Asset MCRA
th
Survey Date 21 February 2020
Revision 1
HIGH - ALARM Machines is in advanced stages of failure. Failure is imminent if use is prolonged.
1
SERIOUS (Repair at earlier opportunity)
Fault is present that requires attention, however, vibration level do not require
LOW - ALARM
immediate attention. 2
SIGNIFICANT
( Schedule for maintenance)
WATCHLIST Additional task are required to monitor or further analysis monitor closely. 3
4 21-Feb-20 Lower Deck G7510B BN GAS TURBINE GENERATOR 2 Acceptable vibration Acceptable vibration. Normal CBM/OPS
5 21-Feb-20 Upper Deck G7520 ENGINE DIESEL GENERATOR 1 Acceptable vibration Acceptable vibration. Normal CBM/OPS
6 21-Feb-20 Upper Deck K5410B AIR COMPRESSOR B 2 Acceptable vibration Acceptable vibration. Normal CBM/OPS
7 21-Feb-20 Lower Deck P-1330B CONDENSATE PUMP 2 Acceptable vibration Acceptable vibration. Normal CBM/OPS
8 21-Feb-20 Lower Deck P-5101A FRESH WATER PUMP 2 Acceptable vibration Acceptable vibration. Normal CBM/OPS
9 21-Feb-20 Lower Deck P-5101B FRESH WATER PUMP 2 Acceptable vibration Acceptable vibration Normal CBM/OPS
10 21-Feb-20 Lower Deck P-6701A DIESEL TRANS PUMP 2 Acceptable vibration Acceptable vibration. Normal CBM/OPS
11 21-Feb-20 Lower Deck P-6701B DIESEL TRANS PUMP 2 Acceptable vibration Acceptable vibration. Normal CBM/OPS
Machinery Severity Tracking
No. Equip No. Equipment Name Jan-19 Feb-19 Mar-19 May-19 Jun-19 Jul-19 Aug-19 Oct-19 Nov-19 Dec-19 Feb-20