Week 7 Date 2/11/2020 22/11/2020 23/11/2020 241172020 25/11/2020 261112020 PART : DAILY ACTIVITY REPOR Work Summary / Daily Activity {MENYAMBUNG MELAKUKAN KERJA-KERJA PENDAWAIAN DI PPE OLIVE - MEMBUAT PENDAWAIAN LUNTOK LAMPU, KIPAS, DAN PENGHAWA DINGIN DI TINGKAT 1 - MEMBUAT PEMASANGAN SOKET 13A, SUIS LAMPU DAN DOUBLE POLE PENGHAWA DINGIN ; MENYAMBUNG MELAKUKAN KERIA-KERJA PENDAWAIAN DI PPE OLIVE - MEMASANG LAMPU LED DAN LAMPU KECEMASAN - MEMASANG SOKET 134, SUIS LAMPU DAN DOUBLE POLE" PENGHAWA DINGIN - MEMBUAT PENGUIIAN DI SUIS LAMPU BAG! MEMASTIKAN SEMUA LAMPU LED YANG DIPASANG BERFUNGSI DENGAN BAIK {MEMBUAT PEMASANGAN ‘CASING’ DAN ‘INSULATION’ UNTUK ‘OUTDOOR’ PENGHAWA DINGIN MASJID PERUDA. INSULATION’ YANG LAMA DAN ROSAK DIGANTIKAN DENGAN 'INSULATION' YANG BARU DAN ‘CASING DIPASANGKAN BAGI MENGELAKKAN TERDEDAH KEPADA CAHAYA MATAHARI UNTUK JANGKA MASA YANG PANJANG ~ MENYAMBUNG MELAKUKAN KERJA-KERIA PENDAWAIAN DI PPE OLIVE (EMBUAT ‘CHEMICAL SERVICE” UNTUK PENGHAWA DINGIN JENIS WALL MOUNTED’ 3 UNIT - MEMBUAT ‘CHEMICAL SERVICE’ UNTUK PENGHAWA DINGIN JENIS ‘CEILING CASSETTE’ 3 UNIT - MEMBUAT PEMERIKSAAN UNTUK PENGIAWA DINGIN YANG TIDAK SEIUK - HASIL PEMERIKSAAN MENDAPATI MOTOR FAN PADA ‘OUTDOOR’ TELAI ROSAK DAN DIGANTIKAN DENGAN BARU [AAMBUAT CHEMICAL SERVICE UNTUK PENGHAWA DINGIN 1 OP SEBANYAK 2 UNIT - MENGEMAS BENGKEL Time Taken 8 how 8 hour's hourls houris PART D: WEEKLY ACTIVITY REPOR UI RERJA-KEIUA PENDAWAIAN FADA MINGGU INI DILAKUKAN DI PPE ULIN| SEHINGGA SLAP 2) MEMBUAT CHEMICAL SERVICE’ UNTUK PENGHAWA DINGIN 2) MEMASANG ‘CASING’ UNTUK MELINDUNGI INSULATION’ YANG TERDEDAH KEPADA CAHAYA MATAHARI DI ATAS BUMBUNG MASIID ction for Supervisor Please confirm the student activity report on the related Week 7 bef WEEKLY EVALUATION BY INDUSTRIAL SUPERVISOR Performance and student report are = Very Unsatisfied 5 Unsatisfied ie] Comments uation and comments. Tick (¥) on the appropriate checkbox Position and Company Stamp: Date:

You might also like