Professional Documents
Culture Documents
Telecommunications Distribution Design Guide: Telecommunications Infrastructure Standards - Revision 3
Telecommunications Distribution Design Guide: Telecommunications Infrastructure Standards - Revision 3
June 1, 2005
Prepared by:
Central Washington University
Approved by:
Central Washington University
Released by:
Central Washington University
TABLE OF CONTENTS
TABLE OF CONTENTS
1 PREFACE ...........................................................................................................4
1.1 LOW VOLTAGE SYSTEMS ................................................................................... 4
1.1.1 SHARED OSP PATHWAY
1.1.2 SHARED OSP MEDIA
1.1.3 SHARED ISP PATHWAY AND MEDIA
1.2 DOCUMENT INTENT .........................................................................................6
1.3 DOCUMENT STRUCTURE .................................................................................... 9
1.4 EXTENTS-OF-CONSTRUCTION.............................................................................10
1.5 CWU PERSONNEL ..........................................................................................11
1.6 TELECOMMUNICATIONS DISTRIBUTION DESIGNERS ....................................................11
1.7 CONTRACTORS AND CABLING INSTALLERS ..............................................................11
2 CWU TELECOMMUNICATIONS POLICIES..........................................................12
2.1 CWU PERSONNEL ..........................................................................................13
2.1.1 TEAM STRUCTURE
2.1.2 CWU PERSONNEL INSTALLATIONS
2.2 INITIATING NEW PROJECTS – GENERAL .................................................................14
2.2.1 NEW CONSTRUCTION
2.2.2 RENOVATION TO EXISTING STRUCTURES
2.2.3 UPGRADING TELECOMMUNICATIONS INFRASTRUCTURE TO SUPPORT NEW TECHNOLOGY
2.2.4 UPGRADING TELECOMMUNICATIONS INFRASTRUCTURE TO MEET NEW STANDARDS
2.2.5 INFRASTRUCTURE TO SUPPORT OTHER AGENCIES AT CWU FACILITIES
2.2.6 DAMAGE TO EXISTING TELECOMMUNICATIONS INFRASTRUCTURE
2.3 INITIATING NEW PROJECTS - SPECIFIC .................................................................15
2.3.1 UNDERGROUND PATHWAY USE
2.3.2 OUTSIDE PLANT FIBER OPTIC CABLING
2.3.3 OUTSIDE PLANT COPPER CABLING – VOICE/DATA
2.3.4 OUTSIDE PLANT CABLING – OTHER LOW VOLTAGE SYSTEMS
2.3.5 COMPUTER CENTER
2.3.6 TELECOMMUNICATIONS ROOM WORK
2.3.7 HORIZONTAL CABLING
2.4 PROCUREMENT AND INSTALLATION POLICY..............................................................17
2.4.1 PROCUREMENT POLICY FOR INFORMATION TECHNOLOGY EQUIPMENT
2.5 LARGE TELECOMMUNICATIONS PROJECTS ...............................................................20
2.5.1 DESIGN PHILOSOPHY
2.6 SMALL TELECOMMUNICATIONS PROJECTS ...............................................................20
2.7 REVIEWING TELECOMMUNICATIONS DESIGNS ..........................................................21
2.7.1 ALTERNATIVE DESIGN REQUESTS (ADR)
2.7.2 DESIGN REVIEW PROCESS
2.8 TELECOMMUNICATIONS OPERATION AND MAINTENANCE ...............................................21
2.8.1 CWU TELECOMMUNICATIONS INFRASTRUCTURE RESPONSIBILITIES
2.8.2 SERVICE PROVIDER RESPONSIBILITIES
2.8.3 AMP NETCONNECT® DESIGN & INSTALLATION CERTIFICATION
2.8.4 CORNING CABLE SYSTEMS’ EXTENDED WARRANTY PROGRAM
2.8.5 MOVES, ADDS, AND CHANGES
2.8.6 ELECTRICAL POWER IN TELECOMMUNICATIONS ROOMS
2.8.7 TELECOMMUNICATIONS ADMINISTRATION
2.9 COMM TEAM MEETINGS ...................................................................................25
3 PROJECT PROCEDURES ...................................................................................26
3.1 DESIGNER QUALIFICATIONS ..............................................................................26
3.2 DESIGN REVIEW PROCESS ................................................................................27
3.2.1 RCDD REVIEW CONSULTANT
3.3 ARCHITECT/ENGINEER TEAMS ............................................................................33
3.3.1 CROSS DISCIPLINE COORDINATION
3.4 GENERAL PROCEDURES ....................................................................................34
3.4.1 PROCUREMENT AND INSTALLATION
3.4.2 CAD FILES
1
TABLE OF CONTENTS
3
PREFACE
LOW VOLTAGE SYSTEMS
1 PREFACE
C. This document was originally adapted (in 1997) from information contained in
the telecommunications standards in use at that time for CWU’s Academic
facilities. Under the current revision (2005), it has been again updated to
reflect current methods, materials and Standards. The TDDG reflects CWU
and Industry Standards in effect as of this publication, including CWU’s
Strategic Plan of the Information Technology Services Department (April
2004).
4
PREFACE
LOW VOLTAGE SYSTEMS
Where low-voltage systems require different media (other than fiber optic cabling
and 24 AWG UTP) the systems shall be designed to comply with the pathway and
space requirements of this document wherever practical.
5
PREFACE
DOCUMENT INTENT
B. The TDDG is intended to be used in conjunction with the TDMM and CO-OSP
in order to reinforce selected TDMM content as well as highlight any
restrictions and/or limitations on TDMM and CO-OSP content in order to meet
the specific requirements of CWU facilities. The TDDG is not intended to
replace or detract from the TDMM or CO-OSP.
C. The TDDG is not intended to serve as a master specification nor for stand-
alone use on design build projects. This document should serve as a guide for
making standards-compliant design decisions that, in due course, will be
reflected in a project specification based upon CWU’s Telecommunications
Construction Guide Specification (TCGS).
• Designers shall adapt the TCGS “as written” for creating specifications for
a particular project according to the instructions in the TDDG. In other
words, Designers shall use the electronic specification section documents
(provided by CWU in MSWord format) and then shall make any project-
specific edits to the specifications in those documents. Any changes to
the specifications shall be done using the “Revision Tracking” features in
MSWord.
Effective December 29, 2000, The Washington State Department of Information Systems has mandated
1
that all Washington State Agencies adopt the ANSI/TIA/EIA Commercial Building Telecommunications
Standards as the basis for telecommunications distribution design in State facilities (see Computing and
Telecommunications Architecture Standards – Building Wiring, http://www.wa.gov/dis/portfolio/ ).
2
The BICSI TDMM is widely considered to be the industry reference text for the design of standards-
compliant telecommunications distribution systems (see http://www.bicsi.org/manuals.htm ). BICSI, 8610
Hidden River Pkwy, Tampa, FL 33637-1000 USA; 1-800-242-7405; http://www.bicsi.org
6
PREFACE
DOCUMENT INTENT
Drawings Specifications
CWU
Telecommunications
Construction Guide
Specification (TCGS)
CSI BICSI TCIM
Design Process
CWU
Telecommunications Distribution Design Guide (TDDG)
(CWU Policies, Project Procedures, Design Criteria, Contract Document Content)
Industry Standards
Industry
ANSI/TIA/EIA Practice &
568-B, 569-A, 606, 607, 758 and others Experience
ISO/IEC 11801
FIGURE 1
7
PREFACE
DOCUMENT INTENT
H. The TDDG uses many terms and abbreviations that are common in the
telecommunications industry. While a glossary is included in the Appendix at
the end of this document, please refer also to of the Glossary in the BICSI
TDMM and also the Glossary section at the end of the BICSI CO-OSP for
further information.
J. All references to the following manuals within the TDDG and TCGS shall
specifically address only the editions specified below. Newer editions shall be
used for reference until authorized by CWU in writing or through a revised
edition of the TDDG:
• BICSI Telecommunications Distribution Methods Manual (10TH Edition)
• BICSI Customer-Owned Outside Plant Design Manual (2nd Edition)
• BICSI Telecommunications Cabling Installation Manual (3rd Edition)
8
PREFACE
DOCUMENT STRUCTURE
1. Preface
2. CWU Policies
3. Project Procedures
4. Design Criteria
5. Construction Document Content
6. Appendices
A. The Preface (this section) describes this document, its intent and its
relationship to industry standards, practices and the various audiences
affected by the document. It also describes how to use this document.
D. The Design Criteria section serves two purposes. The first is to describe the
general requirements for CWU telecommunications infrastructure along with
the typical features required for different categories of building spaces and
construction types. The second purpose is to place limitations on the
materials and methods described in the BICSI TDMM and CO-OSP. While the
TDMM and CO-OSP describe many materials and methods that are generally
accepted in the industry for providing telecommunications infrastructure,
CWU facilities have some unique characteristics that impose limitations on
some of the materials and methods that otherwise might be acceptable.
Some of the practices discussed in the TDMM and CO-OSP are expressly
prohibited in CWU facilities. Other practices are permitted in certain areas
9
PREFACE
EXTENTS-OF-CONSTRUCTION
(residential halls, for example) but prohibited in other areas such as academic
buildings.
F. The Appendices section provides standard forms and diagrams along with
example forms and diagrams that are required for CWU telecommunications
infrastructure designs.
1.4 EXTENTS-OF-CONSTRUCTION
For the purposes of this document, construction projects are categorized by the
extent of the construction work, as follows:
Unless otherwise stated, the guidelines defined in the TDDG apply to all four extents
of construction.
The Designer shall assume that adherence to BICSI guidelines, referenced industry
standards, the TDDG and the TCGS are required (unless specifically indicated
otherwise) for all facility types and for all extents-of-construction. Where exceptions
are permitted, this document will specifically note the facility type and/or extent-of-
construction type where CWU’s requirements may differ from generally applicable
practices and standards.
10
PREFACE
CWU PERSONNEL
11
CWU TELECOMMUNICATIONS POLICIES
CONTRACTORS AND CABLING INSTALLERS
The TDDG has been prepared pursuant to Goal #2 / Objective #7 of CWU’s Strategic
Plan of the Information Technology Services (ITS) Department (April 2004),
regarding the documentation of ITS’ procedures and standards for reference by CWU
personnel.
CWU also operates, occupies, shares or constructs facilities jointly with other
academic institutions, such as Washington State University, and Yakima Valley
Community College. CWU ITS staff, in conjunction with the CWU Assistant to
Provost for University Centers and Community College Relations shall specifically
identify when, and to what extent, the TDDG applies to personnel involved in a joint
project with another institution.
B. Input from CWU ITS must be incorporated in developing the initial and on-
going construction schedules. This input is especially important when an
early or phased turn-up of buildings is required, but is also vital for the initial
start-up of a new facility. Timing on the construction of the main
telecommunications room and building, and the backbone cable plant
connecting it to key buildings, is a vital consideration for bringing key
buildings online at required dates.
D. CWU’s ITS staff is responsible for installation and support of LAN hardware,
software, data telecommunications and voice systems for both
administrative/academic and residential telephones, and certain enterprise
network hardware and software.
12
CWU TELECOMMUNICATIONS POLICIES
CWU PERSONNEL
CWU requires the following personnel to work closely (as a team) with the architects,
engineers and designers throughout the entire project life cycle, starting at the
preliminary design phase:
o CWU ITS Telecom Manager
o CWU ITS Infrastructure Specialist
o CWU FP&CS Project Manager
o Local Site Representative (for branch campus projects)
o A designated CWU staff member serving as a project RCDD (if one is assigned
to the project)
13
CWU TELECOMMUNICATIONS POLICIES
INITIATING NEW PROJECTS – GENERAL
CWU facilities undergoing full remodel or light remodel projects shall incorporate
telecommunications infrastructure in the project, designed and installed in
accordance with the requirements of this document. The CWU ITS Infrastructure
Specialist shall be included in the initial development of the project scope to
determine the extent of any required telecommunications infrastructure upgrades.
CWU will occasionally install new information technology systems at a facility where
the existing telecommunications infrastructure is inadequate for the new application.
It is the responsibility of the organization sponsoring the installation of the new
technology to ensure that the telecommunications infrastructure is capable of
supporting the new technology. If the existing infrastructure is not capable of
supporting the new technology, that organization is responsible to ensure that the
infrastructure is upgraded. Any upgrades made to the telecommunications
infrastructure shall meet the requirements of this document.
14
CWU TELECOMMUNICATIONS POLICIES
INITIATING NEW PROJECTS - SPECIFIC
Residence hall telephone and video service are provided on CWU property under
contract with private companies. As the owner of the property, it is normally
incumbent on CWU to provide the telecommunications infrastructure to support
other agencies at CWU facilities. The terms and conditions for reimbursement of any
expenses incurred by CWU for providing telecommunications support to other
agencies will be negotiated and documented in the contract.
All damaged infrastructure shall be restored to within the scope of the original
design/installation parameters. This shall include, but not be limited to all repair or
replacement work performed by certified Value Added Resellers (VAR) of CWU’s
choosing, all testing and recertification of the infrastructure for full compliance to
CWU’s Telecommunications Standards and applicable SCS warranty.
o New construction
o Renovation of existing structures
o Upgrading telecommunications infrastructure to support new technology
o Upgrading telecommunications infrastructure to meet new standards
o Infrastructure to support other agencies or tenants at CWU facilities
o All moves, adds and changes (MACs) at CWU facilities, including MAC work
performed by CWU personnel
o Low voltage cabling to support proprietary systems that will use the
telecommunications infrastructure (pathways and spaces) as identified in
ANSI/TIA/EIA 862
15
CWU TELECOMMUNICATIONS POLICIES
INITIATING NEW PROJECTS - SPECIFIC
Any CWU department that is planning the installation of outside plant fiber optic
cabling in the telecommunications underground pathway system shall seek prior
written approval from the CWU ITS Infrastructure Specialist. The request must
include the following information:
o Purpose of Fiber (System being served)
o Type of fiber (SM or MM)
o Number of strands
o Type of Connectors
o Termination Location (Telecommunications Room or other location)
o Installation Contractor (Required)
The CWU ITS Infrastructure Specialist shall be provided with both paper and
electronic copies of the fiber test results from the installation Contractor.
Any CWU department that is planning the installation of outside plant copper cabling
to support voice and/or data in the telecommunications underground pathway
system shall coordinate the installation with the CWU ITS Infrastructure Specialist.
This coordination is intended to assure efficient use of the available pathway prior to
installation and proper documentation of any new cabling.
Any CWU department that is planning the installation of outside plant cabling to
support other low voltage (or proprietary) systems in the telecommunications
underground pathway system shall notify the CWU ITS Infrastructure Specialist prior
to the installation. This coordination is intended to assure efficient use of the
available pathway prior to installation and proper documentation of any new cabling.
Any additional cable or equipment proposed for installation in the Computer Center
must be approved in writing by the CWU ITS Telecom and Networks department.
Please refer to the CWU Computer Center Access Policy dated March 1, 2004 for
16
CWU TELECOMMUNICATIONS POLICIES
PROCUREMENT AND INSTALLATION POLICY
Any CWU department that is planning the installation of cabling or equipment in any
Telecommunications Room on campus must coordinate the installation with the CWU
ITS Infrastructure Specialist prior to commencing with work, regardless of the type
of cabling or equipment to be installed. This coordination is intended to assure
efficient use of existing space, and to ensure that resources/spaces planned for
future projects are not inadvertently lost due to other uncoordinated equipment.
B. There are two general methods used for the procurement and installation of
the telecommunications infrastructure. In larger construction projects, the
telecommunications infrastructure installation might either be part of the
general construction contract or it could be a separate contract.
The following policies and procedures apply to the planning and management of
telecommunications infrastructure installation as a separate (non-public works)
project:
The Department of Information Services (DIS) manages the Washington State policy
for the acquisition of information technology equipment. DIS grants CWU a
delegated level of acquisition authority based on an IT portfolio style strategic plan
3
As of this publication, the web site address is: http://techmall.dis.wa.gov/master_contracts/cabling.asp
17
CWU TELECOMMUNICATIONS POLICIES
PROCUREMENT AND INSTALLATION POLICY
submitted to and approved by DIS and the Washington State Office of Financial
Management (OFM) on an ongoing basis. All IT projects with total acquisition and
five year operational costs of $200,000 or more require a written IT Acquisition Plan
that must have prior approval by CWU ITS Senior Director. Large IT projects with
total acquisition and five-year operational costs exceeding $1,000,000 require prior
approval by DIS.
B. Typically, the most efficient, cost effective, and preferred method for
procuring telecommunications infrastructure installation services is through
the use of the pre-existing DIS Master Contracts for Cabling Equipment,
Installation and Maintenance.
18
CWU TELECOMMUNICATIONS POLICIES
PROCUREMENT AND INSTALLATION POLICY
CWU has standardized on the use of AMP Netconnect® Structured Cabling System
(SCS) products and currently uses Category 6 rated products for all new cabling
installations.
The majority of CWU facilities have an installed base of AMP Netconnect® Structured
Cabling System (SCS) products.
A. Where additions are made to existing facilities that currently use AMP
Netconnect® SCS products (including new buildings on an existing campus)
the addition shall exclusively use AMP Netconnect® products.
B. Where additions are made to existing facilities that currently do not have an
AMP Netconnect® SCS installation, products from the AMP Netconnect® SCS
product line shall be used where practical with the eventual goal of
standardizing on these SCS products. Written requests for exemption from
using AMP Netconnect® products in these cases must be submitted to the
CWU ITS Telecom Manager for consideration.
D. Fiber optic related materials from AMP shall not be used on CWU projects.
The majority of CWU facilities have an installed base of LANscape® fiber optic
products from Corning Cable Systems. LANscape® fiber optic products shall be used
for both outside plant and inside plant fiber optic infrastructure.
In addition to the standards listed above, CWU has selected several manufacturers of
products for telecommunications cabling systems (racks, cable tray, enclosures,
etc.). These manufacturers and their products are identified in the TCGS. The
telecommunications distribution designer shall incorporate only these manufacturers
into the design, and to design a telecommunications distribution system that can be
implemented using products from these manufacturers.
Standardization on the AMP Netconnect® SCS product line and the Corning Cable
Systems product line does not imply that there is a sole source for procurement or
installation of these products. AMP products and Corning products can be procured
through multiple supply sources, and installation can be procured through multiple
AMP Netconnect Design and Installation (ND&I) certified cable installation contractors
and Corning Cable Systems certified contractors, using competitive solicitations and
existing contracts. Refer to Section 2.4.1.2 - Criteria and Methods for Acquisition,
above.
19
CWU TELECOMMUNICATIONS POLICIES
LARGE TELECOMMUNICATIONS PROJECTS
A. Depending on the size and scope of a small project, the CWU ITS Telecom
Manager, working with FP&CS, will determine whether an engineering firm is
required to develop a telecommunications distribution design.
20
CWU TELECOMMUNICATIONS POLICIES
REVIEWING TELECOMMUNICATIONS DESIGNS
C. For more information, see Section 3.4.3, Alternative Design Request in this
document.
A. The Design Review Process will be conducted by CWU at the following points
in the design process:
o Schematic Design
o Design Development
o Review Set (99% CD)
o Construction Documents (100% CD)
o Record Drawings
A. CWU is responsible for providing a cable pathway from the property line to
the Entrance Facility (EF). The cable pathway shall be underground conduit,
with telecommunications maintenance holes and handholes as necessary.
Close coordination with the different service providers is required to design
the entrance cable pathway. Some service providers are not willing to share
21
CWU TELECOMMUNICATIONS POLICIES
TELECOMMUNICATIONS OPERATION AND MAINTENANCE
B. The service providers’ technicians will need access to the EF and CWU is
responsible to coordinate and provide escorts as required.
The service provider is responsible for providing and installing the entrance cable up
to the demarcation point as well as the termination hardware at the demarcation
point. In some cases, CWU contracts with the service provider to extend to the
demarcation point from the EF to another location at the facility. In such cases, the
service provider is also responsible for maintenance and troubleshooting of the
extended portion of the cabling and termination hardware. The service provider may
also be contracted (for an additional charge) to provide troubleshooting and
maintenance services for CWU-owned equipment.
B. In order to obtain this warranty coverage, the contractors who perform the
installation must be certified as AMP Netconnect® Design & Installation
Certification (ND&I). Contractors who are ND&I certified have met certain
requirements established by AMP, among which include the AMP-provided
training courses AMP ACT1, AMP ACT2 and AMP ACT3.
E. CWU personnel who have obtained AMP ACT1 certification but fail to follow
required practices during move/add/change (MACs) activities may not be
allowed to perform future installations at CWU facilities. The CWU Telecom
Manager will notify the CWU person in writing that they are no longer allowed
to make MACs to copper telecommunications cabling at CWU facilities.
B. In order to obtain this warranty coverage, the contractors who perform the
installation must be a certified EWP member. Contractors who are EWP
certified have met certain requirements established by Corning Cable
Systems, among which include taking an approved design course and an
approved installation course from CCS. EWP installers are required to update
their training at least every two years.
E. CWU personnel who have obtained CCS certification but fail to follow required
practices during modification activities may not be allowed to perform future
fiber optic modifications at CWU facilities. The CWU Telecom Manager will
notify the CWU person in writing that they are no longer allowed to make
changes to fiber optic telecommunications cabling at CWU facilities.
23
CWU TELECOMMUNICATIONS POLICIES
TELECOMMUNICATIONS OPERATION AND MAINTENANCE
A. In certain situations it may be necessary to use one or two pairs of a four (4)-
pair cable to support one telephone device, and to use the remaining pairs to
support a different telephone device. In these situations, the splitting of the
pairs shall be accomplished with a line-splitting device installed on the outside
of the Work Area Outlet faceplate. At the telecommunications room,
individual cross-connect wires connected to the 110 Termination Field may be
used to cross-connect the services.
B. Under no circumstances will the splitting of data cable pairs be allowed. The
integrity of all four (4)-pair cable [all eight (8) wires] must be maintained
end-to-end for the LAN equipment.
C. Under no circumstances will cable pairs be split or removed from the back of
a modular jack or patch panel. All four (4) pairs of each horizontal
distribution cable must be terminated to a single eight (8)-position, eight (8)-
conductor jack.
B. Each TR will also be equipped with white, gray, or beige-colored power outlets
that are available for use with non-telecommunications equipment.
B. All CWU facilities shall maintain a system for documenting and administering
the telecommunications infrastructure. CWU personnel shall be responsible
for maintaining the telecommunications-related documentation and it is the
responsibility of the CWU ITS Infrastructure Specialist to ensure that cable
and equipment records are maintained for each facility. The administration
system shall include cable records, and equipment records for all information
technology systems. The administration system shall follow the
ANSI/TIA/EIA-606 standard.
CWU holds periodic meetings (approximately every six to eight weeks) to coordinate
the telecommunications and IT needs of the various departments on campus. These
“Comm Team” meetings are run under the direction of the Sr. Director of Facilities
Management and should be attended by the following individuals:
25
PROJECT PROCEDURES
DESIGNER QUALIFICATIONS
3 PROJECT PROCEDURES
A. For the purposes of this document, the term “Designer” shall mean a
Registered Telecommunications Distribution Designer (RCDD) who is currently
in good standing with BICSI. This means that the telecommunications design
shall be produced by the RCDD. CWU’s telecommunications with the
telecommunications consultant shall be mainly through the RCDD. On
projects where the RCDD is not the prime consultant, the RCDD shall keep
the prime consultant (Architect/Engineer (A/E)) informed of all direct
telecommunications with CWU.
B. In addition to the RCDD certification, it is desirable that the RCDD have one
or more of the following qualifications:
o Professional Engineer (P.E.) in the electrical engineering field
o RCDD/OSP certification from BICSI
o RCDD/NTS certification from BICSI
o MCSE certification from Microsoft Corporation4
4
Microsoft Corporation, One Microsoft Way, Redmond, WA 98052-6399, (425) 882-8080;
www.microsoft.com/mcse
26
PROJECT PROCEDURES
DESIGN REVIEW PROCESS
o The RCDD shall demonstrate that he/she has designed or has had
personal design oversight of a minimum of five projects similar in size and
construction cost to the current CWU project.
o The RCDD shall be independent from and unaffiliated with any
manufacturer associated with the telecommunications distribution system
industry.
o The RCDD shall be completely familiar and conversant with the standards
D. The RCDD shall affix his/her RCDD logo stamp (showing the registration
number and expiration date) and signature to the final Construction
Documents (drawings and specifications) pertaining to the
telecommunications distribution design.
As noted in Section 3.5 titled “Procedures Related to Project Phases”, the project
documents will pass through the design review process at the end of each design
phase plus follow-up reviews when necessary. These requirements are in addition to
those contained in the State of Washington Conditions of the Agreement and the
Instructions for Architects and Engineers.
The following steps correspond to the numbered activities shown on the Design
Review Process diagram below:
c Each time a review is required, the A/E shall provide copies of the complete
project documents set (drawings and specifications for all disciplines involved in the
project) for the following people:
• CWU Capital FP&CS Project Manager (PM) (one set)
• CWU ITS Infrastructure Specialist (one set)
• RCDD Review Consultant5 (two sets)
A B
The RCDD Review Consultant will have 3, 5, or 10 days (depending on the
project phase) to review the design documents and provide written RCDD Review
Comments to the CWU FP&CS PM and the CWU ITS Telecom Manager.
def The CWU FP&CS PM and the CWU ITS Infrastructure Specialist will have 5, 8,
or 10 days (depending on the project phase) to review the design documents and
the RCDD Review Consultant’s comments. The CWU ITS Infrastructure Specialist will
create the CWU ITS Review Report, and incorporate the RCDD Review Comments
into the report. Following their review, they will distribute the complete set of
comments to the RCDD Review Consultant (if present on the project) and hold brief
discussions about the comments. If there is no RCDD Review Consultant assigned to
the project:
• The CWU ITS Infrastructure Specialist will create the CWU ITS Review Report
without RCDD Review Comments
• The CWU ITS Review Report will then be sent to the CWU FP&CS PM for
review.
5
On some projects, CWU may hire an RCDD Review Consultant to act in the capacity of an independent
reviewer and consultant to CWU. The RCDD Review Consultant will be responsible to review the overall
design, paying particular attention to areas of the design that are related to the current or future operation
and maintenance of the telecommunications system, and sometimes low voltage systems other than voice
and data. The RCDD Review Consultant will identify issues that do not
appear to be compliant with the requirements in the TDDG and the requirements contained in the TCGS.
27
PROJECT PROCEDURES
DESIGN REVIEW PROCESS
gh The CWU FP&CS PM will submit the RCDD Review Report to the Designer. The
Designer will then be given five days to review the comments and respond to them
in writing. Negative responses to any comment shall include a discussion of the
reasons for non-compliance.
ij Finally, a meeting or teleconference will be held with the CWU FP&CS PM, the
CWU ITS Infrastructure Specialist, the RCDD Review Consultant and the Designer to
discuss the review comments and the Designer’s responses. Following the meeting,
the Designer shall revise the design in accordance with the CWU’s resolution for each
comment.
28
PROJECT PROCEDURES
DESIGN REVIEW PROCESS
1 1
2 1
Schematic
5 Days
Design
3
4 1
5 1
6 5 Days
7 1
8 ?
Business Days: 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
1 1
Development
2 1
3 8 Days
Design
4 1
5 1
6 5 Days
7 1
8 ?
Business Days: 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
1 1
Construction
1
Documents
3 10 Days
4 1
5 1
6 5 Days
7 1
8 ?
3. CWU ITS Infrastructure Specialist reviews the drawings and 7. FP&CS PM, CWU ITS Infrastructure Specialist, and the Designer
specifications and then produces the CWU ITS Review Report. meet to discuss the Designer's responses to the CWU ITS Review
Report and determine a course of action for each item.
8. The Designer shall revise the design per the direction given in
4. CWU FP&CS PM, and the CWU Infrastructure Specialist meet to
Step 7 (above). The Designer shall then submit a second written
discuss and finalize the CWU ITS Review Report.
response to the CWU ITS Review Report, indicating how each
comment was resolved.
29
PROJECT PROCEDURES
DESIGN REVIEW PROCESS
1 1
A 3 Days
Schematic
B 1
Design
2 1
3 5 Days
4 1
5 1
6 5 Days
7 1
8 ?
Business Days: 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
1 1
A 5 Days
Development
B 1
1
Design
3 8 Days
4 1
5 1
6 5 Days
7 1
8 ?
Business Days: 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
1 1
A 10 Days
Construction
Documents
B 1
2 1
3 10 Days
4 1
5 1
6 5 Days
7 1
8 ?
1. Designer ships Drawings and Specifications to RCDD Review 4. CWU FP&CS PM, the RCDD Review Consultant, and the CWU ITS
Consultant, CWU ITS Infrastructure Specialist, and CWU FP&CS Project Infrastructure Specialist meet to discuss and finalize the CWU ITS Review
Manager (PM ) Report.
A. RCDD Review Consultant reviews the drawings & specifications and 5. CWU FP&CS PM issues the CWU ITS Review Report to the RCDD
produces RCDD Review Comments. Review Consultant and to the Designer for response.
B. RCDD Review Consultant ships the RCDD Review Comments to CWU 6. The Designer reviews the CWU ITS Review Report and provides a
FP&CS PM, and CWU ITS Infrastructure Specialist. written response for each comment to the RCDD Review Consultant, CWU
ITS Infrastructure Specialist and CWU FP&CS PM.
2. CWU FP&CS PM reviews the RCDD Review Comments, the drawings
and the specifications. 7. CWU FP&CS PM, CWU ITS Infrastructure Specialist, the RCDD Review
Consultant and the Designer meet to discuss the Designer's responses to
3. CWU ITS Infrastructure Specialist reviews the RCDD Review the CWU ITS Review Report and determine a course of action for each
Comments, drawings and specifications and then produce the CWU ITS item.
Review Report, incorporating the RCDD Review Comments.
8. The Designer shall revise the design per the direction given in Step 7
(above). The Designer shall then submit a second written response to the
CWU ITS Review Report, indicating how each comment was resolved.
30
PROJECT PROCEDURES
DESIGN REVIEW PROCESS
A. The Designer shall require CWU to review the documents and respond
with written review comments to the Designer at each phase of the
design. The Designer shall not proceed with the next phase of
telecommunications design without receipt of written comments from
the CWU ITS Infrastructure Specialist.
For projects where CWU hires an RCDD Review Consultant, the prime consultant
(Designer or A/E) shall provide two sets of the drawings and specifications (from all
disciplines involved in the project) for the RCDD Review Consultant. The RCDD
Review Consultant will not perform any design services. The RCDD Review
Consultant could be asked to do the following:
The RCDD Review Consultant shall review the documents according to CWU’s
requested review scope and then produce a report consistent with the format shown
in Appendix 6.1 that addresses at a minimum the following items:
31
PROJECT PROCEDURES
DESIGN REVIEW PROCESS
A. On some projects, CWU may also use an RCDD Review Consultant to provide
services during the construction phase. These services may include submittal
review and “big-picture” construction observation services. In these
situations however, the Designer always remains responsible for submittal
review, construction observation, punchlist management, and other standard
services as indicated in the Instructions for Architects and Engineers Doing
Business with Division of Engineering and Architectural Services (published by
the Washington State Department of General Administration).
32
PROJECT PROCEDURES
ARCHITECT/ENGINEER TEAMS
More information regarding the above requirements is available in the Design Criteria
section in this document.
33
PROJECT PROCEDURES
GENERAL PROCEDURES
A. CWU uses several methods for the procurement and installation of the
telecommunications infrastructure:
• DIS Master Contract
• Competitive Bid
• Existing CWU Contract
• Strategic Partnerships
• Inter-agency Resource Transfer
• Sole Source (limited use)
The Designer shall coordinate with the A/E to determine that the electronic CAD files
used for backgrounds for the telecommunications design are consistent with the CAD
file backgrounds used by the other disciplines on the project.
B. This document identifies specific design solutions that are intended to meet
the technical requirements of CWU telecommunications and information
technology systems at most CWU facilities. Design issues that are not
consistent with the requirements in this document shall require prior approval
through the CWU Alternative Design Requests (ADR) process. Requests to
deviate from industry standards or CWU design solutions will be considered
on a case-by-case basis. Any request to deviate from applicable code
requirements or to deviate from manufacturer’s warranty requirements will
not be approved.
C. If the Designer feels that deviation from a given standard is warranted, the
Designer shall submit a written deviation request to CWU. The Designer may,
upon written approval from CWU, incorporate the design deviation into the
overall design. CWU approval is required on a project-by-project basis - the
6
As of this writing, more information about the Washington State DIS Master Contract is available at
http://techmall.dis.wa.gov/master_contracts/MC.asp
34
PROJECT PROCEDURES
GENERAL PROCEDURES
Designer shall not assume that a deviation approval for one project means
that the deviation will necessarily be approved for a subsequent project.
Finally, the Designer shall provide written comments indicating that the
proposed alternative design will meet the applicable CWU system
performance requirements, and identifying any performance limitations,
drawbacks and benefits from using the alternative design.
35
PROJECT PROCEDURES
GENERAL PROCEDURES
Return to
JOINT
Requester DENY DECISION
with reason
APPROVE
Review
with NO
FP&CS PM Attach Technical Info
(if applicable)
Return to LAN
CWU Telecom MGR DENY DECISION WAN
with reason Infrastructure
APPROVE
Review
CAPITAL Design and
PROJECT?
YES
Funding with
FP&CS PM
NO
36
PROJECT PROCEDURES
PROCEDURES RELATED TO PROJECT PHASES
SCHEMATIC DESIGN AND FIELDWORK
B. The Designer shall visit the project site during the Schematic Design phase to
perform the preliminary outside plant fieldwork. The Designer shall create
the following types of documentation based on information gathered while
onsite:
• Take digital photographs of existing telecommunications pathways, spaces
and cabling that affect or are affected by the new project work.
• Verify existing or create new butterfly diagrams of each existing
maintenance hole and handhole that is associated with the project,
identifying each cable and conduit in each maintenance hole and
handhole. A sample butterfly diagram is shown in Appendix 6.2.
• Verify existing or create a new backbone schematic diagram showing the
existing outside plant cabling in the area associated with the new project
and the existing cross connection strategy. A sample backbone schematic
diagram is shown in the Appendix 6.3.
C. The Designer shall visit the project site during the Schematic Design phase to
perform preliminary field investigation of the horizontal and intra-building
backbone telecommunications infrastructure. The Designer shall create the
following types of documentation based on information gathered while onsite:
• Take digital photographs of existing telecommunications rooms and work
areas that affect or are affected by the new project work.
• Verify existing or create a new riser diagram showing the existing intra-
building backbone cabling associated with the new project and the existing
cross connection strategy.
• Investigate and document the routing of existing horizontal pathways and
cabling that are affected by the project.
• Verify existing or create new elevation diagrams of each
telecommunications rack and each wall within each TR affected by or
affecting the new project work.
D. The Designer shall also conduct a needs analysis (involving CWU personnel) to
identify and describe the required features and functionality of the new
telecommunications infrastructure.
37
PROJECT PROCEDURES
PROCEDURES RELATED TO PROJECT PHASES
DESIGN DEVELOPMENT
E. The information gathered during the fieldwork, combined with the results of the
needs analysis shall be the starting point for Schematic Design of the
proposed new work.
A. The Designer shall modify the design documents to address the review
comments received during the Schematic Design Phase.
B. During the Design Development phase, the Designer shall obtain the
assistance of manufacturer product representatives to review the project
specification (adapted by the Designer from the CWU Telecommunications
Construction Guide Specification) to determine that the correct part numbers
have been included for each product in the specification.
C. If the design will make use of existing outside plant pathway, the ducts must
be proven during the Design Development phase in order to ensure that the
selected pathway is clear and serviceable. Proving the ducts prior to
construction will not only aid the Designer in selecting the appropriate
pathway for use, it will also minimize unexpected (and costly) problems
encountered during construction. Acceptable proving methods are, in order
of preference:
The proving method should be selected only after determining the quantity
and size of the telecommunications media to be placed in the duct and after
reviewing the condition of the duct in the field.
38
PROJECT PROCEDURES
PROCEDURES RELATED TO PROJECT PHASES
CONSTRUCTION DOCUMENTS
A. The Designer shall modify the design documents to reflect the accepted
review comments received during the Design Development Phase.
B. In addition to the content shown on the Schematic Design and Design
Development documents, the Construction Documents shall show the
following information:
• Raceway routing plans
• Telecommunications room wall elevation details
• Rack elevation details
• Maintenance Hole/Handhole details. Ducts are to be assigned during the
course of design, not during construction. Duct assignments must be
approved by CWU prior to the release of construction documents.
• Ductbank details
The Construction Documents are also expected to contain the items discussed
in the Construction Document Content section of this document.
3.5.4 BIDDING
On projects where a pre-bid walkthrough is held, the Designer shall attend the
walkthrough and shall provide the bidders with a written list of materials and practice
requirements that the bidders might find peculiar and that might affect the bids if
such requirements are overlooked. Noteworthy items would typically be
requirements that are more restrictive than practices considered acceptable for other
commercial projects. The Designer shall consider the following items for inclusion on
such a list, as well as any other items applicable to the project:
39
PROJECT PROCEDURES
PROCEDURES RELATED TO PROJECT PHASES
CONSTRUCTION OBSERVATION
A. The Designer shall review the Contractor’s submittals that are required by the
Construction Documents. When the Contractor’s submittals include materials
or methods that deviate from CWU standards, the Designer shall either:
• Reject the specific materials and methods that do not comply, when the
Designer believes that they constitute undesirable solutions.
• Pursue the ADR process to seek separate approval for each specific
material and method that the Designer believes would constitute a better
solution.
B. The Designer (RCDD) shall visit the construction site frequently to observe
the construction quality and status. The Designer shall confer with the CWU
FP&CS Project Manager prior to proposing services for the project to
determine an appropriate site-visit frequency for the project. On average,
one site visit per week will typically be required for building-wide projects and
one and a half site visits per week will be typically required for campus-wide
projects. The site visit frequency will likely change during the construction as
the telecommunications-related activity increases and decreases.
C. During the site visits, the Designer shall take digital photographs of existing
and new telecommunications pathways, spaces and cabling, both intra-
building and outside plant and that are related to the project. In particular,
the Designer shall photograph infrastructure that will later be concealed
during the course of construction.
E. Accurate record drawings are considered critical for the efficient operation of
CWU facilities. During these site visits, the Designer shall observe and report
on the Contractor’s progress toward staying current with the record drawings
notations.
F. After each site visit, the Designer shall submit a written report describing the
observed construction progress. Observations shall be documented in the
report with annotated digital photographs and a written description of any
problems, a description of the requirements in the Construction Documents
and the resolution to the issues. For each item requiring corrective attention,
the report shall describe the following:
G. The Designer shall submit the construction observation reports via email to
the CWU FP&CS PM and the CWU ITS Infrastructure Specialist as soon as
possible following each site visit. The reports shall also be reviewed at the
40
PROJECT PROCEDURES
PROCEDURES RELATED TO PROJECT PHASES
POST-CONSTRUCTION
next construction meeting. A timely report submission will aid the Designer
and CWU in identifying potential problems early in the construction process.
H. The Designer shall review the cable test reports produced by the Contractor
for each cable installed during the project. The Designer shall verify that the
following conditions are addressed in the cable test reports:
3.5.6 POST-CONSTRUCTION
B. The Designer shall provide record drawings and record documentation to CWU
(based on documents that have been “red-lined” by the Contractor). Record
documents shall be provided in electronic CAD format where applicable, in
addition to requirements put forth by the Designer’s contract with CWU.
C. The Designer shall verify that the cabling contractor provides the appropriate
manufacturer warranty certification documentation to CWU.
41
DESIGN CRITERIA
PROCEDURES RELATED TO PROJECT PHASES
POST-CONSTRUCTION
4 DESIGN CRITERIA
These manufacturers and their products are identified in the TCGS. The
Designer is required to incorporate only these manufacturers into the design
(unless otherwise directed by CWU) and to design a telecommunications
distribution system that will be suitable for the use of products from these
manufacturers. The construction documents shall require that the installation
workmanship fully comply with the current installation requirements from the
manufacturers of these products.
E. Any request to deviate from the requirements of the National Electrical Code
or the AMP Netconnect SCS warranty will not be accepted. The Designer shall
seek approval for designs that are not consistent with CWU TDDG
requirements through the CWU Alternative Design Request (ADR) process.
Requests to deviate from industry standards or CWU design solutions will be
considered on a case-by-case basis by the CWU ITS Infrastructure Specialist.
Designers shall contact the CWU ITS Infrastructure Specialist to discuss
proposed alternatives before spending significant time researching or
42
DESIGN CRITERIA
CODES, STANDARDS AND REGULATIONS
POST-CONSTRUCTION
preparing an ADR.
G. The following subsections are arranged to mirror the chapter sequence of the
BICSI TDMM 10th Edition (the subsection numbers below are in the form of
4.x where x represents the chapter number in the BICSI TDMM).
• Each TDDG subsection contains commentary and requirements regarding
the application of the BICSI TDMM to CWU Projects. In particular, each
section contains limitations and prohibitions on specific materials and
methods discussed in the BICSI TDMM.
• Where no TDDG subsection is written (addressing comments about or
requirements for the corresponding TDMM subchapter) the Designer can
assume that the TDMM subchapter applies as written.
H. Please refer to the Bibliography and Resources section and Glossary section of
the BICSI TDMM for definitions, abbreviations, acronyms and symbols used
for describing and documenting telecommunications infrastructure at CWU
facilities.
Other terms are defined in the Glossary located in Appendix 6.8 of this
document.
Please refer to the Codes, Standards and Regulations section of the BICSI TDMM for
information regarding the codes, standards and regulations required for
telecommunications infrastructure at CWU facilities.
Please refer to the Principles of Transmission section of the BICSI TDMM for general
information regarding the design of telecommunications distribution infrastructure.
Please refer to the Electromagnetic Compatibility section of the BICSI TDMM for
general information regarding the electromagnetic interference with and clearance
requirements for telecommunications infrastructure. The following requirements
take precedence over the BICSI TDMM guidelines for telecommunications
infrastructure at CWU facilities:
Separation distances apply equally to both copper cabling and fiber optic cabling.
Even though fiber optic cabling is impervious to EMI, once a pathway is established
for fiber it could later be used for copper cabling.
Please refer to the Work Areas section of the BICSI TDMM for general information
regarding the design of work area telecommunications infrastructure. The following
requirements take precedence over the BICSI TDMM guidelines for
telecommunications infrastructure at CWU facilities:
The Designer shall identify work areas pursuant to the above goal, and shall
work cooperatively with CWU ITS staff to design telecommunications
infrastructure to appropriately meet the goal.
44
DESIGN CRITERIA
WORK AREAS
DEVICE BOX CONSIDERATIONS
• In the case of new construction and full remodel projects, the power
outlet associated with each telecommunications outlet shall be a 4”x4”
device box (dual gang) with four power receptacles. It is the Designer’s
responsibility to coordinate with the electrical engineer to ensure that
power outlets are located near telecommunications devices boxes.
A. Device boxes shall not be “combo” boxes (i.e. boxes used for both
telecommunications and power, CATV, etc.)
B. Device boxes shall not be mounted in the floor (i.e. “floor boxes”) except
where no suitable alternative exists. If device boxes must be mounted in the
floor, each device box shall be served with its own individual conduit - floor
boxes shall not be “daisy-chained” together.
D. Providing spare ports for an outlet in a work area and providing spare outlets
in a room are encouraged within the limitations of the project budget to meet
projected future needs.
B. Surface mounted device boxes are not acceptable. However, for CMU walls or
45
DESIGN CRITERIA
WORK AREAS
DEVICE BOX CONSIDERATIONS
other wall types that may obstruct cable or conduit installation, the Designer
shall request direction from the CWU ITS Infrastructure Specialist on a case-
by-case basis.
C. In general, two device boxes shall be provided for each work area and shall
be located (subject to design constraints) on opposing walls. Each device box
shall have two ports, unless the telecommunications outlet is intended to
serve a wall-mounted phone or other dedicated application requiring a single
port.
E. For Residence Halls, each dorm room shall be provided with no less than two
ports per resident, located within each resident’s study space. Some study
spaces may serve two students within a single space, in which case it might
be possible to install a single device box located where it would be reachable
from both workspaces within the space. For dorm rooms having a
common/living area, an additional device box with two ports shall be installed
in the common/living area. These situations shall be investigated by the
Designer and reviewed with CWU.
A. Existing device boxes and conduits shall be reused where existing boxes are
standards-compliant or where it can be verified that the existing conduits and
boxes will permit telecommunications cabling to be installed without
negatively affecting the performance of the cabling. The bend radius of the
cabling inside each box will be considered carefully in evaluating existing
boxes. For concealed conduits that can not be verified, the CWU ITS
Infrastructure Specialist will decide whether they should be reused on a case-
by-case basis.
C. In general, a minimum of or two device box shall be provided for each work
area, preferably on opposite walls. A minimum of one device box shall be
located in each classroom.
D. For Residence Halls, a minimum of one device box shall be located in each
dorm room, with no less than one port per resident.
46
DESIGN CRITERIA
HORIZONTAL DISTRIBUTION SYSTEMS
HORIZONTAL PATHWAY SYSTEMS
Please refer to the Horizontal Distribution Systems section of the BICSI TDMM for
general information regarding the design of horizontal distribution pathway and
cabling. The following requirements take precedence over the BICSI TDMM
guidelines for telecommunications infrastructure at CWU facilities:
CWU has standardized on the use of cable tray as the primary feeder pathway and
the use of conduit to route cabling from cable trays to outlets in its buildings. CWU
sometimes uses J-hooks for routing cabling. The process of selecting the type of
pathway for a particular project shall be a cooperative effort involving the Designer
and the CWU ITS Infrastructure Specialist.
A. During the Schematic Design phase, the Designer shall discuss pathway type
and size with the CWU ITS Infrastructure Specialist.
1. The Designer shall discuss the relative merits of the pathway options
available and shall assist the CWU ITS staff and the project design team
to select the most appropriate pathway solution for the project.
2. The future growth anticipated for the facilities affected by the project shall
be discussed. Horizontal feeder pathways (cable trays, conduits from TRs
to distribution junction boxes) shall be sized to support the initial cabling
installation plus a minimum of 25% growth.
E. “Poke-thru” penetrations to the ceiling space of the floor below are normally
not permitted. Permission to use poke-thru pathways in any circumstance
requires an ADR on a project-by-project basis.
47
DESIGN CRITERIA
HORIZONTAL DISTRIBUTION SYSTEMS
HORIZONTAL PATHWAY SYSTEMS
F. For computer lab applications, CWU has standardized on the use of 3” high
access flooring to distribute telecommunications cabling to each computer
workstation.
B. Surface raceways and surface mounted device boxes are not permitted.
A. For light remodel construction, there may not be an existing (or suitable
space for a new) telecommunications room available on the same floor as an
outlet. While pathways shall generally be designed from the device box
serving the telecommunications outlet to the nearest telecommunications
room on the same floor as the outlet, his requirement may be waived.
48
DESIGN CRITERIA
HORIZONTAL DISTRIBUTION SYSTEMS
HORIZONTAL PATHWAY SYSTEMS
B. Projects designed using cable tray shall use welded-wire type trays. Where it
is not possible, to conceal cable trays, the design shall specify aesthetically
finished aluminum or steel cable trays.
D. Conduit used to route cabling from the cable tray to the work area outlet shall
be sized a minimum of 1”.
B. Where conduit runs terminate at cable trays, the conduits shall be arranged in
an organized, uniform manner to facilitate an orderly cable transition from
conduit to cable tray.
D. Non-metallic conduit and flex conduit shall not be used for horizontal
pathways.
E. Conduits shall not be filled beyond 40%. The Designer shall verify the outer
diameter of the cabling for a project at the time of the design to determine
the maximum number of cables that can be placed inside a conduit without
49
DESIGN CRITERIA
HORIZONTAL DISTRIBUTION SYSTEMS
HORIZONTAL PATHWAY SYSTEMS
The following table shows the quantity of cables that can be placed in a single
EMT conduit, based on the typical current outside diameter dimensions for
both CMR and CMP rated CAT3, CAT5E and CAT6 cables from AMP:
F. In new construction, all work area outlets shall have a minimum 1” conduit
routing from the device box to an accessible cable pulling location. The
conduit size shall be increased as necessary for the quantity of cables to be
installed. Where new conduit is installed in existing buildings, the Designer
shall notify CWU when existing conditions prevent the use of one-inch trade
size conduit as a minimum conduit size.
G. Device boxes shall not be “daisy-chained.” Each device box shall be complete
with its own dedicated conduit to the nearest distribution point/pathway.
H. Junction boxes and pull boxes shall be oriented for access doors to open from
the area where the cable installer will normally work. This is typically from
the bottom (floor) side of the box.
I. Ceiling access to junction boxes and pull boxes shall be designed to allow full
access to the door and adequate working room for both the installation
personnel and proper looping of the cable during installation.
J. Junction boxes and pull boxes shall be located in spaces that are easily
accessible during normal working hours – such as hallways and common
areas. Junction boxes and pull boxes shall not be located in classrooms or
offices unless there is an overriding design reason for doing so, dependent
upon approval from CWU.
4.5.2.1 General
A. The Designer shall work with the CWU FP&CS Project Manager and the CWU
ITS staff to identify and understand the needs and requirements for the
facility on a project-by-project basis. This includes understanding the
expected future uses of the facility. The Designer shall design the horizontal
cabling accordingly.
1. For new cabling in a new building on an existing site, when the T568A
configuration does not exist anywhere on the campus.
2. For new cabling added to existing cabling in an existing building, where
the existing cabling is to remain in operation and where the T568A
configuration does not exist anywhere in that building.
In all other cases, new cabling shall be terminated using the T568A
configuration.
F. Splitting of wire pairs degrades the performance of the split pairs and voids
the AMP Netconnect® warranty.
51
DESIGN CRITERIA
HORIZONTAL DISTRIBUTION SYSTEMS
HORIZONTAL CABLING SYSTEMS
B. The only exception is horizontal cabling serving Computer Labs which shall be
terminated on patch panels.
52
DESIGN CRITERIA
HORIZONTAL DISTRIBUTION SYSTEMS
HORIZONTAL CABLING SYSTEMS
A. CWU uses Category 6 cable for a number of applications that require serial
telecommunications, including card access, point of sale, vending machines,
laundry machines, etc. While these applications are not dependent on cabling
that complies with ANSI/TIA/EIA 568B standards (in particular regarding
cable length limits) it is desirable to comply with these standards wherever
possible to provide the greatest degree of flexibility for future uses.
B. At the application end of the cable, the Designer shall require the Contractor
to provide a 50-foot coil for future termination by CWU, and the cable shall be
left coiled in the nearest pathway or distribution point that will accommodate
the coil.
C. At the TR end of the cable, the Category 6 cabling serving these applications
shall be terminated at the bottom of the termination block serving the floor of
the building where the application end of the cable is located.
D. The Designer shall discuss the serial cabling requirements with CWU on a
project-by-project basis and shall expect each building to have unique
requirements.
4.5.2.6 Horizontal Cable to Support Low Voltage and Building Automation Systems
C. The Designer shall request from CWU a list of systems that will require
telecommunications outlets for operations. The Designer shall then include
outlets in the design as necessary to meet the listed requirements.
53
DESIGN CRITERIA
HORIZONTAL DISTRIBUTION SYSTEMS
HORIZONTAL CABLING SYSTEMS
B. The Designer shall quantify and specify the required patch cords in the
Contract Documents to be provided by the Contractor for each particular
project, as shown in Table 4.2, below:
54
DESIGN CRITERIA
BACKBONE DISTRIBUTION SYSTEMS
INTRA-BUILDING BACKBONE PATHWAYS
Please refer to the Backbone Distribution Systems section of the BICSI TDMM, the
Pathways and Spaces section and the Cabling section of the BICSI CO-OSP, and the
Installing Backbone Pathways section of the BICSI TCIM for general information
regarding the design of backbone distribution pathway and cabling. The following
requirements take precedence over the BICSI TDMM, the BICSI CO-OSP, and the
BICSI TCIM guidelines for telecommunications infrastructure at CWU facilities:
B. In general, for new construction and full remodel projects, CWU requires a
minimum of one 4” EMT conduit (or sleeve) and two spare 4” conduits (or
sleeves) between the main telecommunications room/entrance facility and
each intermediate telecommunications room.
55
DESIGN CRITERIA
BACKBONE DISTRIBUTION SYSTEMS
INTRA-BUILDING BACKBONE CABLING
C. CWU does not use 50/125µm multimode fiber optic cabling. CWU uses
56
DESIGN CRITERIA
BACKBONE DISTRIBUTION SYSTEMS
INTER-BUILDING (CAMPUS) BACKBONE PATHWAYS
A. In no case shall copper or fiber optic backbone cabling be run in the same
raceways as those used by electrical power conductors.
4.6.2.4 Innerduct
B. The practice of populating a conduit with spare innerduct for future use is not
permitted.
57
DESIGN CRITERIA
BACKBONE DISTRIBUTION SYSTEMS
INTER-BUILDING (CAMPUS) BACKBONE PATHWAYS
B. The Master Plan divides the campus into nine areas, called “clusters.” Each
building within a cluster is connected via OSP telecommunications pathway
(ductbank) to a building within the cluster that serves as the “cluster hub.”
The cluster hub buildings are in turn connected via OSP telecommunications
pathway to the Telecommunications Center, forming a standards-compliant
two-level hierarchical star topology as shown the Figure below:
COMM
CENTER
An OSP pathway system designed with attention to CWU’s standards and future
needs provides for ease of administration, maintenance, future expansion, and
replacement of cabling as technology changes.
At the start of the project, the Designer shall request direction from CWU regarding
the following aspects of an OSP pathway design:
4.6.3.3 Ductbank
A. CWU requires 4” Schedule 40 PVC for all outside plant pathway except ducts
serving Blue Light Emergency Telephones which shall be trade-size 1½”
conduit.
B. OSP conduit shall transition from PVC to PVC-coated rigid steel conduit when
58
DESIGN CRITERIA
BACKBONE DISTRIBUTION SYSTEMS
INTER-BUILDING (CAMPUS) BACKBONE PATHWAYS
it enters within 10-feet of the building foundation and shall route from that
point to the building entrance facility. PVC-coated, rigid steel conduit is
intended to defend against the shearing effects of differential ground settling
around the building foundation. It also increases the protection against
future landscaping activities near the building.
• Transitioning back to PVC conduit after passing five feet inside the
building foundation is acceptable as long as the conduit remains in or
under the slab, otherwise it shall transition to rigid galvanized steel
conduit.
• The design shall require that a slack loop be installed inside the nearest
maintenance hole or handhole (not stored in the TR). The Designer shall
require that sufficient racking hardware be provided in the maintenance
hole or handhole to support the slack loop.
• The length of the loop shall be a minimum of 25 feet. The Designer shall
consider the arrangement of the telecommunications room and the
possibility of a rearrangement that might consume the cable slack. If
necessary, additional slack shall be required in the design, up to the NEC
limit of 50 feet of exposed OSP-rated cabling.
B. Conduit to be used for routing entrance cables from third party service
providers to an entrance facility shall be installed per the service providers’
requirements, generally 36 to 48 inches deep. The Designer shall consult
with the service providers prior to designing conduits serving an entrance
facility.
C. A continuous drain slope should exist at all points along the ductbank to allow
drainage and prevent the accumulation of water.
• A drain slope of ¼” per foot is desirable where possible.
59
DESIGN CRITERIA
BACKBONE DISTRIBUTION SYSTEMS
INTER-BUILDING (CAMPUS) BACKBONE PATHWAYS
• Where ¼” per foot is not possible due to inadequate natural slope or long
duct runs, a drain slope of no less than 1/8” per foot is acceptable.
• If no other option exists, require the Contractor to provide a “center
crown” drain slope by sloping the first half of the ductbank up towards the
midpoint, and then down from the midpoint to the end. Of course, the
center crown technique can not be used for conduits between a
maintenance hole and a building, because water would then drain into the
building.
B. The Designer shall minimize the effects of sidewall pressure between the
cable and conduit at bend points where possible by designing bends with the
most tightest bend radii to be near the cable feed end of the duct section
rather than the middle or end of the duct bank.
CWU has standardized on concrete encasement with full length reinforcement and
formed sides for all ductbanks except ducts serving Blue Light Emergency
Telephones which shall not be encased in concrete.
A. The OSP pathway system shall accommodate the requirements for signal and
low voltage cabling systems at CWU facilities. The Designer shall inquire with
CWU staff about the potential for future buildings or building expansions that
may adversely affect an existing or proposed distribution pathway and
accommodate those plans within the design.
60
DESIGN CRITERIA
BACKBONE DISTRIBUTION SYSTEMS
INTER-BUILDING (CAMPUS) BACKBONE PATHWAYS
B. The number of ducts in a ductbank should meet the needs of the specific
application and should offer future expansion capability. The following list is a
guideline for consideration when designing a new ductbank.
The NESC requirements above are focused on safety issues, and the performance of
telecommunications systems can be negatively affected by the presence of nearby
sources of EMI, even though the NESC safety-related separation requirements are
met. Where the Designer is concerned about EMI due to the proximity of power
distribution infrastructure, the Designer shall discuss the issue with the CWU ITS
Infrastructure Specialist.
4.6.3.3.7.2 PROXIMITY TO WATER, GAS OR OIL CONDUITS
Outside plant telecommunications conduits shall not be installed closer to conduits
that can be identified as not containing electrical power distribution conductors than:
Telecommunications conduits running in parallel with water, gas or oil conduits shall
not be installed vertically above the other conduits, but rather to the side of the
conduits. This arrangement should contribute to decreased disruption to the
telecommunications conduits in the event of excavation maintenance activities
associated with the other nearby conduits.
4.6.3.3.7.3 PROXIMITY TO STEAM LINES AND STEAM UTILIDORS
A. A minimum separation distance of 12” is required between a steam utilidor
and telecommunications conduits.
A. Due to the requirement to bury conduit beneath the frost line, a cover depth
of 43 inches is required for a topside conduit crossing. Unless a utilidor has
at least this much topside cover, it will not be possible to install a single-level
conduit ductbank over the top of the utilidor while maintaining 12” separation
from the top of the utilidor and while keeping the conduit below the frost line.
B. Telecommunications ductbanks shall not cross over the top of a steam utilidor
in a live load area where vehicle traffic passes without specific CWU approval.
4.6.3.3.8 Innerduct
A. While OSP innerduct for fiber optic cabling has been used on past CWU
telecommunications projects, CWU no longer installs innerduct on its projects
unless the application specifically requires it.
B. In the event that OSP innerduct is needed, sufficient innerduct to meet the
needs shall be designed into the project. However, spare innerduct shall not
be included.
The Designer shall inquire with CWU to determine whether services from utility
service providers will be necessary. If so, the Designer shall contact the utilities to
obtain their entrance pathway, entrance facility and demarcation point requirements.
A. Typically, maintenance holes are installed for main ductbanks (i.e. ductbanks
used for routing large portions of the telecommunications system backbone),
and handholes/pullholes are installed for subsidiary ductbanks (i.e. ductbanks
serving small clusters of buildings or a single building).
B. Maintenance holes and their covers shall be appropriately sized for the
application.
• Diamond plate hinged covers and removable diamond plate covers are not
permitted for maintenance holes at CWU.
64
DESIGN CRITERIA
BACKBONE DISTRIBUTION SYSTEMS
INTER-BUILDING (CAMPUS) BACKBONE PATHWAYS
F. Splices in backbone fiber optic cable are not allowed, and while splices in
backbone copper cable may be permitted in some rare cases (through an
approved ADR), they are discouraged. However, when sizing OSP
telecommunications maintenance holes, the design shall require the
Contractor to provide space for possible future splice closures when required
(for example, to repair cable breaks when and if possible).
65
DESIGN CRITERIA
BACKBONE DISTRIBUTION SYSTEMS
CAMPUS CABLING
The Designer shall review the construction of bridge and waterway crossing
distribution systems for compliance with the design. The design and installation shall
also be reviewed, approved, and inspected by the CWU ITS Infrastructure Specialist
or designee.
B. Radio antenna transmission cables that connect the antenna to the radio
transceiver emit radio frequency (RF) radiation. These cables may be routed
through the common telecommunications ductbank and maintenance hole
system if necessary, but shall be routed in a separate conduit from other
telecommunications cables. Cables containing RF radiation shall be shielded
cables.
4.6.4.1 General
A. CWU uses three types of telecommunications media for the campus backbone
system:
• 24 AWG UTP (copper) – used for voice, analog signaling, and various
metering applications
• Singlemode Fiber Optic – used for data, video, and increasingly, voice
applications
• 62.5/125 um Multimode Fiber Optic – used primarily for data applications
and various metering applications.
66
DESIGN CRITERIA
BACKBONE DISTRIBUTION SYSTEMS
CAMPUS CABLING
CWU does not use 50/125µm multimode fiber optic cabling on campus. CWU
uses singlemode fiber wherever the existing 62.5/125µm fiber is unable to
meet the requirements of a particular application.
D. Where cables are to be pulled through maintenance holes and handholes, the
duct selected for cable installation shall be the same as it enters and exits the
maintenance hole or handhole. Changes in duct selections, especially in
elevations, should be avoided to reduce the risk of damage to cable sheaths
and to minimize pulling tension.
E. Ducts shall be assigned during the course of design, not during construction.
Duct assignments must be approved by CWU prior to the release of
construction documents. If a choice of ducts to use is available, the bottom
ducts should be used first in order to facilitate future cable placement.
I. The use of direct buried cabling and aerial cabling is not authorized. If
circumstances appear to justify either of these cable distribution methods, the
Designer shall seek approval via the Alternative Design Request process.
67
DESIGN CRITERIA
BACKBONE DISTRIBUTION SYSTEMS
CAMPUS CABLING
• For copper cabling, indoor dry splice enclosures shall be provided just
prior to the building entrance terminals.
• For long cable runs, the longest cable reel lengths obtainable shall be
used. Splices shall not be used except where cable reel lengths are
exceeded. If splices are used, the Designer shall ensure that the splice
location will have enough space for storing cable slack loops after the
splice is completed.
• The Designer shall design OSP copper backbone cabling such that it does
not exceed 2,200 feet in length. This is the length limitation for the digital
telephone sets used on campus. Where a project appears to require
lengths longer than this amount, the Designer shall alert the CWU ITS
Infrastructure Specialist to cooperatively consider other options, including
the use of fiber optic cabling with remote telephone system electronics.
C. Typically, CWU uses OSP copper cabling that is “outdoor-only” rated for its
inter-building copper needs.
E. Twisted-pair copper cabling shall not be used for inter-building data backbone
applications.
A. Copper backbone cables shall be sized to support two pairs per work area,
plus 25% growth. When calculating size, work area shall also include fax
machines and dial-up modems. Copper backbone cables shall have a
68
DESIGN CRITERIA
BACKBONE DISTRIBUTION SYSTEMS
CAMPUS CABLING
minimum of 25 pairs.
B. Backbone cable pair sizing shall be considered with respect to possible future
requirements. The cost to add additional backbone pairs during the initial
installation is significantly less than the cost of adding another cable in the
future.
• CWU uses fiber optic cabling for voice applications at some of its buildings.
The Designer shall inquire about whether fiber or copper cabling is to be
used for voice services at a facility, and shall size the copper cabling
accordingly.
A. During the Design Development phase, the Designer shall contact Corning
Cable Systems fiber optic cable suppliers and obtain their projections of the
lead-time requirements for fiber optic cabling. This information shall be
submitted to CWU ITS to aid project-scheduling efforts and determine
whether cable should be pre-ordered.
B. OSP fiber optic cable installed underground shall be loose tube construction
and gel-filled or be constructed of appropriate waterproofing compounds.
C. CWU does not permit the design of any fiber optic cabling system that is
dependent on splices.
D. Typically, CWU uses OSP fiber optic cabling that is “Indoor/Outdoor” rated
(Corning Cable Systems’ “Freedm” line of products) for most of its inter-
building fiber needs. The reason for this choice is that many (if not most) of
the buildings on campus do not have a continuous metallic conduit from the
point of entry to the main telecommunications room in the building and the
length of the entrance cable typically exceeds 50 feet. This solution also
preserves signal headroom that would be lost crossing a spliced Outdoor-to-
Indoor rated cabling transition point.
F. The Designer shall consult with the CWU ITS Infrastructure Specialist prior to
developing the fiber optic design to determine the performance requirements
for the network electronics. Selection of fiber optic interface modules for
network electronics will be affected by the lengths of the fiber optic cabling to
be used by the electronics.
69
DESIGN CRITERIA
BACKBONE DISTRIBUTION SYSTEMS
CAMPUS CABLING
When fiber additions are made to existing facilities where type 568ST
connectors are in use, new 568SC Duplex connectors and new Duplex SC
patch panels shall be used for new fiber.
3. For full remodel and light remodel to existing facilities where type 568ST
connectors are currently in use, CWU may wish to re-terminate the
existing fiber and install 568SC Duplex connectors. The Designer shall
inquire with CWU ITS for direction with this issue on a project-by-project
basis.
4. All strands of a fiber optic cable shall be terminated using fusion-spliced
pigtail connectors. The installation of “dark fiber” is not permitted.
H. Fiber optic cable and components shall be rated and installed to comply with
the IEEE 802.3z 1000Mb/s (Gigabit Ethernet) standard. CWU networks
operate at Gigabit backbone speeds.
I. In new construction and new conduit, fiber optic backbone cables shall be
installed in fiber optic innerduct that routes continuously to each
telecommunications rack or backboard location where the fiber is terminated.
Where fiber optic cable is installed into existing conduits, the use of fiber optic
innerduct is required if space is available. Design or installation of fiber optic
cabling without the use of innerduct shall require approval through the
“Alternative Design Request” process.
A. Fiber optic patch cables shall be factory manufactured Corning Cable Systems
cables
• Fiber optic patch cables shall interconnect with the site backbone using
Duplex SC connectors. If low voltage equipment is not available with SC
connectors, then hybrid fiber patch cables from Corning Cable Systems
shall be used.
multimode fiber optic cable where the length is between 275 meters and 550
meters:
• Between the work area outlet and the LANattached device.
• Between the TR patch panel and the LAN switch.
At CWU, the various services carried via OSP cabling are distributed differently
depending on the type of service and the type of building as described below. These
issues may affect the cabling to be installed on a project.
B. At this point, CWU intends to continue using standard analog telephone for
student residences. There is no intention to use VOIP for students.
Cable television services are generally provided centrally at the Library building
(Media Equipment Services) and then distributed campus-wide to campus buildings
via the coaxial and fiber optic OSP cabling infrastructure.
71
DESIGN CRITERIA
TELECOMMUNICATIONS ROOMS AND ENCLOSURES
TELECOMMUNICATIONS ROOM LOCATION
Student cable television services are generally provided directly to each residential
building by Charter Telecommunications. Each residential building has its own
television demarc locations, and the utility provides its own OSP service cable to the
building.
Network and Internet services are generally provided centrally at the Computer
Center and then distributed campus-wide to campus buildings via the OSP cabling
infrastructure.
Please refer to the Telecommunications Rooms and Enclosures section of the BICSI
TDMM for general information regarding the design of telecommunications rooms.
The following requirements take precedence over the BICSI TDMM guidelines for
telecommunications infrastructure at CWU facilities:
A. In CWU facilities, the TRs in a building may also serve as low voltage systems
equipment rooms, typically containing electronic equipment intended to serve
the building or a portion of the building. The TR shall not be shared with
electrical installations other than those necessary for telecommunications.
A. The Designer shall be responsible to inform the Architect of the sizing and
location requirements for Telecommunications Rooms during the Schematic
Design phase of the project.
72
DESIGN CRITERIA
TELECOMMUNICATIONS ROOMS AND ENCLOSURES
TELECOMMUNICATIONS ROOM SIZING
A. Prior to starting a cabling design for a computer lab, the Designer shall meet
with CWU to determine whether to follow the CWU-standard practice of using
termination blocks for terminating horizontal cabling (see Horizontal Cross-
connects (HC), below), or whether a small rack-mounted Category 6 patch
panel system is desired for terminating horizontal cabling serving the
computer lab. A patch panel system might give the Instructor more flexibility
in configuring the lab network, as well as the ability to easily disconnect the
computer lab network from the building network when required. This issue
will be addressed on a case-by-case basis.
B. There are two options for a cabling and equipment rack serving a computer
lab. In either case, the rack shall be provided with standard intra-building
backbone cabling.
73
DESIGN CRITERIA
TELECOMMUNICATIONS ROOMS AND ENCLOSURES
ENVIRONMENTAL PROVISIONING
C. Doors shall open out from telecommunications spaces wherever possible and
shall be a minimum of 36” wide and 80” high, fitted with a lock. Coordinate
lock and key requirements with CWU. Doors shall be located in hallways or
other common areas. Telecommunications room doors shall never be located
in another building occupant’s designated space.
• Plywood backboards shall extend from the floor to a height of eight feet
above the finished floor.
74
DESIGN CRITERIA
TELECOMMUNICATIONS ROOMS AND ENCLOSURES
FLOOR-STANDING EQUIPMENT RACKS AND CABINETS
C. The Designer shall coordinate with the Mechanical Engineer to ensure that the
HVAC requirements for the telecommunications spaces are met and also that
HVAC ductwork and motors do not conflict with cable tray or conduit routing.
1. A fundamental design assumption is that all TRs will at some time contain
active electronic equipment (hubs, routers, switches, etc.) even if the
current design does not call for such devices. Network electronics require
an HVAC system capable of operating on a 24 hours-per-day, 365 days-
per-year basis. If the building system cannot assure continuous cooling
operation, a stand-alone unit shall be provided for the TR. In addition, a
positive pressure differential with respect to surrounding areas is required
to help keep dust and other particles out of the room.
B. 36” clearances are required surrounding racks, cabinets and any equipment
that may be mounted in the racks, as required by code. See the sample
telecommunications room plan drawing in the Appendix for further
information.
A. Floor standing racks shall be securely bolted to the floor, and shall be braced
to the wall with cable ladder racking. Multiple racks in the same TR shall be
75
DESIGN CRITERIA
TELECOMMUNICATIONS ROOMS AND ENCLOSURES
FLOOR-STANDING EQUIPMENT RACKS AND CABINETS
D. Some IT equipment requires an equipment rack with both front and rear
mounting rails. The Designer shall discuss with CWU the network electronics
that will be hosted in each rack in each TR and shall show this equipment on
the rack elevation details in the plan drawings.
A. When planning the size and location of TRs in existing buildings, the Designer
shall make every reasonable effort to meet the requirements for
telecommunications rooms. In certain instances, the only viable alternative
may be the use of one or several telecommunications cabinets in lieu of TRs.
B. In light remodel projects, some buildings may not justify a separate room as
the telecommunications room. In some circumstances, sufficient space may
not be available for a telecommunications room. In these instances, a wall-
mounted or floor-standing telecommunications cabinet may be used.
76
DESIGN CRITERIA
TELECOMMUNICATIONS ROOMS AND ENCLOSURES
POWER REQUIREMENTS
G. Each cabinet shall be vented and shall be equipped with cooling fans. Vent
filters shall be provided wherever appropriate to minimize the entrance of
dust and foreign materials.
77
DESIGN CRITERIA
TELECOMMUNICATIONS ROOMS AND ENCLOSURES
POWER REQUIREMENTS
B. The Designer shall obtain connection/load requirements from CWU for each
piece of equipment, and tabulate the information for review and confirmation
by CWU. This equipment may include network electronics, UPS equipment,
computers/servers, phone system equipment, voice mail systems, video
equipment and service provider equipment.
C. The Designer shall specifically investigate the potential need for voltage or
ampere requirements other than the typical 120VAC / 20 Ampere power
outlet. Some UPS and network switch equipment requires specialized plugs
or electrical service. The Designer shall inquire with CWU ITS to determine
whether any dedicated or specialized circuit requirements exist.
B. The rack nearest the wall is expected to host a rack-mounted UPS at the base
of the rack as well as a 72” vertical power strip attached to the vertical cable
management on the non-wall side of the rack. The UPS will plug into the
duplex power outlet, and the power strip will plug into the UPS.
D. Typically, the contractor is required to furnish and install the vertical power
strip, and CWU furnishes and installs the UPS equipment.
E. For racks where CWU intends to install equipment with dual-redundant power
supplies, two duplex technical power outlets with separate circuits shall be
provided for those racks. The Designer shall inquire with CWU whether
equipment with dual power supplies will be used.
4.7.6.2.1.2 TELECOMMUNICATIONS ROOMS WITH MORE THAN TWO FLOOR-STANDING RACKS
A. The first two racks are served as described above.
C. Conduit for each pedestal outlet shall be concealed in the floor where
possible. Otherwise, the conduit shall be routed exposed from the wall to the
pedestal, above the base-plates of the first and second racks. The bottom
rack spaces (reserved for UPS equipment) shall not be obstructed by the
power conduit.
4.7.6.2.1.3 OTHER TECHNICAL POWER OUTLETS
In addition to the outlets intended to serve the racks, a minimum of one duplex
technical power outlet shall be provided per wall (centered on the wall) except for
the wall adjacent to the racks. For walls more than 10’ in length a minimum of 2
outlets shall be provided, and at intervals of no more than 6 feet between outlets.
A. The design shall include technical power outlets according to the “new
construction” requirements, wherever possible. However, for some projects it
may not be realistic or practical to meet those requirements. The following
two paragraphs describe an alternative arrangement of technical power
outlets that may be approved on a project-by-project basis via the ADR
process:
• If power outlets are not installed at the base of each rack, the number of
79
DESIGN CRITERIA
EQUIPMENT ROOMS
GROUNDING, BONDING, AND ELECTRICAL PROTECTION
A. In addition to the technical power outlets described above, the design shall
require the Contractor to provide other duplex convenience outlets (120VAC,
15 Ampere) that would be available for use with power tools and testing
equipment. Each outlet shall be labeled with its panel identification and
circuit number.
All equipment racks, metallic conduits and exposed non-current carrying metal parts
of telecommunications and information technology equipment in the TR shall be
bonded to the TMGB. Refer to the Grounding, Bonding and Electrical Protection
section of the BICSI TDMM and this document for more information regarding the
design of grounding, bonding and electrical protection systems.
Please refer to the Equipment Rooms section of the BICSI TDMM for general
information regarding the design of equipment rooms. The following requirements
take precedence over the BICSI TDMM guidelines for telecommunications
infrastructure at CWU facilities:
This document may not completely describe the design guidelines for such
a significant project. If such a project is undertaken, close consultation
with CWU ITS staff is required on all aspects of the project.
81
DESIGN CRITERIA
EQUIPMENT ROOMS
EQUIPMENT ROOM SIZING
floor drain (with a trap primer) is required if there is any risk of water
entering the ER.
2. Areas exposed to excessive heat or direct sunlight.
3. Areas exposed to corrosive atmospheric or environmental conditions.
4. Near or adjacent to potential sources of electromagnetic interference
(EMI) or radio frequency interference (RFI) such as large electric motors,
power transformers, arc welding equipment, or high power radio
transmitting antennas.
5. In a shared space with electrical equipment other than equipment serving
the telecommunications system.
A. The first step in determining the size required for an ER, is to identify the
systems that will be installed into the ER. In this process, first identify the
size of the area that will be served from the ER. Next, identify the quantity,
size and variety of systems to be installed to support the area, and the space
required for each of the systems.
B. The Designer shall consult with the CWU ITS Infrastructure Specialist to
determine any sizing requirements for the ER on a project-by-project basis.
C. A model that CWU has used to create a preliminary forecast of the space
needed for an ER in a building is to design 0.75 ft2 of ER floor space for every
100-ft2 work area to be served in the building.
D. Once the size and quantity of systems are identified, they shall be laid out in
a functionally efficient arrangement. Some equipment, such as WAN
equipment, LAN servers, tape backup equipment, hubs, switches, and patch
panels will require regular access, and shall be arranged in an easily
accessible manner.
E. When laying out the arrangement of the ER, the following requirements and
issues shall be addressed:
1. Equipment shall be grouped together with like equipment (i.e., voice, data
for both LAN and WAN, video.)
2. Designate wall space and equipment rack space for each specific use.
Allocate specific backboard space for the service providers’ demarcation
areas and any associated equipment. The wall space allocated to the
service providers shall be located adjacent to each other on a common
wall and on a single aisle of equipment racks to concentrate the activities
of service technicians in areas away from CWU-owned systems in other
areas of the equipment room.
3. Allocate separate wall and equipment rack space for terminating and cross
connecting campus distribution cables (both copper and fiber optic).
These areas shall be located adjacent to the equipment providing the
services, such as the PBX, voice mail system, and data network
electronics.
4. Equipment racks and rack-mounted equipment shall have a minimum of
three feet of unrestricted clearance in front and back for technician
access. In smaller installations, wall mounted swing-out equipment racks
82
DESIGN CRITERIA
EQUIPMENT ROOMS
ARCHITECTURAL PROVISIONING
can be used to save space, but shall have a three-foot clearance to the
front of the rack. Note that some LAN equipment may be large, or may
require clearance at both the front and back, and wall mounted swing-out
racks may not be appropriate.
G. Equipment rooms shall be sized with at least 150 ft2 of usable floor space.
H. The CWU ITS Infrastructure Specialist shall approve the final space
requirements and design layout for the equipment and racks.
• In large equipment rooms, a raised access floor is required. The raised floor shall
have a minimum of 8 inches clearance to the base floor, and shall not be used as
an air plenum. If raised access flooring used, the ceiling height must be raised to
maintain a minimum clearance of 8 feet. The Designer shall inquire with CWU to
determine whether an access floor is desired.
Where fire suppression sprinklers are used, sprinklers shall be equipped with wire
cages under the sprinkler heads to prevent accidental discharge. Drainage troughs
shall be placed under the sprinkler pipes to prevent leakage onto the equipment
within the room.
Some IT equipment requires an equipment rack with both front and rear mounting
rails. The Designer shall discuss with CWU the network electronics that will be
hosted in each rack in each ER and shall show this equipment on the rack elevation
details in the plan drawings. The Designer shall also discuss with CWU the potential
for future additional racks, and identify spaces for the future racks on the plan
drawings
A. Other styles of equipment racks and cabinets might be used in the ER, some
of which may be proprietary to a particular system or service provider. The
Designer shall plan the ER layout to make allowances for proprietary cabinets
and racks, and allow expansion room for future equipment.
B. Floor-standing cabinets shall have front and rear hinged doors to permit
access to both the front and rear of the equipment. Telecommunications
83
DESIGN CRITERIA
EQUIPMENT ROOMS
POWER REQUIREMENTS
cabinets shall be constructed of heavy gauge steel. The side panels of the
cabinet shall be removable for maintenance accessibility.
C. Each cabinet shall be vented and where appropriate shall be equipped with
cooling fans.
A. A separate supply circuit serving the room shall be provided and terminated
in its own electrical panel located in the ER. This power panel shall be
designated as “ER Technical Power.” The ER technical power panel shall be
used exclusively for supplying power to electronics equipment in the
equipment room. Sizing of electrical power supply is dependent upon the
equipment types and equipment load, and shall be calculated on a case-by-
case basis, including sufficient spare capacity for future growth.
B. The technical power circuits in each ER shall originate from a technical power
panel, dedicated to serving the ER. The technical power panel shall not be
used to supply power to sources of electromagnetic interference such as large
electric motors, arc welding, or industrial equipment.
D. Power for critical network components such as servers, routers, switches, and
telephone systems shall always be provided through at least one
uninterruptible power supply (UPS).
E. Generally speaking, CWU does not use centralized UPS equipment. However,
if CWU wishes to use a centralized UPS, the following requirements shall be
met:
• Some centralized UPS vent noxious battery gasses. The UPS shall
therefore be housed in a room that is equipped to properly vent the
gasses. Centralized UPSs shall not be located within the ER itself. Rooms
housing centralized UPS systems shall have the same environmental
provisioning features as the ER.
• The UPS’ battery bank shall be sized to provide a minimum of two hours
of run time for the supported low voltage systems hardware. The
Designer shall request direction from the CWU ITS Infrastructure
Specialist regarding project specific needs for increased the run time.
84
DESIGN CRITERIA
EQUIPMENT ROOMS
GROUNDING, BONDING, AND ELECTRICAL PROTECTION
B. The Designer shall obtain connection/load requirements from CWU for each
piece of equipment, and tabulate the information for review and confirmation
by CWU. This equipment may include network electronics, UPS equipment,
computers/servers, phone system equipment, voice mail systems, video
equipment and service provider equipment.
All equipment racks, metallic conduits and exposed non-current carrying metal parts
of telecommunications and information technology equipment in the ER shall be
bonded to the TMGB. Please refer to the Grounding, Bonding and Electrical
Protection section of the BICSI TDMM and this document for more information
regarding the design of grounding, bonding and electrical protection systems.
85
DESIGN CRITERIA
TELECOMMUNICATIONS ENTRANCE FACILITIES & TERMINATION
GROUNDING, BONDING, AND ELECTRICAL PROTECTION
A. The entrance facility (EF) shall be located within the building’s equipment
room or main telecommunications room.
• In light remodel projects, it is possible that the EF may already exist and
that it is expected to be reused. This may be acceptable if the size is
appropriate, if there is sufficient environmental provisioning, and if
adequate separation from sources of EMI is maintained. It may be
desirable to extend the incoming entrance conduits (using rigid galvanized
steel conduit) from a non-telecommunications space to a dedicated
telecommunications room.
B. OSP conduits shall be extended into the entrance facility to the point that no
more than fifty feet of outdoor-rated cabling is exposed, including slack loops
and termination. Fire-rated tape wrap is not acceptable. For more
information, see the Inter-Building (Campus) Backbone Pathways section and
the Inter-Building (Campus) Backbone Cabling section, above.
C. Ducts shall enter the entrance facility parallel to the backboard to be used -
perpendicular entry may cause cables to sharply bend beyond their minimum
allowable bend radius.
Please refer to the Grounding, Bonding and Electrical Protection section of the BICSI
TDMM for general information regarding the design of grounding, bonding and
electrical protection systems. See also the Grounding, Bonding and Electrical
Protection section of the BICSI CO-OSP for more information. The following
requirements take precedence over the BICSI TDMM guidelines for
telecommunications infrastructure at CWU facilities:
86
DESIGN CRITERIA
FIRESTOPPING
GROUNDING, BONDING, AND ELECTRICAL PROTECTION
maximum of 3/0 AWG) shall be provided between each TGB and TMGB and
from the TMGB to the building main electrical service ground electrode. The
Designer shall evaluate the grounding cable size that will be appropriate for
each application.
4.11 FIRESTOPPING
Please refer to the Firestopping section of the BICSI TDMM for general information
regarding the design of firestopping for telecommunications infrastructure. The
following requirements take precedence over the BICSI TDMM guidelines for
telecommunications infrastructure at CWU facilities:
B. The Designer shall avoid design solutions calling for penetration of fire-rated
walls and floors when other reasonable cable-routing options exist.
Please refer to the Field Testing section of the BICSI TDMM for general information
regarding the field-testing of telecommunications cabling. The following
requirements take precedence over the BICSI TDMM guidelines for field-testing at
CWU facilities:
A. The Designer shall review the cable test results submitted by the Contractor.
The test results shall be the actual native machine test results downloaded
from the test equipment. In particular, the Designer shall check for the
following items on the cable test reports:
87
DESIGN CRITERIA
SPECIAL DESIGN CONSIDERATIONS
IDENTIFICATION STRATEGY
C. The final test results shall have been verified by the Designer to be acceptable
before submission to CWU. Test results shall be submitted to CWU in both
electronic and paper forms.
Please refer to the Special Design Considerations section of the BICSI TDMM for
information regarding the design of telecommunications infrastructure in accordance
with the Americans with Disabilities Act (ADA) requirements at CWU facilities.
The Designer shall request guidance from CWU regarding the requirements for any
special design considerations, including:
• Spaces within CWU facilities intended to include Americans with Disabilities Act
(ADA) features.
88
DESIGN CRITERIA
TELECOMMUNICATIONS ADMINISTRATION
IDENTIFICATION STRATEGY
B. Campus Backbone cables shall be named by CWU. The Designer shall not
assign names or numbers to maintenance holes or handholes but instead
shall contact CWU’s Facility Management Department and obtain authorized
identifiers from the Campus Utility Map system. The authorized identifiers are
assigned in coordination with other existing cables. Campus backbone cables
shall have identifiers in the form of “M##” where “M” is either “F” (for fiber
backbone media) or “C” (for copper backbone media) and “##” is a unique,
two-digit sequential cable number.
o For example: The first three outside plant fiber backbone cables designed
on a project shall be identified as “F01”, “F02” and “F03”. The eleventh,
twelfth and thirteenth outside plant copper backbone cables designed on a
project shall be identified as “C11”, “C12” and “C13”.
89
DESIGN CRITERIA
TELECOMMUNICATIONS ADMINISTRATION
IDENTIFICATION STRATEGY
E. Patch Panels shall have identifiers sequentially numbered in the form of “PP#”
where “PP” stands for “Patch Panel” and “#” is the sequential patch panel
number terminated within a given telecommunications room, regardless of
media type (horizontal copper or horizontal fiber).
o For example: The first patch panel (terminating horizontal fiber optic
cabling in duplex SC ports) would be labeled “PP1”.
o For example: The second patch panel (terminating horizontal copper
cabling) would have the label “PP2”.
F. Termination Blocks for Backbone Distribution shall have a single label affixed
above the entire termination block wall field which reads “Backbone”. Also,
label each termination block column within the termination block wall field in
the form “TR”, where “TR” is the telecommunications room where the
backbone cable originates (see the Telecommunications Rooms section
above). Use a new column for each telecommunications room. Do not
intermix cables from multiple telecommunications rooms in a single
termination block column.
o For example: If a termination block column on the fourth floor terminates
backbone cabling from the first floor telecommunications room, then the
column on the fourth floor would have the label “1A” and the termination
block column on the first floor would have the label “4A.”
H. Ports on Patch Panels for Horizontal Cabling are typically pre-labeled by the
manufacturer with sequential numbers (i.e. 1 to 48). For ports which are not
pre-labeled, label each port in the form “##” where “##” is the sequential
port number within the panel. The ports in each patch panel shall start at
number “01”.
o For example: The ports on a patch panel terminating horizontal fiber
optic cabling in duplex SC ports would be labeled starting with “01” for the
first duplex port (one label per pair of fiber strands) and continue
sequentially through the remainder of the duplex ports.
90
DESIGN CRITERIA
DESIGN, CONSTRUCTION AND PROJECT MANAGEMENT
IDENTIFICATION STRATEGY
I. Termination Blocks for Horizontal Cabling shall have a single label affixed
above the entire termination block column indicating the floor number on
which the outlets are located, whose cable terminates on that column.
o For example: A termination block column terminating workstation cables
from the second floor would have the label “2nd Floor.”
K. Work Area Connectors (Ports) shall have identifiers in the form of “FTR-###”
where “F” is the floor of the telecommunications outlet where the horizontal
cable terminates, “TR” is the telecommunications room where the cable
terminates (see the Telecommunications Rooms section above), and “###” is
the sequential cable number for that telecommunications room.
o For example: If an outlet on the third floor has a faceplate with two
copper cables (sequentially numbered 5 and 6) terminated in the second
telecommunications room on the fourth floor, then the connectors would
have the labels “34B-005” and “34B-006” respectively.
The only exception to the above identification scheme is for small projects relating to
moves or changes to existing cabling, or the addition of new outlets terminated
among other existing cables in existing TRs. In such cases, the cable identification
scheme for the new cables shall be consistent with the existing identification
scheme.
Please refer to the Design, Construction and Project Management section of the
BICSI TDMM for information regarding design, construction and project management
of telecommunications infrastructure at CWU facilities.
Please refer to the Power Distribution section of the BICSI TDMM for general
information regarding the design of power distribution for telecommunications
infrastructure. The following requirements take precedence over the BICSI TDMM
guidelines for telecommunications infrastructure at CWU facilities:
91
DESIGN CRITERIA
RESIDENTIAL CABLING
IDENTIFICATION STRATEGY
1. Please refer to the Work Areas section of the BICSI TDMM and also in the
Work Areas section this document for information on the power outlet
requirements for work areas.
3. Please refer to the Equipment Rooms section of the BICSI TDMM and also
in the Equipment Rooms section of this document for information on the
power outlet requirements for ERs.
Please refer to the Residential Cabling section of the BICSI TDMM for information
regarding the design of telecommunications infrastructure to support residential
facilities within CWU facilities.
Generally speaking, CWU-owned residential facilities shall be provided with the same
telecommunications infrastructure materials and methods as are used for all other
CWU facilities, except where specifically noted in this document. The Designer shall
inquire of CWU whether a “residential cabling” solution is required for a particular
project.
Please refer to the Networking Fundamentals section of the BICSI TDMM for general
information regarding the design of telecommunications infrastructure for serving
local area networks. The following requirements take precedence over the BICSI
TDMM guidelines for telecommunications infrastructure at CWU facilities:
B. CWU networks are typically based on Cisco switches, with 1GB backbones and
100MB service to the work area. The Designer shall coordinate with the CWU
ITS Infrastructure Specialist to determine the requirements for supporting the
92
DESIGN CRITERIA
BUILDING AUTOMATION SYSTEMS
ADMINISTRATIVE/ACADEMIC CABLE TELEVISION SERVICES
network electronics in each space. The design shall include the infrastructure
for hosting this equipment.
Please refer to the Building Automation Systems section of the BICSI TDMM for
information regarding the design of telecommunications infrastructure to support
building automation systems at CWU facilities.
B. Horizontal connection points are only required for BAS applications. Do not
use an HCP for typical voice/data/video applications.
Please refer to the Private CATV Distribution Systems section of the BICSI TDMM for
information regarding the design of telecommunications infrastructure to support
private CATV distribution systems at CWU facilities.
CWU has established a standard specification for use on its projects where television
distribution systems are required. The Designer, or others on the design team, shall
adapt this specification for use on CWU’s projects. As of the writing of this
document, section 16810 is available on CWU’s website at the following address:
http://www.cwu.edu/~ac/vnetspecs.pdf
Cable television services are generally provided centrally at the Library building
(Media Equipment Services) and then distributed campus-wide to campus buildings
via the coaxial and fiber optic OSP cabling infrastructure.
Student cable television services are generally provided directly to each residential
building by Charter Telecommunications. Each residential building has its own
television demarc locations, and the utility provides its own OSP service cable to the
building.
93
DESIGN CRITERIA
OVERHEAD PAGING SYSTEMS
STUDENT CABLE TELEVISION SERVICES
• If inside plant coaxial cabling is required, the Designer shall comply with the
requirements of the cable television utility in addition to CWU’s requirements for
cable television cabling.
Please refer to the Overhead Paging Systems section of the BICSI TDMM for
information regarding the design of telecommunications infrastructure to support
overhead paging systems at CWU facilities.
Please refer to the Wireless and Microwave Systems section of the BICSI TDMM for
information regarding the design of telecommunications infrastructure to support
wireless and microwave telecommunications systems at CWU facilities.
The Designer shall work cooperatively with CWU ITS staff to design
telecommunications infrastructure to appropriately support wireless
technologies to meet the goal.
B. The design shall comply with the guidelines in BICSI’s Wireless Design
Reference Manual (WDRM).
C. CWU has standardized on the use of Cisco’s Aeronet wireless access point
equipment on campus. The manufacturer’s requirements shall be met when
designing wireless network infrastructure.
D. The Designer shall coordinate with CWU ITS to identify the locations that
telecommunications outlets will be required to support wireless access points.
94
CONSTRUCTION DOCUMENT CONTENT
PLANS AND DIAGRAMS
GENERAL
A. This section of the TDDG describes the content requirements that the
Designer shall include when creating the Construction Documents7. This
content is in addition to the content found in some generally accepted
document sets.
B. The documents produced by the Designer and the services provided by the
Designer shall comply with the requirements in the Conditions of the
Agreement and the Instructions for Architects and Engineers doing Business
with Division of Engineering and Architectural Services. In addition to these
requirements, the Designer shall also meet the requirements in this
document, including the Construction Document content requirements in this
section.
5.1.1 GENERAL
7
As of this writing, the Conditions of the Agreement and the Instructions for Architects and Engineers
Doing Business with Division of Engineering and Architectural Services (both published by the Washington
State Department of General Administration) make reference to the term “Construction Documents.”
However, the Manual of Practice from the Construction Specifications Institute (CSI) defines “Construction
Documents” as a subset of the “Construction Documents” and indicates that drawings, specifications and
other written documentation are contained within the Construction Document subset. The TDDG will use
the term “Construction Documents” according to CSI’s definition.
95
CONSTRUCTION DOCUMENT CONTENT
PLANS AND DIAGRAMS
OUTSIDE PLANT TELECOMMUNICATIONS SITE PLAN DRAWINGS
B. All plan sheets shall be scaled, shall indicate the scale and shall show a north
arrow. All plan sheets shall show a key plan when the building or site is too
big to fit on a single sheet.
C. The site plan shall show the cabling from the service providers (cable
television, telephone, etc.) and shall indicate the requirements for owner-
provided maintenance holes or handholes and pathway to the point of
demarcation.
A. Scaled plan drawings shall be provided for each building showing the
horizontal and intra-building backbone telecommunications infrastructure.
These drawings shall show the following:
B. Where new cabling will be pulled into existing conduits, the Construction
Documents shall show the routes of each existing conduit. Where it is not
96
CONSTRUCTION DOCUMENT CONTENT
PLANS AND DIAGRAMS
DEMOLITION
5.1.4 DEMOLITION
A. Any existing OSP and ISP cabling intended to be no longer in use following
the installation of new cabling shall be removed (demolished) as a part of the
project.
A. Construction documents for CWU projects shall show scaled plan drawing
details for the telecommunications spaces. The details shall show the
footprint and location of each of the major components in the room including
at least the following:
A. The Designer shall provide scaled wall elevation details for each TR and ER
affected by the project. The Designer shall consider (on a project-by-project
basis) whether the plan drawings are better suited for depicting the elevation
diagrams, in lieu of the Project Manual.
B. For remodel projects, the Designer shall produce digital photographs of each
wall depicting the existing conditions where future TRs and ERs will be
located. These photos shall be provided with the wall elevation details in the
Construction Documents.
C. The wall elevation details shall show the components that are mounted on the
walls in the room including at least the following:
97
CONSTRUCTION DOCUMENT CONTENT
PROJECT MANUAL
INTRA-BUILDING BACKBONE SCHEMATIC DIAGRAMS
E. The details shall depict the telecommunications materials that are listed in the
specification.
F. Where a project involves additions to existing racks, the elevation details shall
show the existing equipment in the racks and indicate which items are
existing, in addition to indicating which items are “new, to be provided under
the Contract”.
G. Examples of rack and wall elevation details are included in the Appendix.
A. Where there are multiple TRs in a given building, a schematic diagram of the
intra-building backbone riser is required. The diagram shall depict the copper
backbone cable for voice and the fiber optic backbone cable for data.
A. The Instructions for Architects and Engineers Doing Business with Division of
Engineering and Architectural Services (published by the Washington State
Department of General Administration) lists requirements for the Project
Manual. The State of Washington Conditions of the Agreement (also
published by the Washington State Department of General Administration)
lists additional requirements for the Designer.
98
CONSTRUCTION DOCUMENT CONTENT
PROJECT MANUAL
SPECIFICATIONS
5.2.1 SPECIFICATIONS
C. The Designer shall directly edit the TCGS for use on each project. The
Designer shall notify the CWU ITS Infrastructure Specialist where changes or
additions to the specifications are desired. Edits to the documents shall be
performed with the “Revision Tracking” features activated. At the various
project milestones when the documents are submitted to CWU for review, the
specifications shall be printed showing the revision markings.
D. The Designer shall be responsible for adding any necessary content to the
specification that is applicable to the project and not already contained in the
TCGS.
E. Please refer to the more detailed instructions contained in the TCGS, both in
the Preface of that document as well as in the “hidden text” comments
contained in the electronic files.
99
CONSTRUCTION DOCUMENT CONTENT
RECORD DRAWINGS AND DOCUMENTATION
CUTOVER PLAN
• Ducts to be used for new cabling shall be assigned during the course of
design, not during construction. Duct assignments must be approved by
CWU prior to the release of construction documents.
The Designer shall provide a detailed cutover plan that is coordinated with other
disciplines on the project as well as with CWU data and telephone equipment cutover
requirements. Verbiage describing the sequence of work tasks to accomplish the
cutover shall be provided in this section. Limitations on the permissible downtime
allowed and temporary service arrangements shall be discussed in the cutover plans.
A. The Designer shall provide (in the Construction Documents) a link-loss budget
analysis for each fiber optic cable.
The Instructions for Architects and Engineers Doing Business with Division of
Engineering and Architectural Services (published by the Washington State
Department of General Administration) lists requirements for Record Drawings and
submittals. The following requirements related to Record Drawings and submittals
are in addition to the requirements listed in Instructions for Architects and
Engineers Doing Business with Division of Engineering and Architectural Services:
• The Record Drawings shall show the identifiers for the telecommunications
infrastructure components as constructed.
• One set of 8½x11”-sized butterfly diagrams on bond media shall be delivered
to CWU Facilities Planning and Construction.
• One CDROM containing the digital photographs taken by the Designer during
the project shall be delivered to CWU Facilities Planning and Construction.
100
APPENDIX
SAMPLE REVIEW COMMENT REPORT
6 APPENDIX
The table below depicts an example Review Comment Report form that will be used.
The Designer shall create a Microsoft Excel spreadsheet formatted as shown below.
The spreadsheet shall be used for any comments from the Designer’s review process
and the completed spreadsheet shall be submitted electronically to CWU. Upon
request, CWU will provide an electronic document for this form to be used as a
template.
101
APPENDIX
SAMPLE BUTTERFLY DIAGRAM
The following page shows a sample maintenance hole / handhole Butterfly Diagram.
The Designer shall follow this format and produce a butterfly diagram for each
existing maintenance hole or handhole that is affected by an outside plant
telecommunications project. The Designer shall submit the completed diagrams to
CWU in both electronic and paper forms. Upon request, CWU will provide an
electronic AutoCAD file to be used as a template.
102
APPENDIX
SAMPLE BACKBONE SCHEMATIC DIAGRAM
Below is a sample Backbone Schematic Diagram. The Designer shall follow this
format and produce backbone schematic diagram for each project that includes new
outside plant telecommunications infrastructure.
104
APPENDIX
SAMPLE TELECOMMUNICATIONS ROOM PLAN DETAIL
This page shows a sample plan detail for a telecommunications room. The Designer
shall provide similar information for each telecommunications room and equipment
room affected by the project. This information shall be provided either as a portion
of the Project Manual or on the drawings, and shall be considered part of the
Construction Documents.
The layout of this sample plan detail has been pre-approved for use at CWU. The
Designer shall use this layout wherever appropriate and shall discuss project-specific
alternatives with CWU ITS.
105
INDEX
This page shows a sample scaled rack elevation detail. The Designer shall provide
similar information for each new or existing telecommunications rack showing new
and existing equipment room affected by the project.
This information shall be provided either as a portion of the Project Manual or on the
drawings, and shall be considered part of the Construction Documents.
106
INDEX
This page shows a sample scaled wall elevation detail. The Designer shall provide
similar information for each new or existing telecommunications room wall showing
new and existing equipment room affected by the project.
This information shall be provided either as a portion of the Project Manual or on the
drawings, and shall be considered part of the Construction Documents.
107
INDEX
The following page shows an example Fiber Optic Link-Loss Budget Analysis that the
Designer shall use for each new fiber optic cable designed in the project. The
Designer shall submit the completed link-loss budget analyses to CWU in both
electronic and paper forms. Upon request, CWU will provide an electronic
spreadsheet of this form to be used as a template.
108
INDEX
System Gain Average Transmitter Power -18.0 -18.0 -18.0 -18.0 dBm
- Receiver Sensitivity - -31.0 - -31.0 - -31.0 - -31.0 dBm
= System Gain = 13.00 = 13.00 = 13.00 = 13.00 dB
109
INDEX
6.8 GLOSSARY
ANALOG
Analog comes from the root word “analogous,” which means “similar to.” In
telecommunications, analog is a way of sending signals—voice, data, or video—in which the
transmitted signal is analogous to the original signal. In other words, if you spoke into a
microphone and saw your voice on an oscilloscope took the same voice as was transmitted on
the phone line and viewed that signal on an oscilloscope, the two signals would look the same.
See Digital.
AWG (AMERICAN WIRE GAUGE)
The standard measuring gauge of the diameter of copper wires in telecommunications and
electrical cables.
BACKBOARD
A plywood sheet mounted to the wall where telecommunications distribution equipment is
installed. The backboard must be three-quarter (¾)-inch thick A-C grade fire retardant
plywood, mounted with the “A” side exposed. The backboard must be coated with two coats
of light colored, non-conductive fire retardant paint.
BACKBONE CABLING
Backbone cable is defined as a major service cable that is used to interconnect various
buildings on a campus, connect equipment rooms to telecommunications rooms within a
building, or connect one telecommunications room to another within the same building.
Backbone cables are typically large capacity (high pair-count) copper cables, or fiber optic
cables.
BEND RADIUS
The maximum radius that a cable can be bent to avoid physical or electrical damage or cause
adverse transmission performance.
BONDING
The permanent joining of metallic parts to form an electrically conductive path that will assure
electrical continuity and the capacity to conduct safely to ground any current likely to be
imposed.
BUS
An electrical connection which allows two or more wires to be bonded together.
BUSBAR
A copper bar, drilled and tapped, to allow the bonding together of wires or cables.
CABLE PAIR
Each telecommunications circuit is made up of two copper wires, or a pair of wires. Traditional
analog telephone service uses one-pair of wires. Some modern digital telephone systems, and
most computer networks operate over two or four pairs of wires. The ANSI/TIA/EIA-568-A
standard requires a four-pair cable to each work-area modular jack.
CABLE PLANT
A term which refers to the physical connection media such as optical fiber cable or copper
cable. See Telecommunications Infrastructure.
110
INDEX
the digital signal is again regenerated, and restored to its original form for processing. See
Analog.
ELECTRO MAGNETIC INTERFERENCE (EMI)
Electro Magnetic Interference is a signal distortion directly related to a foreign signal being
imposed through coupling onto a transmission path to which the foreign signal is not
physically connected.
ENTRANCE FACILITY (EF)
See Telecommunications Service Entrance Facility (EF).
FACILITY CONTROL AND MONITORING
It is becoming increasingly common for heating, ventilation, air conditioning, power
distribution, and water distribution systems to be computer controlled. These computer-
controlled systems can be networked on the same LAN, or the same telecommunications
infrastructure, as the traditional data services.
FIRE AND LIFE SAFETY
As with Facility Control and Monitoring systems, Fire and Life Safety systems such as smoke
detectors, sprinkler systems, and fire alarms are increasingly becoming computer controlled
and networked. These systems can also communicate over the common telecommunications
infrastructure. Local codes may have certain restrictions on the manner in which Fire and Life
Safety systems are networked, and shall be consulted prior to system design.
GROUND
A conducting connection, whether intentional or accidental, between an electrical circuit or
equipment and the earth, or to some conducting body that serves in place of the earth.
GROUNDING, BONDING, AND ELECTRICAL PROTECTION
Proper grounding and bonding serves three very important purposes. First, from a life safety
aspect, the ground connection insures that voltages from a malfunctioning system are routed
directly to ground to prevent an electrocution hazard to people who may come in physical
contact with the system. Secondly, from a telecommunications standpoint, grounding and
bonding of telecommunications equipment and systems is an important measure for
controlling electromagnetic interference (EMI). Ungrounded systems can pick up energy that
is radiated from another electrical source, such as a large electric motor, an arc welder, or a
large copy machine. If this energy is absorbed into the telecommunications system, it can
result in annoying interference on the signal, or at worst, corruption and loss of critical data.
Thirdly, the telecommunications ground may be used as a reference voltage for electronics
equipment. The telecommunications ground potential must be consistent to insure reliable
system performance.
GROUNDING ELECTRODE
The metallic component that is placed in the earth to form the electrical connection with the
earth. A grounding electrode is usually a metal rod at least eight (8)-feet long driven into the
earth. Refer to NFPA 70, Article 250, Part H for acceptable electrical service grounding
electrodes.
HANDHOLE
A small cast concrete box placed in an outside plant conduit run as an access point to facilitate
pulling cable into the conduit.
HEAD END
In a CATV system, the head end is a term that refers to the electronics equipment that
receives the television signals from the antennas, and distributes them over the copper and/or
fiber optic cables.
112
INDEX
113
INDEX
114
INDEX
SERVICE PROVIDER
The company or utility that provides telecommunications services to a customer.
SNEAK CURRENT
Unwanted but steady currents that seep into a communication circuit. These low-level
currents are insufficient to trigger electrical surge protectors and therefore are able to pass
them undetected. They are usually too weak to cause immediate damage, but if unchecked
will create harmful heating effects. Sneak currents may result from contact between
telecommunications lines and AC power circuits or from power induction, and may cause
equipment damage due to overheating.
SPLICE
A permanent joining of conductors from separate cables.
SPLICE BOX
A box, located in a pathway, intended to house a cable splice.
SPLICE CLOSURE
A device used to enclose and protect a cable splice.
STAR TOPOLOGY (OR STAR DISTRIBUTION)
A topology where all phones and computers in a given area are wired directly to a central
service location in the telecommunications room. Star topology is the standard wiring
topology for the CWU.
SUBSTRUCTURE
The ISP and OSP pathways and spaces for the low voltage signaling systems including but not
limited to voice, data, building controls, security etc. Substructure does not include cable
plant and electronic devices (see infrastructure).
SWEEP
A conduit bend that meets ANSI/TIA/EIA-569-A bend-radius requirements forming a gentle
arc rather than a sharp bend.
SWITCH
An electronic device that interconnects networked data devices (computers) through port-to-
port switching.
TELECOMMUNICATIONS
Any transmission, emission, or reception of signs, signals, writings, images, and sounds, or
information of any nature by wire, radio, visual, or other electromagnetic systems.
TELECOMMUNICATIONS BONDING BACKBONE (TBB)
The grounding conductor (cable) that interconnects the Telecommunications Main Grounding
Busbar (TMGB), Telecommunications Grounding Busbars (TGB), various telecommunications
equipment, equipment racks, and cable shields to the building’s electrical service grounding
electrode.
TELECOMMUNICATIONS ROOM (TR)
The Telecommunications Room is a location in each building, or each floor of a building, where
backbone cables transition to horizontal distribution cables. The TR may also contain certain
items of network electronics equipment such as hubs or routers. A large building, with large
floors, may have multiple TRs on a floor. Depending on the size of the building, a TR may be
a separate room, or it may be simply be a cabinet containing telecommunications equipment.
116
INDEX
117
INDEX
VOICE SERVICES
Voice services supported by the telecommunications infrastructure include telephone services,
either directly from the Local Exchange Carrier (LEC), or from a CWU owned telephone
system, voice mail services, intercom and paging services, and some radio systems. Fax
services and individual computer modems usually operate over the voice system.
VOICE SWITCH
An electronic device that establishes or disestablishes circuits between telecommunications
systems or devices.
WORK AREA
The work area is defined as the location where telecommunications service is provided for
people to use. This is the area where a computer, telephone, or other telecommunications
device is located and where people will use these tools to do work.
118
INDEX
INDEX
Access Control Systems .............................. 5 74, 77, 85, 92, 95, 96, 98, 100
Access Floors .......................................... 83 Cutover Plans .................................. 99, 100
Acquisition and Procurement 12, 17, 18, 19, 34 CWU Staff .......... 4, 12, 13, 15, 60, 63, 81, 94
Aerial Distribution .................................... 65 Demarcation Point ..... 22, 82, 96, 97, 111, 117
Alarm Systems .......................................... 5 Design Development Phase .. 38, 39, 69, 73, 74
Alternative Design Request .. 9, 13, 21, 34, 35, Design Review Process . 13, 16, 21, 27, 29, 30,
40, 42, 59, 65 31, 32, 38, 39, 101
Americans with Disabilities Act (ADA) ......... 88 Designer Qualifications ..............................26
AMP Netconnect® ...19, 20, 22, 23, 51, 52, 53, Direct-buried Cabling ................................67
54 DIS Master Contract ................ 17, 18, 20, 34
AMP Netconnect® Warranty .22, 23, 34, 42, 51 Disposal of Information Technology Equipment
ANSI/TIA/EIA Commercial Building .................................................... 17, 18
Telecommunications Standards. 6, 8, 10, 21, Doors ............................................. 74, 115
34, 35, 39, 42, 43, 53, 110, 116, 117 Ductbanks .... 8, 32, 33, 39, 58, 59, 60, 61, 63,
Architects4, 13, 20, 26, 27, 31, 32, 33, 34, 72, 64, 66, 67, 96
73, 74, 111 Duplex SC Connectors...............................70
Backboards .....38, 49, 69, 74, 82, 97, 98, 110, Electrical Engineers.................. 26, 45, 77, 92
117 Electrical Power.44, 49, 53, 61, 62, 67, 74, 77,
BICSI................................................. 6, 10 78, 82, 84, 85, 91, 92, 96, 112, 116
Customer-Owned Outside Plant Design Manual...6, Electromagnetic Interference (EMI) .31, 33, 43,
8, 9, 10, 42, 55, 86 44, 77, 78, 82, 84, 112
Telecommunications Cabling Installation Manual.6, Elevation Diagrams.................... 99, 106, 107
8, 10, 42, 55
Energy Management Systems...................... 5
Telecommunications Distribution Methods Manual
.. 6, 8, 9, 10, 42, 43, 53, 75, 77, 80, 85, 92, 93 Engineers ................................. 4, 13, 26, 33
Bidding .............................................34, 39 Enterprise Network ...................................12
Bridge and Waterway Crossing Distribution.. 66 Entrance Facilities .. 7, 21, 22, 33, 59, 86, 111,
Building Automation Systems ......5, 53, 67, 93 112, 114, 115, 117
Butterfly Diagrams............... 37, 99, 100, 102 Environmental Control Systems ................... 5
Cabinets for Telecommunications Equipment Equipment Rooms ....7, 32, 44, 72, 80, 81, 82,
................... 73, 75, 76, 77, 78, 80, 83, 84 83, 84, 85, 86, 89, 92, 105, 106, 107, 113,
Cable Length........................................... 73 114, 117
Cable Television Distribution Systems ......... 93 Extent of Construction
Full Remodel ... 10, 14, 15, 20, 45, 48, 52, 55, 56,
Cable Test Reports ........................ 41, 87, 88
70, 78, 81
Cable Tray ........ 19, 32, 42, 47, 48, 49, 51, 75 Light Remodel . 10, 14, 15, 20, 45, 46, 47, 48, 55,
Category 3 Cable ................................50, 53 70, 72, 73, 75, 76, 79, 81, 86, 87
Category 5 Cable ..................................... 52 New Construction...10, 14, 15, 20, 45, 48, 50, 51,
Category 5e Cable ..............................50, 52 55, 56, 70, 78, 81
Category 5E Cable ................................... 53 Telecommunications-only ......... 10, 15, 45, 46, 48
Category 6 Cable .......................... 50, 52, 53 Facilities Planning & Construction Services
Closed Circuit Television Systems................. 5 (FP&CS)....................................12, 16, 20
Concrete............................. 60, 62, 112, 113 Project Manager 13, 17, 20, 21, 27, 28, 33, 34, 40
Conduit Bends .................. 39, 60, 76, 96, 116 Fiber Optic Cabling ...5, 65, 69, 70, 71, 82, 87,
Conduit Fill ............................................. 49 90, 92, 98, 108, 110, 112
Construction Document Phase ................... 38 Fire Alarm Systems.................................... 5
Construction Documents ...6, 8, 10, 27, 39, 40, Fire Suppression Systems ...............74, 75, 83
41, 42, 67, 88, 89, 95, 96, 97, 100, 105, Firestopping.............................................87
106, 107 Flex Conduit .................................39, 49, 59
Construction Observation .....13, 14, 18, 32, 40 Floors .................................... 33, 74, 82, 83
Contractors ...4, 11, 16, 17, 19, 20, 22, 23, 32, Generators ........................................ 77, 84
34, 40, 41, 87, 88, 96, 111 Grounding and Bonding .. 8, 32, 77, 78, 80, 85,
Convenience Power Outlet......... 24, 45, 80, 85 86, 87, 97, 98, 116, 117
Coordination (Cross-discipline) ...4, 31, 33, 34, Handholes .... 8, 14, 21, 32, 37, 39, 61, 64, 65,
67, 89, 96, 99, 100, 102
119
INDEX
120