You are on page 1of 17

NETWORKING

Networking Outline - 6 Months

Basics N+, Hardware Software,WiFi, CCNA, CCNP


FIRST MONTH SYLLABUS

BASICS (HARDWARE /SOFTWARE)

TERM I : WEEK I
(BASICS OPERATIONS)

Introduction/Course Outline/Cisco
Day 1:
Certifications/Industrial Scope
PRACTICALS

Internetworking Basics, Concepts of LAN and 1.Computers Hardware


Day 2:
Wan PC Assembly (Ram Rom
Internetworking Models, The Layered Hard disk etc.)
Day 3:
Approach
2. Hardware Installation
Advantages of Reference Models, The OSI  Ethernet Lan card
Day 4:
Reference Model  External Wi-Fi
card

The TCP/IP model (DOD Model), Models 3.Practicals Repeated


Day 5:
working Approach

Practical Day / Personality Development/Repeated Class/Doubts


Day 6: Session/Guest Lectures
TERM I : WEEK II
(NETWORK DEVICES OPERATIONS)

Day 1: Operation of IP Data Networks PRACTICALS

Day 2: Recognize the purpose and functions of 1.Cable making


various network devices such as Routers,  Straight cable
Switches, Bridges and Hubs.
 Cross cable
 Roll over cable

Select the components required to meet a 2. Functioning of HUB


Day 3:
given network specification.
3. Functioning of SWITCH

4.Ip addressing to PC
Day 4: Identify common applications and their
impact on the network& Predict the data, 5. Computers sharing.
Flow between two hosts across a network.
 With HUB
 With switch
Identify the appropriate media, cables,
Day 5: ports, and connectors to connect Cisco,
network devices to other network devices
and hosts in a LAN

Practical Day / Personality Development/Repeated Class/Doubts


Day 6: Session/Guest Lectures
TERM I : WEEK III
(IP ADDRESSING (IPV4 /IPV6)

Day 1: Describe the operation and necessity of


using private and public IP addresses for PRACTICALS
IPv4 addressing
Identify the appropriate IPv6 addressing
Day 2: scheme to satisfy addressing 1.Sharing Process
requirements in a LAN/WAN
environment. Hardware sharing
Identify the appropriate IPv4 addressing
 Printer Sharing
Day 3: scheme using VLSM and summarization to
satisfy addressing requirements in a
Software Sharing
LAN/WAN environment.
 Files sharing

Describe the technological requirements  Data sharing


Day 4:
for running IPv6 in conjunction with IPv4
such as dual stack 2.Remote Desktop
Connections

3.Remote Assistance
Day 5: Describe IPv6 addresses
4.Map Network Drive

Practical Day / Personality Development/Repeated Class/Doubts


Day 6:
Session/Guest Lectures
CCNA (200-125) MODULE

TERM I : WEEK IV
(IP ROUTING TECHNOLOGIES)

Day 1: Describe basic routing concepts & describe


PRACTICALS
boot process of Cisco IOS routers
Configure and verify utilizing the CLI to set
1.Introduction Of Simulator
Day 2: basic Router configuration and configure
 Cisco Packet Tracer
and verify operation status of a device  Gns-3
interface, both serial and Ethernet.
Verify router configuration and network 2. Cisco Packet Tracer Simulator
Day 3: connectivity & configure and verify  Basic Commands

routing configuration for a static or default


route given specific routing requirements 3.Designing Of Topologies

Differentiate methods of routing and 4.Routing


Day 4: routing protocols & configure and verify  Static routing
OSPF  Default routing

Configure and verify EIGRP (single AS) and  Dynamic routing

Day 5: configure and verify inter VLAN routing (Rip Eigrp Ospf)

and configure SVI interfaces

Day 6:
MONTHLY PERFORMANCE TEST
SECOND MONTH SYLLABUS

TERM II : WEEK I
(LAN SWITCHING TECHNOLOGIES)
Determine the technology and media
Day 1: access control method for Ethernet
PRACTICALS
networks
Identify basic switching concepts and the Switching
Day 2: operation of Cisco switches & configure
switch configuration including remote 1. Virtual LAN
access management.
Verify network status and switch operation 2. Intervlan
Day 3: using basic utilities such as ping, telnet and
Ssh & Identify enhanced switching 3. Spanning Tree Protocol
technologies
Describe how VLANs create logically 4. Virtual Trunking
Day 4:
separate networks and the need for routing Protocol
between them.
5. Port Security

Configure and verify VLANs and verify


Day 5:
trunking on Cisco switches and configure
and verify PVSTP operation

Practical Day / Personality Development/Repeated Class/Doubts


Session/Guest Lectures
Day 6:
TERM II : WEEK II

(IP SERVICES)

PRACTICALS
Day 1: Configure and verify DHCP (IOS Router)

Describe the types, features, and


1.Dhcp configuration
Day 2: applications of ACLs and configure and

verify ACLs in a network environment


2. Dhcp relay agent

Identify the basic operation of NAT and


Day 3:
configure and verify NAT for given 3.Domain name server

network requirements

4.ACL & NAT Basic


Day 4: Configure and verify NTP as a client
configuration

Day 5: Recognize High availability (FHRP)

Practical Day / Personality Development/Repeated Class/Doubts


Day 6:
Session/Guest Lectures
TERM II : WEEK III
(NETWORK DEVICE SECURITY)
Configure and verify network device
Day 1:
security features configure and verify
Switch Port Security features PRACTICALS
Configure and verify ACLs to filter network
Day 2: Security
traffic configure and verify ACLs to limit
telnet and SSH access to the router 1.Acess control list
 Standard ACL
Troubleshooting Start
 Extended ACL
Identify and correct common network
2. Network address Translation
Day 3: problems and Troubleshoot and correct
common problems associated with IP  Static NAT
addressing and host configurations.  Dynamic NAT
 Overload NAT(PAT)
Day 4: Troubleshoot and Resolve VLAN problems
Troubleshoot and Resolve trunking 3.Troubleshoot Problems
Day 5:
problems on Cisco switches and Spanning
Tree operation Doubts Session.
Practical Day / Personality Development/Repeated Class/Doubts
Session/Guest Lectures
Day 6:
TERM II : WEEK IV

(TROUBLESHOOTING CONTINUES...)

Troubleshoot and Resolve routing Doubts


Day 1: PRACTICALS
Session and Resolve OSPF problems

Troubleshoot and Resolve EIGRP 1.Configure and Troubleshoot


Day 2:
problems EIGRP Protocols

Troubleshoot and Resolve inter VLAN


Day 3:
routing problems 2.Tshoots Intervlan Doubts

Troubleshoot and Resolve ACL Doubts Session

Day 4: Session and Resolve WAN implementation

Doubts Session 3.Tshoots Security Doubts

Troubleshoot and Resolve Layer 1 Session


Day 5:
problems and ether channel problems

Day 6: MONTHLY PERFORMANCE TEST


THIRD MONTH SYLLABUS

CCNP ROUTE MODULE (300-101)

TERM III : WEEK I


PROJECT DISCUSSION WEEK
(ENHANCED INTERIOR GATEWAY ROUTING PROTOCOL)
What is your technology interest?
Project discussion/Idea
Day 1: Why you choose this project? What are the
key benefits of this project?
Determine your smart goals organize your
Day 2: Project Plan/assigned project into steps, specific tasks, and time
frames possible obstacle and solutions.
Prepare for possible setbacks ,making sure
everyone has the resources( equipment,
Day 3: Execute Project time and materials) to do their part of the
project and know what work needs to be
completed
Create an EIGRP 1.Enhanched interior gateway
Day 4: implementation plan
routing protocol
/verification plan
 CONFIGURATION
EIGRP Routing and Frame-
Day 5: relay implementation with  Verification
eigrp
 Implementation

 Solutions
Day 6: Verify an EIGRP solution
TERM III : WEEK II

(OPEN SHORTEST PATH FIRST)

Day 1: Create an OSPF implementation plan PRACTICALS

Day 2: Create an OSPF verification plan


1.Open Shortest Path First

Day 3: Configure OSPF Routing  CONFIGURATION

 Verification
Day 4: Frame-relay implementation with OSPF
 Implementation

 Solutions
Day 5: Verify OSPF Solution

Practical Day / Personality Development/Repeated Class/Doubts


Day 6:
Session/Guest Lectures
TERM III : WEEK III
(EXTERNAL BORDER GATEWAY PROTOCOL)

Day 1: Create an eBGP implementation plan


PRACTICALS
2.BGP Configuration
Day 2: Create an eBGP verification plan
 IBGP/EBGP

 Configuration
Day 3: Configure eBGP Routing/solutions
 Implementation

 Verification
Day 4: Vpn technology gre tunnel

Day 5: Vpn technology ipv4 ipv6 tunnel


2.VPN Configuration

Practical Day / Personality Development/Repeated Class/Doubts


Day 6:
Session/Guest Lectures

TERM III : WEEK IV


(INTERNAL BORDER GATEWAY PROTOCOL AND PATH CONTROL)
Create an IBGP implementation
Day 1: PRACTICALS
/verification plan

Configure IBGP Routing/solutions 1. IBGP Routing


Day 2:
2. IBGP Solution and
Route filtering techniques
Day 3: verification

Day 4: Path Control Implementation 3. Route Filtering

Day 5: Enterprise Internet Connectivity

Day 6: MONTHLY PERFORMANCE TEST


FOURTH MONTH SYLLABUS

TERM IV : WEEK I
(INTERNET PROTOCOL VERSION 6)

Day 1: Create an IPv6 implementation plan PRACTICALS

Day 2: Create an IPv6 verification plan 1.IPV6 Addressing

 Ipv6 routing
Day 3: Configure IPv6 Routing
 Static

 Dynamic

 RIPng
Day 4: Configure IPv6 interoperation with IPv4
 OSPFv3

 EIGRPv6

Day 5: Verify IPv6 solution

Practical Day / Personality Development/Repeated Class/Doubts


Day 6:
Session/Guest Lectures
CCNP SWITCH MODULE (300-115)

TERM IV : WEEK II
(VIRTUAL LAN)
Day 1: Implementing VLAN based solutions
PRACTICALS
Day 2: Create a VLAN based implementation plan
Create a VLAN based verification plan 1.Virtual Lan
Day 3: configure loop prevention for the VLAN  Access port
based solution  Trunk ports
Configure Access Ports for the VLAN
Day 4:  Implementation
based solution

 Trunking
Day 5: Verify the VLAN based solution
 Tagging

Practical Day / Personality Development/Repeated Class/Doubts


Day 6:
Session/Guest Lectures

TERM IV : WEEK III


(SWITCH SECURITY MECHANISM)
Create a implementation plan for the
Day 1:
Security solution PRACTICALS
Create a verification plan for the Security 1.Port Security
Day 2:
solution  Violations
Day 3: Configure port security features  mac address
Configure general switch security  maximum range
Day 4:
features 2. PVLAN & Genral switch
security
Day 5: Configure private VLANs

Practical Day / Personality Development/Repeated Class/Doubts


Day 6:
Session/Guest Lectures
TERM IV : WEEK IV
(SWITCH SECURITY L2 AND L3)
Day 1: Verify the Security based solution
PRACTICALS
Implementing a Switch based Layer 3 1.Intervlan
Day 2:
solution Router on a stick

Create an implementation plan for the


Day 3: 2.Etherchannels
Switch based Layer 3 solution
Aggregation Techniques
Create a verification plan for the Switch  PAGP
Day 4:
based Layer 3 solution  LACP
 Layer 3
verification plan for the Switch based
Day 5:  Layer 2
Layer 3 solution

Day 6:
MONTHLY PERFORMANCE TEST

FIFTH MONTH SYLLABUS

TERM V : WEEK I
(SWITCH SECURITY L2 & L3)
Day 1: Configure routing interfaces
PRACTICALS
1.WiFi Configuration
Day 2: Configure Layer 3 Security
 Private IP
Day 3: Verify the Switch based Layer 3 solution  Public IP
 SSID
Implement a Wireless Extension of a Layer  Password
Day 4:
2 solution 2. WIFI security

Day 5: Wireless /Wi-Fi configuration


Practical Day / Personality Development/Repeated Class/Doubts
Day 6:
Session/Guest Lectures
TERM V : WEEK II
(HIGH AVAILABILITY PROTOCOL AND FHRP IMPLEMENTATION)
Implementing High Availability on a
Day 1:
network PRACTICALS
1.First Hop Redundancy
Create a High Availability implementation
Day 2: Protocols
plan
 HOT Standby Routing
Protocol
 Virtual Router Redundancy
Create a High Availability verification
Day 3: Protocol
plan
 Gateway Load balancing
Protocol
Implement first hop redundancy
protocols and Implement switch
Day 4:
supervisor
redundancy
Day 5: Verify High Availability solution
Practical Day / Personality Development/Repeated Class/Doubts
Day 6:
Session/Guest Lectures
CCNP T-SHOOT (300-135)

TERM V : WEEK III


(TSHOOT EIGRP /OSPF)
Develop a plan to monitor and manage a
Day 1:
network PRACTICALS
Day 2: Perform routine IOS device maintenance 1.Troubleshhoting
Day 3: Troubleshoot EIGRP Topologies
Day 4: Troubleshoot OSPF  EIGRP
Day 5: Troubleshooting combined routing  OSPF
Practical Day / Personality Development/Repeated Class/Doubts
Day 6:
Session/Guest Lectures
TERM V : WEEK IV
(TSHOOT BGP/NAT/DHCP)
Day 1: Troubleshoot eBGP/eBGP
PRACTICALS
Troubleshoot routing redistribution 1. .Troubleshooting
Day 2:
solution Topologies
Troubleshoot a DHCP client and server  DHCP
Day 3:
solution  Redistribution
Day 4: Troubleshoot NAT  EBGP/IBGP
Day 5: Troubleshooting combined Technology  NAT

Day 6:
MONTHLY PERFORMANCE TEST

SIXTH MONTH SYLLABUS

T-SHOOT CONTINUES

TERM VI : WEEK I
(TROUBLESHOOT IPV6 ROUTING)
Troubleshoot IPv6 and IPv4
Day 1:
interoperability PRACTICALS

Troubleshooting
Troubleshoot switch-to-switch connectivity
Day 2:
for the VLAN based solution Ipv6 routing

 Static
Troubleshoot loop prevention for the VLAN
Day 3:
based solution  Dynamic

 RIPng
Troubleshoot Access Ports for the VLAN
Day 4:
based solution  OSPFv3

 EIGRPv6
Day 5: Troubleshoot port security

Practical Day / Personality Development/Repeated Class/Doubts


Day 6:
Session/Guest Lectures
TERM VI : WEEK II
(TROUBLESHOOT GENERAL SWITCH SECURITY)
Day 1: Troubleshoot VACLs and PACLs
PRACTICALS
Troubleshoot switch virtual interfaces 1.Troubleshoot switch virtual
Day 2:
(SVIs),VLAN interfaces (SVIs),VLAN
Day 3: Troubleshoot a Port security  Port security
Day 4: Troubleshoot Layer 3 Security  Layer 3 Security
Day 5: Troubleshoot Layer 3 Security  Layer 3 Security
Practical Day / Personality Development/Repeated Class/Doubts
Day 6:
Session/Guest Lectures

PROJECT WEEK

TERM VI : WEEK III


PROJECT WORK
Design
Implementation
Configurations

TERM VI : WEEK IV
PROJECT WORK
T-Shoot in Project
Final Working

FINAL PERFORMANCE TEST

You might also like