Professional Documents
Culture Documents
TERM I : WEEK I
(BASICS OPERATIONS)
Introduction/Course Outline/Cisco
Day 1:
Certifications/Industrial Scope
PRACTICALS
4.Ip addressing to PC
Day 4: Identify common applications and their
impact on the network& Predict the data, 5. Computers sharing.
Flow between two hosts across a network.
With HUB
With switch
Identify the appropriate media, cables,
Day 5: ports, and connectors to connect Cisco,
network devices to other network devices
and hosts in a LAN
3.Remote Assistance
Day 5: Describe IPv6 addresses
4.Map Network Drive
TERM I : WEEK IV
(IP ROUTING TECHNOLOGIES)
Day 5: configure and verify inter VLAN routing (Rip Eigrp Ospf)
Day 6:
MONTHLY PERFORMANCE TEST
SECOND MONTH SYLLABUS
TERM II : WEEK I
(LAN SWITCHING TECHNOLOGIES)
Determine the technology and media
Day 1: access control method for Ethernet
PRACTICALS
networks
Identify basic switching concepts and the Switching
Day 2: operation of Cisco switches & configure
switch configuration including remote 1. Virtual LAN
access management.
Verify network status and switch operation 2. Intervlan
Day 3: using basic utilities such as ping, telnet and
Ssh & Identify enhanced switching 3. Spanning Tree Protocol
technologies
Describe how VLANs create logically 4. Virtual Trunking
Day 4:
separate networks and the need for routing Protocol
between them.
5. Port Security
(IP SERVICES)
PRACTICALS
Day 1: Configure and verify DHCP (IOS Router)
network requirements
(TROUBLESHOOTING CONTINUES...)
Solutions
Day 6: Verify an EIGRP solution
TERM III : WEEK II
Verification
Day 4: Frame-relay implementation with OSPF
Implementation
Solutions
Day 5: Verify OSPF Solution
Configuration
Day 3: Configure eBGP Routing/solutions
Implementation
Verification
Day 4: Vpn technology gre tunnel
TERM IV : WEEK I
(INTERNET PROTOCOL VERSION 6)
Ipv6 routing
Day 3: Configure IPv6 Routing
Static
Dynamic
RIPng
Day 4: Configure IPv6 interoperation with IPv4
OSPFv3
EIGRPv6
TERM IV : WEEK II
(VIRTUAL LAN)
Day 1: Implementing VLAN based solutions
PRACTICALS
Day 2: Create a VLAN based implementation plan
Create a VLAN based verification plan 1.Virtual Lan
Day 3: configure loop prevention for the VLAN Access port
based solution Trunk ports
Configure Access Ports for the VLAN
Day 4: Implementation
based solution
Trunking
Day 5: Verify the VLAN based solution
Tagging
Day 6:
MONTHLY PERFORMANCE TEST
TERM V : WEEK I
(SWITCH SECURITY L2 & L3)
Day 1: Configure routing interfaces
PRACTICALS
1.WiFi Configuration
Day 2: Configure Layer 3 Security
Private IP
Day 3: Verify the Switch based Layer 3 solution Public IP
SSID
Implement a Wireless Extension of a Layer Password
Day 4:
2 solution 2. WIFI security
Day 6:
MONTHLY PERFORMANCE TEST
T-SHOOT CONTINUES
TERM VI : WEEK I
(TROUBLESHOOT IPV6 ROUTING)
Troubleshoot IPv6 and IPv4
Day 1:
interoperability PRACTICALS
Troubleshooting
Troubleshoot switch-to-switch connectivity
Day 2:
for the VLAN based solution Ipv6 routing
Static
Troubleshoot loop prevention for the VLAN
Day 3:
based solution Dynamic
RIPng
Troubleshoot Access Ports for the VLAN
Day 4:
based solution OSPFv3
EIGRPv6
Day 5: Troubleshoot port security
PROJECT WEEK
TERM VI : WEEK IV
PROJECT WORK
T-Shoot in Project
Final Working