You are on page 1of 6
mer TENTATIVE SPECIFICATION FOR SINGLE COAT BITUMINOUS SURFACE DRESSING (rat Reprint) THE INDIAN ROADS CONGRESS 1996 TENTATIVE SPECIFICATION FOR SINGLE COAT BITUMINOUS SURFACE DRESSING (Firat Reprint) Publised by “THE INDIAN ROADS CONGRESS amnager House, Shajaban Road, "New Det-10011 1996 ea, 0 eu acy Foe) Fst Published : Angus, 1965 Repeated: Feb 1974 Reprinted Feb. 1980 Reprined Novy 2002 (Rights of Pubicorin ad of Tronlaton er reseed) ‘Prine t DEE KAY PRINTERS, New Deh 10015 (600 copes) ‘TENTATIVE SPECIFICATION FOR SINGLE COAT "BITUMINOUS SURFACE DRESSING “The Tentative Speciation as prepared by the Bitumizous aves Commies personel gren lo nthe ating Bld ENGR Biante a ark 85a at lf ct of onal for their comets The Teatve Speticaton ay adopt Sythe Dtuminous Pavements Commitee a ther meting Wel at ‘Changiparh in November 196) la ight of the comments of the toembers of the Comer approved. for pobeston by he Executive Commitee in their meating held onthe 30th. September, 964 ana wart publi in Aug, 1963. "The preset sept cof thease iaorpoater serum amendments inthe ight of ser ‘ess f the Coercion reted speciation. sense or, SX Rajgopeian Dieter Geral ond Deepen) & Asa cyto ne Gout aa fn “he Tentative specication is intended to indicate what ie somsideed tobe geo practice for contruction of ingle cou Diu: ‘soe trie desing Ze sl apy ules toil byspeca “The work spesied consists of « wearing surface composed of 1 single applantin of ituminoss maternal covered with obe app {atog of Sver materal of tau ay spesiedelow,apped. Ona ye ‘ously prepared Bae or pavement ' snes tans 2.1. Bituminous Materials {The bitusinows material sh confor tthe requirements as specie and proned Tor inthe propa and sti the lated ‘feeleation, ished by the tadan Standard Ison (ie C1 andards 73-196, 2181961, 217 1961 and 434-161). Tae grades ‘ot binders co be wsed would depend opon the clint condom, 22. Cover Materials 22:1. General requlcmeats | The cover materi shall ‘ons of cashed stone fused sing. crathed gravel (hing father stones ae spect, ave clea rose Sad fay cael rag rom sisiteiated pce, al vegeible matter dust and adherent oti cast inbie a reasonable cost, woud gravel The aggepte shall preferably be Aydeopbobi in nature and of ow pono. 2.22. sie rquremeats | The apgcegte sal satisfy the egirement given in Table. Pow ae Malet Sey feo i 1s:au Whee all thee conditions cangot be satsed, it set 10 the Eegineersinchargs to slow ensnabl alerances 2.23. Sue: The sie ochinnng 1 be wed shall depend ‘on wither We tcatsien ie forthe a iat forthe subsequent or femoral cut sal bea er the ig seid tion Fo se ‘ppleation othe aggrepres is dcarble to Keep ce adig ofthe ‘howe nes as specie i Table 2. Sire degnation nmi! sof eee Syeifaion spelt tg rtncermsnrlr i SL. Weather and Searonal Limitations Preletably these desing work sal be caved on only when fe smespherictempecnore ih tae te 16 of above. “NO tS mate sh somal be apd whe the sue oF {BSiaa dase, eteps eu of muitos the sulace shod be ‘abt damp. 32. Equipment All equipment necessary for the proper sonetrction of work sant on i she of the work mgood seein. 3 33, Preperation of Road Surface “The uoderying course om which surface desing is oe laid sis epee ander grade td ‘Sade up and throughly, compacted rulbleny ia advance. The ‘Tene parts shuld be clear et owt andthe ptehes of new atrial po aod 80 pt a the existing sue. Where the exiting syace shows signs of “fttingup", such positon soci be rece tis mportant hat he zurface be dy and throughly. cleaned immer Et ying tasee Ee oe ok nape apne eae ele un other orcan mati leaned et wi Ase hes il seb fly ewig ih rarity hg to emi ne dnt ese eet Scone ot a wom apres te i ‘preferably by mechanical sprayer. Ii the ase to be covered bythe surace tectment is on old ‘jtumfnous surfing taba be swept lean and fe fom tah et'dus and oter ove, deleterious, foreign mater. by means of ‘mechanial sneepes ond Blowers, iesvetable, supplemented. by fd broom whee ncenary er by means of vice brushes small Picks, bras Broom, ce and shal be dry. Whenever pine coat poi tthe sre no Bituminous anaes be sled wat he prime oa as tourhy cued ‘Ghsrespene 1H Ioebes) The copes che wurace tobe ene SEATS Sine by rope lines tucched n poston 34, Application of Btminous Matra er the surface io be ented hs bem prepared es specified above! bugis oneal shall be spayed uaormly over te dy vce peesby vg mechani ayes the de all BC SBMS De ents approprateto the typeof binder and eguipe wea Fabled ger apmonimate rate of splcation a bi frinous material aod aggregates Per 1010 of trie. ‘Biumins terial sal be applied to he surface eniormly in quant yeihels Escessne depose of Bituminous mate in avanti’ race caused by stopping ov sarting te sprayer, by TBRnse sr tkeews, sal be ubnedtey removed 3. Application of Cover Materia ‘Process lmao singe appction Tnvmesitely afer the application of bituminows materia, the ‘over material ie the enmity mentioned in Table 3 shall be spread eho by hand or by means of a choi pte 0 28 to cover the ere completely.” It's peveablto use mechanical gies “The surfce eal be bromed with view to ensoreanform spreading 3.6 Rolling Cover Materials Immediately afte the application of the cover materials 2s esrb in Seton 1.5, the ene srfce sal be led with 3 6 12 Wome rod'foller The rlling sl begin at the edge and proceed Ieper hates beled lpg ot Ton oe ie ttherolir tread and proceed towatds the cee. When the Sec raced otf sh then trate open, se tana the fling shea proceed fom the nerf the outer ae ‘Wine the rting iim progress adions!aperqate hall be spad tylband in whee unis maybe regu i el es Shei bE conned un fhe poets re emly embedded he ‘umnous matrats and presnt a tno cloedurface, Peesive olin hich ests a the craig ofthe agveate paces, shall Sebnodes 37, Fishing alist cae hal be nom and conor ft ns {teh template aoa staght edge, the sure shall Stow no 38, Opeing to Trae ‘When straight ron bitumen or road tar ix employed ax the binder, the foshed sree shal be thrown ‘open to tific on the Fbowiog day busin special sucumstancs, he road fegied te bevpendd to tate mediately afer raling. speed, of the tae ShaP belied to 16 kn pe bout il the fling day ‘Where cutback bitumen and emulsion isemploye, the Gisbed sarface shal be kept closed tothe ate ut tha Suen cote fot the caver greats in piace ‘Controlling of rath shal be done by some ritble device, sch ‘as burning and posting af Naish, ee 5 na626 oot -

You might also like