competitive exam by final outcome, in the proposal Academic year 2007-
Technology Space Science, the Institution. terms of availability of of setting up 08 around the
technology and manpower for ISRO is the Institute. existing
applications Conduct of the courses for the expected from 2011 infrastrucutre of
programmes. academic year 2010-11 onwards. VSSC. About 140
studnets have been
Completion of work and admitted to three
Readiness of buildings and courses in Avionics,
other infrastructural facilities in Aerospace engg and
the new campus. applied science.
38
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
SATELLITE TECHNOLOGY
13 Oceansat-2 Development and 129.15 --- 1.60 --- Data quality Evaluation and Intermediate Oceansat-2 Oceansat data is also
launch of delivery of data products to the Outcome: Availability was used for generating
Oceansat-2 users. of Oceansat-2 data successfully bi-weekly advisories
satellite with for Ocean and Coastal launched to fisherman
Ocean Color studies and Potential onboard PSLV- community on the
Monitor and Fishing Zone advisory C14 on Potential Fishing
Scatterometer services. The data September 23, Zones.
instruments for from Oceansat-2 is 2009. The
Oceanography used by Ministry of payloads have
and coastal Earth Sciences, been
studies and Universities, commissioned
providing academic institutions and the
continuity of and NGOs. performance
services for of the
Oceansat-1. spacecraft is
normal.
39
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
14 Resourcesat-2 Development and 138.79 --- 22.00 --- Realisation of Payload systems. Intermediate Resourcesat- Resourcesat-1 (IRS-
launch of Outcome: Availability 2 is planned P6), launched on
Resourcesat-2 for Spacecraft assembly, of Resourcesat-2 data for launch in October 17, 2003 is
natural resource integration and testing. for Natural Resource the early 2010- currently providing
management Management 11 onboard the remote sensing
applications & Environmental tests and Applications. The India's PSLV. data for various
provide readiness of the spacecraft for data from natural resource
continuity of launch. Resourcesat-2 is used management
data / services by Ministry of Earth applications. IRS
currently Sciences, Ministry of data is also received
provided by Agriculture, Ministry world-wide through a
Resourcesat-1 . of Rural Development, network of
Universities, international ground
academic institutions stations.
and NGOs.
15 Radar Imaging Development and 378.49 --- 3.50 --- Fabrication, assembly and The project is Launch and The Transmit-
Satellite (RISAT-launch of Radar testing of Synthetic Aperture currently in operationalisat Receive Module, one
1) Imaging Satellite Radar Payload. intermediate stage. ion of RISAT is of the critical
with active The final outcome of targeted for elements of the
microwave Integration of the payload with 'Indigenous capability 20010-11 Synthetic Aperture
sensors the spacecraft and functional to develop and onboard Radar payload, has
providing all- tests. realise complex PSLV. been successfully
weather remote microwave payloads developed and
sensing Environmental testing and for Remote Sensing qualified in
capability for readiness for launch. and Disaster association with an
critical Management Indian Industry.
applications in Applications' is
Agriculture and associated with the
Disaster launching of RISAT
Management. satellite.
40
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
16 GSAT-4 Development and 99.00 --- 0.00 --- Functional tests on the launch GSAT-4 will GSAT-4 is Ka band
launch of GSAT-4 pad and launching of the demonstrate the planned for communication
for advanced satellite onboard GSLV D3. advanced Ka band launch payload, which is an
communication related onboard GSLV advanced
applications in Ka communication D3 in 2010-11. communication
band. technologies for wide technology, is being
band application developed for the
services in the first time in the
country. country.
The satellite
navigation payload
along with the ground
augmentation under
"GPS Aided GEO
augmented Navigation
(GAGAN) - Satellite
based Navigation
system" will enhance
the air navigation
services in the
country.
41
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
17 Navigational To develop a 1420.00 --- 262.10 --- Critical Design review of Partial Outcome: IRNSS is a Satellite Navigation is
Satellite constellation of Navigational Payload and Realisation of first constellation strategically an
System Indian Regional spacecraft bus elements. spacecraft and of 7 satellites important area of
navigational ground systems. and the first Space technology
satellite system Hardware realisation for IRNSS- satellite in the applications and
(IRNSS) for 1 and initiation of AIT activities. series is taking into account
providing planned for the international
positioning Establishment of Ground launch in scenario and the
services and segment. 2011. national
explore requirements, Indian
possibility of participation in
participation in global navigational
global system. systems is also
under consideration.
18 Advanced Development and 500.00 --- 125.00 --- Payloads and interface Partial Outcome: Government
Communicatio launch of a 4T finalisation. Finalisation of have approved
n Satellite. class payloads for the the project in
(GSAT-11) communication Preliminary design of the satellite. August 2009.
satellite with spacecraft and payload
advanced subsystems.
communication
payloads Initiation of procurement action.
42
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
19 SARAL Development and 73.75 --- 40.00 Preliminary Design Review for Partial Outcome: Approval for SARAL - Satellite
launch of a 400- subsystems and spacecraft for Finalisation of the SARAL project with Argos and Altika
450 kg class SARAL. payloads and was obtained - is a joint mission
satellite for spacecraft in Feb 2009. with the French
ARGOS and Realisation of SARAL configuration. The SARAL Space Agency CNES.
ALTIKA. spacecraft subsystems. satellite
mission is to
Integration of the Spacecraft be launched
bus elements of SARAL. during 2011
into a
Conduct of Critical Design sunsynchrono
Review of SARAL. us, 6 am- 6 pm
orbit at an
altitude of
around 800
km.
20 Earth To undertake (Project --- 35.50 --- Finalisation of project report for Government Cartosat-3 is an
Observation - New Earth not yet Cartosat-3 and processing the approval for advanced high
New Missions ( Observation approved) same for approval of the Cartosat-3 is resolution satellite
Carto-3, TES- Missions of 11th Government. expected by for mapping
HyS, DMSAR) plan such as GEO- Mid 2010-11. applications.
HR mission for Conduct detailed studies on
enhanced TES-HyS and DMSAR missions.
repetivity, TES
with
Hyperspectral
sensors, Cartosat-
3 and SAR for
Disaster
Management
Support.
43
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
21 ISRO Satellite Developing NA 93.07 327.12 --- Technology Development Technology Technology The ISRO Satellite
Centre Satellite initiatives - Miniaturised BMU, development development, Centre (ISAC) is the
Technology and Robotics, HV Solar Array, initiatives and improvement lead centre for
implementation Characterisation of Li-Ion cells, spacecraft hardware and scaling up Satellite Technology.
of satellite Cryogenic Heat pipes, High development and is a A new facility, ISRO
systems for performance onboard realisation lead to continuous Satellite Integration
scientific, computer, development of state-of-art satellites process to and Test
technological and multi split spectro polarimeter, for Indian Space remain state- Establishment (ISITE)
application etc., Programme. of-art in including a
missions. satellite Comprehensive
Assembly, integration and technology Assembly, Test and
testing of Satellites for launch. and to achieve Thermo-Vaccum
(GSAT-6, 8 and INSAT-4D/GSAT- maximum self- Chamber (CATVAC)
5) reliance in this has been set up
strategic area. recently.
Fabrication and testing of
subsystems for YOUTHSAT
small satellite.
44
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
22 Laboratory for Research and NA --- 40.14 --- Technology
Satellite integration level testing Realisation of tested LEOS have
Electro-optics Development in of sensors for Cartosat-2B, development,
and qualified electro- developed unique
Sensors. the field of GSAT-4, Resourcesat-2, RISAT- optical sensors such improvement technological
electro-optics 1 and GSAT-5. and scaling up
as earth sensor, sun capability in the field
sensors required sensor, star sensor,
is a of optics fabrication
for satellites. Development of Fibre Optics magnetometer and continuous and Micro Electro-
Gyro. Development of Optics for sensor electronics for
process to Mechanical Systems
Satellites. satellites. remain state- (MEMS) for space
of-art in applications.
Development of Laser Induced Electro-optic sensors Electro-optics
Breakdown Spectroscopy are intermediate sensors
(LIBS) payload and Camera for products used in technology
LAND ROVER. Development of satellites. and to achieve
Silicon Carbide (SiC) optics maximum self-
technology. reliance in this
strategic area.
Technology development
initiatives: Optical intersatellite
link sensor, development of
laser source, Ultra light weight
optical surface, Robotic sensor,
etc.,
45
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
23 Semi- Design, NA 28.96 24.89 --- Testing, Characterisation and Realisation of microTechnology/ SCL has integrated
conductors development and qualification of CCD signal electronic devices process / capability comprising
Laboratory manufacture of processor, ROIC-Ph2, Timing such as ASICs, MEMS device of design, wafer
(SCL) Very Large Scale Sequencer, SRAM and PCA. based devices, CCDs,development, fabrication (up to 0.8
Integrated (VLSI) Assembly of 200 nos. of memories, etc, for improvement micron technology),
circuits and Ultrasonic level sensors. and scaling up
strategic applications. testing, packaging,
system / board is a quality assurance
level products Analysis of process parameters The output of this unit continuous and system /board
and leading R & D of 0.8 m process and carry out is an intermediate process to level assembly of
effort in the area trials. product used as remain state- micro-electronics
of components / devices of-art in the devices. It has
microelectronics. Development of Radhard in satellites and ares of micro- developed VLSI
technology / process launch vehicles. electronics products, sensing
technology devices and MEMS
Production of Dr Pisharoty and to achieve for strategic
Radiosondes. maximum self- orgnisations such as
reliance in this DRDO DAE and
Dev. of MEMS based Temp,
pressure and humidity sensors.
46
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
LAUNCH SUPPORT, TRACKING NETWORK & RANGE
FACILITIES
24 Satish Dhawan To build, maintain NA 70.50 316.40 --- Production of 10 nos. of S 139 Realisation of tested Launch A State-of-art Second
Space Centre - and operate state- segments and two HPS3 motors and qualified solid support for launch pad has been
SHAR. of-art launch for PSLV. motors for PSLV and GSLV F05, established at
(SDSC-SHAR) infrastructure for GSLV. GSLV D3, Sriharikota to enable
assembly and Production of 10 -S 200 PSLV C16, C17 launch of future
launching of segments for GSLV Mk III. Static and C18 advanced launch
rockets, solid test of S200-ST-02- Solid propellant flights are vehicles as well as to
propellant motors and Launch planned to be provide redundancy
preparation and Integration and Launch support complex facilities are completed in for the existing
auxiliary support for GSLV F05, GSLV D3, PSLV intermediate stages 2010-11. launch pad.
facilities. C15, C16 and C17. for launching of
rockets.
Commissioning of Wind profiler
facility and New MCC facility.
47
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
25 ISRO To provide NA 37.22 50.79 --- Commissioning and Enabling operational Onorbit ISTRAC is an
Telemetry, mission support operationalisation of second services of remote operation and operational centre
Tracking and (Telemetry, Mission operations complex. sensing and scientific maintenance responsible for
Command tracking and satellites. of satellites is onorbit maintenance
Network. command) for To provide IPSTAR ground a continuous and operations of all
(ISTRAC) low earth orbit based Ku-band beacon station round-the- low earth orbit
satellites as well operations support from Port- clock process. satellites (like IRS)
as launch vehicle Blair station. and planetary
missions through missions (like
a network of Operation and maintenance of Chandrayaan-1).
ground stations. all IRS satellites.
ISTRAC has recently
Mission support for PSLV C15, commissioned a
C16, C17, GSLV F05, D3 and the Special Deep Space
satellites. Network at Bylalu
near Bangalore for
Hub services for Telemedicine, Chandrayaan-1 with a
VRCs and Spacenet. 18 m dia and 32 m dia
Antenna realised
through Indian
Industries.
48
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
SPACE APPLICATIONS
26 Space Design and NA 100.44 196.97 --- Delivery of payloads for GSAT- The payloads are the Technology
Applications development of 5, GSAT-7 and IRNSS & RISAT- intermediate products development,
Centre (SAC) payloads for 1. Delivery of Meghatropiques / steps for satellites. improvement
communication, MADRAS payload, YOUTHSAT and scaling up
meteorological and INSAT-3D. Technology is a
and remote development continuous
sensing satellites Development of IRNSS initiatives and process to
and conduct simulator & FPGA based user experiments lead to remain state-
space receivers for SPS & RS. realisation of state-of- of-art in
applications art payloads. payload
research and Finalisation of configuration sensors,
development. and design details of advanced communicatio
communication payload n
elements. transponders
and space
Calibration, Validation and applications
Operational product generation technology
of Oceansat-2 data products. and to achieve
maximum self-
Technology Development reliance in this
initiatives - Intersatellite links, strategic area.
system studies on micro
satellite communication system,
development of UHF terminals,
Ka band propagation studies,
development of TWT & EPCs,
etc.,
49
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
27 Development Conceptualisatio NA 7.85 75.17 --- Installation of EDUSAT model The Tele-education, The The user ministries
and n, definition, studio at Jaipur and NE-SAC. Tele-medicine and application of concerned for
Educational planning, VRCs provide satellite space EDUSAT network,
Communicatio implementation EDUSAT content generation for connectivity for technology for Tele-medicine
n Unit (DECU) and socio- selected user states. various development developmental network and VRCs
economic programmes communicatio are Ministry of HRD,
evaluation of the Expansion of Tele-medicine, implemented by State n and Ministry of Health
developmental Tele-education (Sikkim,UP, HP, / Central agencies and education is a and Family Welfare
applications of NE states, J & K, Gujarath) and NGOs. The benefit of continuous and Rural
space VRC networks. these programmes is process. Development
technology. augmentation of the respectively.
Conduct of social impact Education and
evaluation and awareness healthcare
programmes for Tele-education, infrastructure in the
VRCs and DMS. country for National
development.
Utilisation of Training and
Development communication
channels.
50
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
28 National Developing NA --- 87.62 --- Preparation of thematic Image processing The NNRMS is a national
Natural National Natural mapping at large scale and tools / software and application of level apex body in
Resource Resource digitisation of cadastral maps updated information space the country guiding
Management Management for the 5 prioritised States on Natural resources technology for and co-ordinating the
System Applications under Space based Information for use by the natural application of
(NNRMS) using Remote System for Decentralised concerned Ministries resource satellite based
sensing data and Planning (SIS-DP) in Government. management remote sensing for
supporting region- is a natural resource
specific remote Geomorphological and continuous management
sensing lineament mapping for 30% of process. applications in
applications. the geographical area of the various thematic
country. areas.
51
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
Earth --- 2.31 --- Earth Observation application
Observation projects - Cropping system
Application analysis, snow and glacier
Mission studies, FASAL software
development, Biodiversity
characterisation, study of meso
scale processes in bay of
Bengal, application of
Hyperspectral remote sensing
data, etc.,
Regional --- --- Implementation of region / user The RRSSCs have
Remote specific projects in application been amalgamated
Sensing of remote sensing for with NRSC with effect
Service developmental planning. from December 2009.
Centres
(RRSSC) Software development in the
new areas of image processing.
52
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
29 North Eastern To promote NA 1.75 6.25 --- Preparation of soil and land Space technology The NESAC is setup as
Space application of capability maps for intensive inputs related to application of an autonomous
Applications space technology agriculture districts of NER. natural resource space society jointly with
Centre (NE- for the management, technology for the North Eastern
SAC) development of Mapping of bamboo flowering developmental development Council to provided
north-eastern areas of NC Hills district. communications and of North space technology
region in the disaster management Eastern based solutions for
areas of natural Development of network of support for Region is a NE region.
resource Sericulture Information Linkage developmental continuous
management, & Knowledge Systems (SILKS) programmes of the NE process.
developmental in intensive sericulture- States.
planning, disaster practicing districts.
management
support, Setting up of ground system
interactive facilities for the conduct of
training, tele- distance education, training and
education, tele- Tele-education programmes for
medicine and North East.
other space
applications. Expansion of Tele-medicine,
Tele-education, VRC and AWS
programmes.
53
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
30 National Acquisition, NA 62.05 168.10 --- Ground system readiness for Availability of Reception, IRS data are used by
Remote processing, data reception and processing processed IRS processing Ministry of Urban
Sensing Centre distribution of for Resourcesat-2 and RISAT-1 satellite data and and Development,
(NRSC) data from Indian and SARAL. value added products distribution of Ministry of
Remote Sensing of remote sensing IRS data is a Agriculture, Ministry
Satellites and Operationalisation of IMGEOS technology / methods continuing of Water Resources,
research, facility for the in-orbit satellites, for use by various activity. Ministry of Earth
development and pre and post launch operations Ministries in Scineces, Ministry of
executing remote for new satellites. Government, private Rural Development,
sensing entrepreneurs and Ministry of
application Data reception, processing and NGOs. Environment and
projects in dissemination of data from Forests, Ministry of
collaboration with operational IRS satellites. Science and
users. Technology and
Advance actions for acquisition State development
of aircraft LiDAR/LFDC and agencies for various
replacement of avionics for one natural resource
aircraft.
54
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
31 Disaster Providing space NA --- 38.62 --- Periodical monitoring of Floods, Strengthening of Setting up of The Virtual Private
Management technology Landslides, Drought, Forest Disaster Management dedicated Network connects
Support inputs and fires and Cyclones. System in the country. Airborne ariel Ministry of Home
services on a survey facility Affairs with State
reliable and Conclusion of contract for for DMS is Emergency
timely manner for dedicated aerial survey facility planned by Operations Centre for
the disaster for DMS 2010-11. real time exchange of
management critical information
system in the Completion and expansion of and digital data for
country. the network to the district level Disaster
in respect of DMS-VPN first Management.
phase. ( 37 nos)
55
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
SPACE SCIENCES
32 Megha- Design and 81.60 --- 10.00 --- Completion of Ground Segment Partial Outcome: Launch and Megha Tropiques will
Tropiques development of a review Realisation of Operationalisa contribute
satellite jointly payloads and tion of Megha- significantly towards
with France to Realisation of Flight Model spacecraft. Tropiques is the understanding of
conduct ocean- Payloads and mainframe targeted for Weather systems of
atmosphere subsystems. The project is 2011 using tropical region.
research currently in PSLV.
particularly over Assembly, Integration and intermediate stage.
tropical regions. Testing activities on the Final outcome, in
Spacecraft terms of climatic
research data, is
Readiness of the satellite for expected after the
launch. launch and
operationalisation of
Megha-Tropiques
satellite.
33 ASTROSAT Design and 177.85 --- 10.00 --- Completion of payload The project is ASTROSAT ASTROSAT is a
development of a Engineering Model activities currently in satellite unique observatory
satellite for Multi- and realisation of Flight Model intermediate stage. launch is satellite
wavelength Payloads. Final outcome, in planned for simultaneously
studies of a terms of scientific 2011 onboard covering a range of
variety of Realisation of spacecraft results of the data PSLV. high energy radiation
celestial sources subsystems from the satellite will hitherto not covered
and phenomena start accruing after from any other global
using X-ray / Initiation of activities related to the launch of observatory
Gamma ray spacecraft assembly and ASTROSAT satellite. missions.
astronomy integration.
instruments and
UV telescope.
56
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
34 Indian Lunar The baseline 811.00 --- 100.00 --- Chandrayaan-1: Final outcome is the Chandrayaan- Chandrayaan-1 was
Mission mission objective enhanced 2 is slated for successfully
Chandrayaan- of Chandrayaan-2 Analysis of the Science data understanding of the launch in 2012- launched into earth
1& 2 is to soft land at a received from the Satellite. Moon and its 13 orbit on October 22,
suitable site on environment from the 2008. Subsequently,
the lunar surface Chandrayaan-2: analysis of the it was placed in the
and to carry out scientific data intended lunar orbit
in-situ chemical Finalisation of configuration of received from and the Moon Impact
analysis. payloads and payload Chandrayaan satellite. Probe was released
interfaces on to the surface of
Moon on November
Fabrication of structures. 14, 2008. The
scientific instruments
Preliminary Design review. onboard
Chandrayaan-1
Fabrication of spacecraft satisfactorily
subsystems - BMU, Power, RF provided a new
systems. insight on the Moon's
origin and evolution.
Finalisation of Mission Concept.
57
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
35 ADITYA To launch a 127.75 40.00 Finalisation of payload Final outcome is to The project is
spacecraft, which specifications and interface achieve a fundamental approved in
will be the first details. understanding of the 2009-10 with a
Indian Space physical processes total cost of
based solar Initiation of procurement of long that heat the solar Rs 127.75
coronagraph, lead / critical materials. corona, accelerate the Crores.
which will be Procurement of Components. solar wind and
available for solar produce Coronal
coronal Mass Ejections
observation to all (CMEs)
the Indian
researchers in
the field of Solar
Astronomy.
58
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
36 Physical Carryout basic NA 26.00 45.70 --- Installation of a multi collector Partial Outcome: The Research
Research research in the inductively coupled plasma Capability to develop is a
Laboratory areas of mass spectrometer for studies complex payloads and continuous
(PRL) astronomy and of terrestrial and planetary analysis of data for process.
astrophysics, processes. space science and
solar physics, planetary exploration.
planetary Continuation of analysis of the
science, data from Imaging payload and PRL is primarily an R
interplanetary low and high energy X ray & D institution and the
science, earth's payloads of Chandrayaan-1. outcome is in the form
magnetosphere, of expanding our
Sensor Payload ionosphere,atmo NA --- 16.00 --- Fabrication of breadboard knowledge in the
development / sphere, earth's model of the visible airglow areas of Astronomy
Planetary surface and photometer payload planned and Astrophysics,
Science interior, onboard SENSE satellite. Solar physics,
Programme theoretical Planetary science,
physics, quantum Development of payloads based Earth Science,
optics / lasers on nuclear techniques as well Atmospheric science
as wireless sensor networks and related fields.
under PLANEX programme.
59
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
37 National Carryout NA 2.45 12.00 --- Study of the diurnal variability NARL is basically a The Research NARL, located at
Atmospheric scientific of convection and rainfall. research institute and is a Gadanki, Near
Research research in the outcome of the continuous Tirupati, has
Laboratory Atmospheric Modeling and data centre programme will lead process. established a major
(NARL) Science and establishment related to to expanding our state-of-art
serve as a major Atmospheric science. understanding of the experimental
national complex processes of National MST Radar
experimental Setting up of a Lighting detector the lower and middle Facility for middle
facility for which will give continuous atmosphere. atmospheric
atmospheric observations of the lightning research.
research in the intensity.
NICES country including 1.00
boundary layer, Studies on weather and climate
troposphere, prediction research.
middle
atmosphere, Undertake Climate and
thermosphere Environment Studies.
and ionosphere.
60
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
38 Atmospheric Undertake NA --- 28.45 --- Augmentation of observational The Outcome is The Research An indigenous low
Science studies and network with AWS, Wind Intermediate in nature. and cost version of the
Programme research on profilers, GPS Sonde, DWR and The development development Automatic Weather
development of GPS Receivers. efforts in terms of in atmospheric Station (AWS) has
advanced observational tools science is a been successfully
observational Conduct of GPS based and modeling is continuous realised towards
tools, use of experiments for Meteorology applied by the process. building a network of
satellite data and and Space Sciences. operational agencies AWS in the country,
techniques of towards improved which will
modelling in Mesoscale modeling to improve capabilities for substanitally
atmospheric local weather prediction over weather prediction enhance the data
science leading National Capital Region. and climate inputs for weather
to user products monitoring. modelling.
for adoption by Improved modeling for Regional
operational Weather Prediction.
agencies.
39 RESPOND To strengthen the NA --- 15.00 --- Supporting Research and Development of The Research Over 80 Universities /
academia Development projects at knowledge-base and is a continous institutions from
interaction academic institutions, human resources in process. different parts of the
through universities and Space academic institutions country participate in
collaberative technology cells at IITs / IISc in in the area of space the RESPOND
research, the area of Space science, research. programme. Every
educational and technology and applications. year, about 150 R & D
scientific projects are
activities. undertaken under
this programme.
61
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
40 ISRO To investigate the NA --- 28.96 --- Initiatives on National Action Enhancing the The Research
Geosphere processes Plan for Climate Change. understanding of the and
Biosphere between dynamics of global Development
Programme Geosphere- Carryout studies on aerosol environment & its is a
(ISRO GBP) Biosphere- radiative forcing over India. impact on regional continuous
Atmosphere and climate. process.
Other Schemes their interactions, NA 2.00 13.70 --- Studies on atmospheric trace
radiative forcing, gases, transport and modeling. Improved weather
regional prediction over
climate,micro LU/LC and impact of human Sriharikota which is of
gravity and and dimensions in Indian River paramount
space science Basins. importance for rocket
promotion / launches.
research. Undertaking microgravity
research and space science
promotion activities.
41 Small Satellites To design and 9.85 --- 10.00 --- Mission definition and Partial Outcome: Spacecraft Nano satellite for
for develop small finalisation of payload. Finalisation of the realisation in Aerosol monitoring.
Atmospheric satellites for configuration. 2011-12
Studies and study of Earth's Realisation of subsystems of
Astronomy near space the spacecraft and payload.
environment,
study of aerosol Critical design review
and gases, inner
magnetosphere Spacecraft assembly and
and Solar integration.
Physics
62
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
42 Special Indigenous NA --- 231.79 --- Undertaking upgradation of Indigenous capability The More than 150 types
Indigenisation / development of micro electronics fabrication for micro-electronics indigenous of high reliability
Advance high reliability facilities at Semi Conductors fabrication (better development electronic
Ordering electronic Laboratory to better than 0.18 than 0.18 microns). of space components and
components microns. Indigenous realisation materials and space grade
including micro- of ASICs, C band components materials, developed
electronics Dev and productionisation of Li Traveling Wave to maximise and qualified under
devices, space Ion cells Tubes, Solar Cell the self this programme, are
grade materials interconnectors, PCB reliance is a being currently used
and stock piling Development of Traveling Wave connectors, metal film continuous in various satellite
of critical Tubes, solar cell interconnects, resistors, silicon process. and launch vehicles
components and connectors, crystal oscillators, carbide mirrors, of ISRO.
subassemblies Application Specific Integrated lithium ion cells and
for satellites and Circuits (ASICs), Field various metallic, non-
launch vehicles. Programmable Gate Arrays metallic and polymer
(FPGAs), sensor devices, materials.
polymers, chemicals and
metallic materials. These components /
materials are
intermediate products
used in fabrication of
satellites and launch
vehicles.
63
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
43 Others To provide NA 60.39 77.74 --- Corporate functions. Providing overall Continuous
(includes overall direction direction and co- process
mainly ISRO and co-ordination Imparting training to ordination of the
Head quarters, of space international students at UN space programme
Civil programmes in Centre for Space Science and including long term
Engineering the areas of Technology Education for Asia planning.
Division Head Satellite and the Pacific.
quarters, DOS Communications,
secretariat and earth
Central observations,
Management launch vehicle
Expenses) development,
space sciences,
space industry
development,
international co-
operation and
human resource
development.
64
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
INSAT OPERATIONAL
44 Master Control Carrying out NA 25.86 29.17 --- On orbit operations and Providing operational Onorbit MCF has set up an
Facility initial phase maintenance of INSATs, GSATs services of operation and Earth Station in
operations and and METSATs. Geostationary maintenance Bhopal, Madhya
regular on-orbit satellites for the users of satellites is Pradesh to augment
monitoring and Establishment of IRNSS in the area of a continuous the tracking,
control of all Satellite Control Facility and telecommunications, round-the- telemetry and
Geostationary Earth Station terminals. broadcasting and clock process. communication
satellites of ISRO meteorological data. infrastructure for
namely INSATs, Progress of work on setting up GSO satellites.
METSATs and of Optical Tracking System for
GSATs. GEO satellites.
65
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
45 INSAT-3 Development and 2887.63 --- 77.60 --- INSAT-3D Spacecraft: Partial Outcome: Launch and INSAT-3A, 3B, 3C &
satellites launch of third Realisation of tested operationalisat 3E satellites in INSAT-
(including generation INSAT- Assembly and Integration of the and qualified ion of INSAT- 3 series have already
launch 3 satellites payload and spacecraft. advanced 3D is targeted been launched
services) (INSAT-3A to 3E) meteorological for 2010-11. successfully and are
to augment the Thermal balance and payloads for INSAT- being used
capacity of INSAT Thermovac tests. 3D satellite. operationally.
system.
Dynamic tests. The project is in Currently, INSAT-3A
intermediate stage and Kalpana
Readiness of the spacecraft for and the final outcome, (METSAT-1) are
launch. in terms of availability providing the
of meteorological data meteorological data
from the satellite, will to the users for
accrue after the weather forecasting.
launch and
operationalisation of
INSAT-3D.
66
(Rs. in Crores)
Total Outlay 2010-11
Name of the Sanctioned
Sl. Objective / Quantifiable deliverables / Physical Processes /
Scheme / Cost Projected Outcome Remarks / Risk Factors
No. Outcome Non-Plan Plan CEBR Outputs Timelines
Program ( In respect of
Projects)
1 2 3 4 4(i) 4(ii) 4(iii) 5 6 7 8
46 INSAT-4 Development and 3597.70 --- 574.30 --- Assembly, Integration and INSAT-4D/GSAT-5 will INSAT- INSAT system
Satellites launch of fourth Testing of GSAT-5, GSAT-6 and augment the capacity 4D/GSAT-5, currently has 200
(including generation INSAT- GSAT-8 satellites and their of INSAT system with INSAT- Transponders, which
launch 4 satellites to readiness for launch. additional 4E/GSAT-6 is used for
services) augment the transponders for and INSAT- Telecommunications,
INSAT system Payload and mainframe various 4G/GSAT-8 Broadcasting,
capacity. subsystem realisation of GSAT- telecommunications satellites are Business
(Currently, INSAT- 9, GSAT-10 & GSAT-12 and broadcasting targeted for Communications,
4A to 4G and satellites. services including launch in 2010- Rural Area
GSAT-9, GSAT-10 DTH services. 11. communications,
& GSAT-12 and Emergecny
GSAT-6A have communication and
been approved). developmental
communications.
67
CHAPTER III
68
acquire the required technical know-how in the areas related to Space. It is
important to note that this partnership with Industries has enabled the
Department to meet the growing challenges of advanced technology,
handling complex manufacturing jobs and increasing demand for space
services without any significant increase in in-house manpower.
69
3.3 So far more than 473 VRCs have been set up in Andhra
Pradesh, Assam, Bihar, Delhi, Gujarat, Himachal Pradesh, Jharkhand,
Karnataka, Kerala, Maharashtra, Madhya Pradesh, Meghalaya, Nagaland,
Orissa, Rajasthan, Sikkim, Tamil Nadu/Pondicherry, Uttar Pradesh,
Uttarakhand, West Bengal, A&N Islands. Around 45
NGOs/Trusts/Institutes/Govt. Departments have associated with DOS/ISRO
in VRC programme.
3.4 The feedback from the VRCs has been highly encouraging.
Even though it is difficult to isolate the impact created by VRCs alone since
it is not a stand-alone system, VRC has clearly demonstrated the catalytic
effect to other on-going activities. The programmes conducted cover a wide
gamut, including agriculture, adult and computer literacy, alternate
livelihood related vocational training, marketing of agro-products, micro-
finance/enterprises, live stock management, healthcare and disaster relief
measures. So far more than 5000 programmes have been conducted and
around 400,000 people have availed the services.
*****
70
CHAPTER IV
ONGOING PROJECTS/PROGRAMMES
2. GSLV-Operational Project
(Rs. in crores)
Sanctioned Expenditure Budget Revised Budget
Cost to end of 2009-2010 2009-2010 2010-2011
March 2009
72
3. GSLV Mk-III Development
(Rs. in crores)
Sanctioned Cost Expenditure Budget Revised Budget
to end of 2009-2010 2009-2010 2010-2011
March 2009
73
4. Polar Satellite Launch Vehicle - Continuation (PSLV-C)
Project
(Rs. in crores)
Sanctioned Expenditure Budget Revised Budget
Cost to end of 2009-2010 2009-2010 2010-2011
March 2009
74
in the series, the PSLV-C6 was successfully launched on May 5, 2005
carrying IRS-P5 (Cartosat-1) as the payload. On January 10, 2007, PSLV-
C7 has placed four satellites i.e., Cartosat-2, Space Capsule Recovery
Experiment (SRE-I), LAPAN-TUBSAT and PEHUENSAT-1 in the pre-
determined orbit successfully. PSLV-C8 carrying Italian astronomical
Satellite, Agile and AAM of India as payloads was successfully launched on
April 23, 2007. PSLV-C9 carrying Cartosat-2A/IMS Mission and eight
nano-satellites for International customers was successfully launched on
April 28, 2008. On January 21, 2008, PSLV-C10 has successfully launched
TESCAR Satellite built by IAI, Israel. PSLV-C11 in its fourteenth flight
successfully launched Chandrayaan-1 Spacecraft carrying 11 scientific
payloads on October 22, 2008. PSLV-C12 successfully launched RISAT-2
along with ANUSAT satellites on April 20, 2009. In its recent flight
launched on September 23, 2009, the PSLV- C14 carrying Oceansat-2 along
with six other nano satellites placing it in circular SSPO orbit. With the 15
consecutive successful launches so far, PSLV has repeatedly proved itself as
a reliable, versatile and cost-effective launch vehicle of ISRO. The work on
next 2 flights of PSLV is in progress. The launch of PSLV-C15 & C16 are
planned during the first quarter of 2010-2011.
75
The objective of the Project is to develop and qualify an
indigenous restartable cryogenic stage employing liquid oxygen as oxidizer
and liquid hydrogen as fuel for the upper stage of GSLV. The cryo stage
was tested successfully for the full flight duration at LMF, Mahendragiri on
15th November 2007. The CUS flight engine acceptance hot test was
successfully conducted for 200s duration and Engine was operated in both
the nominal and 13% up-rated regimes. CUS3 flight stage mechanical
integration and stage fluid system integration activities were completed.
Main Engine Thrust chamber for next flight (A7) Engine
realized. The flight version of the Indigenous stage has been transported to
Sriharikota for use in the next flight of GSLV. The first flight of the
indigenous cryo stage is targeted for flight testing by GSLV during 2010.
76
zone studies and provide inputs for weather forecasting and climatic studies.
The spacecraft was launched successfully onboard PSLV-C14 on 23rd
September 2009. The payloads have been commissioned and the
performance of the spacecraft is normal.
6.2 Taking into account the increased use of space imageries for
different applications and continued Earth Observation services required
from the IRS satellites, Resourcesat-2 has been conceived as a continuity
mission with enhanced capabilities, which will be mainly for crop
applications, vegetation dynamics and natural resources census applications.
77
7.1 The Radar Imaging Satellite (RISAT-1) with active microwave
sensors, mainly, synthetic aperture radar is intended to provide all-weather,
day and night imaging capability providing vital inputs during Khariff
season for various agricultural and disaster management applications.
Besides, with the known sub-surface penetration and the relief
measurements capabilities, the microwave imaging from RISAT-1 will aid
many other resources management applications, either in a stand-alone
mode or in complementary to electro-optical sensors.
78
8. Indian Lunar Mission – Chandrayaan-1&2
(Rs. in crores)
Sanctioned Expenditure Budget Revised Budget
Cost to end of 2009-2010 2009-2010 2010-2011
March 2009
79
Chandrayaan-1 and Lander Craft module (LC). Both the modules are
interfaced mechanically by a inter module adapter. Lander craft will also
carry rovers. Preliminary studies for the landing site selection have been
done and a possible list of payloads has been prepared. The spacecraft is
planned to be launched during 2012.
9. Astrosat 1&2
(Rs. in crores)
Sanctioned Expenditure Budget Revised Budget
Cost to end of 2009-2010 2009-2010 2010-2011
March 2009
80
10. INSAT-3 Satellites (including Launch Services)
(Rs. in crores)
INSAT-3
Satellites 2979.63 2952.64 8.70 5.50 77.60
& Launch
Services
81
11. INSAT-4 Satellites (including Launch Services)
(Rs. in crores)
Sanctioned Expenditure Budget Revised Budget
Cost end of 2009- 2009- 2010-
March 2009 2010 2010 2011
Leasing of
Transponders - - 2.00 2.00 25.00
82
Band and 12 Extended C-Band transponders. The spacecraft weights 2330
kgs and has a power generation capability of 2000W. The layouts for all
equipment panels are finalized. North payload panel integration is in
progress at SAC, Ahmedabad. Fabrication of bus system elements are
initiated in view of sub-systems being diverted to GSAT-5 Prime on
priority.
83
with 12 high power Ku-band transponders providing India coverage. In
addition, it will carry the third GPS Aided GEO Augmented Navigation
(GAGAN) payload. The sanctioned cost of GSAT-9 is Rs.140.00 crores
and that of GSAT-12 is Rs.80.00 crores. The satellite will carry 12
Extended C-band transponders. Fabrication of bus systems are in progress
on fast track and launch is planned onboard PSLV.
84
recoverable capsule (SRE-1) was successfully launched onboard PSLV-C7
on January 10, 2007 and successfully recovered from the Bay of Bengal after
re-entry from orbit on January 22, 2007. SRE-1 was a unique mission
incorporating several Key technologies such as reusable thermal protection
system, deceleration and flotation system, re-entry control and propulsion
systems, space qualified parachute systems, locating aids, etc. The successful
recovery of SRE-1 is a major landmark achievement of Indian Space
Programme and it has laid a strong technological foundation for future re-
usable launch vehicle systems. The work on SRE-2 is in progress. The SRE-
2 will be launched by PSLV during 2010-2011.
13. GSAT-4
(Rs. in crores)
Sanctioned Expenditure Budget Revised Budget
Cost to end of 2009-2010 2009-2010 2010-2011
March 2009
85
13.2 The spacecraft integration and test activities are in advanced
stage. The spacecraft close mode IST is completed. The thermovaccum
tests were completed successfully and the Spacecraft Dynamic and CATF
tests are in progress. The GSAT-4 satellite is planned for launch on board
GSLV during the first quarter of 2010-2011.
86
procurement of components and strategic materials for ten spacecraft has
been initiated. Most of the standard hardware is productionised with the
support of external vendors. The ground system augmentation has also been
taken up. The first IRNSS Satellite (IRNSS-1) is targeted for launch in
2011.
87
composites (the Reinforced Plastics Facility). An Ammonium Perchlorate
Experimental Plant (APEP) is located at Aluva, near Kochi. VSSC also
supports the (i) Thumba Equatorial Rocket Launching Station (TERLS), the
international sounding rocket range (ii) Rohini Sounding Rocket (RSR)
Programme and (iii) Space Physics Laboratory (SPL), which carries out
research in atmospheric and related space sciences.
89
Major Achievements during 2009-2010
(ix) Realization of flight and flight standby IMU for SRE-2 Mission;
90
(xii) Realization and qualification of AINS-200, single cluster
redundant inertial navigation system with six ILG-200 and 6 CSAs
in Hexad Triad configuration for GSLV-F06 mission and delivery
of proto for GSLV MK-III Hardware realization under progress;
92
activities are carried out at its facilities at Valiamala. Spacecraft propulsion
systems engineering, mono-propellant thruster development and transducer
production activities are carried out at its facilities at Bangalore. Earth
storable and cryogenic engine and stage facilities, assembly and integration
of engine and stages for launch vehicles, propellant storage and Liquid
Hydrogen production facilities are located at Mahendragiri.
93
♦ Integrated test of indigenous Cathode with 18mN imported thrusters
were conducted demonstrating the cathode performance as electron
source and neutralizer for SPT application;
♦ Engine realization for flight stage and flight acceptance test at TCT
facility;
♦ Realisation and delivery of GS2 stages and L40 stages for GSLV
mission;
♦ Studies on Heat pipe nozzle cooling for high specific impulse rocket
engines;
95
♦ Cryo Sub-system Test Facility commissioning;
96
activities. Programme Planning and Evaluation Group is responsible for all
planning and acts as the central coordinating agency and technical
secretariat of Director of Centre. Space Astronomy and Instrumentations
Division has been involved in optical, X-ray and Gamma ray astronomy
research with strong emphasis on instrumentation. Computer and
Information Group is responsible for establishment and management of
centralised IT infrastructure in ISAC. Avionics Production Division is the
nodal agency for production of standardized electronic packages. Three
Programme Management Offices coordinate the implementation of the
INSAT, IRS & Small satellites and Navigation Progammes.
97
♦ After completion of all assembly, integration and testing activities,
the Oceansat-2 was launched onboard PSLV-C14 on 23rd
September 2009;
98
♦ Productionaisation of standardized subsystems of Telemetry &
Telecommand, Power Electronic Packages, Bus Management Unit
(BMU), Solar panel, Battery, Structure, Heat pipes, deployment
mechanisms etc., have been planned with the support of external
industries;
99
♦ Complete GSAT-11 commensurate with bus system design
development and qualification;
100
Coupled Devices (CCD), Time Delay Integration (TDI) devices with
external participation.
101
♦ Completion of new design of High Resolution Optics (HRC) for
CARTOSAT-3;
103
♦ Integration, Checkout and successful launch of PSLV-C14
carrying Oceansat-2 from First Launch Pad (FLP) on 23rd
September 2009;
♦ Production of nine S139 segments and two S139 segment and two
High Performance Motor planned;
♦ Casting of S200 MS for the first S200 static test motor, Head End
Segment for second S200 static test motor for GSLV-Mk III
Project;
♦ Sea level testing of Retro & Ullage motors for PSLV-C15, C16 &
GSLV-D3 flights;
104
♦ Production of ten S200 segments for static test motor (02) for
GSLV Mk-III Project;
♦ Fluid mock-up for L110 & C25 stages of GSLV Mk-III Project;
106
♦ Activities related to Launch & Early Orbit Phase support for GSLV-
D3/GSAT-04, PSLV-C15 and CARTOSAT-2B have been geared up;
♦ Extended support for IRS-1D & TES normal phase operations and
skeletal operations of IRS-1C as part of Disaster Management Plan for
spacecraft operations;
107
♦ TTC operations support from External stations at Svalbard, Tromso
and Tollsat;
108
22. Space Applications Centre (SAC)
(Rs. in crores)
Budget Revised Budget
2009-2010 2009-2010 2010-2011
109
Major Achievements during 2009-2010
110
♦ SSPAs for the ranging transmitters designed and DVMs were
realized;
111
♦ Planned to integrate the development model of X-band DMSAR and
test flown in 2010;
112
space applications. The major current activities of DECU include EDUSAT
projects, their implementation action & utilisation, Training and
Development Communication Channel (TDCC), Tele-Health (TH), Tele-
Education (TE) mission and new satellite communication development and
applications.
113
♦ Resource Persons training in content Generation for Edusat Users of
the states where Edusat Networks are installed/to be installed;
♦ Proposed to set up 4000 VRCs by the end of 11th Financial year plan
covering the rural/semi-urban blocks/taluks (out of around 6000) of
the country;
114
♦ Study on Health related information needs to provide inputs to
Telemedicine network and in the planning a HealthSat;
♦ Planned for Central Video Storage System for video editing in NLE
Systems;
116
♦ Establishment/updation of Oceansat-2 data reception facilities at
Brazil, Mauritius and Matera;
♦ Near real time flood monitoring for 6 States and agricultural drought
monitoring for 13 States & forest fire alerts and disseminated to the
users;
♦ Organisation of Land use/Land cover data, data bases for all States
(except J&K);
♦ ALTM data acquisition is planned for Bihar, Assam & East coast;
♦ Land Use/Land Cover analysis (1:25,000 scale) for five more years
under Remote Sensing Application;
118
♦ National Ground Water Development & Management System,
Climate change studies addressing five national missions;
119
Major Achievements during 2009-2010
120
♦ Establish IRNSS Satellite Control Facility and Earth Station
terminals at Hassan and Bhopal campuses;
122
♦ Developed Web enabled LU/LC information system in conjunction
with ancillary information (named as ‘Bhusampada’) to facilitate
value added data query, utilization and dissemination;
123
helps to visualize Raster and Vector data geographically and perform
various Image Processing and GIS operations;
♦ Collection for the priority areas will be completed under the GCPL
Phase II Project;
125
Major Achievements during 2009-2010
126
Major Programmes for 2010-2011
`
127
through operational use of space data, the concept of a space-based
observation and communication system for disaster management support is
being evolved in the country. Based on the experience gained through several
studies using Space data, DOS/ISRO has initiated a programme for Disaster
Management Support (DMS). The major goal of the Programme is to provide
decision support through Space-based information on the disasters, affected
areas, their impact, etc., on a near-real time basis. The main components of
the Disaster Management Support Programme include (i) Establishment of a
Decision Support Centre; (ii) Air-borne Laser Terrain Mapper (ALTM)
surveys & hazard zonation; (iii) Database creation & query shell
development; (iv) Emergency communication support; (v) Airborne SAR
development; (vi) R&D support for DMS; (vii) Decision support tools
development and (viii) International Charter Support. The Decision Support
Centre, being established at the National Remote Sensing Centre, Hyderabad,
will be suitably interfaced with other Government agencies such as IMD,
CWC, GSI, NIC, etc., and will provide online services to the State and
Central Government user agencies.
♦ Monitoring of the flood Disaster in Bihar due to the breach in the course
of Kosi River was continuously monitored till the breach was plugged;
`
128
♦ Daily active fire location derived from satellite data was updated to
INFFRAS (Indian Forest Fire Response and Assessment System)
website on a daily basis from February to June 2009;
♦ Regular Monitoring of all seismic and landslide events were carried out;
♦ ALTM data acquisition for 110 hours to cover selected parts of the
coastal region; an area of 2,400 sq. km area covering 2 km inland from
the coastlines for the Tsunami Warning Centre of INCOIS (MoES);
`
129
Major activities planned during 2010-2011
♦ Sustain and enhance the overall quality and turn-around time of space
technology enabled products and services for disaster management in the
country;
♦ Conduct ALTM surveys for 12,000 sq. kms in flood prone areas in
Andhra Pradesh and West Bengal States and processing of data acquired
for Bihar and Assam will be completed;
♦ Complete and expand the network of DMS-VPN first Phase (all the 37
nodes) to the district level;
130
♦ To establish DTH based Digital Disaster Warning System (DDWS) in
cyclone prone coastal areas of the country;
♦ Necessary ground segment for the new Jet Aircraft which is being
procured will be put in place;
(Rs. in crores)
Budget Revised Budget
2009-2010 2009-2010 2010-2011
131
maximum data from ISRO’s own satellites. Data from balloon-borne
experiments are also used for studying the climate change processes. The
ISRO GBP covered projects relating to climate observations & modeling,
atmospheric chemistry & aerosols and Biogas cycles & Global changes.
(Rs. in crores)
Budget Revised Budget
2009-2010 2009-2010 2010-2011
*****
132
CHAPTER - V
FINANCIAL REVIEW
133
Additional Secretary & IFA of the Department takes a rigorous review of
the expenditure/commitment status on a monthly basis to ensure that the
financial and programmatic targets are realized. The project management
councils/project management boards of all the major projects constituted at
the DOS/ISRO Centre level also review the progress of
expenditure/commitment status and initiate necessary follow-up actions
keeping in view the programmatic criticalities. Thus, periodical review of
the physical and financial performance of all the projects/schemes is an
integral part of the planning and implementation strategy of DOS/ISRO.
(Rs. in crores)
Non-Plan Plan Total
134
the Industry Contract, Management Strategy and financial aspects of the
‘Galileo Programme’ were not finalized by the European Commission.
Considering this and also the ceiling fixed by Ministry of Finance, the
Revised Estimates 2006-2007 was reduced to Rs.2997.29 crores. The actual
expenditure during 2006-2007 was Rs.2998.66 crores. i.e., 99.71% budget
utilisation w.r.t. RE.
(Rs. in crores)
Non-Plan Plan Total
135
6. The Revised Estimates 2008-2009 was reduced to Rs.3499.04
crores in compliance with the reduced ceilings fixed by the Ministry of
Finance. The actual expenditure during the year was Rs.3493.57 crores
which is about 99.84% budget utilization with respect to RE.
*****
136
Department of Space
Table 5.1
A SPACE TECHNOLOGY
I Launch Vehicle Technology
1 Geo-synchronous Satellite Launch Vehicle (GSLV) Project 1.00 0.00 0.00 0.00 0.00 0.00
2 Cryogenic Upper Stage Project 0.10 0.70 0.70 0.37 0.27 0.10
3 PSLV-Continuation Project 180.00 150.00 164.97 220.00 200.00 250.00
4 GSLV Mk-III Development 270.00 240.19 219.96 217.00 200.20 152.96
5 Space Capsule Recovery Experiment - I & II 10.00 10.00 7.88 12.00 9.00 4.93
6 GSLV – Operational Project (including Mk-III Operational) 255.00 240.00 251.99 275.00 235.00 250.00
7 Vikram Sarabhai Space Centre 432.28 494.69 507.22 613.42 625.43 583.66
8 ISRO Inertial Systems Unit 23.16 23.19 23.52 30.84 29.71 28.78
9 Liquid Propulsion Systems Centre 204.19 209.36 204.25 285.93 285.55 303.54
10 Manned Mission Initiatives/Human Space Flight Programme 125.00 42.01 34.82 230.00 30.00 150.00
11 Indian Institute of Space Science & Technology 65.25 65.25 65.25 175.00 145.00 140.00
12 Semi Cryogenic Engine Development 22.50 4.09 4.27 155.00 36.00 250.00
Sub-Total 1588.48 1479.48 1484.83 2214.56 1796.16 2113.97
II Satellite Technology
13 Cartosat-2 0.00 0.00 0.00 0.00 0.00 0.00
14 Oceansat-2 & 3 10.00 12.00 8.24 6.00 6.00 1.60
15 Resourcesat-2 & 3 35.00 25.00 25.13 35.00 25.00 22.00
137
Sl. Programmes/Projects/Centres/Units Budget Revised Actuals Budget Revised Budget
No. 2008-2009 2008-2009 2008-2009 2009-2010 2009-2010 2010-2011
16 G.SAT-4 7.00 4.30 4.79 2.90 2.40 0.00
17 RISAT-1 25.00 30.00 27.64 5.00 6.50 3.50
18 Advanced Communication Satellite (GSAT 11 including Launch Services) 22.50 1.00 0.00 5.00 11.00 125.00
19 Navigational Satellite System (including IRNSS) 270.00 200.00 166.65 270.00 220.00 262.10
20 ISRO Satellite Centre 215.85 253.44 270.50 304.87 332.45 420.19
21 Laboratory for Electro-Optics System 37.14 31.63 31.26 44.59 37.09 40.14
22 Semi-conductor Laboratory 34.28 39.48 37.60 45.00 46.67 53.85
23 Earth Observation-New Missions (Cartosat-3, Tes Hyperspectral, 65.00 2.70 0.00 13.00 4.00 35.50
DMSAR-1 and GISAT)
24 SARAL 0.00 0.00 0.00 0.00 0.00 40.00
Sub- Total 721.77 599.55 571.81 731.36 691.11 1003.88
24 Satish Dhawan Space Centre - SHAR 237.99 318.95 330.78 340.41 361.24 386.90
25 ISRO Telemetry, Tracking and Command Network 63.28 85.94 90.01 101.02 101.98 88.01
Sub- Total 301.27 404.89 420.79 441.43 463.22 474.91
B SPACE APPLICATIONS
1 Space Applications Centre 169.84 195.13 193.17 254.10 296.17 297.41
2 Development & Educational Communication Unit 58.41 60.00 62.17 58.13 36.29 83.02
3 Earth Observation Applications Mission 2.68 2.59 1.46 4.40 3.18 2.31
4 National Natural Resources Management System 28.23 26.63 21.60 20.00 18.36 87.62
5 Regional Remote Sensing Service Centres 11.10 13.77 15.48 21.89 35.14 0.00
138
Sl. Programmes/Projects/Centres/Units Budget Revised Actuals Budget Revised Budget
No. 2008-2009 2008-2009 2008-2009 2009-2010 2009-2010 2010-2011
6 National Remote Sensing Agency (including Aid Equipment) 35.00 0.00 0.00 0.00 0.00 0.00
7 North Eastern Space Applications Centre 5.00 5.00 5.00 7.00 7.00 8.00
8 Disaster Management Support 65.00 29.32 21.01 40.00 26.01 38.62
9 National Remote Sensing Centre 0.00 70.31 76.28 141.16 161.11 230.15
TOTAL : B - SPACE APPLICATIONS 375.26 402.75 396.17 546.68 583.26 747.13
C SPACE SCIENCES
1 Physical Research Laboratory 51.44 60.91 56.50 62.32 67.10 71.70
2 ISRO Geosphere-Biosphere Programme 19.00 21.50 19.48 25.78 21.63 28.96
3 Sensor Payload Development/Planetary Science Programme 5.00 4.50 3.02 5.00 2.34 16.00
4 Megha-tropiques Project 20.00 20.00 18.92 15.00 15.00 10.00
ADITYA 0.00 0.00 0.00 0.00 0.00 40.00
5 Indian Lunar Mission-Chandrayaan-1&2 78.00 88.00 74.30 90.00 19.50 100.00
6 Astrosat-1 & 2 25.00 21.00 21.08 20.00 13.70 10.00
7 National Atmospheric Research Laboratory (NARL) 11.31 12.78 12.40 15.43 11.85 14.45
National Institute of Climate Change and Environment Studies (NICES) 0.00 0.00 0.00 0.00 0.00 1.00
8 Sponsored Research (RESPOND) 13.00 12.65 12.61 13.00 16.50 15.00
9 Atmospheric Science Programme 14.49 15.30 10.77 20.96 27.47 28.45
10 Small Satellites for Atmospheric Studies & Astronomy 10.00 0.00 0.00 2.00 12.00 10.00
11 Other Schemes 21.13 11.65 10.40 14.25 13.14 15.70
139
Sl. Programmes/Projects/Centres/Units Budget Revised Actuals Budget Revised Budget
No. 2008-2009 2008-2009 2008-2009 2009-2010 2009-2010 2010-2011
E INSAT OPERATIONAL
1 INSAT-3 Satellites 9.90 20.00 20.71 8.60 5.50 77.50
2 INSAT-3 Launch Services 0.10 0.10 0.10 0.10 0.00 0.10
3 INSAT-4 Satellites (including leasing of Transponders) 280.00 161.69 164.96 323.00 187.80 318.10
4 INSAT-4 Launch Services 60.00 0.00 0.00 50.00 0.00 256.20
5 Master Control Facility 54.81 54.10 46.03 64.56 51.88 55.03
TOTAL : E - INSAT OPERATIONAL 404.81 235.89 231.80 446.26 245.18 706.93
140
CHAPTER – VI
141
Major Achievements during 2009-2010
142
♦ Studies of radiative mechanisms for understanding small neutrino masses
and the appropriate magnitudes of neutrino mixing angles are pursued;
♦ Impact of new theories for neutrino masses and dark energy in the
context of upcoming Large Hadron Collider experiments will be studied;
♦ The new IR array (NICS) will be operated in both its imaging and
spectrometer modes for the study of star forming regions, close binary
systems, evolved stellar objects and Active Galactic Nuclei;
♦ Planned to install a 50cm telescope for Blazer studies and for looking at
gravitationally lensed planets;
143
♦ An aerosol time-of-flight Mass Spectrometer will be commissioned to
measure size-segregated chemical composition of aerosol particles;
144
♦ Studies on signatures of physics beyond the standard model and of
theories of inflation and their relation to cosmic microwave background
will be pursued. Studies on problems in classical and quantum chaotic
systems will be continued;
♦ Conversion of the existing MST radar to a fully active aperture array and
realization of MF radar for mesospheric studies. Under this project, the
concept of active array will be implemented on an external 133-element
circular array;
145
♦ Completion of first phase of the Rayleigh Doppler lidar in which the low
altitude region is being probed first with a small aperture telescope, a
stabilized laser and single etalon with associated optics;
146
♦ Upgradation of the existing Rayleigh lidar for day time temperature
profile measurement, development of a Fe Boltzmann temperature lidar
for studying the mesospheric temperature inversion, and an all sky
imager for studying the air glow from the Ionospheric and thermospheric
regions;
147
♦ Taken up a major national project on ‘Applications of remote sensing
and GIS in sericulture development’ for Central Silk Board (CSB) with
the participation of State Remote Sensing Applications Centres
(SRSAC);
♦ Weather advisory has been issued regularly to the farmers in the villages
covered by ISRO-ABITA installed VRC Centers;
148
♦ Lakhimpur District of Assam. Four events of flood were forecasted
during the monsoon season;
♦ Planned to complete all major items under the Natural Resources Census
(NRC) projects. The CSB sponsored project on ‘Applications of remote
sensing and GIS in Sericulture development’ will be one of the major
activities during the XI plan period. Four new projects has been taken up
under Earth Observation Application Mission (EOAM);
149
♦ To attempt three hourly rainfall estimates from satellite data for hilly
region like NER;
150
Assurance & Reliability and System Level Assembly Facility.
Development & manufacture of ASICs for Strategic Sector is the major
thrust;
151
♦ Completion of production of 221 nos of Dr.Pisharoty’s sondes units and
dispatched to various users for Atmospheric studies;
152
5. Indian Institute of Space Science & Technology (IIST)
(Rs. in crores)
153
5.3 The work of constructing permanent campus for IIST at Valiamala
was awarded to a reputed construction company. The construction work had
started in the month of December 2008 and has made a good progress since
then. The govt. of Kerala has allotted about 45 acres of land at Valiamala, to
IIST, in addition to the 20 acres already allotted at Ponmudi.
♦ UGC sanction was obtained for starting three new M.Tech Courses. A
UGC team visited IIST and reviewed the performance of the Institute and
expressed satisfaction in the progress made. The overall student strength
has increased to 438, with the admission for the third batch. The
infrastructure required to accommodate the third batch of students was
created in the ATF campus. New Laboratories for Analog Electronics,
Digital Signal Processing and Physics were created in the TERLS area,
thereby minimizing the dependence on outside Institutions;
154
Major programmes for 2010-2011
♦ IIST will have its full complement of students in 2010-11, with the
admission of the fourth batch of students. Unlike the previous years, the
selection of students will be done through a competitive examination to be
organized by the Institute itself;
*****
155