ANDY MUHAMMAD SANDIKA | 20255006

SISTEM INFORMASI A

1. PLANNING THE CONSTRUCTION SCHEDULE OF THE COFFEE TRUCK


PROJECT
A. Scope of Project.
• Prioritize the best quality coffee types throughout Indonesia in the main
ingredients.
• Conduct market analysis to obtain data on consumers' desires.
• Create computer programs for Coffee Truck's web-based sales information
system.
• Find a comfortable gathering place at an affordable price.
• Make comfort with ambience Coffe Truck so that more and more people are
interested to come to the place with the concept of Coffee Truck.

B. Resources needed
• Analyst System
• Car Designer
• Water Tank
• Furniture
• Fixture
• Kitchen Equipment
• Equipment

C. Scheduling Planning
87 HARI 1/01/2021 - 29/03/2021
NO TUGAS / PEKERJAAN DURASI JANUARI FEBRUARI MARET
1 s/d 5 6 s/d 12 13 s/d 22 23 s/d 26 27 s/d 26 27 s/d 2 3 s/d 4 5 s/d 11 12 s/d 17 18 s/d 20 21 s/d 22 23 s/d 29
1 Menganalisis pasar dengan
melakukan wawancara kepada 5
pihak yang dituju
2 menghubungi pemerintahan
setempat untuk mendapatkan izin 7
dan lisensi
3 mendesain interior dan eksterior 10
mobil
4 mendesain logo brand Coffe Truck 4
5 membangun mobil yang sudah 30
dimiliki sesuai konsep coffee truck
6 Mencari pekerja sebagai koki dan 3
pelayan
7 membeli asuransi 2
8 melakukan pencarian bahan baku
kopi terbaik disetiap titik penjuru 7
nusantara yang telah ditentukan
9 Membuat resep produk 6
10 Melakukan tester 3
11 medokumentasikan foodtruck 2
12 Uji coba foodtruck 7
Source : ANDY MUHAMMAD
SANDIKA_20255006_Assignment7_MgmtIntro.xlsx
2. PROJECT COMBINATION
A. Project A
(0, 45 x 26.000.000) + (0, 2 x 22.000.000) + (0, 35 x 18.000.000) – 20.000.000 =
= 11.700.000 + 4.400.000 + 6.300.000 – 20.000.000
= 2.400.000
100.000.000 – 2.400.000 = 97.600.000
the NEV you will get is Rp. 2,400,000 and the project capital that will be used is Rp.
97,600,000
B. Projects cancel each other's IDR 100,000,000 budget
- Projects A
(0, 45 x 26.000.000) + (0, 2 x 22.000.000) + (0, 35 x 18.000.000) – 20.000.000 =
= 11.700.000 + 4.400.000 + 6.300.000 – 20.000.000
= 2.400.000
the NEV you will get is Rp. 2,400,000 and the project capital that will be used is Rp.
97,600,000
- Proyek B
(0, 35 x 45000.000) + (0, 2x 29.000.000) + (0, 5 x 22.000.000) =
= 13.500.000 + 76.00.000 + 14.500.000 – 35.000.000
= 35.600.000 – 28.000.000
= 600.000
the NEV you will get is Rp. 600,000 and the project capital that will be used is Rp.
99,400,000
- Proyek D
(0, 3 x 80.000.000) + (0, 3 + 60.000.000) + (0,4x 40.000.000) – 55.000.000 =
= 24.000.000 + 18.000.000 + 16.000.000 – 55.000.000
= 55.000.000 – 55.000.000
= 3000.000
If you choose project D, the NEV will get a profit of Rp. 3000,000 and the project capital that
will be used is Rp. 97,000,000
C. Projects cancel each other's IDR 70,000,000 budget
- Proyek D
(0, 3 x 80.000.000) + (0, 3 + 60.000.000) + (0,4x 40.000.000) – 55.000.000 =
= 24.000.000 + 18.000.000 + 16.000.000 – 55.000.000
= 55.000.000 – 55.000.000
= 3000.000
the NEV will get a profit of Rp. 3000,000 and the project capital that will be used is Rp.
67,000,000
- Proyek E
(0, 5 x 17.000.000) + (0, 3 x 12.000.000) + (0, 2 x 11.000.000) – 12.000.000 =
= 8.500.000 + 3.600.000 + 2.200.000 – 12.000.000
=2.300.000
the NEV will get a profit of Rp. 230,000 and the project capital that will be used is Rp.
67,700,000
- Proyek G
(0, 4 x 45.000.000) + (0, 3 x 34.000.000) + (0, 3 x 26.000.000) – 21.000.000 =
= 10.000.000 + 6.600.000 + 6.000.000 – 21.000.000
= 22.600.000 – 21.000.000
= 1.600.000
the NEV will get a profit of Rp. 1.600,000 and the project capital that will be used is Rp.
68,400,000