Question 1
The P&ID includes:
Correct
Question 2
A piping and instrumentation diagram (P&ID) will show
Correct major flow lines:
Mark 1.00 out
of 1.00
Select one:
a. only with line size and major valves
The correct answer is: with all information for those lines
Question 3
When colour coding and labeling is used in a plant:
Incorrect
Question 4
(4-021-1.3) One of the most important features of the
Incorrect first lines drawn in a sketch is that they:
Mark 0.00 out
of 1.00
Select one:
a. Show the main proportion of the sketch
b. Are bold
Question 5
A plant line tracing is a _________ that helps Power
Incorrect Engineers to learn a new plant:
Mark 0.00 out
of 1.00
Select one:
a. Process Flow Diagram
b. Level glass
c. Level recorder
Question 7
(4-021-1.4) Lines used to indicate distance between two
Correct points on a sketch are called:
Mark 1.00 out
of 1.00
Select one:
a. Dimension lines
b. Centre lines
c. Extension lines
d. Object lines
Question 8
(4-021-4.1) Section lines of a drawing that show the
Correct material of construction are usually drawn at an angle
Mark 1.00 out of:
of 1.00
Select one:
a. 60°
b. 45°
c. 30°
d. 90°
b. Personal maintenance
c. Preventative maintenance
d. Panic maintenance
Question 10
Who would be one of the most important reviewers of a
Correct new SOP?
Mark 1.00 out
of 1.00
Select one:
a. The HR manager
d. The Author
Question 11
In comparing the two common communication
Correct methods, writtencommunication is more effectively
Mark 1.00 out used when:
of 1.00
Select one:
a. There is less time to prepare
b. In emergency situations
b. Front
c. Right side
d. Bottom
Question 13
On a P&ID, symbols are used for instrumentation the
Incorrect first letter stands for:
Mark 0.00 out
of 1.00
Select one:
a. The type of alarm
Question 14
One of the main advantages of verbal communication is:
Correct
Question 16
An SOP is used to
Correct
Question 17
(4-021-1.5) Foundation or centre lines of a sketch should
Incorrect be:
Mark 0.00 out
of 1.00
Select one:
a. Always done to scale
b. Check valve
c. Globe valve
d. Gate valve
Question 19
One of the main types of maintenance is:
Correct
b. QMS
c. SOP's
d. Preventative
Question 20
Incorrect The symbol is used in P&ID diagrams to indicate
Mark 0.00 out
of 1.00 a:
Select one:
a. Globe valve
b. Check valve
c. Plug valve
d. Gate valve