PART : DAILY ACTIVITY REPOR
Work Summary / Daily Activity
{MENYAMBUNG MELAKUKAN KERJA-KERJA PENDAWAIAN DI PPE OLIVE - MEMBUAT PENDAWAIAN
LUNTOK LAMPU, KIPAS, DAN PENGHAWA DINGIN DI TINGKAT 1 - MEMBUAT PEMASANGAN SOKET 13A,
SUIS LAMPU DAN DOUBLE POLE PENGHAWA DINGIN
; MENYAMBUNG MELAKUKAN KERIA-KERJA PENDAWAIAN DI PPE OLIVE - MEMASANG LAMPU LED DAN
LAMPU KECEMASAN - MEMASANG SOKET 134, SUIS LAMPU DAN DOUBLE POLE" PENGHAWA DINGIN -
MEMBUAT PENGUIIAN DI SUIS LAMPU BAG! MEMASTIKAN SEMUA LAMPU LED YANG DIPASANG
BERFUNGSI DENGAN BAIK
{MEMBUAT PEMASANGAN ‘CASING’ DAN ‘INSULATION’ UNTUK ‘OUTDOOR’ PENGHAWA DINGIN MASJID
PERUDA. INSULATION’ YANG LAMA DAN ROSAK DIGANTIKAN DENGAN 'INSULATION' YANG BARU DAN
‘CASING DIPASANGKAN BAGI MENGELAKKAN TERDEDAH KEPADA CAHAYA MATAHARI UNTUK JANGKA
MASA YANG PANJANG
~ MENYAMBUNG MELAKUKAN KERJA-KERIA PENDAWAIAN DI PPE OLIVE
(EMBUAT ‘CHEMICAL SERVICE” UNTUK PENGHAWA DINGIN JENIS WALL MOUNTED’ 3 UNIT - MEMBUAT
‘CHEMICAL SERVICE’ UNTUK PENGHAWA DINGIN JENIS ‘CEILING CASSETTE’ 3 UNIT - MEMBUAT
PEMERIKSAAN UNTUK PENGIAWA DINGIN YANG TIDAK SEIUK - HASIL PEMERIKSAAN MENDAPATI
MOTOR FAN PADA ‘OUTDOOR’ TELAI ROSAK DAN DIGANTIKAN DENGAN BARU
[AAMBUAT CHEMICAL SERVICE UNTUK PENGHAWA DINGIN 1 OP SEBANYAK 2 UNIT - MENGEMAS
BENGKEL
Time
Taken
8
how
8
hour's
hourls
houris
PART D: WEEKLY ACTIVITY REPORUI RERJA-KEIUA PENDAWAIAN FADA MINGGU INI DILAKUKAN DI PPE ULIN|
SEHINGGA SLAP
2) MEMBUAT CHEMICAL SERVICE’ UNTUK PENGHAWA DINGIN
2) MEMASANG ‘CASING’ UNTUK MELINDUNGI INSULATION’ YANG TERDEDAH KEPADA
CAHAYA MATAHARI DI ATAS BUMBUNG MASIIDction for Supervisor
Please confirm the student activity report on the related Week 7 bef
WEEKLY EVALUATION BY INDUSTRIAL SUPERVISOR
Performance and student report are
= Very Unsatisfied 5 Unsatisfied
ie]
Comments
uation and comments. Tick (¥) on the appropriate checkbox
Position and Company
Stamp:
Date: